Femtosecond Pump / Probe Operation and Plans at the LCLS Josef Frisch for the LCLS Commissioning team 1.
Federico Alessio Supervisors Diego Gamba, Angelo Rivetti Richard Jacobsson A complete system for controlling and monitoring the timing of the LHCb experiment.
R. Bartolini, John Adams Institute, 3 May 20131/29 Lecture 6: beam optics in Linacs LINAC overview Acceleration Focussing Compression.
C. Ohmori ( KEK) 2009/7/2PRISM FFAG workshop@Imperial College.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep. 2005 ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Rol Johnson 6/22/2005 NuFact05 Plenary 1 Technical Challenges of Muon Colliders Rolland P. Johnson Technical Challenges of Muon Colliders Rolland P. Johnson.
Status of the accelerator upgrade Dec.10 2008 Mika Masuzawa mm 12/10/2008.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Walter Wuensch, CERN CLIC Project meeting, 29 September2015 The CERN dc Spark System (and a little bit of theory)
CERN Accelerator School Superconductivity for Accelerators Case study introduction Paolo Ferracin [email protected] CERN, Geneva Claire Antoine [email protected].
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.