EPOS GAMIT/GLOBK/Track Workshop Introduction Thomas Herring, MIT [email protected].
POD/Geoid Splinter Summary OSTS Meeting, Hobart 2007.
Reference Frames Global Center of Mass ~ 30 mm ITRF ~ 2 mm, < 1 mm/yr Continental < 1 mm/yr horiz., 2 mm/yr vert. Local -- may be self-defined.
Reference frames in Geodetic Analyses Two aspects
EPOS GAMIT/GLOBK/Track Workshop Introduction
Reference Frames
Izmir GAMIT/GLOBK Workshop Introduction Thomas Herring, MIT [email protected].
Montserrat GAMIT/GLOBK/Track Workshop Introduction
Izmir GAMIT/GLOBK Workshop Introduction
12.540 Principles of the Global Positioning System Lecture 19