7-Cp VII Antena & Cell Site
ESRF Operation Status Report & Accelerator Upgrade Programme P. Raimondi On behalf of the Accelerator & Source Division Grenoble, November 25 - 2014.
MICE: overview K. Long, 18 March, 2008. Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
April 2009 AAP Review Global Design Effort 1 “Minimum Machine” is code for Design and Integration Studies in 2009 toward a Re-Baseline in 2010 which will.
Tor Raubenheimer SLAC ILC Accelerator Program DOE HEP Program Review June 14 th, 2005.
1 Configuration Overview. Agenda General RF setup Physical connections Review of front panel options Overview of Maestro configuration 2.
The TIMING System … …as used in the PS accelerators.
SRF Cryomodules November 2013 Meeting Christine Darve Lead Engineer – SRF Linac (704 MHz) November 21, 2013.
Document