Download - Todd Wyatt Resume A 2011

Transcript
Page 1: Todd Wyatt Resume A 2011

T O D D W Y A T T [email protected] 414.704.5568 114 N Hartwell Ave Waukesha WI 53186

E X P E R I E N C E

Eppstein Uhen Architects www.eua.com 333 East Chicago Street Milwaukee, WI 53202 800.789.8436 Largest architectural firm in Milwaukee (per registered architects - 51, 133 FTE’s) Dates of Employment April 2004 – October 2009 Project Types Health Care, Education, Commercial, Residential, Corporate Revenues $20.1M (2005-2008 average) Quality Assurance Manager

� Production Developed standardized tags, schedules and nomenclature for CAD and Revit content � Project Management Formulated seminars focusing on change orders, submittals, RFI’s, and case studies � Design Established best practices relating to parking structure design and precast insulated panels � Risk Management Reviewed deliverables of (25) projects during SD, DD, and CD phases � Staff Development Developed a firm-wide professional development program for +100 technical staff � Data Management Established a paper-less archiving process and managed all code-related resources � Human Resources Led (4) QC teams focused on production, specifications, project management, and design

Project Manager / Senior Project Architect

� First Place Condos - Milwaukee, WI 420,000 sf • (12) Stories • 160 Units • $42M (Const Cost)

� WFH Franklin Hospital - Franklin, WI 19,035 sf • Pre/Post & Surgical Suite • $3.9M (Const Cost)

� Deerfield Elementary - Oak Creek, WI 60,200 sf • 550 Students (K-5) • SE2 Award • $7M (Const Cost) H+L Architecture www.hlarch.com 1755 Blake Street Denver, CO 80202 303.298.4700 4th largest architectural firm in Colorado (per Colorado revenue)

Dates of Employment July 1996 – March 2004 Project Types Health Care, Education, Commercial, Corporate Revenues $24.1M (2005-2008 average) Project Manager / Senior Project Architect

� GPRMC - North Platte, NE 64,000 sf • ED, Pre/Post-Op, ICU, Cath Lab, 6 OR’s, CS • $24M

� Ivinson Memorial Hospital - Laramie, WY 85,000 sf • ED, Imaging, CS, ICU, Oncology, Atrium • +$20M

Production Team Leader � Developed quality assurance checklists for Pre-Design through Project Closeout phases � Created a standard millwork detail library and interior elevation millwork blocks for CAD

Gary Anderson & Assoc. www.gwaarchitect.com 333 East State Street Rockford, IL 61104 815.963.1900

Dates of Employment May 1990 – June 1991 and May 1993 – June 1996 Project Types Adaptive Re-Use, Historical Restoration, Health Care, Commercial, Intuitional Architectural Intern � Assisted project managers and project architects in the planning & design of renovation & new building projects.

E D U C A T I O N University of Illinois Masters in Architecture 1993 GPA : 4.0 (5.0) Champaign/Urbana Bachelor of Science in Architecture 1990 GPA : 4.5 (5.0)

Page 2: Todd Wyatt Resume A 2011

T O D D W Y A T T [email protected] 414.704.5568 114 N Hartwell Ave Waukesha WI 53186

A F F I L I A T I O N S Registered Architect Colorado American Institute of Architects Member National CAD Standards BIM Committee National Institute of Building Sciences BIM Standards buildingSMART Alliance Member Open Geospatial Consortium Member S O F T W A R E K N O W L E D G E Revit Architecture Since 2007 BlueBeam Revu Since 2006 Deltek Vision Since 2000 AutoDesk ADT Since 1995 AutoDesk AutoCAD Since 1989 MS Office Since 1989 o Excel, Word, Access, PowerPoint, Visio, SharePoint H E A L T H C A R E S P A C E S

Clin

ical Spaces

Admin & Public Areas

2

Cardiac Cath Lab

2

Central Services

2

Critical Care Units

3

CT Scanning

1

Emergency Suite

2

Employee Facilities

3

Endoscopy Suite

2

Cleaning/Sanitizing Carts

2

General Stores

1

Linen Services

1

Medical Records

1

Morgue

1

Nursing Unit

3

Oncology Suite

2

Pediatric & Adolescent Unit

2

Psychiatric Nursing Unit

1

Radiotherapy Suite (Linacs)

3

Rehabilitation Therapy Dept

2

Renal Dialysis Unit

2

Respiratory Therapy Service

1

Outpatient Facility

1

Surgical Suites

4

Services Life Safety Planning

8

Master Planning

2

Medical Equipment Planning

2

Statement of Conditions

2

P R O J E C T F O C U S EUA H+L GAA Quality Control 50% 10% 5% Health Care 25% 65% 15% Institutional 10% 10% 15% Commercial 5% 5% 40% Residential 5% 5% 10% Marketing 5% 5% 10% H E A L T H C A R E P R O J E C T S (Phase) University Hospital (Denver, CO) o Linear Accelerator Addition SD-CA Ivinson Memorial Hospital (Laramie, WY) o Dialysis Remodel SD-CA o ICU Remodel SD-CA o ED/Imaging Addition CA o Pre-Op/Surgery Remodel CD-CA o Atrium/Gift Shop Remodel SD-CA o Oncology Center SD-CA GPRMC (North Platte, NE) o ED/Surgery Addition PD-CA o Oncology Addition/Remodel PD-DD o Home Health Remodel PD-DD o Behavioral Science Remodel PD-DD Porter Adventist Hospital (Denver, CO) o Cath Lab Remodel SD-CA o Extra Procedure Room Remodel SD-CA o Cancer Center - Vertical Expansion Study o Master Plan Implementation Study Littleton Adventist Hospital (Littleton, CO) o Surgical Expansion SD-CA o Children’s After Hours Remodel CA o Surgi-Center Remodel CA o JCAHO Review: Statement of Conditions Study St. Mary’s Hospital (Grand Junction, CO) o Pediatric Remodel CD-CA o Parking Structure DD-CD Children’s Hospital (Aurora, CO) o Replacement Hospital – Code Review SD-DD C O R P O R A T E P R O J E C T S (Phase) HP - Building #5 (Fort Collins, CO) SD-CD TRW Building (Aurora, Co) SD-CD Benedek Broadcasting (Rockford, IL) SD-CD M I S C P R O J E C T S (Phase) CSU- Engineering Bldg (Fort Collins, CO) SD-CD Denver Zoo- Amphitheatre (Denver, CO) PD-CA Olson Mortuary (Rockford, IL) SD-CD Museum Facility Study (Rockford, IL) Study o Burpee, Tinker, Riverfront, Midway Village