Due Diligence and Contamination Management on Design Build Projects

Cyrus Parker, LG, PE, CPM

North Carolina Department of Transportation

Lesson Learned

Reduce Risk

Maintain Accountability

Meaningful Bids

And

Successful Projects

5/5/2015

2

NC Design Build Project History

102 Projects

39 Low Bid and Others

4 Turnpike Projects

59 Conventional

Projects

NC Design Build History

Conventional Projects With GeoEnvironmental Scopes of Work

40%

60%

Yes

No

5/5/2015

3

Due Diligence by the Department

• Identify Sites of Concern• Estimate Risk Level of Each Site

Related to the Project

Phase I

Planning

• Design Recommendations• Right of Way Recommendations

Phase II Investigation

• Remove Underground Storage Tank• Remove Contaminated Soil

Phase III Remediation

IIIIII

5/5/2015

4

First Design Build Scope of Work

Department Design Build Team

Design Build Teams’ Response

Questions

How can we bid a

Lump Sum

Too Many UnknownsConcerns

Very High Risk

5/5/2015

5

First Design Build Scope of Work

Department Design Build Team

Final Scope of Work

Department Design Build Team

5/5/2015

6

Adjusted Low

BidderManagement

Responsiveness

Long Term Maintenance

Schedule And Milestones Innovation

Quality

Aesthetics

Warranty

5/5/2015

7

5/5/2015

8

5/5/2015

9

5/5/2015

10

5/5/2015

11

5/5/2015

12

5/5/2015

13

5/5/2015

14

1978 Aerial

5/5/2015

15

1987 Aerial

2007Aerial

5/5/2015

16

5/5/2015

17

5/5/2015

18

5/5/2015

19

5/5/2015

20

5/5/2015

21

5/5/2015

22

5/5/2015

23

5/5/2015

24

5/5/2015

25

Contamination Management

Landfill

5/5/2015

26

5/5/2015

27

Reduce Risk

Maintain Accountability

Meaningful Bids

and

Successful Projects