October 2016
REGIONFOR BUSINESS
4 thplace
in rating of investment attractiveness of Russian regions
TULA REGIONDEVELOPMENT CORPORATION
1 2
Within the forum Tula region presented the largest and most promising investment projects, opening up new opportunities for cooperation with the region, as well as presented the export potential of successfully developing Tula
manufacturers.Within the "Sochi-2016" were signed 3 agreements of intent to cooperate in the implementation of projects on the territory of the special economic zone of industrial type "Uzlovaya" totaling more than 10 billion rubles.
Construction of the complex for the production of mushrooms. The volume of investments - up to 6 billion rubles. Number of workplaces - 900
Construction of flexible pump-compressor tubing production. The volume of investments - 2.5 billion rubles. Number of workplaces - 100
Construction of the plant for the production of tin container with a view to establishing the production of cosmetic products, household chemical products in metal aerosol packaging. The volume of investments - 1.58 billion rubles. Number of workplaces - 400
In September and October Tula region took part in the XV International Investment Forum "Sochi-2016". The delegation was headed by the Governor of Tula Region Alexey Dyumin.
"Engelsspetstrubmash", LLC"Arnest", JSC"AgroGrib", LLC
«
»
The Sochi investment forum for the Tula delegation turned out to be successful. For us, this is another opportunity to present the investment potential of the region. How it works? Here is an example. At the St. Petersburg International Economic Forum, we presented a special economic zone "Uzlovaya", and within the Sochi investment forum were signed the first investment agreements with potential zone residents. This is not the idea, but real businesses, new jobs and investments in Tula region and in the future - new taxes in the budget.
POTENTIAL RESIDENTS SEZ "UZLOVAYA":
Tula Region at "Sochi-2016": Results
Governor ofTula Region,
Alexey Dyumin
October 2016
3 4October 2016
Construction of the complex for the production of mushrooms. The volume of investments - up to 6 billion rubles. Number of workplaces - 900
Construction of flexible pump-compressor tubing production. The volume of investments - 2.5 billion rubles. Number of workplaces - 100
Construction of the plant for the production of tin container with a view to establishing the production of cosmetic products, household chemical products in metal aerosol packaging. The volume of investments - 1.58 billion rubles. Number of workplaces - 400
ст. Маклец
IP2187 ha2187 haIPSEZ
Uzlovaya
0%
PRIVILEGES FOR RESIDENTS OF THE
SPECIAL ECONOMIC ZONE
PROPERTY TAX (10 ЛЕТ)
LAND TAX (5 ЛЕТ)
TRANSPORT TAX (10 ЛЕТ)
IMPORT DUTY AND VATUP TO 2065 YEAR
2%PROFIT TAX FOR THE FIRST 5 YEARS
7%PROFIT TAX FOR THE NEXT 5 YEARS
15,5%PROFIT TAX
UP TO 2065 YEAR
SEZ «UZLOVAYA» WEBSITE
ha
Favorable geographical position:- Moscow– 180 km- Domodedovo – 2 hours- Sheremetyevo – 3,5 hours
The proximity of large industrial centers of the region:- Tula– 40 km- Novomoskovsk– 15 km- Uzlovaya – 7 km
M4 "Don" along the site’s border. Water - 13,000 cubic meters/day.Electricity - 100 MW. Gas - 180 million cubic meters/year.
Largest investment projects of Tula region:
PRIVILEGES FOR RESIDENTS OF THE
INDUSTRIAL PARK
0%PROPERTY TAX
UP TO10 YEARS
15,5%PROFIT TAX
UP TO 10 YEARS
"TULACHERMET-STEEL"
SPECIAL ECONOMIC ZONE «UZLOVAYA»
ROLLED SECTION STEEL
THE VOLUME OF INVESTMENTS
THE NUMBER OF JOBS
1,8 thousand tons / year
43 billion rubles
1665
Casting and rolling complex of "Tulachermet-Steel" is the first new post-Soviet converter production in Russia and the only one in the European part of Russia fully integrated steel bar-rolling enterprise.Construction of CRC is being conducted with modern environment friendly and resource-saving German technologies.The company will provide high-quality metal to developing domestic machine-building enterprises.
СТРОИТЕЛЬСТВО КОМПЛЕКСА ПРОИЗВОДСТВА МЕТАНОЛА И АММИАКА
СТРОИТЕЛЬСТВО КОМПЛЕКСА ПРОИЗВОДСТВА МЕТАНОЛА И АММИАКА
SEZ «UZLOVAYA» WEBSITE
Favorable geographical position:- Moscow– 180 km- Domodedovo – 2 hours- Sheremetyevo – 3,5 hours
The proximity of large industrial centers of the region:- Tula– 40 km- Novomoskovsk– 15 km- Uzlovaya – 7 km
M4 "Don" along the site’s border.Water - 13,000 cubic meters/day.Electricity - 100 MW. Gas - 180 million cubic meters/year.
Casting and rolling complex of "Tulachermet-Steel" is the first new post-Soviet converter production in Russia and the only one in the European part of Russia fully integrated steel bar-rolling enterprise.Construction of CRC is being conducted with modern environment friendly and resource-saving German technologies.The company will provide high-quality metal to developing domestic machine-building enterprises.
200
478
ОАО«Щекиноазот»СТРОИТЕЛЬСТВО КОМПЛЕКСА ПРОИЗВОДСТВА МЕТАНОЛА И АММИАКА
SQUARE
THE VOLUME OF INVESTMENTS
NUMBER OF JOBS
Regeneration of the former embankment, lost about a hundred years ago. The purpose of the project - to create a unique architectural and recreational space, attractive to residents and visitors, enhancing the image of the city, its historical significance, comfortable living and ecological state of the urban environment.
1,2 billion rubles
63 935 м2
5 6"SHCHEKINOAZOT"
ОАО«Щекиноазот»СТРОИТЕЛЬСТВО КОМПЛЕКСА ПРОИЗВОДСТВА МЕТАНОЛА И АММИАКА
THE VOLUME OF INVESTMENTS
NUMBER OF JOBS
Construction of the production of cheese with a long ripening period with the expansion of the warehouse. The expected investment is amounted up to 400 million rubles. The purpose of the project - the release of high-quality cheeses with a long shelf life, are not inferior to European analogues. 35
400 million rubles
"TULA MILK PLANT" KAZAN EMBANKMENT
METHANOL
AMMONIA
THE VOLUME OF INVESTMENTS
NUMBER OF JOBS
450 thousand tons / year
150 thousand tons / year
СТРОИТЕЛЬСТВО КОМПЛЕКСА ПРОИЗВОДСТВА МЕТАНОЛА И АММИАКА
Construction of the production of ammonia and methanol. The project involves the developing and building a plant for the production of ammonia and methanol in the industrial area of "Schekinazot". The aim of the project is to reduce costs, as well as gaining the access to the global and domestic markets through the introduction of advanced resource-saving and energy-efficient methanol production technology.
19 billion rubles
"MIRATORG"
СТРОИТЕЛЬСТВО КОМПЛЕКСА ПРОИЗВОДСТВА МЕТАНОЛА И АММИАКА
THE VOLUME OF INVESTMENTS
NUMBER OF JOBS
Creation in Tula region of meat-production oriented cattle farms. The plans of Russia's largest agricultural holding - to invest in Tula region 10 billion rubles. By 2020, the region will create a cattle growing cluster oriented on meat breeds up to 70 thousand units. As a result of the investment project it will be created about three thousand jobs, half of them in the sphere of service industries, the other half - in the processing of products.
50010 billion rubles
October 2016
During the meeting, first deputy Governor of Tula region - chairman of Tula Region Government Yury Andrianov and the vice president of Great Wall Motors Company Hao Jian Jun discussed the stages of realization of the investment project on construction of automobile plant in the industrial park "Uzlovaya".Currently there were received positive expert conclusions and building
permits, built temporary roads and repaired existing ones, water is brought to the site of construction, built the lines of permanent and temporary power, work began on the arrangement of the pile field. At the construction site was built a temporary office in which already work the employees of HMMR. Work has begun on construction of administrative-business complex (residential zone).
In response, the vice-president of Great Wall Motors Company Hao Jian Jun thanked Yury Andrianov for the meeting and expressed confidence in further fruitful work.
Tula region was visited by the vice-president of Great Wall Motors Company
«»
Construction of the automobile plant is an investment in the development of the region, as well as the creation of new jobs. In our region, there is everything necessary for dynamic development of your company. We would like to assure you of the full support of the project. I am confident that our joint work will be successful and provide tangible results.
The first deputy Governor of Tula region - chairman of
Tula Region Government, Yury Andrianov
IN TULA REGION WAS OPENED A FACTORY FOR THE PRODUCTION OF FOOD ADDITIVES AND PREMIXES BY "AGROFEED RUS" Previously, the Hungarian company "Agrofeed" supplied additives from abroad. Now, their production will be established on the Tula land, in Yasnogorsk area. The total cost of the project is about 500 million rubles. The planned production capacity of the production of premixes and concentrates - 128 tons per day.
IN TULA REGION WAS OPENED A LARGE MEAT-PROCESSING COMPLEX The company "Volovskiy Broiler" launched the poultry complex with capacity of more than 50 thousand tons of broiler meat per year. The total investment in the construction and development of the company - more than 5 billion rubles. It has begun the production of the entire product line of chicken meat, which will be presented in retail chains of the region.
News
KAZAN EMBANKMENT
"MIRATORG"Октябрь 20167 8
9 10
THE CONSTRUCTION SITE OF "TULACHERMET-STEEL" RECEIVED THE FIRST BATCH OF ROLLING MILL EQUIPMENTAbout 65 tons of equipment of the rolling mill heating furnace has arrived on the construction site of a foundry-rolling complex of "Tulachermet-steel" in accordance with the delivery schedule. Equipment designed for the rolling mill shop was manufactured by one of the leading manufacturers of machine-building complexes for processing steel and non-ferrous metals SMS Group GmbH (Germany).The complex will be launched at the end of 2017. This will create more than 1,600 jobs and increase contributions to the budgets of all levels with more than 3 billion rubles a year. The projected capacity of the first stage of casting and rolling complex - 1.75 million tons of rolled steel per year.
October 2016
TULA REGIONDEVELOPMENT CORPORATION
THE VOLUME OF INVESTMENTS
NUMBER OF JOBS
Construction of the production of cheese with a long ripening period with the expansion of the warehouse. The expected investment is amounted up to 400 million rubles. The purpose of the project - the release of high-quality cheeses with a long shelf life, are not inferior to European analogues.
Announcement
RUSSIAN REGIONS DAY IN THE REPUBLIC OF AUSTRIANovember 18, 2016 in Vienna will be held the Day of Russian regions in the Republic of Austria, which framework will contain the presentation of the largest investment projects of Tula region.For the first time in the program of the event - "contact exchange" for the representatives of Austrian and Russian business community.You are the participant of the Day of the Russian regions in the Republic of Austria and want to learn more about Tula region? Schedule an appointment now! Contact person - First Deputy General Director of the Tula region development corporation Valentin Zarubin, [email protected] you in Vienna!
Top Related