Download - Upgrade of Atlas TAS

Transcript
Page 1: Upgrade of Atlas TAS

Upgrade of Atlas TAS

S. EVRARD July 19th 2009

Page 2: Upgrade of Atlas TAS

Agenda1. New shieldings2. New RP

calculations3. Protection against

overpressure4. Motorization (TAS

alignment)5. Survey issues6. Cooling7. Schedule8. AOB

Page 3: Upgrade of Atlas TAS

Protection against overpressure

By O. Beltramello

Page 4: Upgrade of Atlas TAS

Cooling

• Demineralized water• Routing agreed by integration (J-P Corso)• UJ 14 RB14• UJ16 RB16• Stainless steel pipes 2 x DN15 4 X DN12• Flexibles EPDM/Kevlar rad-hard 4m long• Adjustable circuit pressure• Target : installation in August

Page 5: Upgrade of Atlas TAS

Schedule      ATLAS TAS SCHEDULE  

Date Week RB14 RB16 UX15

22-Jun 26    

29-Jun 27    

06-Jul 28   Cool-down --> 8o K  

13-Jul 29 Bake-out     

20-Jul 30 Cool-down --> 8o K Bake-out  

27-Jul 31   Dome installation Shielding in monobloc

03-Aug 32 Dome installation    Octogonal parts installation

10-Aug 33    

17-Aug 34   Shielding in octogonal parts and Survey

24-Aug 35  

31-Aug 36  

07-Sep 37    

14-Sep 38      

Page 6: Upgrade of Atlas TAS

Drawing

LHCTAS0044

Page 7: Upgrade of Atlas TAS

Drawing

Page 8: Upgrade of Atlas TAS

Pics

RB14 RB16