Hall A Collaboration Meeting S. Nanda, June 23, 2005 Hall A Compton Polarimeter For Hall A Collaboration Meeting June 23 rd 2005 Sirish Nanda Thomas Jefferson.
Thursday 12 th April - morning Machine in access for a problem on the injection kickers… MKI2 problem – fuse - PFNs were properly charged but pulses were.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/2009 1. Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
Beam injection and kicker KEK H. Iinuma and H. Nakayama I’ll talk about this part We measure Muon precession 1000 1 mission (a)Smooth injection without.
Tracking, vertexing and Luminosity monitor at LHCb Tomáš Laštovička (CERN ) VERTEX 2006 - Perugia 15th International workshop on vertex detectors.
CERN plans on high field magnet development
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
Beam Dynamic Calculation by NVIDIA® CUDA Technology E. Perepelkin, V. Smirnov, and S. Vorozhtsov JINR, Dubna 7 July 2009.
June 20, 2008Shin'ya Sawada @ Fermilab E9061 J-PARC and Dimuon Experiments Shin’ya Sawada KEK (High Energy Accelerator Research Organization, Japan)
STRIPLINE KICKER STATUS
1 Lsp Simulations of RF and Beam-Driven Breakdown in Hydrogen* D. V. Rose, C. Thoma, D. R. Welch, and R. E. Clark Voss Scientific, LLC Albuquerque, New.