Jim Thomas - LBL 1 HFT Performance & Simulation Studies Experience Gained by Simulating One Track at a Time Jim Thomas Lawrence Berkeley National Laboratory.
Support and alignment of PXL box with MSC, operation steps 10/6/20151 During this operation the PXL box rests on two 6 inch aluminum box beams. These beams.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
HFT & PXL geometry
SSD upgrade
IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/2010 - LG.
PXL Electronics
PXL insertion
PXL Sensors Overview