Phase I : L = 2-3 x10 34 cm -2 s -1 (NbTi) Phase II : L =10 35 cm -2 s -1 (Nb 3 Sn)
S. Zelepoukine CMS Electronics 2003 1 Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ 28.3.2003.
Status of the Reference Link
1 Status Report on the LOC ASIC 1.The LOC ASIC proposal 2.The SOS technology 3.LOC1 test results 4.LOC2 design status 5.Summary Datao Gong, Andy Liu, Annie.
Status Report on the LOC ASIC
2011.09.29 First test results with the Gigabit Link Interface Board (GLIB) Paschalis VICHOUDIS CERN PH-ESE-BE on behalf of the GLIB team (M. Barros Marin,
Ion Beam Cocktail Development and ECR Ion Source Plasma Physics Experiments at JYFL Olli Tarvainen 11th International Conference on Heavy Ion Accelerator.
Collimation Meeting 30.07.2012 Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
EuCARD 2 ColMat -HDED kick -off meeting
Opto Working Group Summary