NOTES: N Liara Bridge Road Finnigan Road Maxwell Road ...

1
NOTES: 1. This drawing contains x-ref: X-OsmapA2-01, and X-HMPEA2-01. 2. All dimensions are in metres unless stated otherwise. 3. The specification for the works shall be based on SHW and PCC standard details. 4. This drawing is for feasibility layout only. Royal Citadel Madeira Road NCN27 Waterfront - The Hoe and City Centre Madeira Road Mayflower steps National Marine Aquarium Marina Victoria Pier Breakwater Hill LAIRA BRIDGE Swing Bridge Teats Hill Road Liara Bridge Road Commercial Road Widened footway for shared use path. Prince Rock Highways Depot Breakwater Hill is an off road elevated path with views accross harbour, marina and out to sea. Segregated off road cycle/pedestrian path NCN2 to Embankment Road and Saltram National Trust site Maxwell Road Finnigan Road Finnigan Road Cattedown Road Clovelly Road Breakwater Hill PL2005772-121 Sheet 2 PL2005772-121 Sheet 3 PL2005772-121 Sheet 4 Sheet 5 .PL2005772-121 FP FP FP FP FP FP FP FP FP FP FP FP FP B B B B B Benches Bench B B B B B B B B FP FP FP FP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP FP Cycle lanes 2m wide along quiet industrial estate Commercial Wharf B Barbican Leisure Park Laira Rail Bridge recently opened for Pedestrians and cyclists connecting to NCN27, Plymstock, Devon and Saltram National Trust site. Shapters Way Mount Batten BARBICAN Barbican P01 Initial issue only HA HA 13/11/15 File ref - p:\pth structures\pl2005772 the ride to broxton drivew&c\5.0 cad - drawings\work area\highways\1 live drawings\pl2005772-fea-120-121 p2 122-124 p1 element 2-barbican to laira rail bridge-sheet 1 to 5.dwg 0 100 Drawing No Project Name Drawing Title Original Drg Size : Scale : Dimensions : A3 Revision Revision details Drawn: Checked: Approved: Designed: Rev Chkd Appd Date Date: Date: Date: Date: Drawing Status Suitability Prince Rock Depot | Macadam Road | Plymouth | PL4 0RZ Public Helpdesk 01752 668000 OVW 13/11/15 OVW 13/11/15 HA 13/11/15 HA 13/11/15 Eastern Corridor and City Centre Strategic Cycle Network Element 2: Barbican to Laira Rail Bridge Sheet 1 of 5 - Overview Plan 1:6000 m WORK-IN-PROGRESS S0 PL2005772-FEA-120 P02 ¤ N P02 amended to clients requirements HA HA 17/11/15

Transcript of NOTES: N Liara Bridge Road Finnigan Road Maxwell Road ...

Page 1: NOTES: N Liara Bridge Road Finnigan Road Maxwell Road ...

NOTES:

1. This drawing contains x-ref: X-OsmapA2-01,

and X-HMPEA2-01.

2. All dimensions are in metres unless stated

otherwise.

3. The specification for the works shall be based

on SHW and PCC standard details.

4. This drawing is for feasibility layout only.

Royal

Citadel

Madeira Road NCN27

Waterfront - The Hoe

and City Centre

M

a

d

e

ira

R

o

a

d

Mayflower

steps

National Marine

Aquarium

Marina

Victoria

Pier

Breakwater

Hill

LAIRA

BRIDGE

Swing

Bridge

T

e

a

ts

H

ill R

o

a

d

L

i

a

r

a

B

r

i

d

g

e

R

o

a

d

C

o

m

m

e

r

c

i

a

l

R

o

a

d

Widened footway for

shared use path.

Prince Rock

Highways

Depot

Breakwater Hill is an off

road elevated path with

views accross harbour,

marina and out to sea.

Segregated off road

cycle/pedestrian path

NCN2 to Embankment

Road and Saltram

National Trust site

M

a

x

w

e

l

l

R

o

a

d

F

i

n

n

i

g

a

n

R

o

a

d

F

i

n

n

i

g

a

n

R

o

a

d

C

attedow

n R

oad

C

lo

v

e

lly

R

o

a

d

B

r

e

a

k

w

a

t

e

r

H

i

l

l

PL2005772-121 Sheet 2

PL2005772-121 Sheet 3

PL2005772-121 Sheet 4

Sheet 5

.PL2005772-121

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

B

B

B

B

B

Benches

Bench

B

B

B

B

B

B

B

B

FP

FP

FP

FP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

FP

Cycle lanes 2m wide

along quiet industrial

estate

Commercial

Wharf

B

Barbican

Leisure Park

Laira Rail Bridge recently

opened for Pedestrians

and cyclists connecting to

NCN27, Plymstock, Devon

and Saltram National

Trust site.

S

h

a

p

t

e

r

s

W

a

y

Mount

Batten

BARBICAN

B

a

r

b

ic

a

n

P01 Initial issue only HA HA 13/11/15

File ref - p:\pth structures\pl2005772 the ride to broxton drivew&c\5.0 cad - drawings\work area\highways\1 live drawings\pl2005772-fea-120-121 p2 122-124 p1 element 2-barbican to laira rail bridge-sheet 1 to 5.dwg

0 100

Drawing No

Project Name

Drawing Title

Original Drg Size : Scale :

Dimensions :

A3

Revision

Revision details

Drawn:

Checked:

Approved:

Designed:

Rev Chkd Appd Date

Date:

Date:

Date:

Date:

Drawing Status Suitability

Prince Rock Depot | Macadam Road | Plymouth | PL4 0RZ

Public Helpdesk 01752 668000

OVW 13/11/15

OVW 13/11/15

HA 13/11/15

HA 13/11/15

Eastern Corridor and City

Centre Strategic Cycle

Network

Element 2:

Barbican to Laira Rail Bridge

Sheet 1 of 5 - Overview Plan

1:6000

m

WORK-IN-PROGRESS S0

PL2005772-FEA-120 P02

N

P02 amended to clients

requirements

HA HA 17/11/15