Practical design of helical cooling channel Katsuya Yonehara APC, Fermilab 2/28/11 - 3/04/11 1.
NsFFAGs and ADSRs what they are and why you need them 1. The current nsFFAG programme 2. Thorium ADSRs and their advantages 3. Matching the two Roger Barlow.
Beam commissioning strategy 09-12-09 Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
THE MICE RF SYSTEM J.F.Orrett* [email protected], A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre .
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, 14-16 June 2006.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Electron Motion in a RF Cavity with external Magnetic Fields Diktys Stratakis Brookhaven National Laboratory RF Workshop – FermiLab October 15, 2008.
An Introduction to Breakdown Simulations With PIC Codes C. Nieter, S.A. Veitzer, S. Mahalingam, P. Stoltz Tech-X Corporation MTA RF Workshop 2008 Particle-in-Cell.
Muons, Inc. 4.27/2010IDS Front End Meeting Cary Y. Yoshikawa 1 Status of the Quasi-Isochronous Helical Channel Cary Yoshikawa Chuck Ankenbrandt Rol Johnson.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements First list of requirements, based on Yagmur’s document: u .