C. Fischer-BIW04-May 3-6, 2004- Knoxville, Tennessee Design and Tests of a New Rest Gas Ionization Profile Monitor Installed in the SPS as a Prototype.
Power Supplies at BESSY II. 2 POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans Layout Who is HZB? – Bessy II Storage Ring – The Metrology Light Source (MLS)
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER The basic idea VLHC type magnets LER in the LHC tunnel Layout LER experiment.
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test Station @ LASA, INFN-Milano.
Tunnel Access During Powering Tests
L. Serio on behalf of FAIR project team members (TE and EN depts )
Status of MICE MUTAC March 2006 at FERMILAB
Neutrino Factory Workshop UK Magnet Manufacturing Capability Elwyn Baynham CCLRC Rutherford Appleton Laboratory, UK Elwyn Baynham UKNF Oct 2003.
CC focuses on controlling outcomes. CC controls change, making sure that its impact is assessed and that every effort is made to prevent erosion of functionality.
PROJECT OVERVIEW
Advanced Optics Measurements at Tevatron
ILC Damping rings