1 Promosalons Paris 20 February 2006 Javier Santiso Chief Development Economist & Deputy Director OECD Development Centre LATIN AMERICA: The political.
1 ARGENTINA: EMERGING FROM THE GREATEST CRISIS Dr. Horacio D. Casabé
SPS Information Management System (SPS IMS). 2 Why SPS IMS? Since 1995 > 10,000 SPS notifications > 2,000 other SPS documents > 300 specific trade concerns.
Inclusive Toolkit for Universal Design 1 Reconstruction: Haiti for All in Long- Term Recovery Chapter 1 Physical Environment An Initiative of the GPDD.
Chapter 1. Focus on Physical Environment 1 Haiti: Toolkit for Long-Term Reconstruction for All Recovery A collaboration between GPDD WG on Haiti and IDB.
1 Haiti: Toolkit for Long-Term Reconstruction for All Recovery A collaboration between GPDD WG on Haiti and IDB Chapter 7 Organizational and Operational.
1 Original Sin The Pain, the Mystery And the Road to Redemption Barry Eichengreen, Ricardo Hausmann & Ugo Panizza UC Berkeley, Harvard, and IDB.
P4 Shutter Review May, 2005 P4 – ID Movable Beam Stop and Integral Shutters Presented by K. Beyer and T. Lutes.
0 IDB Initiatives for Developing Trade and Transport across Europe, Asia and the Arab region Dr. Walid Abdelwahab, Director Infrastructure Department.
0 Developing international corridors across Africa, Asia and the Middle-East, lessons learnt from IDB experience Dr. Walid Abdelwahab, Director Infrastructure.
Review of SWG-1 Presented by IDB. Introduction: IDB organized an Expert Group Meeting (EGM) on Statistical Capacity Building at its headquarters on 29.
Midway Design Review Advisor: Professor Russell Tessier Team: Michael Shusta Lucas Root Brandon Thorpe Gilbert T. Kim.