8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
1/57
Contractor Logo Contractor Name
Project TitleProject TitleProject TitleProject Title
DOCUMENTDOCUMENTDOCUMENTDOCUMENT
DESCRIPTION:DESCRIPTION:DESCRIPTION:DESCRIPTION:
MANIFOLDMANIFOLDMANIFOLDMANIFOLD
CRANE AND PIPE SUPPCRANE AND PIPE SUPPCRANE AND PIPE SUPPCRANE AND PIPE SUPPORTINGORTINGORTINGORTING
STRUCTURE DESIGNSTRUCTURE DESIGNSTRUCTURE DESIGNSTRUCTURE DESIGN.
A Issued for Client’s Approval. XXX XXX XXX XXX
Rev.Rev.Rev.Rev. DateDateDateDate Revision DescriptionRevision DescriptionRevision DescriptionRevision Description PreparedPreparedPreparedPrepared CheckedCheckedCheckedChecked ReviewedReviewedReviewedReviewed ApprovedApprovedApprovedApproved
DOCUMENT NUMBERDOCUMENT NUMBERDOCUMENT NUMBERDOCUMENT NUMBER
Type Discp Job SJ Seq Format PAGES
A4A4A4A4 1111 OF 51515151
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
2/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 2 of 57
Record of Revisions
Rev. Date Revision Description
A Issued for Client’s Approval.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
3/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 3 of 57
TABLE OF CONTENTS
Sr.
No.Description
Page No.
1. Introduction 4
2. Scope 4
3. Design considerations 4
4. Crane girder design: 6
5. White oil manifold Platforms and Pipe supports: 16
6. Black oil manifold Platforms and Pipe supports: 31
7. Annexure
Annexure 1-Crane Layout Data 48
Annexure 2- White oil manifold: LOADING DATA 49
Annexure 3- Black oil manifold: LOADING DATA 50
Annexure 4 –Staadpro output files 51
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
4/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 4 of 57
1. Introduction:
This document is produced to cover the design calculations of crane girder, supporting
structure pipe supporting and operation platform for manifold. It is optional to fabricate the
crane girder or vendor supplied. In both cases it is required to assess the forces, design
parameter of the girder as the span is high, and installation of girder is outdoor.
2. Scope:
This document presents design calculations of crane girder, supporting structure pipe
supporting and operation platform for manifold.
3. Design considerations:
a) Geometry:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
5/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 5 of 57
Refer Drawing Number …………………. and client’s drawing Number …………….
CL
750
25GAP
1’
775
1000
750x 800 D
BEAM
5000
EL +11.8MTOP OFRAIL
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
6/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 6 of 57
Central support
Crane span = 40000+150+375-500=40025mm:
Crane span = 30000+150+375-500=30025mm
4. Crane girder design:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
7/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 7 of 57
Ref is = R1 i.e 1 meaning R1, 2 meaning R2…and so on.
Property of Box girder: 300 wide x 1200 Deep box of 12 thk plate.
Node Numbers:
Member Numbers:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
8/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 8 of 57
Support condition: Pinned supports at crane wheel location.
a) Loading
Dead load: Self weight of crane block is assumed 500 Kgs = 5kN.
Girder self weight as per self weight command.
Walkway dead weight is 200 kgs/m = 2kN/m (UDL) along one long girder.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
9/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 9 of 57
Live load: Crane lifting weight is considered as live load. Crane capacity 2T =20 kN
Walkway Live load is 500 kgs/m = 5kN/m (UDL) along one long girder.
Vertical Impact factor as per client’s design basis = 25% = 1.25 x 20 = 25kN.
Transverse and longitudinal load along crane movement is considered conservatively equal
to 10% of weight of crab + lifted weight = 0.1 x (5 + 20) = 2.5 kN.
Seismic load: Seismic load and crane operating load will not act simultaneously. But crane
girder in parked position will be checked for seismic forces.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
10/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 10 of 57
Seismic load combination and load factor. While using UBC force for BS8110 combination
shall be divided by 1.4 hence
Ve= 0.1/1.4 W = 0.0714 W.
= (1.4) x Dead load + (1.6) x crane load.
Seismic load combination.
= (1.2) x Dead load + (1.2) x Seismic load.
Wind load:
Refer BS 6399 Part -2,
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
11/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 11 of 57
Wind Load on crane built up girder 1200 deep= 2 x 1.2 x 0.971 = 2.33 kN/m.
Load combination: Client’s design basis does not provides appropriate load combination so
reference is made to shell DEP for load combination.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
12/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 12 of 57
Design Parameter: Ratio within 9.0 for all.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
13/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 13 of 57
Stress ratio:
Deflection check:
Deflection limits,
Vertical deflection of girder: L/600
Span/300 = 40025/600 = 66.70mm > (76-12) 63mm hence ok.
Lateral deflection direction wind and eq case : = span /300 BS 5950-1 Table 8
40025/300= 133.4167mm > 49 mm hence ok.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
14/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 14 of 57
General BMD:
SFD:
AFD:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
15/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 15 of 57
Support Reaction to transfer on Manifold concrete structure.
Use 30kN along X 195 kN along Y and 56 along Z. at 6m c/c of wheels.
Seismic and wind reaction is less critical that DL + CL so only DL + CL is considered on RC beam
design of manifold.
New load case is generated to assess highest load on RC beam when crane is closer to support.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
16/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 16 of 57
Use 30kN along X 201 kN along Y and 61 along Z. at 6m c/c of wheels.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
17/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 17 of 57
5. White oil manifold Platforms and Pipe supports:
Dimensions
PLAN AT TOS EL +5.500M Pipe Support.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
18/57
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
19/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 19 of 57
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
20/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 20 of 57
Bracing:
Ref 1 = R1…and so on.
Node Numbers:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
21/57
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
22/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 22 of 57
Member Numbers:
At +7.050M
At +5.500M
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
23/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 23 of 57
Column Numbers: Platform:
Dead Load: at 7.05 level platform.
Load on middle girder G1 = 3.5/2 x 100 kg/sqm = 1.75kN/m.
Load on middle Girder G1 contribution on both sides= (3.5 + 3.3)/2x 100 kg/sqm = 3.4 kN/m.
Load on side girder G2 = 3.3/2 x 100 kg/sqm = 1.65kN/m.
Consider 3.5 kN/m UDL for all Girders.
3500
3300
G1
G2
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
24/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 24 of 57
Live Load: at 7.05 level platform.
Live load 500kg/sqm = 5kN/sqm x 3.4 = 17kN/m UDL.
Side girder = 8.5kN/m.
Piping load: Refer annexure B for white oil Manifold load by piping.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
25/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 25 of 57
N-S = 13.8 kN VERT 67.5kN E-W = 13.8 kN.
Load combination: as per BS 8110 and BS 5950 and design basis …………….;
LC 10 For member design.
LC 11 For deflection design
Member design Parameters:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
26/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 26 of 57
All column effective length 1.5 times unsupported length.
Member stress ratio below 0.9 for all members.
Note:
1. Platform only main members are modeled.
2. Platform members are resting on wall top of steel stub column are not modeled only
supports at that location are modeled.
3. At pit floor columns are resting on 300 high pedestals are not modeled.
4. Highest reaction due to all supports will be transferred to RC manifold pit raft and wall
respectively.
Stress check:
At +7.050M
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
27/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 27 of 57
At +5.500M
Column Numbers: Platform:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
28/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 28 of 57
Pipe Support Columns:
Bracings:
Deflection limits: Horizontal
Horizontal deflection of plat form: L/300
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
29/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 29 of 57
Height/300 = 4450/300 = 14.83mm > 8mm hence ok.
Horizontal deflection pipe supports: L/300 : = span /300 BS 5950-1 Table 8
Height/300 = 2900/300 = 10mm > 9mm hence ok.
Support Reactions: To transfer manifold base slab: Nodes: Pipe support unbraced bays;
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
30/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 30 of 57
Consider E-W 2 kN Vertical 191 kN and N-S 45 kN force for manifold slab design.
Braced bay loads:
Consider E-W 118 kN Vertical 443 kN and N-S 11 kN force for manifold slab design.
Platform loads:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
31/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 31 of 57
Consider E-W 5 kN Vertical 55 kN and N-S 5 kN force for manifold column design.
Platform bracing:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
32/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 32 of 57
E-W 118 kN Vertical 443 kN and N-S 11 kN force for manifold slab design same as .braced bay load.
BMD, SFD and AFD:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
33/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 33 of 57
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
34/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 34 of 57
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
35/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 35 of 57
2. Black oil manifold Platforms and Pipe supports:
Dimensions
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
36/57
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
37/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 37 of 57
Member Properties:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
38/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 38 of 57
Ref 1 = R1…and so on.
Node Numbers:
At +7.050M
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
39/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 39 of 57
At +5.500M
At +2.900M
Member Numbers:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
40/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 40 of 57
At +7.050M
At +5.500M
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
41/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 41 of 57
Column Numbers:
Bracing Numbers:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
42/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 42 of 57
Dead Load: at 7.05 level platform.
Load on middle girder G1 = 3.5/2 x 100 kg/sqm = 1.75kN/m.
Load on middle Girder G1 contribution on both sides= (3.5 + 3.3)/2x 100 kg/sqm = 3.4 kN/m.
Load on side girder G2 = 3.3/2 x 100 kg/sqm = 1.65kN/m.
Consider 3.5 kN/m UDL for all Girders.
Live Load: at 7.05 level platform.
Live load 500kg/sqm = 5kN/sqm x 3.4 = 17kN/m UDL.
Side girder = 8.5kN/m.
3500
3300
G1
G2
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
43/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 43 of 57
Piping load: Refer annexure B for white oil Manifold load by piping.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
44/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 44 of 57
N-S = 15 kN VERT 100kN E-W = 15 kN.
Load combination: as per BS 8110 and BS 5950 and design basis……………………..;
LC 10 For member design.
LC 11 For deflection design
Member design Parameters:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
45/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 45 of 57
All column effective length 1.5 times unsupported length.
Member stress ratio below 0.9 for all members.
Note:
5. Platform only main members are modeled.
6. Platform members are resting on wall top of steel stub column are not modeled only
pinned support is modeled.
7. At pit floor columns are resting on 300 high pedestals not modeled.
8. Highest reaction due to all supports will be transferred to RC manifold pit raft and wall
respectively.
Stress check:
At +7.050M
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
46/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 46 of 57
At +5.500M
Column Platform:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
47/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 47 of 57
Pipe Support Columns:
Deflection limits: Horizontal
Horizontal deflection of plat form: L/300
Height/300 = 4500/300 = 15mm > 3 mm hence ok.
Horizontal deflection pipe supports: L/300 : = span /300 BS 5950-1 Table 8
Height/300 = 2900/300 = 10mm > 3mm hence ok.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
48/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 48 of 57
Support Reactions: To transfer manifold base slab: Nodes: Unbraced pipe supports:
Consider E-W 2 kN Vertical 257 kN and N-S 38 kN force for manifold slab design black oil.
Braced pipe supports::
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
49/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 49 of 57
Consider E-W 94 kN Vertical 180 kN and N-S 17 kN force for manifold slab design.
Reaction on wall
Consider E-W 5 kN Vertical 55 kN and N-S 5 kN force for manifold column design.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
50/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 50 of 57
Consider E-W 1 kN Vertical 218 kN and N-S 89 kN force for manifold column design.
BMD, SFD and AFD:
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
51/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 51 of 57
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
52/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 52 of 57
Reaction Summary
White oil Manifold. Black oil Manifold. Remark
Location EW V NS EW V NS
Unbraced Pipes supportframes
2 191 45 2 257 38
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
53/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 53 of 57
braced Pipes support frames 118 433 11 94 180 17Adopt for WO Bracedlocation
Platform resting on Raft 110 233 1 1 218 89
110 233 45 Adopt for WO manifold slab
94 257 94 Adopt for BO manifold slab
Reaction on wall 5 55 5 5 55 5 Same for WO and BO
1. Annexures
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
54/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 54 of 57
Annexure 1-Crane Layout Data
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
55/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 55 of 57
Annexure 2- White oil manifold: LOADING DATA.
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
56/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 56 of 57
Annexure 3- Black oil manifold: LOADING DATA
8/16/2019 XX X XXXX XX XXXX Rev XX Manifold Crane Supporting Structure and Pipe Supporting Platforms
57/57
Client Logo MANIFOLD CRANEAND PIPE
SUPPORTINGSTRUCTURE
DESIGN.
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. NoRevision : Date:
A
Annexure 4 –Staadpro output files