Index by Project NameProject Number Project Name Page #
Section 4.1 - West Slope Road and Bridge Projects78717 Airport Road - Slip Below Road 277123* Alder Drive at EID Canal - Bridge Replacement 477128* Bassi Road at Granite Creek - Bridge Replacement 697016 Bicycle/Pedestrian Counters - Class 1 Trails 877119* Blair Road at EID Canal - Bridge Replacement 10Bridge Match Bridge Program Match 1378716 Bucks Bar Rd - Sink Hole 1477116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1678710 Cable Road - Culvert Damage 1872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2077142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 2277139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2678701 Cosumnes Mine Rd 1 - Slip Below Road 2878712 Cosumnes Mine Rd 2 - Slip Below Road 3078700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3272377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3471362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671361 Country Club Drive Extension - Tong Road to Bass Lake Road 3871360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272334 Diamond Springs Parkway - Phase 1B 4472311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4697012 El Dorado Trail - Los Trampas to Halcon 4897015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097014 El Dorado Trail - Missouri Flat Road to El Dorado 5278702 Fort Jim Road - Culvert Damage 5478707 Green Valley Rd - Slip Below Road 5677127* Green Valley Road at Indian Creek - Bridge Replacement 5877136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 64GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 6672376 Green Valley Road Widening from County Line to Sophia Parkway 6877137* Greenstone Road at Slate Creek - Bridge Replacement 7078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7277135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7678724 Happy Valley Road - Slip Below Road 78
Page 1 of 39
Section 4.1 - West Slope Road and Bridge Projects, Continued77125* Hazel Valley Road at EID Canal - Bridge Replacement 8071375 Headington Road Extension - Missouri Flat Road to El Dorado Road 82
77131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8472191 Ice House Road Pavement Rehab, Ph 2. 8672187 Ice House Road Rehabilitation 8878703 Kyburz Dr - Slide Dumped On Road 9066116 Latrobe Connection 9272312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike Paths 94OP005 Metal Beam Guardrail Installation - Various Locations 9672142 Missouri Flat Road Widening - China Garden to Pleasant Valley Road/SR49 9878714 Mosquito Rd - Culvert Damage 10077126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 10478713 Mt Aukum Rd - Sink Hole 10672308 New York Creek Trail East - Phase 2 10878706 Newtown Rd - Slip Below Road 11077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11478708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11878718 Pony Express Trail Slipout 12077117* Rubicon Trail at Ellis Creek - Bridge Replacement 12273362 Salmon Falls Road South of Glenesk Lane Realignment 12471324 Saratoga Way Extension - Phase 1 126GP147 Saratoga Way Extension - Phase 2 12878709 Sciaroni Rd - Slip Below Road 13072310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272378 Silva Valley Parkway/Harvard Way Intersection Improvements 13477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13676108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13877115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14078715 Starkes Grade Rd - Slip Below Road 14278705 String Canyon Rd - Slip Below Road 144
TIM Prog TIM Fee Program Projects 146Traffic Traffic Signal and Intersection Operational Improvements 14753118 Transit Service Improvements 149GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road 15053126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr 15253127 U.S. 50 Auxiliary Lane Eastbound - Cameron Park Drive to Ponderosa Road 15453125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd 15653117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway 158
Page 2 of 39
Section 4.1 - West Slope Road and Bridge Projects, ContinuedGP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road 16053115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento
County Line 16253128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr 16453124 U.S. 50 HOV Lanes Phase 0 16671330 U.S. 50/Bass Lake Road Interchange Improvements 16871332 U.S. 50/Cambridge Road Interchange Improvements 17072361 U.S. 50/Cameron Park Drive Interchange Improvements 17271319 U.S. 50/Camino Area Safety Project 17471323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871376 U.S. 50/El Dorado Road Interchange Phase 2 18071359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 18271346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration 18471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19071328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19471345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 5019677118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 19878711 White Meadows Rd - Slide Dumped On And Shifted Road 20072381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento
County Line 202
72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interchange 204
Section 4.2 - Tahoe EIP Projects
78723 Angora Creek Road Damage 272380 Apache Avenue/US Highway 50 Intersection Improvement Project 495174 Chiapa Erosion Control Project 695187 Cold Creek Fisheries Enhancement Project 895191 Country Club Heights Erosion Control Project 1095157 CSA #5 Erosion Control Project 1295197 Delaware Water Quality Project 1478725 Elks Club Drive Sinkhole 1678721 Evelyn Drive Road Failure 1878726 Fallen Leaf Road Washout 2095195 Forest View Water Quality Project 2295180 Glenridge Erosion Control Project 2495176 Golden Bear Erosion Control Project 2695708 Highway 89 Class 1 Trail 2895163 Lake Tahoe Boulevard Erosion Control Project 3095175 Lake Tahoe Boulevard SEZ Project 32
Page 3 of 39
Section 4.2 - Tahoe EIP Projects, Continued78722 Lakeview Drive Road Failure 3473120 Meyers Corridor Operational Improvement Project 3695179 Meyers Stream Environment Zone/Erosion Control Project 3895170 Montgomery Estates Area 2 Erosion Control Project 4095172 Montgomery Estates Area 3 Erosion Control Project 4295166 North Upper Truckee SEZ Restoration Project 4495177 Oflyng Water Quality Project 4695838 Passenger Facility 4972379 Pioneer Trail / US 50 Intersection Safety Improvement Project 50
95177 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St 52
95198 San Bernardino Water Quality Project 5495192 Sawmill 2B Bike Path and Erosion Control Project 5695168 South Upper Truckee I Erosion Control Project 5895171 Tahoe Hills Erosion Control Project 60
Section 4.3A - Georgetown Airport Projects
93523 Airport Layout Plan 2024 Update - Georgetown 293520 Construction of AWOS 493535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes;
Change Runway End ID 893503 Obstruction Survey 1093536 Relocate Taxiway A Connector 1293537 Runway Pavement Closure for Runway Safety Area 1493538 Runway Protection Zone Land Acquisition 16
Section 4.3B - Placerville Airport Projects
93132 Airport Layout Plan Update and Obstruction Survey - Placerville 2293133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 20192493130 Taxiway Edge Lights 26
Section 4.4 - Transportation Facilities Improvement Projects81134 Headington Wash Rack Facility Project 2
Section 4.5 - Capital Overlay and Rehabilitation Projects72193 Overlay - El Dorado Hills Blvd. 272190 Overlay - Patterson Drive and Missouri Flat Road 4
Page 4 of 39
Index by Project NumberProject Number Project Name Page #
Section 4.1 - West Slope Road and Bridge Projects53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento
County Line 16253117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway 15853118 Transit Service Improvements 14953124 U.S. 50 HOV Lanes Phase 0 16653125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd 15653126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr 15253127 U.S. 50 Auxiliary Lane Eastbound - Cameron Park Drive to Ponderosa Road 15453128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr 16466116 Latrobe Connection 9271319 U.S. 50/Camino Area Safety Project 17471323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671324 Saratoga Way Extension - Phase 1 12671328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271330 U.S. 50/Bass Lake Road Interchange Improvements 16871332 U.S. 50/Cambridge Road Interchange Improvements 17071333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19071338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary
Lanes on U.S. 50 19671346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian
Restoration 18471347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 18271360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4071361 Country Club Drive Extension - Tong Road to Bass Lake Road 3871362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19471375 Headington Road Extension - Missouri Flat Road to El Dorado Road 8271376 U.S. 50/El Dorado Road Interchange Phase 2 18072142 Missouri Flat Road Widening - China Garden to Pleasant Valley Road/SR49 9872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2072187 Ice House Road Rehabilitation 8872191 Ice House Road Pavement Rehab, Ph 2. 8672308 New York Creek Trail East - Phase 2 10872310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4672312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike
Paths 94
Page 5 of 39
Section 4.1 - West Slope Road and Bridge Projects, Continued72334 Diamond Springs Parkway - Phase 1B 4472361 U.S. 50/Cameron Park Drive Interchange Improvements 17272374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley
Parkway Interchange 20472375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272376 Green Valley Road Widening from County Line to Sophia Parkway 6872377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3472378 Silva Valley Parkway/Harvard Way Intersection Improvements 13472381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento
County Line 20273320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11873362 Salmon Falls Road South of Glenesk Lane Realignment 12476108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13878700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3278701 Cosumnes Mine Rd 1 - Slip Below Road 2878702 Fort Jim Road - Culvert Damage 5478703 Kyburz Dr - Slide Dumped On Road 9078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7278705 String Canyon Rd - Slip Below Road 14478706 Newtown Rd - Slip Below Road 11078707 Green Valley Rd - Slip Below Road 5678708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11678709 Sciaroni Rd - Slip Below Road 13078710 Cable Road - Culvert Damage 1878711 White Meadows Rd - Slide Dumped On And Shifted Road 20078712 Cosumnes Mine Rd 2 - Slip Below Road 3078713 Mt Aukum Rd - Sink Hole 10678714 Mosquito Rd - Culvert Damage 10078715 Starkes Grade Rd - Slip Below Road 14278716 Bucks Bar Rd - Sink Hole 1478717 Airport Road - Slip Below Road 278718 Pony Express Trail Slipout 12078724 Happy Valley Road - Slip Below Road 7897012 El Dorado Trail - Los Trampas to Halcon 4897014 El Dorado Trail - Missouri Flat Road to El Dorado 5297015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097016 Bicycle/Pedestrian Counters - Class 1 Trails 877109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 6477115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14077116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1677117* Rubicon Trail at Ellis Creek - Bridge Replacement 12277118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 198
Page 6 of 39
Section 4.1 - West Slope Road and Bridge Projects, Continued77119* Blair Road at EID Canal - Bridge Replacement 1077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277123* Alder Drive at EID Canal - Bridge Replacement 477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13677125* Hazel Valley Road at EID Canal - Bridge Replacement 8077126* Mosquito Road Bridge at South Fork American River 10277127* Green Valley Road at Indian Creek - Bridge Replacement 5877128* Bassi Road at Granite Creek - Bridge Replacement 677129* Mount Murphy Road at South Fork American River - Bridge Replacement 10477131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8477134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11477135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077137* Greenstone Road at Slate Creek - Bridge Replacement 7077138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2677139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7677142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 22Bridge Match Bridge Program Match 13GP147 Saratoga Way Extension - Phase 2 128GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road 150GP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road 160GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 66OP005 Metal Beam Guardrail Installation - Various Locations 96
TIM Prog TIM Fee Program Projects 146Traffic Traffic Signal and Intersection Operational Improvements 147
Section 4.2 - Tahoe EIP Projects
72379 Pioneer Trail / US 50 Intersection Safety Improvement Project 5072380 Apache Avenue/US Highway 50 Intersection Improvement Project 473120 Meyers Corridor Operational Improvement Project 3678721 Evelyn Drive Road Failure 1878722 Lakeview Drive Road Failure 3478723 Angora Creek Road Damage 278725 Elks Club Drive Sinkhole 1678726 Fallen Leaf Road Washout 2095157 CSA #5 Erosion Control Project 1295163 Lake Tahoe Boulevard Erosion Control Project 3095166 North Upper Truckee SEZ Restoration Project 4495168 South Upper Truckee I Erosion Control Project 58
Page 7 of 39
Section 4.2 - Tahoe EIP Projects, Continued95170 Montgomery Estates Area 2 Erosion Control Project 4095171 Tahoe Hills Erosion Control Project 6095172 Montgomery Estates Area 3 Erosion Control Project 4295174 Chiapa Erosion Control Project 695175 Lake Tahoe Boulevard SEZ Project 3295176 Golden Bear Erosion Control Project 2695177 Oflyng Water Quality Project 4695177 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino
St 5295179 Meyers Stream Environment Zone/Erosion Control Project 3895180 Glenridge Erosion Control Project 2495187 Cold Creek Fisheries Enhancement Project 895191 Country Club Heights Erosion Control Project 1095192 Sawmill 2B Bike Path and Erosion Control Project 5695195 Forest View Water Quality Project 2295197 Delaware Water Quality Project 1495198 San Bernardino Water Quality Project 5495708 Highway 89 Class 1 Trail 2895838 Passenger Facility 49
Section 4.3A - Georgetown Airport Projects
93503 Obstruction Survey 1093520 Construction of AWOS 493523 Airport Layout Plan 2024 Update - Georgetown
2
93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes; Change Runway End ID 8
93535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693536 Relocate Taxiway A Connector 1293537 Runway Pavement Closure for Runway Safety Area 1493538 Runway Protection Zone Land Acquisition 16
Section 4.3B - Placerville Airport Projects
93130 Taxiway Edge Lights 2693132 Airport Layout Plan Update and Obstruction Survey - Placerville 2293133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 201924
Section 4.4 - Transportation Facilities Improvement Projects81134 Headington Wash Rack Facility Project 2
Section 4.5 - Capital Overlay and Rehabilitation Projects72193 Overlay - El Dorado Hills Blvd. 272190 Overlay - Patterson Drive and Missouri Flat Road 4
Page 8 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 1 Projects2017 Capital Improvement Program
CORP
72193 Overlay - El Dorado Hills Blvd. $5,397,285
West Slope
53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento County Line $5,621,404
53117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway $5,466,500
53118 Transit Service Improvements $6,985,618
53124 U.S. 50 HOV Lanes Phase 0 $17,768,551
66116 Latrobe Connection $723,300
71323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B $8,651,655
71324 Saratoga Way Extension - Phase 1 $9,326,580
71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $54,400,028
71330 U.S. 50/Bass Lake Road Interchange Improvements $5,872,156
71345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 50 $7,658,023
71360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive $7,483,000
71361 Country Club Drive Extension - Tong Road to Bass Lake Road $12,448,722
71362 Country Club Drive Extension - Silva Valley Parkway to Tong Road $8,240,000
71368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape $2,200,000
72308 New York Creek Trail East - Phase 2 $1,447,744
72310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) $1,944,101
72311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place $1,136,869
72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interch $5,622,588
72376 Green Valley Road Widening from County Line to Sophia Parkway $85,000
72377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway $10,751,488
72378 Silva Valley Parkway/Harvard Way Intersection Improvements $613,000
72381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento County Line $4,428,540
76108 Silver Springs Pkwy to Bass Lake Rd (south segment) $9,456,690
Affordable 1-Affordable Housing TIM Fee Reserve $20,000,000
Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,152,126
Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $16,380,136
Bridge Match Bridge Program Match $3,687,029
GP147 Saratoga Way Extension - Phase 2 $3,310,727
GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road $8,830,500
GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway $6,029,000
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $8,538,272
Monday, May 22, 2017 Page 1 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 9 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 1 Projects2017 Capital Improvement Program
RDMAINT 1-Road Maintenance $7,364,955
TIM Prog TIM Fee Program Projects $14,188,952
Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000
Monday, May 22, 2017 Page 2 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 10 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 2 Projects2017 Capital Improvement Program
West Slope
53118 Transit Service Improvements $6,985,618
53125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd $6,510,500
53126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr $8,743,500
53127 U.S. 50 Auxiliary Lane Eastbound - Cameron Park Drive to Ponderosa Road $8,381,000
53128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr $8,961,000
66116 Latrobe Connection $723,300
71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 $54,400,028
71330 U.S. 50/Bass Lake Road Interchange Improvements $5,872,156
71332 U.S. 50/Cambridge Road Interchange Improvements $8,612,692
71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $22,625,416
71338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment $9,880,152
71345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary Lanes on U.S. 50 $7,658,023
71368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape $2,200,000
72142 Missouri Flat Road Widening - China Garden to Pleasant Valley Road/SR49 $3,920,000
72143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road $1,323,772
72312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike Paths $897,000
72361 U.S. 50/Cameron Park Drive Interchange Improvements $87,283,512
72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interch $5,622,588
77115 Sly Park Road at Clear Creek Crossing - Bridge Replacement $5,816,028
77116 Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement $8,555,734
77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $4,087,452
77138 Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement $4,363,075
77139 Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement $4,456,673
77140 Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project $368,010
78700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out $1,112,250
78701 Cosumnes Mine Rd 1 - Slip Below Road $1,796,750
78712 Cosumnes Mine Rd 2 - Slip Below Road $1,096,750
78713 Mt Aukum Rd - Sink Hole $850,000
Appr Reimb 2-Approved Reimbursement Agreements-El Dorado Hills TIM $13,152,126
Appr Reimb 2-Approved Reimbursement Agreements-Silva Valley Interchange $16,380,136
Bridge Match Bridge Program Match $3,687,029
GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road $8,830,500
GP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road $8,685,500
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-El Dorado Hills TIM $8,538,272
Monday, May 22, 2017 Page 3 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 11 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 2 Projects2017 Capital Improvement Program
RDMAINT 1-Road Maintenance $7,364,955
TIM Prog TIM Fee Program Projects $14,188,952
Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000
Monday, May 22, 2017 Page 4 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 12 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 3 Projects2017 Capital Improvement Program
Airports-Placerville
93130 Taxiway Edge Lights $741,034
93132 Airport Layout Plan Update and Obstruction Survey - Placerville $660,000
93133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 2019 $633,500
CORP
72190 Overlay - Patterson Drive and Missouri Flat Road $1,091,099
Facilities
81134 Headington Wash Rack Facility Project $1,491,235
West Slope
31120 MC & FP - Phase II $536,304
53118 Transit Service Improvements $6,985,618
71319 U.S. 50/Camino Area Safety Project $4,137,406
71346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration $1,868,190
71347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 $5,160,916
71359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 $2,177,059
71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $6,500,147
71376 U.S. 50/El Dorado Road Interchange Phase 2 $10,475,000
72191 Ice House Road Pavement Rehab, Ph 2. $9,667,500
72334 Diamond Springs Parkway - Phase 1B $28,291,824
72375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment $14,211,368
73320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization $4,808,134
77114 Green Valley Road at Weber Creek - Bridge Replacement $12,115,371
77122 Newtown Road at South Fork of Weber Creek - Bridge Replacement $5,657,900
77123 Alder Drive at EID Canal - Bridge Replacement $1,132,141
77126 Mosquito Road Bridge at South Fork American River $69,924,569
77127 Green Valley Road at Indian Creek - Bridge Replacement $5,573,479
77134 Oak Hill Road at Squaw Hollow Creek - Bridge Replacement $4,074,882
77135 Hanks Exchange at Squaw Hollow Creek - Bridge Replacement $4,087,452
77137 Greenstone Road at Slate Creek - Bridge Replacement $3,643,670
77142 Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation $3,247,500
78702 Fort Jim Road - Culvert Damage $1,521,356
78704 Grizzly Flat Rd - Culvert Damage + Slip Below Road $506,750
78705 String Canyon Rd - Slip Below Road $532,500
78706 Newtown Rd - Slip Below Road $2,159,375
Monday, May 22, 2017 Page 5 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 13 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 3 Projects2017 Capital Improvement Program
78707 Green Valley Rd - Slip Below Road $1,477,500
78708 Peavine Ridge Rd - Slip Below Road and Culvert Damage $555,000
78709 Sciaroni Rd - Slip Below Road $849,750
78710 Cable Road - Culvert Damage $612,280
78714 Mosquito Rd - Culvert Damage $727,851
78715 Starkes Grade Rd - Slip Below Road $1,091,000
78716 Bucks Bar Rd - Sink Hole $545,444
78717 Airport Road - Slip Below Road $596,000
97012 El Dorado Trail - Los Trampas to Halcon $1,220,404
97014 El Dorado Trail - Missouri Flat Road to El Dorado $4,205,713
97015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing $2,806,255
97016 Bicycle/Pedestrian Counters - Class 1 Trails $267,500
Appr Reimb 2-Approved Reimbursement Agreements-TIM Zones 1-7 $6,640,218
Bridge Match Bridge Program Match $3,687,029
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $7,483,000
RDMAINT 1-Road Maintenance $7,364,955
TIM Prog TIM Fee Program Projects $14,188,952
Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000
Monday, May 22, 2017 Page 6 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 14 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 4 Projects2017 Capital Improvement Program
Airports-Georgetown
93503 Obstruction Survey $567,696
93520 Construction of AWOS $267,500
93523 Airport Layout Plan 2024 Update - Georgetown $85,000
93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes; Change Runway En $721,356
93535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes $322,800
93536 Relocate Taxiway A Connector $583,500
93537 Runway Pavement Closure for Runway Safety Area $555,500
93538 Runway Protection Zone Land Acquisition $185,000
West Slope
53118 Transit Service Improvements $6,985,618
71333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements $22,625,416
71339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment $6,934,893
71375 Headington Road Extension - Missouri Flat Road to El Dorado Road $6,500,147
71376 U.S. 50/El Dorado Road Interchange Phase 2 $10,475,000
72143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road $1,323,772
72361 U.S. 50/Cameron Park Drive Interchange Improvements $87,283,512
72376 Green Valley Road Widening from County Line to Sophia Parkway $85,000
73362 Salmon Falls Road South of Glenesk Lane Realignment $1,708,603
77109 Green Valley Road at Tennessee Creek - Bridge Replacement $6,039,993
77117 Rubicon Trail at Ellis Creek - Bridge Replacement $1,173,028
77118 Wentworth Springs Road at Gerle Creek - Bridge Replacement $1,474,251
77126 Mosquito Road Bridge at South Fork American River $69,924,569
77127 Green Valley Road at Indian Creek - Bridge Replacement $5,573,479
77128 Bassi Road at Granite Creek - Bridge Replacement $3,868,980
77129 Mount Murphy Road at South Fork American River - Bridge Replacement $23,057,481
77131 Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project $1,118,478
77136 Green Valley Road at Mound Springs Creek - Bridge Replacement $5,598,110
77137 Greenstone Road at Slate Creek - Bridge Replacement $3,643,670
Appr Reimb 2-Approved Reimbursement Agreements-TIM Zones 1-7 $6,640,218
Bridge Match Bridge Program Match $3,687,029
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
Pend Reimb 3-Pending Reimbursement Agreements-TIM Zones 1-7 $7,483,000
RDMAINT 1-Road Maintenance $7,364,955
TIM Prog TIM Fee Program Projects $14,188,952
Monday, May 22, 2017 Page 7 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 15 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 4 Projects2017 Capital Improvement Program
Traffic Signal Traffic Signal and Intersection Operational Improvements $35,280,000
Monday, May 22, 2017 Page 8 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 16 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 5 Projects2017 Capital Improvement Program
Tahoe
72379 Pioneer Trail / US 50 Intersection Safety Improvement Project $4,502,489
72380 Apache Avenue/US Highway 50 Intersection Improvement Project $510,000
73120 Meyers Corridor Operational Improvement Project $325,534
78721 Evelyn Way Road Failure $225,870
78722 Lakeview Avenue Road Failure $193,250
78723 Angora Creek Road Damage $207,625
78725 Elks Club Drive Sinkhole $462,750
78726 Fallen Leaf Road Washout $197,625
95117 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St $1,610,000
95157 CSA #5 Erosion Control Project $1,541,352
95163 Lake Tahoe Boulevard Erosion Control Project $716,669
95166 North Upper Truckee SEZ Restoration Project $956,600
95168 South Upper Truckee I Erosion Control Project $596,584
95170 Montgomery Estates Area 2 Erosion Control Project $967,806
95171 Tahoe Hills Erosion Control Project $795,508
95172 Montgomery Estates Area 3 Erosion Control Project $523,886
95174 Chiapa Erosion Control Project $2,083,600
95175 Lake Tahoe Boulevard SEZ Project $289,224
95176 Golden Bear Erosion Control Project $337,682
95177 Oflyng Water Quality Project $867,500
95179 Meyers Stream Environment Zone/Erosion Control Project $2,544,337
95180 Glenridge Erosion Control Project $2,832,300
95187 Cold Creek Fisheries Enhancement Project $1,844,917
95191 Country Club Heights Erosion Control Project $1,133,605
95192 Sawmill 2B Bike Path and Erosion Control Project $2,890,120
95195 Forest View Water Quality Project $382,447
95197 Delaware Water Quality Project $750,500
95198 San Bernardino Water Quality Project $750,500
95708 Highway 89 Class 1 Trail $2,110,000
95838 Passenger Facility $140,500
West Slope
72187 Ice House Road Rehabilitation $5,719,728
77119 Blair Road at EID Canal - Bridge Replacement $1,926,090
77124 Silver Fork Road at South Fork American River - Bridge Rehabilitation $2,550,666
Monday, May 22, 2017 Page 9 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 17 of 39
Project # Description Total Cost
Community Development Agency
Supervisor District 5 Projects2017 Capital Improvement Program
77125 Hazel Valley Road at EID Canal - Bridge Replacement $3,030,013
78703 Kyburz Dr - Slide Dumped On Road $431,140
78711 White Meadows Rd - Slide Dumped On And Shifted Road $908,000
78718 Pony Express Trail Slipout $945,000
78724 Happy Valley Road - Slip Below Road $868,000
OP005 Metal Beam Guardrail Installation - Various Locations $672,000
RDMAINT 1-Road Maintenance $7,364,955
Monday, May 22, 2017 Page 10 of 10CIPProgram.mdb\ProjectsBySupervisorDistrics Page 18 of 39
West Slope Road and Bridge Program - Index by Project ScheduleProject Number Project Name Page #
Section 4.1 - West Slope Road and Bridge Program - Current Year Projects78717 Airport Road - Slip Below Road 277123* Alder Drive at EID Canal - Bridge Replacement 477128* Bassi Road at Granite Creek - Bridge Replacement 697016 Bicycle/Pedestrian Counters - Class 1 Trails 877119* Blair Road at EID Canal - Bridge Replacement 1078716 Bucks Bar Rd - Sink Hole 1477116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1678710 Cable Road - Culvert Damage 1872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2077139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2678701 Cosumnes Mine Rd 1 - Slip Below Road 2878712 Cosumnes Mine Rd 2 - Slip Below Road 3078700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3271360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272334 Diamond Springs Parkway - Phase 1B 4472311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4697012 El Dorado Trail - Los Trampas to Halcon 4897015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097014 El Dorado Trail - Missouri Flat Road to El Dorado 5278702 Fort Jim Road - Culvert Damage 5478707 Green Valley Rd - Slip Below Road 5677127* Green Valley Road at Indian Creek - Bridge Replacement 5877136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 6472376 Green Valley Road Widening from County Line to Sophia Parkway 6877137* Greenstone Road at Slate Creek - Bridge Replacement 7078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7277135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7678724 Happy Valley Road - Slip Below Road 7877125* Hazel Valley Road at EID Canal - Bridge Replacement 8077131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8472191 Ice House Road Pavement Rehab, Ph 2. 8672187 Ice House Road Rehabilitation 8878703 Kyburz Dr - Slide Dumped On Road 9072312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike
Paths 9478714 Mosquito Rd - Culvert Damage 10077126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 10478713 Mt Aukum Rd - Sink Hole 10672308 New York Creek Trail East - Phase 2 10878706 Newtown Rd - Slip Below Road 11077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11478708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11878718 Pony Express Trail Slipout 120
Page 19 of 39
Section 4.1 - West Slope Road and Bridge Program - Current Year Projects, Continued77117* Rubicon Trail at Ellis Creek - Bridge Replacement 12271324 Saratoga Way Extension - Phase 1 12678709 Sciaroni Rd - Slip Below Road 13072310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272378 Silva Valley Parkway/Harvard Way Intersection Improvements 13477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13676108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13877115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14078715 Starkes Grade Rd - Slip Below Road 14278705 String Canyon Rd - Slip Below Road 144
TIM Prog TIM Fee Program Projects 14653124 U.S. 50 HOV Lanes Phase 0 16672361 U.S. 50/Cameron Park Drive Interchange Improvements 17271319 U.S. 50/Camino Area Safety Project 17471359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 18471346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian
Restoration 18471338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19477118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 18878711 White Meadows Rd - Slide Dumped On And Shifted Road 20072381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento
County Line 202
Section 4.1 - West Slope Road and Bridge Program - 5-Year Projects78717 Airport Road - Slip Below Road 277123* Alder Drive at EID Canal - Bridge Replacement 477128* Bassi Road at Granite Creek - Bridge Replacement 697016 Bicycle/Pedestrian Counters - Class 1 Trails 877119* Blair Road at EID Canal - Bridge Replacement 1078716 Bucks Bar Rd - Sink Hole 1477116* Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement 1678710 Cable Road - Culvert Damage 1872143 Cameron Park Drive Widening - Palmer Drive to Hacienda Road 2077142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 2277139* Clear Creek Road at Clear Creek (PM 0.25) - Bridge Replacement 2477138* Clear Creek Road at Clear Creek (PM 1.82) - Bridge Replacement 2678701 Cosumnes Mine Rd 1 - Slip Below Road 2878712 Cosumnes Mine Rd 2 - Slip Below Road 3078700 Cosumnes Mine Rd. Bridge - Bridge Approach Wash Out 3272377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3471362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671361 Country Club Drive Extension - Tong Road to Bass Lake Road 3871360 Country Club Drive Realignment - Bass Lake Road to Tierra de Dios Drive 4072375 Diamond Springs Parkway - Phase 1A - SR-49 Realignment 4272334 Diamond Springs Parkway - Phase 1B 4472311 El Dorado Hills Blvd Class I Bike Path: Governor Drive to Brittany Place 4697012 El Dorado Trail - Los Trampas to Halcon 4897015 El Dorado Trail - Missouri Flat Road Bike/Pedestrain Overcrossing 5097014 El Dorado Trail - Missouri Flat Road to El Dorado 5278702 Fort Jim Road - Culvert Damage 5478707 Green Valley Rd - Slip Below Road 5677127* Green Valley Road at Indian Creek - Bridge Replacement 58
Page 20 of 39
Section 4.1 - West Slope Road and Bridge Program - 5-Year Projects, Continued77136* Green Valley Road at Mound Springs Creek - Bridge Replacement 6077109* Green Valley Road at Tennessee Creek - Bridge Replacement 6277114* Green Valley Road at Weber Creek - Bridge Replacement 6472376 Green Valley Road Widening from County Line to Sophia Parkway 6877137* Greenstone Road at Slate Creek - Bridge Replacement 7078704 Grizzly Flat Rd - Culvert Damage + Slip Below Road 7277135* Hanks Exchange at Squaw Hollow Creek - Bridge Replacement 7477140* Happy Valley Cutoff Road at Camp Creek - Bridge Maintenance Project 7678724 Happy Valley Road - Slip Below Road 7877125* Hazel Valley Road at EID Canal - Bridge Replacement 8077131* Ice House Road at Jones Fork Silver Creek - Bridge Maintenance Project 8472191 Ice House Road Pavement Rehab, Ph 2. 8672187 Ice House Road Rehabilitation 8878703 Kyburz Dr - Slide Dumped On Road 9066116 Latrobe Connection 9572312 Merrychase and Country Club Drive - Sidewalks and Class II and Class III Bike
Paths 9478714 Mosquito Rd - Culvert Damage 10077126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 10478713 Mt Aukum Rd - Sink Hole 10672308 New York Creek Trail East - Phase 2 10878706 Newtown Rd - Slip Below Road 11077122* Newtown Road at South Fork of Weber Creek - Bridge Replacement 11277134* Oak Hill Road at Squaw Hollow Creek - Bridge Replacement 11478708 Peavine Ridge Rd - Slip Below Road and Culvert Damage 11673320 Pleasant Valley Road (SR 49)/Patterson Drive Intersection Signalization 11878718 Pony Express Trail Slipout 12077117* Rubicon Trail at Ellis Creek - Bridge Replacement 12273362 Salmon Falls Road South of Glenesk Lane Realignment 12471324 Saratoga Way Extension - Phase 1 12678709 Sciaroni Rd - Slip Below Road 13072310 Silva Valley Parkway Class 1 and Class 2 Bike Lanes (Harvard to Green Valley) 13272378 Silva Valley Parkway/Harvard Way Intersection Improvements 13477124* Silver Fork Road at South Fork American River - Bridge Rehabilitation 13676108 Silver Springs Pkwy to Bass Lake Rd (south segment) 13877115* Sly Park Road at Clear Creek Crossing - Bridge Replacement 14078715 Starkes Grade Rd - Slip Below Road 14278705 String Canyon Rd - Slip Below Road 144
TIM Prog TIM Fee Program Projects 14653124 U.S. 50 HOV Lanes Phase 0 16672361 U.S. 50/Cameron Park Drive Interchange Improvements 17271319 U.S. 50/Camino Area Safety Project 17471359 U.S. 50/Missouri Flat Road Interchange - Phase 1B.2 182
71346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian Restoration 184
71328 U.S. 50/Silva Valley Parkway Interchange - Phase 1 19271368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 19477118* Wentworth Springs Road at Gerle Creek - Bridge Replacement 18878711 White Meadows Rd - Slide Dumped On And Shifted Road 200
72381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento County Line 202
Page 21 of 39
Section 4.1 - West Slope Road and Bridge Program - Ten-Year Projects77142* Cedar Ravine Rd at Weber Creek - Bridge Rehabilitation 2272377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 3471362 Country Club Drive Extension - Silva Valley Parkway to Tong Road 3671361 Country Club Drive Extension - Tong Road to Bass Lake Road 38GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 6666116 Latrobe Connection 95OP005 Metal Beam Guardrail Installation - Various Locations 9677126* Mosquito Road Bridge at South Fork American River 10277129* Mount Murphy Road at South Fork American River - Bridge Replacement 104
TIM Prog TIM Fee Program Projects 11053117 U.S. 50 Auxiliary Lane Westbound - Bass Lake Road to Silva Valley Parkway 15871330 U.S. 50/Bass Lake Road Interchange Improvements 16871332 U.S. 50/Cambridge Road Interchange Improvements 17071323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871368 U.S. 50/Silva Valley Parkway Interchange - Phase 1 Landscape 17472381 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento
County Line 20272374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva
Valley Parkway Interchange 204
Section 4.1 - West Slope Road and Bridge Program - 20-Year ProjectsBridge Bridge Program Match 1372377 Country Club Drive Extension - El Dorado Hills Blvd to Silva Valley Parkway 34GP178 Green Valley Road Widening - Francisco to Silva Valley Parkway 6671375 Headington Road Extension - Missouri Flat Road to El Dorado Road 8272142 Missouri Flat Rd Widening - China Garden to SR49 98GP147 Saratoga Way Extension - Phase 2 128TIM Prog TIM Fee Program Projects 146Traffic Traffic Signal and Intersection Operational Improvements 14753118 Transit Service Improvements 149GP148 U.S. 50 Auxiliary Lane Eastbound - Bass Lake Road to Cambridge Road 15053126 U.S. 50 Auxiliary Lane Eastbound - Cambridge Rd to Cameron Park Dr 15253127 U.S. 50 Auxiliary Lane Eastbound - Cambridge to Cameron Park Drive 154
53125 U.S. 50 Auxiliary Lane Eastbound - Sacramento County Line to El Dorado Hills Blvd 156GP149 U.S. 50 Auxiliary Lane Westbound - Cambridge Road to Bass Lake Road 160
53115 U.S. 50 Auxiliary Lane Westbound - El Dorado Hills Boulevard to Sacramento County Line 162
53128 U.S. 50 Auxiliary Lane Westbound - Ponderosa Rd to Cameron Park Dr 16471332 U.S. 50/Cambridge Road Interchange Improvements 17072361 U.S. 50/Cameron Park Drive Interchange Improvements 17271323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 17671347 U.S. 50/El Dorado Road Interchange Improvements - Ph 1 17871376 U.S. 50/El Dorado Road Interchange Phase 2 18071338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 18671339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 18871333 U.S. 50/Ponderosa Rd/So. Shingle Rd Interchange Improvements 19071345 U.S. 50/Silva Valley Parkway Interchange - Phase 2 - On Ramps and Auxiliary
Lanes on U.S. 50 196
72374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva Valley Parkway Interchange 204
Page 22 of 39
Tahoe EIP - Index by Project ScheduleProject Number Project Name Page #
Section 4.2 - Tahoe EIP Projects - Current Year Projects78723 Angora Creek Road Damage 272380 Apache Avenue/US Highway 50 Intersection Improvement Project 495191 Country Club Heights Erosion Control Project 1095157 CSA #5 Erosion Control Project 1278725 Elks Club Drive Sinkhole 1678721 Evelyn Way Road Failure 1878726 Fallen Leaf Road Washout 2095195 Forest View Water Quality Project 2295176 Golden Bear Erosion Control Project 2695708 Highway 89 Class 1 Trail 2895163 Lake Tahoe Boulevard Erosion Control Project 3095175 Lake Tahoe Boulevard SEZ Project 3278722 Lakeview Avenue Road Failure 3473120 Meyers Corridor Operational Improvement Project 3695179 Meyers Stream Environment Zone/Erosion Control Project 38
95170 Montgomery Estates Area 2 Erosion Control Project40
95172 Montgomery Estates Area 3 Erosion Control Project 4295177 Oflyng Water Quality Project 4672379 Pioneer Trail / US 50 Intersection Safety Improvement Project 5095117 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St 5295192 Sawmill 2B Bike Path and Erosion Control Project 5695171 Tahoe Hills Erosion Control Project 60
Section 4.2 - Tahoe EIP Projects - 5- Year Projects78723 Angora Creek Road Damage 272380 Apache Avenue/US Highway 50 Intersection Improvement Project 495191 Country Club Heights Erosion Control Project 1095157 CSA #5 Erosion Control Project 1278725 Elks Club Drive Sinkhole 1678721 Evelyn Way Road Failure 1878726 Fallen Leaf Road Washout 2095195 Forest View Water Quality Project 2295176 Golden Bear Erosion Control Project 2695708 Highway 89 Class 1 Trail 2895163 Lake Tahoe Boulevard Erosion Control Project 3095175 Lake Tahoe Boulevard SEZ Project 3278722 Lakeview Avenue Road Failure 3473120 Meyers Corridor Operational Improvement Project 3695179 Meyers Stream Environment Zone/Erosion Control Project 3895170 Montgomery Estates Area 2 Erosion Control Project 4095172 Montgomery Estates Area 3 Erosion Control Project 4295177 Oflyng Water Quality Project 46
72379 Pioneer Trail / US 50 Intersection Safety Improvement Project50
95117 San Bernardino Class 1 Bikepath - East San Bernardino St to West San Bernardino St 5295192 Sawmill 2B Bike Path and Erosion Control Project 5695171 Tahoe Hills Erosion Control Project 60
Page 23 of 39
Airport Capital Improvement Program - Index by Project ScheduleProject Number Project Name Page #
Section 4.3A - Georgetown Airport - Current Year Projects93527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes;
Change Runway End ID 893503 Obstruction Survey 10
Section 4.3B - Placerville Airport - Current Year Projects93132 Airport Layout Plan Update and Obstruction Survey - Placerville 2293133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes -
2019 2493130 Taxiway Edge Lights 26
Section 4.3A - Georgetown Airport - 5-Year Projects93523 Airport Layout Plan 2024 Update - Georgetown 293520 Construction of AWOS 493535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693527 Crack Seal, Joint Seal & Mark Runway, Taxiways, Aprons & T-Hangar Taxilanes;
Change Runway End ID 893503 Obstruction Survey 1093536 Relocate Taxiway A Connector 1293537 Runway Pavement Closure for Runway Safety Area 1493538 Runway Protection Zone Land Acquisition 16
Section 4.3B - Placerville Airport - 5-Year Projects93132 Airport Layout Plan Update and Obstruction Survey - Placerville 22
93133 Crack Seal and Remark Runway 5-23, Taxiways, Aprons and T- Hangar Taxilanes - 20192493130 Taxiway Edge Lights 26
Section 4.3A - Georgetown Airport - 10-Year Projects93523 Airport Layout Plan 2024 Update - Georgetown 293520 Construction of AWOS 493535 Crack Seal and Remark Runway, Taxiways, Aprons and T- Hangar Taxilanes 693538 Runway Protection Zone Land Acquisition 16
Page 25 of 39
Transportation Facilities Improvement Program - Index by Project ScheduleProject Number Project Name Page #
Section 4.4 - Transportation Facilities Improvement Current Year Projects81134 Headington Wash Rack Facility Project 2
Page 27 of 39
Capital Overlay and Rehabilitation Program - Index by Project ScheduleProject Number Project Name Page #
Section 4.5 - Capital Overlay and Rehabilitation Program - Current Year Projects
72193 Overlay - El Dorado Hills Blvd. 272190 Overlay - Patterson Drive and Missouri Flat Road 4
Page 29 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
Wes
t S
lop
e
17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
5312
4C
U.S
. 50
HO
V L
anes
Pha
se 0
17.7
71
7132
4P
DR
CS
arat
oga
Way
Ext
ensi
on -
Pha
se 1
C9.
332
7132
8R
CU
.S. 5
0/S
ilva
Val
ley
Par
kway
Inte
rcha
nge
- P
hase
154
.40
3
7134
6C
U.S
. 50/
Mis
sou
ri F
lat R
oad
Inte
rcha
nge
Impr
ovem
ents
- P
hase
1C
Rip
ar1.
874
EE
EE
E
7135
9C
U.S
. 50/
Mis
sou
ri F
lat R
oad
Inte
rcha
nge
- P
hase
1B
.22.
185
7136
0P
CC
oun
try
Clu
b D
rive
Rea
lignm
ent -
Bas
s La
ke R
oad
to T
ierr
a de
Dio
s D
riC
7.48
6
7136
8D
CU
.S. 5
0/S
ilva
Val
ley
Par
kway
Inte
rcha
nge
- P
hase
1 L
ands
cape
2.20
7E
EE
EE
7218
7C
Ice
Hou
se R
oad
Reh
abili
tatio
n5.
728
7230
8C
New
Yor
k C
ree
k T
rail
Eas
t - P
hase
21.
459
7231
0C
Silv
a V
alle
y P
ark
way
Cla
ss 1
and
Cla
ss 2
Bik
e L
anes
(H
arva
rd to
Gre
en1.
9410
E
7237
5P
DC
Dia
mon
d S
prin
gs P
arkw
ay -
Pha
se 1
A -
SR
-49
Rea
lignm
ent
C14
.21
11
7332
0C
Ple
asan
t Val
ley
Roa
d (S
R 4
9)/P
atte
rson
Driv
e In
ters
ectio
n S
igna
lizat
ion
4.81
12
7336
2C
Sal
mon
Fal
ls R
oad
Sou
th o
f Gle
nesk
Lan
e R
ealig
nmen
t1.
7113
7711
5*D
RC
Sly
Par
k R
oad
at C
lear
Cre
ek C
ross
ing
- B
ridge
Rep
lace
men
tC
5.82
14
7711
9*C
Bla
ir R
oad
at E
ID C
anal
- B
ridge
Rep
lace
men
t1.
9315
7712
3*C
Ald
er D
rive
at E
ID C
anal
- B
ridge
Rep
lace
men
t1.
1316
7712
4*D
RC
Silv
er F
ork
Roa
d at
Sou
th F
ork
Am
eric
an R
iver
- B
ridge
Reh
abili
tatio
nC
2.55
17
7712
5*D
CH
azel
Val
ley
Roa
d at
EID
Can
al -
Brid
ge R
epla
cem
ent
3.03
18E
7712
8*D
CB
assi
Roa
d at
Gra
nite
Cre
ek -
Brid
ge R
epla
cem
ent
C3.
8719
EE
7713
1*C
Ice
Hou
se R
oad
at J
ones
For
k S
ilver
Cre
ek -
Bri
dge
Mai
nten
ance
Pro
je1.
1220
7713
8*D
RC
Cle
ar C
reek
Roa
d at
Cle
ar C
reek
(P
M 1
.82)
- B
ridge
Rep
lace
men
tC
4.36
21E
7713
9*D
RC
Cle
ar C
reek
Roa
d at
Cle
ar C
reek
(P
M 0
.25)
- B
ridge
Rep
lace
men
tC
4.46
22E
7714
0*C
Hap
py
Val
ley
Cut
off R
oad
at C
amp
Cre
ek -
Brid
ge M
aint
enan
ce P
roje
ct0.
3723
7870
0P
DR
CC
osum
nes
Min
e R
d. B
ridge
- B
ridge
App
roac
h W
ash
Out
1.11
24
7870
1P
DR
CC
osum
nes
Min
e R
d 1
- S
lip B
elow
Roa
d1.
8025
7870
2P
DR
CF
ort J
im R
oad
- C
ulve
rt D
amag
e1.
5226
7870
3P
CK
ybur
z D
r -
Slid
e D
umpe
d O
n R
oad
0.43
27
7870
4P
DR
CG
rizzl
y F
lat R
d -
Cul
vert
Da
mag
e +
Slip
Bel
ow R
oad
0.51
28
7870
5P
DR
CS
trin
g C
anyo
n R
d -
Slip
Bel
ow R
oad
0.53
29
7870
6P
DR
CN
ewto
wn
Rd
- S
lip B
elow
Roa
d2.
1630
7870
7P
DR
CG
reen
Val
ley
Rd
- S
lip B
elow
Roa
d1.
4831
7870
8P
DR
CP
eavi
ne R
idge
Rd
- S
lip B
elow
Roa
d an
d C
ulve
rt D
amag
e0.
5632
7870
9P
DR
CS
ciar
oni R
d -
Slip
Bel
ow R
oad
0.85
33
7871
0P
DC
Cab
le R
oad
- C
ulve
rt D
amag
e0.
6134
7871
1P
DR
CW
hite
Mea
dow
s R
d -
Slid
e D
umpe
d O
n A
nd S
hifte
d R
oad
0.91
35
7871
2P
DR
CC
osum
nes
Min
e R
d 2
- S
lip B
elow
Roa
d1.
1036
7871
3C
Mt A
ukum
Rd
- S
ink
Hol
e0.
8537
7871
4P
DC
Mos
quito
Rd
- C
ulve
rt D
am
age
0.73
38
7871
5P
DR
CS
tark
es G
rade
Rd
- S
lip B
elow
Roa
d1.
0939
7871
6C
Buc
ks B
ar R
d -
Sin
k H
ole
0.55
40
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
0 P
MP
age
1 of
8
Page 31 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
Wes
t S
lop
e
17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
7871
7P
DR
CA
irpor
t Roa
d -
Slip
Bel
ow R
oad
0.60
41
7871
8P
DR
CP
ony
Exp
ress
Tra
il S
lipou
t0.
9542
7872
4P
DR
CH
app
y V
alle
y R
oad
- S
lip B
elow
Roa
d0.
8743
9701
2D
CE
l Dor
ado
Tra
il -
Los
Tra
mpa
s to
Hal
con
C1.
2244
9701
6P
DC
Bic
ycle
/Ped
est
rian
Cou
nter
s -
Cla
ss 1
Tra
ils0.
2745
7131
9P
DR
U.S
. 50/
Ca
min
o A
rea
Saf
ety
Pro
ject
DR
CC
C4.
1446
7214
3P
DC
amer
on P
ark
Driv
e W
iden
ing
- P
alm
er D
rive
to H
acie
nda
Roa
dD
CC
1.32
47
7231
1D
RE
l Dor
ado
Hill
s B
lvd
Cla
ss I
Bik
e P
ath:
Gov
erno
r D
rive
to B
ritta
ny P
lace
C1.
1448
7231
2P
DR
Mer
rych
ase
and
Cou
ntry
Clu
b D
rive
- S
idew
alks
and
Cla
ss II
and
Cla
ss I
C0.
9049
7237
8D
Silv
a V
alle
y P
ark
way
/Har
vard
Way
Inte
rsec
tion
Impr
ovem
ents
DC
0.61
50
7610
8P
DR
Silv
er S
prin
gs P
kwy
to B
ass
Lake
Rd
(so
uth
segm
ent)
RC
C9.
4651
E
7712
2*D
RN
ewto
wn
Roa
d at
Sou
th F
ork
of W
eber
Cre
ek -
Brid
ge R
epla
cem
ent
DC
C5.
6652
E
7713
4*D
RO
ak H
ill R
oad
at S
quaw
Hol
low
Cre
ek -
Brid
ge R
epla
cem
ent
DR
CC
4.07
53E
E
7713
5*P
DR
Han
ks E
xcha
nge
at S
quaw
Hol
low
Cre
ek -
Brid
ge R
epla
cem
ent
DR
CC
4.09
54E
E
7713
7*P
DR
Gre
enst
one
Roa
d at
Sla
te C
reek
- B
ridge
Rep
lace
men
tC
C3.
6455
EE
9701
4P
DR
El D
orad
o T
rail
- M
isso
uri F
lat R
oad
to E
l Dor
ado
DC
C4.
2156
9701
5P
DR
El D
orad
o T
rail
- M
isso
uri F
lat R
oad
Bik
e/P
edes
tra
in O
verc
ross
ing
DC
C2.
8157
7711
6*P
DR
Buc
ks B
ar R
oad
at th
e N
orth
For
k C
osum
nes
Riv
er -
Brid
ge R
epla
cem
eD
RR
CC
8.56
58E
E
7712
7*P
DR
Gre
en V
alle
y R
oad
at In
dian
Cre
ek -
Bri
dge
Rep
lace
men
tD
RC
C5.
5759
EE
7713
6*P
DR
Gre
en V
alle
y R
oad
at M
ound
Spr
ings
Cre
ek -
Brid
ge R
epla
cem
ent
DR
CC
5.60
60E
E
7219
1P
Ice
Hou
se R
oad
Pav
emen
t Reh
ab, P
h 2.
PD
RP
DR
C9.
6761
7233
4D
RD
iam
ond
Spr
ings
Par
kway
- P
hase
1B
DR
DR
DC
C28
.29
62E
E
7712
6*P
DR
Mos
quito
Roa
d B
ridge
at S
outh
For
k A
mer
ican
Riv
erD
RD
RD
CC
C69
.92
63
7712
9*P
Mou
nt M
urph
y R
oad
at S
outh
For
k A
mer
ican
Riv
er -
Brid
ge R
epla
cem
enP
DR
DR
DR
CC
23.0
664
7238
1P
DW
hite
Roc
k R
oad
Wid
enin
g (2
to 4
lane
s) -
Man
ches
ter
Driv
e to
Sac
ram
PD
PD
PD
DR
C4.
4365
7236
1P
U.S
. 50/
Ca
mer
on P
ark
Driv
e In
terc
han
ge Im
prov
emen
tsP
PD
RC
87.2
866
7237
6D
RG
reen
Val
ley
Roa
d W
iden
ing
from
Cou
nty
Line
to S
oph
ia P
ark
way
0.09
67
7710
9*G
reen
Val
ley
Roa
d at
Ten
ness
ee C
reek
- B
ridge
Rep
lace
men
t6.
0468
EE
EE
E
7711
4*G
reen
Val
ley
Roa
d at
Web
er C
reek
- B
ridge
Rep
lace
men
t12
.12
69E
EE
EE
7711
7*R
ubic
on T
rail
at E
llis
Cre
ek -
Brid
ge R
epla
cem
ent
1.17
70E
7711
8*W
entw
orth
Spr
ings
Roa
d at
Ger
le C
ree
k -
Brid
ge R
epla
cem
ent
1.47
71E
7136
1C
oun
try
Clu
b D
rive
Ext
ensi
on -
Ton
g R
oad
to B
ass
Lake
Roa
dP
PD
PD
DR
C12
.45
72
7136
2C
oun
try
Clu
b D
rive
Ext
ensi
on -
Silv
a V
alle
y P
arkw
ay to
Ton
g R
oad
PP
DP
DP
DR
C8.
2473
7714
2*C
eda
r R
avin
e R
d at
Web
er C
reek
- B
ridge
Reh
abili
tatio
nP
PD
DD
RC
3.25
74
7237
7C
ount
ry C
lub
Driv
e E
xten
sion
- E
l Dor
ado
Hill
s B
lvd
to S
ilva
Val
ley
Par
kP
PP
DD
RC
10.7
575
5311
7U
.S. 5
0 A
uxili
ary
Lane
Wes
tbou
nd -
Bas
s La
ke R
oad
to S
ilva
Va
lley
Par
PD
C5.
4776
6611
6La
tro
be C
onne
ctio
nP
DC
0.72
77
7132
3U
.S. 5
0/E
l Dor
ado
Hill
s B
oule
vard
Inte
rcha
nge
Imp
rove
men
ts -
Pha
se 2
PD
CC
8.65
78
7133
0U
.S. 5
0/B
ass
Lak
e R
oad
Inte
rcha
nge
Impr
ovem
ents
PD
CC
5.87
79
OP
005
Met
al B
eam
Gua
rdra
il In
stal
latio
n -
Var
ious
Loc
atio
nsD
C0.
6780
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
0 P
MP
age
2 of
8
Page 32 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
Wes
t S
lop
e
17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
7133
2U
.S. 5
0/C
am
brid
ge R
oad
Inte
rcha
nge
Impr
ovem
ents
PD
C8.
6181
7133
8U
.S. 5
0/P
onde
rosa
Rd
Inte
rcha
nge
- D
uroc
k R
d R
ealig
nmen
tD
RC
9.88
82E
7133
9U
.S. 5
0/P
onde
rosa
Rd
Inte
rcha
nge
- N
. Shi
ngle
Rd
Rea
lignm
ent
DR
C6.
9383
E
7134
7U
.S. 5
0/E
l Dor
ado
Roa
d In
terc
hang
e Im
prov
emen
ts -
Ph
1P
DR
C5.
1684
7237
4W
hite
Roc
k R
oad
Wid
enin
g (2
to 4
lane
s) -
Mon
te V
erde
Driv
e to
US
50/
PD
RC
5.62
85
GP
178
Gre
en V
alle
y R
oad
Wid
enin
g -
Fra
ncis
co to
Silv
a V
alle
y P
arkw
ayP
PD
RC
6.03
86
5311
5U
.S. 5
0 A
uxili
ary
Lane
Wes
tbou
nd -
El D
orad
o H
ills
Bou
leva
rd to
Sac
raP
DC
5.62
87
5311
8T
rans
it S
ervi
ce Im
prov
emen
tsC
6.99
88
5312
5U
.S. 5
0 A
uxili
ary
Lane
Eas
tbou
nd -
Sac
ram
ento
Cou
nty
Line
to E
l Dor
adP
DC
6.51
89
5312
6U
.S. 5
0 A
uxili
ary
Lane
Eas
tbou
nd -
Cam
brid
ge R
d to
Cam
eron
Par
k D
rP
DC
8.74
90
5312
7U
.S. 5
0 A
uxili
ary
Lane
Eas
tbou
nd -
Cam
eron
Par
k D
rive
to P
onde
rosa
RP
DC
8.38
91
5312
8U
.S. 5
0 A
uxili
ary
Lane
Wes
tbou
nd -
Pon
dero
sa R
d to
Cam
eron
Par
k D
rP
DC
8.96
92
7133
3U
.S. 5
0/P
onde
rosa
Rd/
So.
Shi
ngle
Rd
Inte
rcha
nge
Impr
ovem
ents
DR
C22
.63
93
7134
5U
.S. 5
0/S
ilva
Val
ley
Par
kway
Inte
rcha
nge
- P
hase
2 -
On
Ram
ps a
nd A
PD
C7.
6694
7137
5H
ead
ingt
on R
oad
Ext
ensi
on
- M
isso
uri F
lat R
oad
to E
l Dor
ado
Roa
dP
DC
6.50
95E
7137
6U
.S. 5
0/E
l Dor
ado
Roa
d In
terc
hang
e P
hase
2P
DR
C10
.48
96
7214
2M
isso
uri F
lat R
oad
Wid
enin
g -
Chi
na G
arde
n to
Ple
asan
t Val
ley
Roa
d/S
PD
C3.
9297
GP
147
Sar
atog
a W
ay E
xten
sion
- P
hase
2P
DR
C3.
3198
GP
148
U.S
. 50
Aux
iliar
y La
ne E
astb
ound
- B
ass
Lake
Roa
d to
Cam
brid
ge R
oad
PD
C8.
8399
GP
149
U.S
. 50
Aux
iliar
y La
ne W
estb
ound
- C
ambr
idge
Roa
d to
Bas
s La
ke R
oa
PD
C8.
6910
0
*
Not
es:
1. P
roje
ct 5
3118
- T
rans
it S
ervi
ce Im
prov
emen
ts: $
6,98
6,00
0 is
incl
ude
d in
the
20
-Yea
r pr
ogra
m fo
r bu
s fle
et e
xpan
sion
and
new
Par
k an
d R
ide
faci
litie
s.
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
0 P
MP
age
3 of
8
Page 33 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
CO
RP
17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
7219
0C
Ove
rlay
- P
atte
rson
Driv
e a
nd M
isso
uri F
lat R
oad
1.09
101
7219
3P
DO
verla
y -
El D
orad
o H
ills
Blv
d.D
RC
5.40
102
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
0 P
MP
age
4 of
8
Page 34 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
Air
po
rts-
Pla
cerv
ille
17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
9313
0D
CT
axiw
ay E
dge
Ligh
ts0.
7410
3
9313
3P
DC
rack
Sea
l and
Rem
ark
Run
way
5-2
3, T
axiw
ays,
Apr
ons
and
T-
Han
gar
DC
C0.
6310
4
9313
2P
Airp
ort L
ayou
t Pla
n U
pdat
e an
d O
bstr
uctio
n S
urve
y -
Pla
cerv
ille
PP
PC
0.66
105
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
0 P
MP
age
5 of
8
Page 35 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
Air
po
rts-
Geo
rget
ow
n 17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
9352
7D
CC
rack
Sea
l, Jo
int S
eal &
Mar
k R
unw
ay, T
axiw
ays,
Apr
ons
& T
-Han
gar
T0.
7210
6
9350
3P
Obs
truc
tion
Sur
vey
C0.
5710
7
9353
7R
unw
ay P
avem
ent C
losu
re fo
r R
unw
ay S
afet
y A
rea
PD
DC
C0.
5610
8
9353
6R
eloc
ate
Tax
iway
A C
onn
ecto
rP
DD
CC
0.58
109
9352
0C
onst
ruct
ion
of A
WO
SP
DC
0.27
110
9353
5C
rack
Sea
l and
Rem
ark
Run
way
, Tax
iwa
ys, A
pron
s an
d T
- H
ang
ar T
axil
PD
C0.
3211
1
9352
3A
irpor
t Lay
out P
lan
2024
Upd
ate
- G
eorg
etow
nP
0.09
112
9353
8R
unw
ay P
rote
ctio
n Z
one
Land
Acq
uisi
tion
PR
0.19
113
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
1 P
MP
age
6 of
8
Page 36 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
Fac
iliti
es
17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
8113
4H
eadi
ngto
n W
ash
Rac
k F
acili
ty P
roje
ctD
C1.
4911
4
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
1 P
MP
age
7 of
8
Page 37 of 39
Proj
ect #
Nam
eTo
tal
Cos
t($
M)
PD
= R
ight
of W
ay
RC
= P
lann
ing/
Env
ironm
enta
l =
Des
ign
= C
onst
ruct
ion
* =
Brid
ge P
roje
cts
Pro
ject
Su
mm
ary
Tab
le -
Tah
oe
17/1
818
/19
19/2
020
/21
21/2
222
/23-
26/2
727
/28-
36/3
7
E =
Env
iron
men
tal M
onito
ring
7872
1D
RC
Eve
lyn
Way
Roa
d F
ailu
re0.
2311
5
7872
2D
RC
Lake
view
Ave
nue
Roa
d F
ailu
re0.
1911
6
7872
3D
RC
Ang
ora
Cre
ek R
oad
Dam
age
0.21
117
7872
5D
RC
Elk
s C
lub
Driv
e S
inkh
ole
0.46
118
7872
6D
RC
Fal
len
Leaf
Roa
d W
asho
ut0.
2011
9
9517
7P
DC
Ofly
ng W
ater
Qua
lity
Pro
ject
CC
0.87
120
EE
EE
9517
9C
Mey
ers
Str
eam
Env
ironm
ent
Zon
e/E
rosi
on C
ontr
ol P
roje
ct2.
5412
1E
EE
9519
1D
CC
oun
try
Clu
b H
eigh
ts E
rosi
on C
ontr
ol P
roje
ct1.
1312
2E
EE
7238
0P
Apa
che
Ave
nue/
US
Hig
hway
50
Inte
rsec
tion
Impr
ovem
ent P
roje
ctD
C0.
5112
3
9511
7P
San
Ber
nard
ino
Cla
ss 1
Bik
epat
h -
Eas
t San
Ber
nard
ino
St t
o W
est S
anP
DR
CD
CC
1.61
124
EE
E
9515
7P
DC
SA
#5
Ero
sion
Con
trol
Pro
ject
DC
1.54
125
EE
7237
9P
DP
ione
er T
rail
/ US
50
Inte
rsec
tion
Saf
ety
Impr
ovem
ent P
roje
ctP
DC
C4.
5012
6E
E
9570
8P
DH
ighw
ay 8
9 C
lass
1 T
rail
PD
CC
2.11
127
EE
7312
0P
Mey
ers
Cor
ridor
Ope
ratio
nal I
mpr
ove
men
t Pro
ject
0.33
128
9516
3La
ke T
ahoe
Bou
leva
rd E
rosi
on C
ontr
ol P
roje
ct0.
7212
9E
9517
0M
ontg
omer
y E
stat
es A
rea
2 E
rosi
on C
ontr
ol P
roje
ct0.
9713
0E
9517
1T
ahoe
Hill
s E
rosi
on C
ontr
ol P
roje
ct0.
8013
1E
9517
2M
ontg
omer
y E
stat
es A
rea
3 E
rosi
on C
ontr
ol P
roje
ct0.
5213
2E
9517
5La
ke T
ahoe
Bou
leva
rd S
EZ
Pro
ject
0.29
133
E
9517
6G
olde
n B
ear
Ero
sion
Con
trol
Pro
ject
0.34
134
E
9519
2S
awm
ill 2
B B
ike
Pat
h an
d E
rosi
on C
ontr
ol P
roje
ct2.
8913
5E
9519
5F
ores
t Vie
w W
ater
Qua
lity
Pro
ject
0.38
136
E
9519
8S
an B
erna
rdin
o W
ater
Qua
lity
Pro
ject
PD
CC
C0.
7513
7E
EE
E
9519
7D
elaw
are
Wat
er
Qua
lity
Pro
ject
PD
CC
C0.
7513
8E
EE
9517
4C
hiap
a E
rosi
on C
ontr
ol P
roje
ctP
DD
RC
2.08
139
E
9518
0G
lenr
idge
Ero
sion
Con
trol
Pro
ject
PP
DD
RC
2.83
140
E
9516
8S
outh
Upp
er T
ruck
ee I
Ero
sion
Con
trol
Pro
ject
PD
RC
0.60
141
EE
9518
7C
old
Cre
ek F
ishe
ries
Enh
ance
men
t Pro
ject
PD
RC
1.82
142
E
9516
6N
orth
Upp
er T
ruck
ee S
EZ
Res
tora
tion
Pro
ject
P0.
0414
3
9583
8P
asse
nger
Fac
ility
P0.
0214
4
CIP
Pro
gram
.mdb
/Pro
ject
Sum
mar
yGrid
5/19
/201
7 3:
40:1
1 P
MP
age
8 of
8
Page 38 of 39
Figures and Tables
FIGURES Section 1 – Executive Summary:
1-1 CIP/Budget Cycle 1-2 Major Five-Year CIP/TIM Fee Update Cycle 1-3 Annual CIP Cycle 1-4 Sources of Revenue for Transportation CIP 1-5 Tahoe EIP Annual Updating Process 1-6 Airport Annual Updating Process 1-7 CORP Annual Updating Process 1-8 ACIP Annual Updating Process
TABLES Section 1 – Executive Summary:
1-1 West Slope Road/Bridge Current-Year Construction Projects 1-2 West Slope Road/Bridge Current-Year Planning, Design or Right of Way
Projects 1-3 Current Year Airport Projects 1-4 Current Year CORP Projects 1-5 CORP Infrastructure Options List
Page 39 of 39