STRIPLINE KICKER STATUS
Abstract
New X-band testing facility a.k.a. Xbox 2
CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team
BINP Workshop consists of two divisions (Workshop-1 and Workshop-2) : Total area more than 55,000 m 2. Total work power more than 1,000,000 work hours.
PROPOSAL 2006 - G.I.A.F. (HYBRID GUN AT HIGH FREQUENCY) INFN-LNF – UNIVERSITY OF ROME “LA SAPIENZA”- UCLA D. Alesini (T), M. Ferrario (R), A. Gallo (T),
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Status of the Front End Test Stand April 2007. Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Actividades del grupo de aceleradores del CIEMAT en los grandes aceleradores lineales en proyecto
Status of SRF Modules, LLRF, RF Amplifiers & Network Dr. Ozlem KARSLI Ankara University On behalf of TARLA Team.
Michael Batistatos (Academic Laboratory Teacher)
Choke-mode damp ed accelerating structures for CLIC main linac