Todd Wyatt Resume A 2011

2
T O D D W Y A T T [email protected] 414.704.5568 114 N Hartwell Ave Waukesha WI 53186 E X P E R I E N C E Eppstein Uhen Architects www.eua.com 333 East Chicago Street Milwaukee, WI 53202 800.789.8436 Largest architectural firm in Milwaukee (per registered architects - 51, 133 FTE’s) Dates of Employment April 2004 – October 2009 Project Types Health Care, Education, Commercial, Residential, Corporate Revenues $20.1M (2005-2008 average) Quality Assurance Manager Production Developed standardized tags, schedules and nomenclature for CAD and Revit content Project Management Formulated seminars focusing on change orders, submittals, RFI’s, and case studies Design Established best practices relating to parking structure design and precast insulated panels Risk Management Reviewed deliverables of (25) projects during SD, DD, and CD phases Staff Development Developed a firm-wide professional development program for +100 technical staff Data Management Established a paper-less archiving process and managed all code-related resources Human Resources Led (4) QC teams focused on production, specifications, project management, and design Project Manager / Senior Project Architect First Place Condos - Milwaukee, WI 420,000 sf (12) Stories 160 Units $42M (Const Cost) WFH Franklin Hospital - Franklin, WI 19,035 sf Pre/Post & Surgical Suite $3.9M (Const Cost) Deerfield Elementary - Oak Creek, WI 60,200 sf 550 Students (K-5) SE2 Award $7M (Const Cost) H+L Architecture www.hlarch.com 1755 Blake Street Denver, CO 80202 303.298.4700 4th largest architectural firm in Colorado (per Colorado revenue) Dates of Employment July 1996 – March 2004 Project Types Health Care, Education, Commercial, Corporate Revenues $24.1M (2005-2008 average) Project Manager / Senior Project Architect GPRMC - North Platte, NE 64,000 sf ED, Pre/Post-Op, ICU, Cath Lab, 6 OR’s, CS $24M Ivinson Memorial Hospital - Laramie, WY 85,000 sf ED, Imaging, CS, ICU, Oncology, Atrium +$20M Production Team Leader Developed quality assurance checklists for Pre-Design through Project Closeout phases Created a standard millwork detail library and interior elevation millwork blocks for CAD Gary Anderson & Assoc. www.gwaarchitect.com 333 East State Street Rockford, IL 61104 815.963.1900 Dates of Employment May 1990 – June 1991 and May 1993 – June 1996 Project Types Adaptive Re-Use, Historical Restoration, Health Care, Commercial, Intuitional Architectural Intern Assisted project managers and project architects in the planning & design of renovation & new building projects. E D U C A T I O N University of Illinois Masters in Architecture 1993 GPA : 4.0 (5.0) Champaign/Urbana Bachelor of Science in Architecture 1990 GPA : 4.5 (5.0)

Transcript of Todd Wyatt Resume A 2011

Page 1: Todd Wyatt Resume A 2011

T O D D W Y A T T [email protected] 414.704.5568 114 N Hartwell Ave Waukesha WI 53186

E X P E R I E N C E

Eppstein Uhen Architects www.eua.com 333 East Chicago Street Milwaukee, WI 53202 800.789.8436 Largest architectural firm in Milwaukee (per registered architects - 51, 133 FTE’s) Dates of Employment April 2004 – October 2009 Project Types Health Care, Education, Commercial, Residential, Corporate Revenues $20.1M (2005-2008 average) Quality Assurance Manager

� Production Developed standardized tags, schedules and nomenclature for CAD and Revit content � Project Management Formulated seminars focusing on change orders, submittals, RFI’s, and case studies � Design Established best practices relating to parking structure design and precast insulated panels � Risk Management Reviewed deliverables of (25) projects during SD, DD, and CD phases � Staff Development Developed a firm-wide professional development program for +100 technical staff � Data Management Established a paper-less archiving process and managed all code-related resources � Human Resources Led (4) QC teams focused on production, specifications, project management, and design

Project Manager / Senior Project Architect

� First Place Condos - Milwaukee, WI 420,000 sf • (12) Stories • 160 Units • $42M (Const Cost)

� WFH Franklin Hospital - Franklin, WI 19,035 sf • Pre/Post & Surgical Suite • $3.9M (Const Cost)

� Deerfield Elementary - Oak Creek, WI 60,200 sf • 550 Students (K-5) • SE2 Award • $7M (Const Cost) H+L Architecture www.hlarch.com 1755 Blake Street Denver, CO 80202 303.298.4700 4th largest architectural firm in Colorado (per Colorado revenue)

Dates of Employment July 1996 – March 2004 Project Types Health Care, Education, Commercial, Corporate Revenues $24.1M (2005-2008 average) Project Manager / Senior Project Architect

� GPRMC - North Platte, NE 64,000 sf • ED, Pre/Post-Op, ICU, Cath Lab, 6 OR’s, CS • $24M

� Ivinson Memorial Hospital - Laramie, WY 85,000 sf • ED, Imaging, CS, ICU, Oncology, Atrium • +$20M

Production Team Leader � Developed quality assurance checklists for Pre-Design through Project Closeout phases � Created a standard millwork detail library and interior elevation millwork blocks for CAD

Gary Anderson & Assoc. www.gwaarchitect.com 333 East State Street Rockford, IL 61104 815.963.1900

Dates of Employment May 1990 – June 1991 and May 1993 – June 1996 Project Types Adaptive Re-Use, Historical Restoration, Health Care, Commercial, Intuitional Architectural Intern � Assisted project managers and project architects in the planning & design of renovation & new building projects.

E D U C A T I O N University of Illinois Masters in Architecture 1993 GPA : 4.0 (5.0) Champaign/Urbana Bachelor of Science in Architecture 1990 GPA : 4.5 (5.0)

Page 2: Todd Wyatt Resume A 2011

T O D D W Y A T T [email protected] 414.704.5568 114 N Hartwell Ave Waukesha WI 53186

A F F I L I A T I O N S Registered Architect Colorado American Institute of Architects Member National CAD Standards BIM Committee National Institute of Building Sciences BIM Standards buildingSMART Alliance Member Open Geospatial Consortium Member S O F T W A R E K N O W L E D G E Revit Architecture Since 2007 BlueBeam Revu Since 2006 Deltek Vision Since 2000 AutoDesk ADT Since 1995 AutoDesk AutoCAD Since 1989 MS Office Since 1989 o Excel, Word, Access, PowerPoint, Visio, SharePoint H E A L T H C A R E S P A C E S

Clin

ical Spaces

Admin & Public Areas

2

Cardiac Cath Lab

2

Central Services

2

Critical Care Units

3

CT Scanning

1

Emergency Suite

2

Employee Facilities

3

Endoscopy Suite

2

Cleaning/Sanitizing Carts

2

General Stores

1

Linen Services

1

Medical Records

1

Morgue

1

Nursing Unit

3

Oncology Suite

2

Pediatric & Adolescent Unit

2

Psychiatric Nursing Unit

1

Radiotherapy Suite (Linacs)

3

Rehabilitation Therapy Dept

2

Renal Dialysis Unit

2

Respiratory Therapy Service

1

Outpatient Facility

1

Surgical Suites

4

Services Life Safety Planning

8

Master Planning

2

Medical Equipment Planning

2

Statement of Conditions

2

P R O J E C T F O C U S EUA H+L GAA Quality Control 50% 10% 5% Health Care 25% 65% 15% Institutional 10% 10% 15% Commercial 5% 5% 40% Residential 5% 5% 10% Marketing 5% 5% 10% H E A L T H C A R E P R O J E C T S (Phase) University Hospital (Denver, CO) o Linear Accelerator Addition SD-CA Ivinson Memorial Hospital (Laramie, WY) o Dialysis Remodel SD-CA o ICU Remodel SD-CA o ED/Imaging Addition CA o Pre-Op/Surgery Remodel CD-CA o Atrium/Gift Shop Remodel SD-CA o Oncology Center SD-CA GPRMC (North Platte, NE) o ED/Surgery Addition PD-CA o Oncology Addition/Remodel PD-DD o Home Health Remodel PD-DD o Behavioral Science Remodel PD-DD Porter Adventist Hospital (Denver, CO) o Cath Lab Remodel SD-CA o Extra Procedure Room Remodel SD-CA o Cancer Center - Vertical Expansion Study o Master Plan Implementation Study Littleton Adventist Hospital (Littleton, CO) o Surgical Expansion SD-CA o Children’s After Hours Remodel CA o Surgi-Center Remodel CA o JCAHO Review: Statement of Conditions Study St. Mary’s Hospital (Grand Junction, CO) o Pediatric Remodel CD-CA o Parking Structure DD-CD Children’s Hospital (Aurora, CO) o Replacement Hospital – Code Review SD-DD C O R P O R A T E P R O J E C T S (Phase) HP - Building #5 (Fort Collins, CO) SD-CD TRW Building (Aurora, Co) SD-CD Benedek Broadcasting (Rockford, IL) SD-CD M I S C P R O J E C T S (Phase) CSU- Engineering Bldg (Fort Collins, CO) SD-CD Denver Zoo- Amphitheatre (Denver, CO) PD-CA Olson Mortuary (Rockford, IL) SD-CD Museum Facility Study (Rockford, IL) Study o Burpee, Tinker, Riverfront, Midway Village