2018 Enacted Road Plan
Amended Senate Draft
Report Date:4/16/2018 1:04:00PM
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ADAIR KY-704 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 (11.909) OVER PETTY'S FORK. (001B00078N)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
490,000
0 175,000 490,000 0 0 0 0
1068
ADAIR LN-9008 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 43.02 TO MILEPOINT 57.79
PL
Project Cost:
CN
UT
RW
DN PM
PM
400,000
4,000,000
0 0 0 0 0 4,400,000 0
20000
ADAIR KY 55 CONGESTION MITIGTN(O)
KY 55 NEW TURNING LANE AT BETTY'S OK COUNTRY COOKING
PL
Project Cost:
CN
UT
RW
DN SPP 250,000
0 0 250,000 0 0 0 0
80003
Total for ADAIR county PL
Total Amounts:
CN
UT
RW
DN 175,000 250,000
490,000 4,000,000
400,000
0 175,000 740,000 0 0 4,400,000 0
ALLEN KY-100 RECONSTRUCTION(O)IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTION IMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EAST OF THE ALONZO LONG HOLLOW
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
1,880,000
1,300,000
12,000,000
0 0 1,880,000 1,300,000 0 12,000,000 0
320
2
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ALLEN KY-100 RECONSTRUCTION(O)IMPROVE KY-100 (OLD GALLATIN ROAD) FROM SOUTH OF KY-2160 TO KY-980. (06CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 1,250,000
1,250,000 0 0 0 0 0 0
8305
ALLEN KY-100 MAJOR WIDENING(O) WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 LANES WITH URBAN SECTION FROM OLIVER STREET TO US 31E TO INCREASE CAPACITY/SAFETYMP 11.800-12.700 (14CCN)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
480,000
380,000
670,000
3,800,000
0 0 0 480,000 380,000 670,000 3,800,000
8802
ALLEN ECONOMIC DEVEL(O)IMPROVE ACCESS ROAD ON EACH END OF INDUSTRIAL ACCESS ROAD IN SCOTTSVILLE
PL
Project Cost:
CN
UT
RW
DN
SPP 300,000
0 0 300,000 0 0 0 0
8901
ALLEN KY-3499 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3499 BRIDGE OVER BAYS FORK. (002B00004N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
525,000
0 175,000 525,000 0 0 0 0
10000
ALLEN KY-585 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 585 BRIDGE OVER MIDDLE FORK DRAKES CREEK. (002B00021N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
822,500
0 245,000 822,500 0 0 0 0
10011
3
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ALLEN US 231 AIR QUALITY(P) CONSTRUCT A NEW TURN LANE ON US 231 AT JOHNSON ROAD TO IMPROVE ACCESS TO INDUSTRIAL PARK
PL
Project Cost:
CN
UT
RW
DN
SPP 250,000
0 0 250,000 0 0 0 0
80004
Total for ALLEN county PL
Total Amounts:
CN
UT
RW
DN
1,250,000
420,000
1,880,000
1,897,500
480,000
1,300,000
380,000
12,000,000
670,000
3,800,000
1,250,000 420,000 3,777,500 1,780,000 380,000 12,670,000 3,800,000
ANDERSON BG-9002 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 58.3 TO MILEPOINT 61.84
PL
Project Cost:
CN
UT
RW
DN PM
PM
150,000
1,500,000
0 0 0 0 0 0 1,650,000
20001
ANDERSON US-62 SPOT IMPROVEMENTS(O)
IMPROVE US-62 (VERSAILLES RD.) FROM HILLTOP DR. TO WEST END OF BRIDGE OVER KENTUCKY RIVER AT TYRONE
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,200,000
3,300,000
4,000,000
11,300,000
0 0 1,200,000 3,300,000 4,000,000 11,300,000 0
80001
Total for ANDERSON county PL
Total Amounts:
CN
UT
RW
DN 1,200,000
3,300,000
4,000,000
11,300,000
150,000
1,500,000
0 0 1,200,000 3,300,000 4,000,000 11,300,000 1,650,000
4
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BALLARD US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10) (06CCR)(12CCR)(14CCR).
PL
Project Cost:
CN
UT
RW
DN
NH
NH
2,500,000
3,500,000
0 0 2,500,000 3,500,000 0 0 0
115
BALLARD US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10) (06CCR)(12CCR)(14CCR).
PL
Project Cost:
CN
UT
RW
DN
NH 2,500,000
0 0 0 2,500,000 0 0 0
115.01
BALLARD US-60 MAJOR WIDENING(O) IMPROVE US-60 FROM PROPOSED SOUTHERN BYPASS OF LA CENTER TO EAST OF DENIS JONES ROAD. (02CCR
PL
Project Cost:
CN
UT
RW
DN
NH
NH
2,370,000
1,900,000
0 0 0 0 0 0 4,270,000
118
BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDE EXISTING LOCATION. (004B00021N)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
BR
BR
2,500,000
1,000,000
100,000
49,500,000
0 0 2,500,000 0 0 50,600,000 0
1140.01
BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDE EXISTING LOCATION.(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
6,500,000
49,500,000
0 0 0 0 6,500,000 0 49,500,000
1140.02
5
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDE EXISTING LOCATION.
PL
Project Cost:
CN
UT
RW
DN BR 20,000,000
0 0 0 20,000,000 0 0 0
1140.03
BALLARD US-51 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
275,000
2,750,000
0 0 3,025,000 0 0 0 0
20000
Total for BALLARD county PL
Total Amounts:
CN
UT
RW
DN 2,775,000
2,500,000
2,750,000
20,000,000
2,500,000
3,500,000
6,500,000
49,500,000
1,000,000
100,000
2,370,000
1,900,000
49,500,000
0 0 8,025,000 26,000,000 6,500,000 50,600,000 53,770,000
BARREN KY-90 RECONSTRUCTION(O)PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVER FALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE. (2002BOPC(08CCR)(10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 3,950,000
0 0 0 0 3,950,000 0 0
108.5
BARREN KY-90 PREFINANCD CONVRSN(P)
PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVER FALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE. (2002BOPC(08CCR)(10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 9,210,000
0 0 0 0 0 9,210,000 0
108.51
6
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BARREN LN-9008 AM-BRG PAINTING(P) LOUIE B NUNN PKWY (LN-9008) BRIDGE PAINTING, CLEANING, AND MINOR REPAIRS ON BRIDGE OVER I-65 IN BARREN CO. KY. 005B00067R, 005B00067L (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
NH 500,000
500,000 0 0 0 0 0 0
195
BARREN KY-1297 MAJOR WIDENING(O) IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS), AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.
PL
Project Cost:
CN
UT
RW
DN
STP
STP
2,250,000
2,000,000
0 0 0 0 4,250,000 0 0
8821
BARREN KY-1297 PREFINANCD CONVRSN(O)
IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS), AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.
PL
Project Cost:
CN
UT
RW
DN
STP
STP
2,250,000
2,000,000
0 0 0 0 0 4,250,000 0
8821.01
BARREN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31EX BRIDGE OVER WATER STREET. (005B00058N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
945,000
0 245,000 945,000 0 0 0 0
10001
BARREN I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 42.89 TO MILEPOINT 43.307
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 550,000 0 0 0 0 0
20000
7
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BARREN I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 45.935 TO MILEPOINT 46.881
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 0 0 0 550,000
20001
BARREN LN-9008 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 16.117 TO MILEPOINT 20.1
PL
Project Cost:
CN
UT
RW
DN PM
PM
320,000
3,200,000
0 3,520,000 0 0 0 0 0
20003
BARREN LN-9008 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 20.1 TO MILEPOINT 22.357
PL
Project Cost:
CN
UT
RW
DN PM
PM
180,000
1,800,000
0 0 0 1,980,000 0 0 0
20004
BARREN LN-9008 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 9.375 TO MILEPOINT 14.85
PL
Project Cost:
CN
UT
RW
DN PM
PM
440,000
4,400,000
0 0 0 4,840,000 0 0 0
20005
BARREN US-68 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
400,000
4,000,000
0 0 0 4,400,000 0 0 0
20006
8
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BARREN US-68 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 0.00 TO MILEPOINT 9.70
PL
Project Cost:
CN
UT
RW
DN
PM 1,180,000
0 0 0 0 1,180,000 0 0
20020
BARREN US-68 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 16.95 TO MILEPOINT 23.16
PL
Project Cost:
CN
UT
RW
DN
PM 920,000
0 0 0 0 920,000 0 0
20021
BARREN LN-9008 NEW INTERCHANGE(O)
NEW INTERCHANGE ON THE LOUIE NUNN CUMBERLAND PARKWAY AT KY-249 IN GLASGOW
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,500,000
2,000,000
750,000
8,000,000
0 0 1,500,000 2,000,000 750,000 0 8,000,000
80002
Total for BARREN county PL
Total Amounts:
CN
UT
RW
DN
500,000
615,000
3,700,000
1,500,000
945,000
1,020,000
2,000,000
10,200,000
2,250,000
2,750,000
9,210,000
2,250,000
2,000,000
6,050,000
50,000
8,500,000
500,000 4,315,000 2,445,000 13,220,000 11,050,000 13,460,000 8,550,000
BATH US-60 SAFETY(P) IMPROVE SAFETY AND EFFICIENCY AT THE KY-211 AND US-60 INTERSECTION IN SALT LICK. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 1,000,000 0 0 0 0
8813
9
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BATH KY-1106 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1106 BRIDGE OVER FLAT CREEK. (006B00069N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
595,000
2,258,000
0 595,000 2,258,000 0 0 0 0
10000
BATH KY-1944 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1944 BRIDGE OVER WHITE OAK CREEK. (006B00076N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
473,000
1,015,000
0 473,000 1,015,000 0 0 0 0
10001
BATH KY-211 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 211 BRIDGE OVER COW CREEK. (006B00043N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
315,000
717,500
0 315,000 717,500 0 0 0 0
10017
BATH US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM 410,000
0 410,000 0 0 0 0 0
20001
Total for BATH county PL
Total Amounts:
CN
UT
RW
DN 1,793,000
4,990,500
0 1,793,000 4,990,500 0 0 0 0
10
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK. (007B00071N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
441,000
0 175,000 441,000 0 0 0 0
10000
BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK. (007B00072N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
791,000
0 175,000 791,000 0 0 0 0
10001
BELL CR-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1041 BRIDGE OVER YORK BRANCH. (007C00003N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
193,000
595,000
0 193,000 595,000 0 0 0 0
10002
BELL KY-92 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER GREASY CREEK. (007B00040N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
490,000
0 175,000 490,000 0 0 0 0
10038
BELL KY-2012 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT, SCHOOL BUS SAFETY ISSUE.
PL
Project Cost:
CN
UT
RW
DN PM
PM
61,000
610,000
0 671,000 0 0 0 0 0
20000
11
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BELL US-25 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 0.90 TO MILEPOINT 2.86
PL
Project Cost:
CN
UT
RW
DN
PM 1,391,000
0 0 0 0 1,391,000 0 0
20021
BELL NEW ROUTE(O) CONSTRUCT A NEW ROADWAY ON PAGE SPUR RD.
PL
Project Cost:
CN
UT
RW
DN
SPP 650,000
0 0 0 650,000 0 0 0
80050
Total for BELL county PL
Total Amounts:
CN
UT
RW
DN 779,000
610,000 2,317,000 650,000 1,391,000
0 1,389,000 2,317,000 650,000 1,391,000 0 0
BOONE I-75 I-CHANGE RECONST(O)
IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
5,430,000
5,000,000
5,430,000 0 0 5,000,000 0 0 0
14
BOONE I-75 PREFINANCD CONVRSN(O)
IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 17,080,000
0 0 0 0 17,080,000 0 0
14.02
12
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE I-75 MINOR WIDENING(O) ADD AUXILIARY LANES ON I-71/75 FROM KY-536 TO US-42 (NB & SB) AS PER THE INTERCHANGE JUSTIFICATION STUDY (IJS).(10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,060,000
10,000,000
1,060,000 0 0 0 0 0 10,000,000
14.5
BOONE I-275 NEW INTERCHANGE(O)
IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD).
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
3,000,000
4,000,000
3,000,000
5,000,000
0 3,000,000 12,000,000 0 0 0 0
78
BOONE I-275 PREFINANCD CONVRSN(O)
IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD).
PL
Project Cost:
CN
UT
RW
DN
NH
NH
4,000,000
10,000,000
0 0 0 4,000,000 10,000,000 0 0
78.01
BOONE I-75 CONGESTION MITIGTN(O)
IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS.
PL
Project Cost:
CN
UT
RW
DN NH 2,000,000
0 2,000,000 0 0 0 0 0
79
BOONE I-75 CONGESTION MITIGTN(O)
REDUCE CONGESTION AND IMPROVE TRAFFIC MOBILITY AT THE INTERCHANGE OF I-75 AND KY-14 IN WALTON.
PL
Project Cost:
CN
UT
RW
DN
NH 500,000
0 0 0 500,000 0 0 0
80
13
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE US-25 MINOR WIDENING(O) MINOR WIDENING AND CONSTRUCT A SOUTHBOUND LEFT TURN LANE ON US-25 (DRY RIDGE-FLORENCE ROAD) AT MUBEA.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,100,000
0 1,100,000 0 0 0 0 0
351.45
BOONE US-42 SAFETY(P) IMPROVE MOBILITY AT THE INTERSECTION OF KY-842 AND US-42(12CCR)(16CCN)
PL
Project Cost:
CN
UT
RW
DN
STP 2,500,000
2,500,000 0 0 0 0 0 0
367
BOONE -0 MATCHED FED FUNDS(O)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 414,000
414,000 0 0 0 0 0 0
400.03
BOONE -0 MATCHED FED FUNDS(O)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 44,000
0 44,000 0 0 0 0 0
400.14
BOONE -0 MATCHED FED FUNDS(O)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 44,000
0 0 44,000 0 0 0 0
400.15
14
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE -0 MATCHED FED FUNDS(O)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 44,000
0 0 0 44,000 0 0 0
400.16
BOONE -0 MATCHED FED FUNDS(O)
NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 44,000
0 0 0 0 44,000 0 0
400.17
BOONE -0 MATCHED FED FUNDS(O)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 280,000
280,000 0 0 0 0 0 0
401.09
BOONE -0 MATCHED FED FUNDS(O)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 56,000
0 56,000 0 0 0 0 0
401.14
BOONE -0 MATCHED FED FUNDS(O)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 56,000
0 0 56,000 0 0 0 0
401.15
15
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE -0 MATCHED FED FUNDS(O)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 56,000
0 0 0 56,000 0 0 0
401.16
BOONE -0 MATCHED FED FUNDS(O)
OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK 56,000
0 0 0 0 56,000 0 0
401.17
BOONE -0 MATCHED FED FUNDS(O)
N KY PLANNING FY18 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
SNK 150,000
150,000 0 0 0 0 0 0
401.18
BOONE -0 MATCHED FED FUNDS(O)
N KY PLANNING FY 2019 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
SNK 150,000
0 150,000 0 0 0 0 0
401.19
BOONE -0 MATCHED FED FUNDS(O)
N KY PLANNING FY 2020 AIR QUALITY, FIAM, LAND USE, RIDESHARE.
PL
Project Cost:
CN
UT
RW
DN
SNK 150,000
0 0 150,000 0 0 0 0
401.2
16
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE -0 MATCHED FED FUNDS(O)
N KY PLANNING FY 2021 AIR QUALITY, FIAM, LAND USE, RIDESHARE.
PL
Project Cost:
CN
UT
RW
DN
SNK 150,000
0 0 0 150,000 0 0 0
401.21
BOONE KY-237 MATCHED FED FUNDS(O)
INCREASE THROUGH LANE CAPACITY ON KY 237 FROM I-275 RAMPS TO CARDINAL WAY AND IMPROVE WORLDWIDE BLVD WITH TWO-WAY LEFT TURN AND ADDITIONAL RIGHT
PL
Project Cost:
CN
UT
RW
DN
SNK 3,000,000
3,000,000 0 0 0 0 0 0
415
BOONE CR-1002 MATCHED FED FUNDS(O)
RECONSTRUCTION OF THE INTERSECTION OF CAMP ERNST ROAD AND LONGBRANCH ROAD. WIDENING OF 1,900 FEET OF LONGBRANCH ROAD. (2012BOP)
PL
Project Cost:
CN
UT
RW
DN
SNK 524,640
524,640 0 0 0 0 0 0
422
BOONE KY-3060 MATCHED FED FUNDS(O)
CORRECT GEOMETRIC DEFICIENCIES AND ADD LEFT TURN LANES ON FROGTOWN ROAD AT TRIPLE CROWN BLVD AND CEDARWOOD.(2012BOP)(ADM. BY KYTC)
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
200,000
120,000
1,200,000
1,520,000 0 0 0 0 0 0
423
BOONE KY-717 SAFETY(P) IMPROVE SAFETY ALONG KY 717 AT THE 90 DEGREE BEND NEAR THE CIN/NKY AIRPORT, 0.337 MI N OF KY 1017. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
1,500,000
250,000
1,000,000
2,750,000 0 0 0 0 0 0
433
17
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE KY-3159 MATCHED FED FUNDS(O)
WIDEN KY 3159 (TED BUSHELMAN BLVD) FROM DOERING DRIVE TO KY 1017 (AERO PARKWAY) TO PROVIDE A TWO-WAY LEFT TURN LANE TO IMPROVE TRAFFIC FLOW FOR FUTURE
PL
Project Cost:
CN
UT
RW
DN
SNK 1,000,000
1,000,000 0 0 0 0 0 0
439
BOONE KY-237 MATCHED FED FUNDS(O)
CONSTRUCT A MULTI-MODAL PATH ALONG KY 237 FROM STEPHENS ELEMENTARY SCHOOL NORTH TO KY 20/PETERSBURG ROAD (2016BOP).
PL
Project Cost:
CN
UT
RW
DN
SNK 1,786,400
1,786,400 0 0 0 0 0 0
440
BOONE KY-3076 BIKE/PED FACIL(O) CONSTRUCT NEW SIDEWALKS, DEDICATED BIKE LANES AND RETAINING WALLS ALONG DOLWICK ROAD TO MINEOLA PIKE TO OLYMPIC BLVD IN THE CITY OF ERLANGER.
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
80,000
200,000
1,576,000
280,000 1,576,000 0 0 0 0 0
441
BOONE CR-1001 MATCHED FED FUNDS(O)
ADD A LEFT TURN LANE ON SB CAMP ERNST ROAD AT LONGBRANCH ROAD (2016BOP).
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
400,000
69,271
461,809
469,271 461,809 0 0 0 0 0
442
BOONE KY-236 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-236 (DONALDSON ROAD) FROM KY-842 (HOUSTON ROAD) TO KY-3076 (MINEOLA PIKE).
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
2,000,000
5,000,000
1,000,000
0 2,000,000 5,000,000 0 0 1,000,000 0
444
18
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE KY-3076 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON KY-3076 (MINEOLA PIKE) FROM KY-236 TO I-275.
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
1,500,000
4,000,000
750,000
0 1,500,000 0 0 4,000,000 750,000 0
445
BOONE US-42 NEW ROUTE(O) PROVIDE EAST-WEST CONNECTIVITY AND IMPROVED MOBILITY FROM KY-237 (PLEASANT VALLEY ROAD) THRU KY-842 (HOPEFUL CHURCH ROAD) TO MALL ROAD/I-75
PL
Project Cost:
CN
UT
RW
DN NH 1,500,000
0 0 1,500,000 0 0 0 0
446
BOONE US-25 MAJOR WIDENING(O) IMPROVE MOBILITY AND REDUCE CONGESTION ON US-25 FROM WINNING COLORS DRIVE TO THE NORFOLK SOUTHERN RAILROAD CROSSING SOUTH OF KY-1829
PL
Project Cost:
CN
UT
RW
DN STP 3,300,000
0 0 0 0 0 3,300,000 0
447
BOONE -0 SAFETY(P) SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FOR AMAZON DEVELOPMENT.
PL
Project Cost:
CN
UT
RW
DN
SPP 2,000,000
2,000,000 0 0 0 0 0 0
937
BOONE -0 PREFINANCD CONVRSN(O)
SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FOR AMAZON DEVELOPMENT. (ADDITIONAL FUNDING FOR 6-937.00)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,000,000
0 2,000,000 0 0 0 0 0
937.01
19
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SNK 35,140,000
35,140,000 0 0 0 0 0 0
966
BOONE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019 (FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SNK 9,100,000
0 9,100,000 0 0 0 0 0
966.07
BOONE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SNK 9,200,000
0 0 9,200,000 0 0 0 0
966.08
BOONE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SNK 9,200,000
0 0 0 9,200,000 0 0 0
966.09
BOONE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SNK 9,200,000
0 0 0 0 9,200,000 0 0
966.1
20
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SNK 9,200,000
0 0 0 0 0 9,200,000 0
966.11
BOONE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SNK 9,200,000
0 0 0 0 0 0 9,200,000
966.12
BOONE KY-842 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON RICHARDSON ROAD (KY 842) 0.14 MI E OF US 25 NEAR INDEPENDENCE (008B00092N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
BR
BR
480,000
2,800,000
350,000
3,500,000
0 480,000 3,150,000 0 3,500,000 0 0
1087
BOONE KY-338 TRANSP ENHANCEMENT(P)
PHASE II: IMPROVE INTERSECTION OPERATIONS AT THE INTERSECTIONS OF IDLEWILD RD. (KY-338)/JEFFERSON ST./TEMPERATE ST. AND IMPROVE PEDESTRIAN SAFETY ALONG
PL
Project Cost:
CN
UT
RW
DN
STP 500,000
500,000 0 0 0 0 0 0
3019.1
BOONE KY-237 RECONSTRUCTION(O)IMPROVE KY-237 FROM VALLEY VIEW DRIVE TO ROGERS LANE. (14CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 22,180,000
22,180,000 0 0 0 0 0 0
8001.21
21
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE I-71 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 69.89 TO MILEPOINT 77.724
PL
Project Cost:
CN
UT
RW
DN PM
PM
650,000
6,500,000
0 0 0 0 0 0 7,150,000
20001
BOONE I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 169.439 TO MILEPOINT 183.08
PL
Project Cost:
CN
UT
RW
DN PM
PM
2,180,000
21,800,000
0 0 23,980,000 0 0 0 0
20002
BOONE I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-075 BOTH DIRECTION(S) FROM MILEPOINT 183.08 (182.9 NON-CARDINAL) TO MILEPOINT 183.312
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 1,100,000 0 0 0
20004
BOONE I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-275 BOTH DIRECTION(S) FROM MILEPOINT 13.076 TO MILEPOINT 13.7
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 550,000 0 0 0
20005
BOONE I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 1.58 TO MILEPOINT 7.25
PL
Project Cost:
CN
UT
RW
DN PM
PM
850,000
8,500,000
0 0 0 9,350,000 0 0 0
20006
22
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 7.25 TO MILEPOINT 13.08 (13.56 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
650,000
6,500,000
0 0 0 0 0 0 7,150,000
20007
BOONE KY-18 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
225,000
2,250,000
0 2,475,000 0 0 0 0 0
20008
BOONE KY-237 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
320,000
3,200,000
0 0 0 3,520,000 0 0 0
20009
BOONE US-42 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-42 FROM MILEPOINT 8.71 TO MILEPOINT 11.63
PL
Project Cost:
CN
UT
RW
DN
PM 438,000
0 0 0 0 0 438,000 0
20047
BOONE KY-237 RECONSTRUCTION(O)RECONSTRUCT GUNPOWDER RD. FROM US-42 TO KY-536
PL
Project Cost:
CN
UT
RW
DN SPP 1,000,000
0 1,000,000 0 0 0 0 0
80000
23
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOONE KY-237 CONGESTION MITIGTN(O)
EXPANSION OF ROUNDABOUTS ALONG KY-237 AT CARDINAL COVE AND GRAVES RD
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
500,000
250,000
250,000
0 1,000,000 0 0 0 0 0
80001
BOONE US 42 AIR QUALITY(P) INCREASE CAPACITY AND REDUCE CONGESTION ON US 42 AT I 71/75
PL
Project Cost:
CN
UT
RW
DN SPP 650,000
0 650,000 0 0 0 0 0
80003
Total for BOONE county PL
Total Amounts:
CN
UT
RW
DN
150,000
2,180,000
7,129,271
71,525,040
2,150,000
9,355,000
250,000
250,000
16,587,809
150,000
8,680,000
6,800,000
3,350,000
36,100,000
650,000
1,320,000
4,000,000
27,500,000
4,000,000
9,638,000
3,300,000
1,000,000
750,000
39,880,000
1,300,000
32,200,000
80,984,311 28,592,809 55,080,000 33,470,000 43,880,000 14,688,000 33,500,000
BOURBON KY-3364 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRUCTURE OVER SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH OF US 460 AT NORTH MIDDLETOWN (BRIDGE IMPROVEMENTS). (03KYDN)(2012BOP
PL
Project Cost:
CN
UT
RW
DN KYD 1,568,000
1,568,000 0 0 0 0 0 0
365.1
BOURBON US-460 RECONSTRUCTION(O)IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
1,000,000
1,000,000
5,620,000
0 2,000,000 0 5,620,000 0 0 0
8705
24
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOURBON US-460 PREFINANCD CONVRSN(O)
IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
2,030,000
1,500,000
6,880,000
0 0 0 3,530,000 0 6,880,000 0
8705.01
BOURBON CR-1205 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOUSTON ANTIOCH RO BRIDGE OVER HOUSTON CREEK. (009C00031N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
143,500
325,500
0 143,500 325,500 0 0 0 0
10007
BOURBON CR-1320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER CSX RR. (009R00605N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
220,500
518,000
0 220,500 518,000 0 0 0 0
10008
BOURBON US-68 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
250,000
2,500,000
0 2,750,000 0 0 0 0 0
20002
Total for BOURBON county PL
Total Amounts:
CN
UT
RW
DN 1,568,000 614,000
1,000,000
1,000,000
2,500,000 843,500
2,030,000
1,500,000
5,620,000 6,880,000
1,568,000 5,114,000 843,500 9,150,000 0 6,880,000 0
25
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOYD -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2018. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SAH 6,265,000
6,265,000 0 0 0 0 0 0
208.04
BOYD -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2019. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SAH 1,200,000
0 1,200,000 0 0 0 0 0
208.05
BOYD -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2020. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SAH 1,200,000
0 0 1,200,000 0 0 0 0
208.06
BOYD -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2021. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SAH 1,600,000
0 0 0 1,600,000 0 0 0
208.07
BOYD -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2022. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SAH 1,600,000
0 0 0 0 1,600,000 0 0
208.08
26
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOYD -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2023. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SAH 1,600,000
0 0 0 0 0 1,600,000 0
208.09
BOYD -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2024. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SAH 1,600,000
0 0 0 0 0 0 1,600,000
208.1
BOYD -0 MATCHED FED FUNDS(O)
PLANNING STUDY/ENVIRONMENTAL ASSESSMENT FOR RUSH OFF ROAD (2016BOP)
PL
Project Cost:
CN
UT
RW
DN SAH 48,000
48,000 0 0 0 0 0 0
404
BOYD US-60 CONGESTION MITIGTN(O)
IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTION AT CANNONSBURG. (08CCN) (10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 5,000,000
0 0 5,000,000 0 0 0 0
8400
BOYD US-60 PREFINANCD CONVRSN(O)
IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTION AT CANNONSBURG. (08CCN) (10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 15,000,000
0 0 0 15,000,000 0 0 0
8400.01
27
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOYD US-23 SAFETY(P) SAFETY UPGRADES AND CONSTRUCT TURN LANES ON US-23 AT 12TH STREET - CATLETTSBURG. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 920,000
920,000 0 0 0 0 0 0
8801
BOYD US-23 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON 12TH STREET BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (010B00040N)(BSBP)
PL
Project Cost:
CN
UT
RW
DN
BR 1,750,000
1,750,000 0 0 0 0 0 0
10014
BOYD US-60 AM-BRIDGE (P) PAINTING AND PREVENTIVE MAINTENANCE ON CATLETTSBURG KENOVA BRIDGE ON 35TH ST. OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (010B00062N)(BSBP)
PL
Project Cost:
CN
UT
RW
DN
BR 1,200,000
0 0 1,200,000 0 0 0 0
10015
BOYD I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON PERRY GENTRY BRIDGES OVER THE BIG SANDY RIVER. JOINT PROJECT WITH WEST VIRGINIA. (010B00046L AND 010B00046R)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 1,500,000
0 0 1,500,000 0 0 0 0
10016
BOYD KY-854 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 854 BRIDGE OVER GARNER CREEK. (010B00045N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
525,000
1,085,000
0 525,000 1,085,000 0 0 0 0
10018
28
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOYD I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 180.812 TO MILEPOINT 183.95
PL
Project Cost:
CN
UT
RW
DN PM
PM
250,000
2,500,000
0 2,750,000 0 0 0 0 0
20002
BOYD I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 183.95 TO MILEPOINT 191.507
PL
Project Cost:
CN
UT
RW
DN PM
PM
600,000
6,000,000
0 0 0 0 0 6,600,000 0
20003
BOYD US-23 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.67 TO MILEPOINT 16.95
PL
Project Cost:
CN
UT
RW
DN
PM 2,365,000
0 0 0 0 2,365,000 0 0
20015
BOYD US-23 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 2.92 TO MILEPOINT 10.67
PL
Project Cost:
CN
UT
RW
DN
PM 4,288,000
0 0 0 0 0 4,288,000 0
20016
Total for BOYD county PL
Total Amounts:
CN
UT
RW
DN 48,000
8,935,000
775,000
3,700,000 9,985,000 16,600,000 11,888,000
600,000
3,965,000 1,600,000
8,983,000 4,475,000 9,985,000 16,600,000 3,965,000 12,488,000 1,600,000
29
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BOYLE US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 AND US 150 BRIDGE OVER CHAPLIN RIVERPERRYVILLE. (SEE 7-242.01 FOR HPP FUNDS)(2005HPP-KY134)(011B00042N)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 1,253,000
0 0 1,253,000 0 0 0 0
242
BOYLE US-68 AM-BRIDGE (P) REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE. 011B00042N (2005HPP-KY134)(EARMARK DOES NOT COVER TOTAL PROJECT COST OF
PL
Project Cost:
CN
UT
RW
DN
HPP 487,797
487,797 0 0 0 0 0 0
242.01
BOYLE US-127 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-127B FROM MILEPOINT 0.00 TO MILEPOINT 5.27
PL
Project Cost:
CN
UT
RW
DN
PM 2,301,000
0 0 0 0 2,301,000 0 0
20024
BOYLE NEW ROUTE(O) CONSTRUCT A NEW CONNECTOR ROAD ON THE EAST SIDE OF DANVILLE CONNECTING KY-34 AND US-150 BYPASS
PL
Project Cost:
CN
UT
RW
DN SPP 1,500,000
0 0 0 1,500,000 0 0 0
80000
Total for BOYLE county PL
Total Amounts:
CN
UT
RW
DN
487,797 1,253,000
1,500,000
2,301,000
487,797 0 1,253,000 1,500,000 2,301,000 0 0
30
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2019.(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 190,000
0 190,000 0 0 0 0 0
355.21
BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2020.(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 190,000
0 0 190,000 0 0 0 0
355.22
BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
SPP 190,000
0 0 0 190,000 0 0 0
355.23
BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
SPP 190,000
0 0 0 0 190,000 0 0
355.24
BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 190,000
0 0 0 0 0 190,000 0
355.25
31
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 190,000
0 0 0 0 0 0 190,000
355.26
BRACKEN KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 8 BRIDGE OVER HOLTS CREEK AT FOSTER. (012B00004N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
455,000
3,325,000
0 455,000 3,325,000 0 0 0 0
10008
BRACKEN KY-8 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 13.95 TO MILEPOINT 18.99
PL
Project Cost:
CN
UT
RW
DN
PM 552,000
0 0 0 0 0 0 552,000
20048
Total for BRACKEN county PL
Total Amounts:
CN
UT
RW
DN 455,000
190,000 3,515,000 190,000 190,000190,000 742,000
0 645,000 3,515,000 190,000 190,000 190,000 742,000
BREATHITT KY-205 MINOR WIDENING(O) IMPROVE KY-205 FROM NORTH OF KY-1812 TO SOUTH OF PEGGS FORK RD.
PL
Project Cost:
CN
UT
RW
DN STP
STP
1,000,000
1,030,000
0 0 0 1,000,000 0 1,030,000 0
375
32
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BREATHITT KY-15 MAJOR WIDENING(O) IMPROVE KY-15 FROM THE INTERSECTION OF NEW KY-15/30 TO INTERSECTION OF KY-1812.
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
1,500,000
2,900,000
1,150,000
7,500,000
0 1,500,000 0 2,900,000 1,150,000 7,500,000 0
376
BREATHITT KY-378 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER FROZEN CREEK ON KY 378 0.7 MI N OF KY 1812. (013B00050N)
PL
Project Cost:
CN
UT
RW
DN
BR 735,000
0 0 735,000 0 0 0 0
1110
BREATHITT CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MORRIS FORK ROAD BRIDGE OVER BURTON FORK. (013C00050N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
315,000
0 140,000 315,000 0 0 0 0
10000
BREATHITT CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LITTLE BUCKHORN ROAD BRIDGE OVER BUCKHORN CREEK. (013C00016N)(SD
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
350,000
0 140,000 350,000 0 0 0 0
10001
BREATHITT KY-1812 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1812 BRIDGE OVER JOHNSON FORK. (013B00007N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
507,500
0 175,000 507,500 0 0 0 0
10010
33
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BREATHITT CR-1104 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BIG BRANCH ROAD BRIDGE OVER BIG BRANCH CREEK. (013C00008N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
385,000
0 175,000 385,000 0 0 0 0
10011
Total for BREATHITT county PL
Total Amounts:
CN
UT
RW
DN 2,130,000
2,292,500
1,000,000
2,900,000
1,150,000
7,500,000
1,030,000
0 2,130,000 2,292,500 3,900,000 1,150,000 8,530,000 0
BRECKINRIDGE CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER SINKING CREEK ON DENTS BRIDGE ROAD (CR 1021) 1.4 MI W OF KY 333 (014C00003N)
PL
Project Cost:
CN
UT
RW
DN
BR 406,000
0 0 406,000 0 0 0 0
1090
BRECKINRIDGE KY-261 DRAINAGE IMPROVE(P)
REPLACE LOW WATER STRUCTURE ON KY 261 AT MP 15.74
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
100,000
25,000
25,000
400,000
0 0 0 100,000 450,000 0 0
8902
BRECKINRIDGE KY-992 MINOR WIDENING(O) MINOR WIDENING OF KY 992 BETWEEN ROCK QUARRY AND US 60.
PL
Project Cost:
CN
UT
RW
DN
SPP 580,000
0 0 0 580,000 0 0 0
8904
34
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BRECKINRIDGE US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 0.00 TO MILEPOINT 2.78
PL
Project Cost:
CN
UT
RW
DN
PM 642,000
0 0 0 0 642,000 0 0
20025
BRECKINRIDGE US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 3.45 TO MILEPOINT 12.74
PL
Project Cost:
CN
UT
RW
DN
PM 1,739,000
0 0 0 0 1,739,000 0 0
20026
Total for BRECKINRIDGE county PL
Total Amounts:
CN
UT
RW
DN
406,000
100,000
580,000
25,000
25,000
2,781,000
0 0 406,000 680,000 2,831,000 0 0
BULLITT KY-44 RECONSTRUCTION(O)SECTION 5 - FROM US-31EX TO US-31E BYPASS. (2008BOPC).
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
1,000,000
1,550,000
550,000
0 1,000,000 0 0 0 0 2,100,000
150.5
BULLITT KY-44 SAFETY(P) NEW TURN LANES IN FRONT OF BULLITT EAST HIGH SCHOOL. BREAKOUT FROM 347.5
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
500,000
100,000
545,000
575,000
0 500,000 100,000 545,000 575,000 0 0
347.51
35
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BULLITT KY-480 RECONSTRUCTION(O)WIDEN CEDAR GROVE ROAD (KY-480FROM CEDAR GROVE ELEMENTARY SCHOOL TO VALLEY VIEW DRIVE. (12CCR)(14CCR) (SEE 5-391.3 FOR INTERCHANGE IMPROVEMENTS)
PL
Project Cost:
CN
UT
RW
DN
STP 6,240,000
0 0 0 0 6,240,000 0 0
391.2
BULLITT KY-480 RECONSTRUCTION(O)IMPROVE OPERATIONAL PERFORMANCE OF THE I-65/KY-480 INTERCHANGE INCLUDING RAMP IMPROVEMENTS AND TURNING LANES(12CCR)(14CCR)(2014BOP)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 5,970,000
0 0 0 0 0 5,970,000 0
391.3
BULLITT I-65 NEW INTERCHANGE(O)
CONSTRUCT NEW I-65 INTERCHANGE BETWEEN KY-480 AND KY-245.
PL
Project Cost:
CN
UT
RW
DN
NH 18,720,000
18,720,000 0 0 0 0 0 0
538
BULLITT KY-44 BIKE/PED FACIL(O) INSTALLATION OF NEW SIDEWALKS AND REHABILITATION OF EXISTING SIDEWALKS TO FIX GAPS IN THE PEDESTRIAN NETWORK ALONG KY 44 FROM FRANK E. SIMON DRIVE (CITY
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
60,000
60,000
220,000
120,000 220,000 0 0 0 0 0
544
BULLITT I-65 MAJOR WIDENING(O) WIDEN I-65 FROM 6 TO 8 LANES FROM KY-61 (PRESTON HIGHWAY) IN LEBANON JUNCTION TO I-265 (GENE SNYDER FREEWAY)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
250,000
7,470,000
0 0 250,000 0 7,470,000 0 0
550
36
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BULLITT -0 NEW ROUTE(O) STUDY NEW CONNECTION BETWEEN I-65 IN BULLITT COUNTY TO I-64 IN SHELBY COUNTY TO I-71 IN OLDHAM COUNTY.
PL
Project Cost:
CN
UT
RW
DN
STP 2,000,000
0 2,000,000 0 0 0 0 0
564
BULLITT KY-245 MINOR WIDENING(O) WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE. (08CCN)(10CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 12,640,000
0 0 0 0 12,640,000 0 0
8509
BULLITT I-65 TRANSP ENHANCEMENT(P)
SOUND BARRIERS ON EAST SIDE OF I-65 BETWEEN MP 117.4 AND MP 117.8(14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,000,000
0 0 0 0 2,000,000 0 0
8856
BULLITT KY-480 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-480 FROM MILEPOINT 0.00 TO MILEPOINT 5.14
PL
Project Cost:
CN
UT
RW
DN
PM 910,000
0 0 0 0 910,000 0 0
20036
BULLITT KY-245 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-245 FROM MILEPOINT 0.00 TO MILEPOINT 7.18
PL
Project Cost:
CN
UT
RW
DN
PM 1,094,000
0 0 0 0 0 1,094,000 0
20037
37
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for BULLITT county PL
Total Amounts:
CN
UT
RW
DN60,000
60,000
18,720,000
2,000,000
1,500,000
220,000
250,000
100,000
545,000
7,470,000
7,064,00022,365,000
1,550,000
550,000
18,840,000 3,720,000 350,000 545,000 29,835,000 7,064,000 2,100,000
BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2019.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 157,200 0 0 0 0 0
125.14
BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2020.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 157,200 0 0 0 0
125.15
BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2021.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 157,200 0 0 0
125.16
BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2022.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 0 157,200 0 0
125.17
38
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 0 0 157,200 0
125.18
BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 0 0 0 157,200
125.19
BUTLER WN-9007 RECONSTRUCTION(O)I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAY FROM I-65 INTERCHANGE (EXIT 2) EXTENDING NORTH TO THE BUTLER-OHIO COUNTY LINE.
PL
Project Cost:
CN
UT
RW
DN
NH 18,250,000
0 18,250,000 0 0 0 0 0
2042.1
BUTLER WN-9007 I-CHANGE RECONST(O)
I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE (EXIT 36). (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
NH 6,750,000
0 0 0 6,750,000 0 0 0
2042.3
BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2019.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 157,200 0 0 0 0 0
8504.09
39
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2020.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 157,200 0 0 0 0
8504.1
BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2021.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 157,200 0 0 0
8504.11
BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2022.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 0 157,200 0 0
8504.12
BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 0 0 157,200 0
8504.13
BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 157,200
0 0 0 0 0 0 157,200
8504.14
40
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BUTLER KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER PANTHER CREEK. (016B00019N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
889,000
0 245,000 889,000 0 0 0 0
10003
BUTLER CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WAVERLY SCHOOL ROAD BRIDGE OVER LITTLE BULL CREEK. (016C00031N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
266,000
0 157,500 266,000 0 0 0 0
10004
BUTLER WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 87.544 TO MILEPOINT 88.433
PL
Project Cost:
CN
UT
RW
DN PM
PM
70,000
700,000
0 0 0 770,000 0 0 0
20007
BUTLER WN-9007 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 21.78 TO MILEPOINT 28.5 (26.42 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
540,000
5,400,000
0 0 0 0 5,940,000 0 0
20008
BUTLER WN-9007 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 28.50 (26.42 NON-CARDINAL) TO MILEPOINT 34.72
PL
Project Cost:
CN
UT
RW
DN PM
PM
675,000
6,750,000
0 0 0 0 0 0 7,425,000
20009
41
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
BUTLER WN-9007 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 34.724 TO MILEPOINT 37.143
PL
Project Cost:
CN
UT
RW
DN PM
PM
240,000
2,400,000
0 2,640,000 0 0 0 0 0
20010
Total for BUTLER county PL
Total Amounts:
CN
UT
RW
DN 642,500
20,964,400 1,469,400
70,000
7,764,400
540,000
314,4005,714,400
675,000
7,064,400
0 21,606,900 1,469,400 7,834,400 6,254,400 314,400 7,739,400
CALDWELL -0 NEW ROUTE(O) NEW CONNECTOR FROM HOPKINSVILLE ROAD (KY-91) TO WILSON WAREHOUSE ROAD (KY-293) NORTHEAST OF PRINCETON. (06CCR(10CCR)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
3,000,000
2,000,000
14,000,000
0 0 0 3,000,000 0 2,000,000 14,000,000
153
CALDWELL KY-126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-126 BRIDGE OVER DREEN CREEK. (017B00023N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
1,312,500
0 245,000 1,312,500 0 0 0 0
10000
CALDWELL I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-24 BOTH DIRECTION(S) FROM MILEPOINT 54.842 TO MILEPOINT 57.389
PL
Project Cost:
CN
UT
RW
DN PM
PM
250,000
2,500,000
0 0 0 0 2,750,000 0 0
20000
42
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CALDWELL I-69 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 82.934 TO MILEPOINT 86.344
PL
Project Cost:
CN
UT
RW
DN PM
PM
400,000
4,000,000
0 0 0 4,400,000 0 0 0
20004
Total for CALDWELL county PL
Total Amounts:
CN
UT
RW
DN 245,000
1,312,500
400,000
3,000,000
4,000,000
250,000
2,000,000
2,500,000 14,000,000
0 245,000 1,312,500 7,400,000 2,750,000 2,000,000 14,000,000
CALLOWAY US-641 MAJOR WIDENING(O) MAJOR WIDENING FROM TENN. STATE LINE TO MURRAY PRIORITY SECTION FROM CLARKS RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING 4-LANE.(SEE 1-8852.00)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 6,040,000
6,040,000 0 0 0 0 0 0
314.1
CALLOWAY US-641 MAJOR WIDENING(O) IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITY SECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
2,000,000
2,000,000
3,000,000
15,000,000
2,000,000 5,000,000 0 15,000,000 0 0 0
314.2
CALLOWAY US-641 PREFINANCD CONVRSN(O)
IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITY SECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)
PL
Project Cost:
CN
UT
RW
DN
NH 10,000,000
0 0 0 0 10,000,000 0 0
314.21
43
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CALLOWAY KY-280 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 280 BRIDGE OVER PANTHER CREEK. (018B00054N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
735,000
0 140,000 735,000 0 0 0 0
10008
CALLOWAY KY-1327 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
175,000
1,750,000
0 1,925,000 0 0 0 0 0
20001
CALLOWAY KY-121 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 10.51 TO MILEPOINT 14.08
PL
Project Cost:
CN
UT
RW
DN
PM 635,000
0 0 0 0 0 635,000 0
20024
CALLOWAY KY-121 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 0.00 TO MILEPOINT 10.51
PL
Project Cost:
CN
UT
RW
DN
PM 1,872,000
0 0 0 0 0 1,872,000 0
20025
CALLOWAY KY-94 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 13.11 TO MILEPOINT 24.21
PL
Project Cost:
CN
UT
RW
DN
PM 1,977,000
0 0 0 0 0 1,977,000 0
20026
44
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for CALLOWAY county PL
Total Amounts:
CN
UT
RW
DN 2,000,000
6,040,000
315,000
2,000,000
3,000,000
1,750,000 735,000 15,000,000 4,484,00010,000,000
8,040,000 7,065,000 735,000 15,000,000 10,000,000 4,484,000 0
CAMPBELL I-471 MAJOR WIDENING(O) REDUCE CONGESTION ALONG THE I-471 CORRIDOR FROM US-27 TO OHIO STATE LINE.
PL
Project Cost:
CN
UT
RW
DN
NH 4,500,000
0 0 0 0 0 0 4,500,000
81
CAMPBELL I-471 RECONSTRUCTION(O)STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY, KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)
PL
Project Cost:
CN
UT
RW
DN
HPP 1,439,840
1,439,840 0 0 0 0 0 0
183
CAMPBELL I-275 AM-BRIDGE (P) BRIDGE REHABILITATION ON EXISTING COMBS HEHL BRIDGE CARRYING I-275 OVER THE OHIO RIVER. 019B00040L/R (LET BY ODOT) (2016BOP)(BSBP)
PL
Project Cost:
CN
UT
RW
DN
BR 4,500,000
0 4,500,000 0 0 0 0 0
369
CAMPBELL KY-1892 MATCHED FED FUNDS(O)
ROADWAY REHABILITATION ON CAROTHERS ROAD FROM MONMOUTH STREET (US 27) TO RIGHT TURN LANE INTO NEWPORT SHOPPING CENTER.
PL
Project Cost:
CN
UT
RW
DN
SNK 1,005,052
1,005,052 0 0 0 0 0 0
427
45
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CAMPBELL -0 MATCHED FED FUNDS(O)
NEWPORT RIVERFRONT COMMONS - CONSTRUCT TWO NEW PEDESTRIAN/BICYCLE BRIDGES TO CONNECT BOTH SIDES OF THE TAYLOR SOUTHGATE BRIDGE TO THE
PL
Project Cost:
CN
UT
RW
DN
SNK 1,097,427
1,097,427 0 0 0 0 0 0
434
CAMPBELL US-27 MATCHED FED FUNDS(O)
ADD LANE ON US 27 TO PROVIDE THREE CONTINUOUS SOUTHBOUND THROUGH-LANES FROM MARSHALL LANE TO JOHNS HILL ROAD (KY 3490). (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
200,000
100,000
500,000
300,000 500,000 0 0 0 0 0
443
CAMPBELL KY-9 CONGESTION MITIGTN(O)
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-275 INTERCHANGE WITH KY-9 (AA HWY.)
PL
Project Cost:
CN
UT
RW
DN
NH 700,000
0 0 0 700,000 0 0 0
448
CAMPBELL US-27 BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1. IMPROVE/ADD SIDEWALKS, ACCESS MANAGEMENT, STREET LIGHTING, IMPROVE SAFETY FROM NEWPORT/SOUTHGATE CITY LIMITS TO
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
SNK
SNK
454,960
61,600
1,496,000
1,200,000
454,960 1,557,600 1,200,000 0 0 0 0
451
CAMPBELL US-27 BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH UNDERPASS. IMPROVE FOR PEDESTRIANS BY REPLACING OBSOLETE STAIRS/WALKWAY WITH 10' SIDEWALK, LIGHTING BUS STOPS
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
SNK
SNK
378,400
32,000
24,000
1,320,000
0 0 434,400 1,320,000 0 0 0
452
46
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CAMPBELL -0 BIKE/PED FACIL(O) RIVERFRONT COMMONS. CONSTRUCT A 15' WIDE CONCRETE BICYCLE/PEDESTRIAN TRAIL AND CONDUIT FOR FUTURE LIGHTING FROM BERRY STREET TO FOURTH AVENUE
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
126,000
760,000
0 126,000 760,000 0 0 0 0
453
CAMPBELL KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER TWELVEMILE CREEK ON KY 8 0.1 MI N OF NEISES ROAD (CR 1009). (019B00003N)
PL
Project Cost:
CN
UT
RW
DN
BR
BR
BR
50,000
150,000
2,500,000
0 200,000 2,500,000 0 0 0 0
1085
CAMPBELL CR-1363 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON COVERT RUN PIKE (CR-1363) (0.048) OVER TRIBUTARY TO TAYLOR CREEK019C00069N
PL
Project Cost:
CN
UT
RW
DN BR
BR
122,500
630,000
0 122,500 630,000 0 0 0 0
1095
CAMPBELL I-275 NEW ROUTE(O) TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELL COUNTY. (2005HPP-KY155)(SEE 6-8105.00 FOR "KYD" COMPONENT)(06CCR)(10CCR)
PL
Project Cost:
CN
UT
RW
DN
HPP 690,401
690,401 0 0 0 0 0 0
8105.01
CAMPBELL -0 NEW ROUTE(O) CONSTRUCT NEW TECHNOLOGY TRIANGLE ACCESS ROAD, CAMPBELL COUNTY, KENTUCKY. (2005HPP-KY126)(2006BOPC).(10CCR)
PL
Project Cost:
CN
UT
RW
DN
HPP 1,439,840
1,439,840 0 0 0 0 0 0
8105.03
47
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CAMPBELL KY-2238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GIBSON ROAD BRIDGE OVER THREEMILE CREEK. (019B00060N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
318,500
0 140,000 318,500 0 0 0 0
10000
CAMPBELL US-27 AM-BRIDGE (P) SAFETY CABLE REPAIR AND PREVENTIVE MAINTENANCE ON TAYLOR SOUTHGATE BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (019B00076N)(BSBP)
PL
Project Cost:
CN
UT
RW
DN
BR 250,000
250,000 0 0 0 0 0 0
10007
CAMPBELL I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 73.061 TO MILEPOINT 77.58
PL
Project Cost:
CN
UT
RW
DN PM
PM
675,000
6,750,000
0 0 0 0 0 0 7,425,000
20010
CAMPBELL I-471 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-471 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 4.75
PL
Project Cost:
CN
UT
RW
DN PM
PM
575,000
5,750,000
0 0 0 0 0 0 6,325,000
20011
CAMPBELL KY-8 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
225,000
2,250,000
0 0 0 2,475,000 0 0 0
20012
48
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CAMPBELL KY-9 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
225,000
2,250,000
0 0 0 2,475,000 0 0 0
20013
CAMPBELL KY-1892 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
250,000
2,500,000
0 0 0 2,750,000 0 0 0
20014
CAMPBELL US-27 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
275,000
2,750,000
0 0 0 3,025,000 0 0 0
20015
CAMPBELL US-27 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
75,000
750,000
0 825,000 0 0 0 0 0
20016
CAMPBELL US-27 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
75,000
750,000
0 0 0 825,000 0 0 0
20017
49
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CAMPBELL KY-8 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 15.97 TO MILEPOINT 19.36
PL
Project Cost:
CN
UT
RW
DN
PM 583,000
0 0 0 0 0 0 583,000
20049
Total for CAMPBELL county PL
Total Amounts:
CN
UT
RW
DN 454,960
200,000
100,000
5,922,560
463,500
111,600
1,646,000
5,750,000
378,400
32,000
24,000
5,408,500
700,000
1,050,000
11,820,000
4,500,000
1,250,000
13,083,000
6,677,520 7,971,100 5,842,900 13,570,000 0 0 18,833,000
CARLISLE US-51 SAFETY(P) CORRECT GEOMETRIC DEFICIENCIES AT INTERSECTION OF US-51/US-62/FRONT ST/ELM ST IN BARDWELL TO ADDRESS FLOW, SAFETY, AND ACCESS ISSUES(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 250,000
0 0 250,000 0 0 0 0
333
CARLISLE US-51 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-51 FROM MILEPOINT 7.86 TO MILEPOINT 12.66
PL
Project Cost:
CN
UT
RW
DN
PM 746,000
0 0 746,000 0 0 0 0
20027
Total for CARLISLE county PL
Total Amounts:
CN
UT
RW
DN
996,000
0 0 996,000 0 0 0 0
50
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CARROLL US-42 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER KENTUCKY RIVER ON US 42 IN PRESTONSVILLE/CARROLLTON 0.13 MI E OF KY 55. (021B00043N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
BR
BR
1,460,000
1,218,000
476,000
17,717,000
0 1,460,000 1,694,000 0 17,717,000 0 0
1084
CARROLL KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 55 BRIDGE OVER MAJORS RUN CREEK. (021B00019N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
980,000
0 140,000 980,000 0 0 0 0
10009
CARROLL I-71 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 50.808 TO MILEPOINT 53.433
PL
Project Cost:
CN
UT
RW
DN PM
PM
275,000
2,750,000
0 0 0 0 0 0 3,025,000
20020
CARROLL KY-467 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-467 FROM MILEPOINT 0.00 TO MILEPOINT 4.52
PL
Project Cost:
CN
UT
RW
DN
PM 365,000
0 0 0 0 365,000 0 0
20050
Total for CARROLL county PL
Total Amounts:
CN
UT
RW
DN 1,600,000
1,218,000
476,000
980,000 18,082,000
275,000
2,750,000
0 1,600,000 2,674,000 0 18,082,000 0 3,025,000
51
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CARTER I-64 CONGESTION MITIGTN(O)
IMPROVE MOBILITY AND REDUCE CONGESTION AT THE KY 1/I-64 WESTBOUND OFF-RAMP INTERSECTION.
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
80,000
80,000
80,000
500,000
0 740,000 0 0 0 0 0
62
CARTER KY-7 MAJOR WIDENING(O) IMPROVE KY-7/KY-1 (CAROL MALONE BLVD.) FROM LITTLE SANDY RIVER BRIDGE TO ACADEMIC PARKWAY. (08CCR)(12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,120,000
0 0 0 3,120,000 0 0 0
144
CARTER KY-67 SAFETY(P) SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FOR INDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FOR BRAIDY INDUSTRIES
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
2,000,000
2,500,000
2,500,000
2,000,000
2,000,000 5,000,000 2,000,000 0 0 0 0
397
CARTER KY-67 PREFINANCD CONVRSN(O)
SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FOR INDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FOR BRAIDY INDUSTRIES
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 0 5,000,000 0 0 0
397.01
CARTER KY-67 PREFINANCD CONVRSN(O)
SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FOR INDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FOR BRAIDY INDUSTRIES
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 0 0 0 5,000,000 0
397.02
52
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CARTER US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US-60 (MP 4.111) OVER TYGARTS CREEK; .75 MI E OF JCT KY 1662; 022B00037N
PL
Project Cost:
CN
UT
RW
DN
BR 693,000
693,000 0 0 0 0 0 0
1075
CARTER KY-1 SAFETY(P) IMPROVE SAFETY AT THE EAST CARTER HIGH SCHOOL. (06CCN)(08CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
720,000
490,000
2,000,000
0 0 720,000 490,000 2,000,000 0 0
8311
CARTER KY-773 AM-BRIDGE (P) REPLACEMENT OF TWO TRUSS BRIDGES ON KY 773 OVER THE LITTLE SANDY RIVER. (022B00074N)(022B00075N)
PL
Project Cost:
CN
UT
RW
DN
BR 5,019,000
0 5,019,000 0 0 0 0 0
8506
CARTER KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1 BRIDGE OVER POWELL BRANCH. (022B00006N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
525,000
1,015,000
0 525,000 1,015,000 0 0 0 0
10002
CARTER KY-182 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-182 BRIDGE OVER SINKING CREEK. (022B00140N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
490,000
1,750,000
0 490,000 1,750,000 0 0 0 0
10003
53
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CARTER KY-9 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
320,000
3,200,000
0 0 0 3,520,000 0 0 0
20006
CARTER KY-9 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
150,000
1,500,000
0 0 0 1,650,000 0 0 0
20007
CARTER KY-9 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
350,000
3,500,000
0 0 0 3,850,000 0 0 0
20008
CARTER US-60 RECONSTRUCTION(O)IMPROVE US-60 GEOMETRY BEGINNING TERMINI AT NEW CONSTRUCTION AT OLIVE HILL MP 12EXTENDING 1.1 MILES TO I-64 EXIT 161
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,900,000
2,750,000
2,300,000
7,500,000
0 0 0 0 1,900,000 0 12,550,000
80050
Total for CARTER county PL
Total Amounts:
CN
UT
RW
DN 2,000,000
693,000
1,095,000
2,580,000
2,580,000
5,519,000
720,000
4,765,000
820,000
490,000
16,320,000
1,900,000
5,000,0002,000,000
2,750,000
2,300,000
7,500,000
2,693,000 11,774,000 5,485,000 17,630,000 3,900,000 5,000,000 12,550,000
54
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CASEY CR-1169 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1169 (0.059) OVER SOUTH FORK CREEK. (023C00029N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
532,000
0 175,000 532,000 0 0 0 0
1067
CASEY KY-70 RECONSTRUCTION(O)RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
1,560,000
3,420,000
0 0 0 1,560,000 0 3,420,000 0
8703
CASEY KY-49 RECONSTRUCTION(O)RECONSTRUCT BRUSHY CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
1,250,000
1,320,000
1,040,000
0 1,250,000 0 0 0 1,320,000 1,040,000
8704
CASEY KY-2310 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2310 BRIDGE OVER LUTTRELL CREEK. (023B00066N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
927,500
0 192,500 927,500 0 0 0 0
10000
CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER BR OF BRUSH CREEK. (023B00061N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
70,000
266,000
0 70,000 266,000 0 0 0 0
10006
55
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER LONG BRANCH. (023B00062N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
70,000
266,000
0 70,000 266,000 0 0 0 0
10007
CASEY KY-3270 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3270 BRIDGE OVER HOWE BRANCH. (023B00077N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
70,000
234,500
0 70,000 234,500 0 0 0 0
10008
CASEY KY-70 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
375,000
3,750,000
0 4,125,000 0 0 0 0 0
20001
Total for CASEY county PL
Total Amounts:
CN
UT
RW
DN 2,202,500
3,750,000 2,226,000
1,560,000
4,740,000
1,040,000
0 5,952,500 2,226,000 1,560,000 0 4,740,000 1,040,000
CHRISTIAN KY-1682 NEW ROUTE(O) EXTEND KY-1682 FROM THE E.T. BREATHITT PARKWAY TO US-68/KY-80 EAST OF HOPKINSVILLE (HOPKINSVILLE NORTHEAST BYPASS).
PL
Project Cost:
CN
UT
RW
DN SPP 1,000,000
0 0 0 0 0 0 1,000,000
136
56
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CHRISTIAN KY-911 MAJOR WIDENING(O) IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR).
PL
Project Cost:
CN
UT
RW
DN
STP 2,530,000
0 0 2,530,000 0 0 0 0
180
CHRISTIAN KY-911 PREFINANCD CONVRSN(O)
IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 5,910,000
0 0 0 5,910,000 0 0 0
180.01
CHRISTIAN KY-1007 RECONSTRUCTION(O)RECONSTRUCT KY 1007 FROM US 68 TO SANDERSON ROAD IN HOPKINSVILLE.(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
3,250,000
11,250,000
0 0 3,250,000 0 11,250,000 0 0
227
CHRISTIAN US-41 NEW ROUTE(O) CONSTRUCT NEW CONNECTOR FROM US 41 NEAR THE INDUSTRIAL PARK TO KY 115 SOUTH OF PEMBROKE.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
300,000
700,000
12,000,000
0 0 1,000,000 0 1,000,000 12,000,000 0
381
CHRISTIAN EB-9004 RECONSTRUCTION(O)RECONSTRUCT THE BREATHITT PARKWAY INTERCHANGE AT KY 1682 NORTH OF HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE INTERSTATE SPUR PROJECT)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
250,000
1,000,000
1,000,000
5,000,000
0 250,000 1,000,000 1,000,000 0 5,000,000 0
898
57
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CHRISTIAN US-68 RECONSTRUCTION(O)ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 IN HOPKINSVILLE.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,200,000
1,750,000
1,500,000
5,500,000
0 0 0 1,200,000 0 3,250,000 5,500,000
899
CHRISTIAN CR-1116 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SUB STATION RD (CR 1116) OVER CSX RR 0.04 MILE E OF US 41 024C00034N
PL
Project Cost:
CN
UT
RW
DN
BR 880,000
880,000 0 0 0 0 0 0
1085
CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CSX RR ON WALNUT STREET (US 41A) IN HOPKINSVILLE 475 FT NE OF EAST 21ST STREET (CS 1016) (024B00112N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
385,000
2,002,000
0 385,000 2,002,000 0 0 0 0
1089
CHRISTIAN CS-1262 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER N FORK LITTLE RIVER ON MILBROOKE DRIVE (CS 1262) 500 FT SW OF KAREN DRIVE (CS 1268) 024C00081N
PL
Project Cost:
CN
UT
RW
DN
BR 1,470,000
0 0 1,470,000 0 0 0 0
1094
CHRISTIAN KY-107 MINOR WIDENING(O) IMPROVE KY-107 FROM GATEWAY LANE TO KY-380.(12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
1,280,000
1,530,000
2,540,000
0 0 0 0 1,280,000 1,530,000 2,540,000
8703
58
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CHRISTIAN KY-115 MINOR WIDENING(O) IMPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO JUST SOUTH OF PEMBROKE (MP 9.625)
PL
Project Cost:
CN
UT
RW
DN SPP 1,000,000
0 0 0 1,000,000 0 0 0
8953
CHRISTIAN KY-189 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-189 BRIDGE OVER BRANCH OF BUCK FORK. (024B00064N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
1,032,500
0 245,000 1,032,500 0 0 0 0
10001
CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 41 BRIDGE OVER NORTH FORK LITTLE RIVER. (024B00005N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
35,000
175,000
0 35,000 175,000 0 0 0 0
10022
CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 4.719
PL
Project Cost:
CN
UT
RW
DN PM
PM
400,000
4,000,000
0 400,000 4,000,000 0 0 0 0
20005
CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 12.13 TO MILEPOINT 16.5 (16.7 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN
PM 4,120,000
0 0 4,120,000 0 0 0 0
20006
59
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 4.719 TO MILEPOINT 6.77
PL
Project Cost:
CN
UT
RW
DN PM
PM
175,000
1,750,000
0 0 0 0 0 1,925,000 0
20008
CHRISTIAN I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 76.142
PL
Project Cost:
CN
UT
RW
DN PM
PM
325,000
3,250,000
0 0 0 0 3,575,000 0 0
20010
CHRISTIAN I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 81.83
PL
Project Cost:
CN
UT
RW
DN PM
PM
600,000
6,000,000
0 0 0 0 0 0 6,600,000
20011
CHRISTIAN I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 76.142 TO MILEPOINT 85.563
PL
Project Cost:
CN
UT
RW
DN PM
PM
475,000
4,750,000
0 0 0 0 0 5,225,000 0
20012
CHRISTIAN I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 BOTH DIRECTION(S) FROM MILEPOINT 85.563 TO MILEPOINT 92
PL
Project Cost:
CN
UT
RW
DN PM
PM
650,000
6,500,000
0 0 0 0 7,150,000 0 0
20013
60
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CHRISTIAN US-68 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
75,000
750,000
0 0 0 825,000 0 0 0
20016
CHRISTIAN US-41 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-41 FROM MILEPOINT 14.79 TO MILEPOINT 31.57
PL
Project Cost:
CN
UT
RW
DN
PM 1,635,000
0 0 0 0 1,635,000 0 0
20046
CHRISTIAN KY 115 RESURFACING(P) RESURFACING ON KY 115 FROM CARNEAL LANE TO US 41
PL
Project Cost:
CN
UT
RW
DN
PM 730,000
0 730,000 0 0 0 0 0
80000
CHRISTIAN US 41A NEW INTERCHANGE(O)
US 41A NEW TURNING LANE NORTHBOUND AT EXISTING MEDIAN CROSSOVER NEAR MILEPOST 11.4. CITY TO CONSTRUCT AND BE REIMBURSED.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
8,000
67,000
0 75,000 0 0 0 0 0
80001
CHRISTIAN KY 1026 RESURFACING(P) RESURFACING ON KY 1026 FROM GRACEY SINKING FORK ROAD TO SHURDAN CREEK ROAD
PL
Project Cost:
CN
UT
RW
DN
PM 200,000
0 200,000 0 0 0 0 0
80002
61
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for CHRISTIAN county PL
Total Amounts:
CN
UT
RW
DN
880,000
1,323,000
997,000
1,000,000
1,000,000
3,250,000
15,329,500
2,275,000
1,000,000
6,660,000
975,000
1,580,000
700,000
23,500,000
650,000
1,750,000
3,030,000
22,635,000
1,600,000
14,040,000
880,000 2,320,000 20,579,500 9,935,000 25,890,000 28,930,000 15,640,000
CLARK KY-1958 NEW ROUTE(O) EXTEND THE WINCHESTER EAST BYPASS (KY 1958) FROM IRVINE ROAD (KY 89) TO KY 627 SOUTH OF WINCHESTER. (08CCN)(10CCR)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
250,000
7,000,000
11,000,000
12,000,000
0 250,000 7,000,000 0 11,000,000 0 12,000,000
8401
CLARK -0 NEW ROUTE(O) EXTEND FULTON ROAD. (BY COUNTY(10CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 1,410,000
0 0 0 1,410,000 0 0 0
8639
CLARK US-60 AIR QUALITY(P) RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM I-64 IN CLARK COUNTY (MP 14.210) TO 500 FEET WEST OF SEWELL SHOP ROAD. (MP 17.032)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
2,000,000
6,000,000
10,500,000
36,500,000
0 0 0 0 2,000,000 0 53,000,000
8952
CLARK I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 89.48 TO MILEPOINT 94.7
PL
Project Cost:
CN
UT
RW
DN PM
PM
630,000
6,300,000
0 0 0 0 6,930,000 0 0
20004
62
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CLARK I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 94.65 TO MILEPOINT 98.1
PL
Project Cost:
CN
UT
RW
DN PM
PM
525,000
5,250,000
0 0 0 0 5,775,000 0 0
20005
CLARK I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 98.1 TO MILEPOINT 101.78
PL
Project Cost:
CN
UT
RW
DN PM
PM
430,000
4,300,000
0 0 4,730,000 0 0 0 0
20006
CLARK KY-9000 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 9.45 (5.311 NON-CARDINAL) TO MILEPOINT 11.913
PL
Project Cost:
CN
UT
RW
DN PM
PM
530,000
5,300,000
0 0 0 5,830,000 0 0 0
20007
Total for CLARK county PL
Total Amounts:
CN
UT
RW
DN 250,000 430,000
7,000,000
4,300,000
530,000
6,710,000
3,155,000
11,000,000
11,550,000
6,000,000
10,500,000
48,500,000
0 250,000 11,730,000 7,240,000 25,705,000 0 65,000,000
CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER OTTER CREEK ON OTTER CREEK ROAD (CR 1160) AT JUNCTION WITH MAY FORK ROAD (CR 1158)(026C00031N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
105,000
364,000
0 105,000 364,000 0 0 0 0
1099
63
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CLAY US-421 MINOR WIDENING(O) IMPROVE US-421/KY-80 FROM KY-80 SOUTH TO KY-149 (LOCKARTS CREEK ROAD). (00CCN)(10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 20,000,000
0 0 20,000,000 0 0 0 0
8003
CLAY CR-1263 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CURRY BRANCH ROAD IN CLAY COUNTY.(12CCN)
PL
Project Cost:
CN
UT
RW
DN
BR 960,000
0 960,000 0 0 0 0 0
8711
CLAY KY-66 RECONSTRUCTION(O)IMPROVE GEOMETRICS ON THE S-CURVE FROM NORTHEAST OF KY-3135 (COLLEGE STREET) TO NORTHEAST OF PR-1006 (MULBERRY STREET).(14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 405,000
0 405,000 0 0 0 0 0
8856
CLAY KY-638 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ALONG KY 638 (MP 6.7 TO MP 7.1) AND ITS INTERSECTION WITH KY 3476. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
250,000
650,000
1,840,000
0 0 900,000 1,840,000 0 0 0
8861
CLAY CR-1286 SAFETY(P) IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND, INCLUDING INTERSECTIONS AT HAL ROGERS PARKWAY AND KY 687. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 6,100,000
0 0 0 6,100,000 0 0 0
8864
64
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CLAY HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM CLAY/LAUREL LINE TO MANCHESTER (JUST PAST EXIT 20 AT BRIDGE OVER
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
15,000,000
11,000,000
98,000,000
0 0 0 1,000,000 15,000,000 11,000,000 98,000,000
8910
CLAY HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929 (SEGMENT 8)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
18,000,000
13,000,000
129,900,000
0 0 0 1,000,000 18,000,000 13,000,000 129,900,000
8911
CLAY KY-1850 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1850 BRIDGE OVER PHILLIPS FORK. (026B00087N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
595,000
0 175,000 595,000 0 0 0 0
10003
CLAY KY-577 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-577 BRIDGE OVER LITTLE SEXTON CREEK(026B00093N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
424,000
0 175,000 424,000 0 0 0 0
10004
CLAY CR-1055 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1055 BRIDGE OVER WILES BRANCH. (026C00010N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
400,000
0 175,000 400,000 0 0 0 0
10005
65
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CLAY CR-1117 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ARNETTS FORK ROAD BRIDGE OVER DOUBLE CREEK. (026C00018N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
364,000
0 140,000 364,000 0 0 0 0
10006
CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OTTER CREEK ROAD BRIDGE OVER GOOSE CREEK. (026C00032N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
595,000
0 175,000 595,000 0 0 0 0
10007
CLAY CR-1255 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1255 BRIDGE OVER HORSE CREEK. (026C00070N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
371,000
0 175,000 371,000 0 0 0 0
10008
CLAY CR-1118 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD HIGHWAY 66 BRIDGE OVER RED BIRD RIVER. (026C00099N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
2,177,000
0 350,000 2,177,000 0 0 0 0
10009
CLAY US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 421 BRIDGE OVER BRANCH OF ISLAND CREEK. (026B00002N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
647,500
0 175,000 647,500 0 0 0 0
10039
66
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CLAY HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 13.93 TO MILEPOINT 15.958
PL
Project Cost:
CN
UT
RW
DN PM
PM
80,000
800,000
0 0 0 0 880,000 0 0
20001
CLAY HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 15.958 TO MILEPOINT 19.527
PL
Project Cost:
CN
UT
RW
DN PM
PM
150,000
1,500,000
0 0 0 0 0 1,650,000 0
20002
CLAY HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 19.527 TO MILEPOINT 28.4
PL
Project Cost:
CN
UT
RW
DN PM
PM
350,000
3,500,000
0 3,850,000 0 0 0 0 0
20003
CLAY HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 28.4 TO MILEPOINT 31
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 1,100,000 0 0 0 0 0
20004
CLAY HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 31 TO MILEPOINT 35.08
PL
Project Cost:
CN
UT
RW
DN PM
PM
160,000
1,600,000
0 1,760,000 0 0 0 0 0
20005
67
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CLAY HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 35.08 TO MILEPOINT 39
PL
Project Cost:
CN
UT
RW
DN PM
PM
150,000
1,500,000
0 0 0 0 1,650,000 0 0
20006
Total for CLAY county PL
Total Amounts:
CN
UT
RW
DN 2,255,000
7,465,000
250,000
650,000
25,937,500
2,000,000
7,940,000
230,000
33,000,000
1,500,000
150,000
24,000,000
2,300,000 227,900,000
0 9,720,000 26,837,500 9,940,000 35,530,000 25,650,000 227,900,000
CLINTON KY-738 AM-BRIDGE (P) REPLACE BRIDGE OVER CLEAR FORK CREEK ON KY 738 0.2 MI S OF US 127X. (027B00011N)(SR=31.5)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
525,000
0 175,000 525,000 0 0 0 0
1062
CLINTON US-127 RELOCATION(O) RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127 INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 AND MANTOWN INTERSECTION. (SEE
PL
Project Cost:
CN
UT
RW
DN
NH 10,060,000
0 0 0 0 0 10,060,000 0
8601.26
CLINTON US-127 PREFINANCD CONVRSN(O)
RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127 INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 AND MANTOWN INTERSECTION. (SEE
PL
Project Cost:
CN
UT
RW
DN
NH 11,070,000
0 0 0 0 0 0 11,070,000
8601.28
68
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CLINTON US-127 RELOCATION(O) RELOCATION OF US-127 FROM EAST OF THE AARON RIDGE RD AND OLD US-127 INTERSECTION, EXTENDING NORTHERLY TO NORTH OF THE KY-3063 AND OLD US-127
PL
Project Cost:
CN
UT
RW
DN SPP 1,600,000
0 0 0 0 0 0 1,600,000
8601.3
Total for CLINTON county PL
Total Amounts:
CN
UT
RW
DN 175,000
525,000 10,060,000
1,600,000
11,070,000
0 175,000 525,000 0 0 10,060,000 12,670,000
CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2019.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 402,000
0 402,000 0 0 0 0 0
326.16
CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2020.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 402,000
0 0 402,000 0 0 0 0
326.17
CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
SPP 402,000
0 0 0 402,000 0 0 0
326.18
69
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
SPP 402,000
0 0 0 0 402,000 0 0
326.19
CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 402,000
0 0 0 0 0 402,000 0
326.2
CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 402,000
0 0 0 0 0 0 402,000
326.21
CRITTENDEN CR-1085 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1085 (0.048) OVER HUGHES BRANCH 028C00053N
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
546,000
0 210,000 546,000 0 0 0 0
1159
CRITTENDEN KY-91 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-91 BRIDGE OVER CROOKED CREEK. (028B00021N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
980,000
0 245,000 980,000 0 0 0 0
10000
70
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for CRITTENDEN county PL
Total Amounts:
CN
UT
RW
DN 455,000
402,000 1,928,000 402,000 402,000402,000 402,000
0 857,000 1,928,000 402,000 402,000 402,000 402,000
CUMBERLAND KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVER ON KY 61 0.1 MI N OF COLD SPRINGS ROAD (CR 1204).(029B00012N)
PL
Project Cost:
CN
UT
RW
DN
BR 3,640,000
0 0 3,640,000 0 0 0 0
1060
CUMBERLAND KY-90 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVER ON KY 90 0.27 MI SE OF KY 61 AT THE SCL OF BURKESVILLE. (029B00027N)
PL
Project Cost:
CN
UT
RW
DN
BR 5,200,000
0 0 5,200,000 0 0 0 0
1061
CUMBERLAND KY-90 RECONSTRUCTION(O)IMPROVE KY-90 FROM NORRIS BRANCH ROAD EXTENDING WESTERLY TO PA DUERSON ROAD NEAR MARROWBONE. (14CCN)
PL
Project Cost:
CN
UT
RW
DN SPP 3,500,000
0 0 3,500,000 0 0 0 0
8852
CUMBERLAND CR-1012 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHETSTONE ROAD BRIDGE OVER BIG WHETSTONE CREEK. (029C00057N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
556,500
0 175,000 556,500 0 0 0 0
10001
71
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
CUMBERLAND KY-379 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 379 BRIDGE OVER BIG WILLIS CREEK. (029B00005N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
129,500
952,000
0 129,500 952,000 0 0 0 0
10009
Total for CUMBERLAND county PL
Total Amounts:
CN
UT
RW
DN 304,500 3,500,000
10,348,500
0 304,500 13,848,500 0 0 0 0
DAVIESS KY-298 SAFETY(P) RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND KY 298. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 1,800,000
0 1,800,000 0 0 0 0 0
229
DAVIESS US-60 RECONSTRUCTION(O)RECONSTRUCT ON US 60 BETWEEN OAKFORD RD LOOP (CR 1370) TO ADDRESS FLOODING PROBLEM IN THE VICINITY OF THE KIMBERLY-CLARK PLANT (14CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 2,000,000
0 2,000,000 0 0 0 0 0
237
DAVIESS WN-9007 RECONSTRUCTION(O)I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAY FROM THE OHIO-BUTLER COUNTY LINE (MP 37.143) TO THE US-60 INTERCHANGE (MP 72.264) IN
PL
Project Cost:
CN
UT
RW
DN
NH
NH
200,000
4,750,000
200,000 0 4,750,000 0 0 0 0
2092.1
72
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
DAVIESS KY-54 MAJOR WIDENING(O) IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTON ROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
10,540,000
5,750,000
34,000,000
0 10,540,000 0 0 5,750,000 0 34,000,000
8300
DAVIESS KY-54 PREFINANCD CONVRSN(O)
IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTON ROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
4,520,000
13,420,000
0 0 0 4,520,000 0 13,420,000 0
8300.01
DAVIESS CR-1053 AM-BRIDGE (P) GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E JCT KY 405 (MM 1.005-1.009) OVER ALLGOOD DITCH. (14CCN) 030C00016N
PL
Project Cost:
CN
UT
RW
DN
BR 619,500
0 0 619,500 0 0 0 0
8813
DAVIESS KY-81 MINOR WIDENING(O) EXTEND THE CURRENT 4 LANES TO THE ROUNDABOUT AT KY-56/KY-81. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,750,000
3,750,000 0 0 0 0 0 0
8851
DAVIESS KY-3143 MINOR WIDENING(O) IMPROVE KY-3143 FROM KY-3335 TO KY 54. (14CCN)
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
680,000
2,730,000
3,380,000
0 0 0 680,000 0 0 6,110,000
8854
73
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
DAVIESS CR-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCKPORT FERRY RD BRIDGE OVER KELLY CREEK. (030C00021N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
647,500
0 175,000 647,500 0 0 0 0
10002
DAVIESS CR-1129 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD KY 54 BRIDGE OVER BR OF N FK PANTHER CREEK. (030C00029N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
647,500
0 175,000 647,500 0 0 0 0
10003
DAVIESS CR-1257 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LYDANNE BRIDGE S BRIDGE OVER FLAT LICK CREEK. (030C00069N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
717,500
0 175,000 717,500 0 0 0 0
10004
DAVIESS KY-2262 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH GLOVER CARY BRIDGE OVER OHIO RIVER. JOINT PROJECT WITH INDIANA. (030B00118N)(BSBP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
200,000
2,250,000
0 200,000 2,250,000 0 0 0 0
10020
DAVIESS US-231 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH NATCHER BRIDGE OVER OHIO RIVERJOINT PROJECT WITH INDIANA. (030B00164N)(BSBP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
10,000,000
0 175,000 10,000,000 0 0 0 0
10021
74
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
DAVIESS KY-764 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 764 BRIDGE OVER UNNAMED STREAM. (030B00111N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
70,000
350,000
0 70,000 350,000 0 0 0 0
10023
DAVIESS KY-81 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
250,000
2,500,000
0 0 0 0 2,750,000 0 0
20017
DAVIESS KY-331 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC & AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 550,000 0 0 0
20018
DAVIESS KY-2155 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
150,000
1,500,000
0 1,650,000 0 0 0 0 0
20019
DAVIESS WN-9007 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 61.553 TO MILEPOINT 66.08
PL
Project Cost:
CN
UT
RW
DN
PM 4,238,000
0 0 4,238,000 0 0 0 0
20020
75
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
DAVIESS WN-9007 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 66.08 TO MILEPOINT 72.26
PL
Project Cost:
CN
UT
RW
DN
PM 5,768,000
0 0 5,768,000 0 0 0 0
20021
DAVIESS US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 23.77 TO MILEPOINT 27.54
PL
Project Cost:
CN
UT
RW
DN
PM 1,609,000
0 0 0 0 1,609,000 0 0
20047
Total for DAVIESS county PL
Total Amounts:
CN
UT
RW
DN200,000
3,750,000
1,120,000
10,540,000
5,300,000 29,988,000
730,000
4,520,000
500,000
250,000
5,750,000 13,420,000
4,109,000
2,730,000
3,380,000
34,000,000
3,950,000 16,960,000 29,988,000 5,750,000 10,109,000 13,420,000 40,110,000
EDMONSON KY-259 SPOT IMPROVEMENTS(O)
RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER BRIDGE AT BROWNSVILLE TO 0.42 MILE NORTH OF THE KY-70/KY-259 INTERSECTION.(06CCR)(2004BOPC)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
1,540,000
1,470,000
5,480,000
0 1,540,000 1,470,000 5,480,000 0 0 0
7030.1
EDMONSON KY-743 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 743 BRIDGE OVER BEAVER DAM CREEK. (031B00004N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
402,500
0 157,500 402,500 0 0 0 0
10012
76
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
EDMONSON I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 43.307 TO MILEPOINT 43.6
PL
Project Cost:
CN
UT
RW
DN PM
PM
40,000
400,000
0 440,000 0 0 0 0 0
20011
EDMONSON I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 43.6 TO MILEPOINT 45.935.
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 0 0 0 1,100,000
20012
EDMONSON US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TO MILEPOINT 8.00
PL
Project Cost:
CN
UT
RW
DN
PM 1,301,000
0 0 0 0 1,301,000 0 0
20022
Total for EDMONSON county PL
Total Amounts:
CN
UT
RW
DN 197,500
1,540,000
400,000
1,470,000
402,500 5,480,000 1,301,000
100,000
1,000,000
0 2,137,500 1,872,500 5,480,000 1,301,000 0 1,100,000
ELLIOTT KY-32 RECONSTRUCTION(O)IMPROVE KY-32 FROM WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR(10CCR)(12CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
3,900,000
5,000,000
15,500,000
0 0 0 3,900,000 5,000,000 15,500,000 0
192.01
77
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ELLIOTT KY-32 RECONSTRUCTION(O)RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
3,820,000
15,500,000
0 0 0 3,820,000 15,500,000 0 0
192.02
ELLIOTT KY-32 RECONSTRUCTION(O)RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)
PL
Project Cost:
CN
UT
RW
DN
STP 15,500,000
0 0 0 0 0 15,500,000 0
192.03
ELLIOTT KY-7 RECONSTRUCTION(O)IMPROVE KY-7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARD WRIGLEY. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
2,890,000
6,620,000
6,490,000
15,420,000
0 0 0 2,890,000 6,620,000 6,490,000 15,420,000
228
ELLIOTT KY-32 MAJOR WIDENING(O) KY-32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING. (14CCN)
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
220,000
480,000
320,000
9,340,000
0 0 0 220,000 480,000 320,000 9,340,000
8802
ELLIOTT CR-1206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR 1206 BRIDGE OVER OVER LITTLE SANDY. (030C00032N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
455,000
1,663,000
0 455,000 1,663,000 0 0 0 0
10004
78
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for ELLIOTT county PL
Total Amounts:
CN
UT
RW
DN 455,000
1,663,000
3,110,000
7,720,000 7,100,000
5,000,000
31,000,000
6,810,000
15,500,000 24,760,000
0 455,000 1,663,000 10,830,000 27,600,000 37,810,000 24,760,000
ESTILL KY-82 RECONSTRUCTION(O)IMPROVE LEVEL OF SERVICE, SAFETY, AND CONNECTIVITY ON KY-82 FROM KY-89 IN ESTILL CO. TO NEW CONSTRUCTION LOCATED NORTH OF HUDSON MILL ROAD IN
PL
Project Cost:
CN
UT
RW
DN STP 1,500,000
0 0 0 0 0 1,500,000 0
205
ESTILL KY-2459 SPOT IMPROVEMENTS(O)
IMPROVE SAFETY ON KY-2459 (CARHARTT AVE.) FROM KY-89 TO THE RAILROAD BRIDGE.
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
250,000
250,000
250,000
0 0 250,000 500,000 0 0 0
206
ESTILL KY-89 MAJOR WIDENING(O) IMPROVE GEOMETRICS ON KY-89 IN ESTILL COUNTY FROM KY-1886 TO THE ESTILL/CLARK COUNTY LINE.
PL
Project Cost:
CN
UT
RW
DN STP 1,200,000
0 0 0 1,200,000 0 0 0
207
ESTILL KY-1645 RECONSTRUCTION(O)IMPROVE SAFETY AND MOBILITY ON KY-1645 (KIRKLAND AVE) NEAR CR-1087 (LOCK 12 ROAD).
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
100,000
100,000
50,000
320,000
0 100,000 470,000 0 0 0 0
208
79
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ESTILL KY-794 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 794 BRIDGE OVER WHITE OAK CREEK. (033B00038N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
735,000
0 245,000 735,000 0 0 0 0
10012
Total for ESTILL county PL
Total Amounts:
CN
UT
RW
DN 345,000 250,000
100,000
50,000
1,055,000
1,200,000
250,000
250,000
1,500,000
0 345,000 1,455,000 1,700,000 0 1,500,000 0
FAYETTE KY-4 MAJOR WIDENING(O) IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWN ROAD. (12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
1,300,000
1,500,000
11,780,000
0 0 0 2,800,000 0 0 11,780,000
113.02
FAYETTE KY-4 PREFINANCD CONVRSN(O)
IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWN ROAD. (12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 1,500,000
0 0 0 1,500,000 0 0 0
113.03
FAYETTE CS-4174 MINOR WIDENING(O) CLAYS MILL ROAD; WIDEN FROM HARRODSBURG ROAD TO NEW CIRCLE ROAD (SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH) (ALL WORK BY LFUCG) (CONSTRUCTION SEQU. 2)
PL
Project Cost:
CN
UT
RW
DN
SLX
SLX
1,900,000
11,000,000
0 12,900,000 0 0 0 0 0
224.1
80
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO
PL
Project Cost:
CN
UT
RW
DN
SLX 49,200,000
0 0 0 0 0 0 49,200,000
227
FAYETTE -0 MATCHED FED FUNDS(O)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2018. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT
PL
Project Cost:
CN
UT
RW
DN
SLX 730,000
730,000 0 0 0 0 0 0
227.07
FAYETTE -0 MATCHED FED FUNDS(O)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2019. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT
PL
Project Cost:
CN
UT
RW
DN
SLX 756,000
0 756,000 0 0 0 0 0
227.08
FAYETTE -0 MATCHED FED FUNDS(O)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2020. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT
PL
Project Cost:
CN
UT
RW
DN
SLX 756,000
0 0 756,000 0 0 0 0
227.09
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLX 12,400,000
12,400,000 0 0 0 0 0 0
227.1
81
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLX 8,000,000
0 8,000,000 0 0 0 0 0
227.13
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLX 8,200,000
0 0 8,200,000 0 0 0 0
227.14
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLX 8,200,000
0 0 0 8,200,000 0 0 0
227.15
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLX 8,200,000
0 0 0 0 8,200,000 0 0
227.16
FAYETTE -0 MATCHED FED FUNDS(O)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2021. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT
PL
Project Cost:
CN
UT
RW
DN
SLX 756,000
0 0 0 756,000 0 0 0
227.17
82
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE -0 MATCHED FED FUNDS(O)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2022. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT
PL
Project Cost:
CN
UT
RW
DN
SLX 756,000
0 0 0 0 756,000 0 0
227.18
FAYETTE -0 MATCHED FED FUNDS(O)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2023. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT
PL
Project Cost:
CN
UT
RW
DN
SLX 756,000
0 0 0 0 0 756,000 0
227.19
FAYETTE -0 MATCHED FED FUNDS(O)
VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2024. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT
PL
Project Cost:
CN
UT
RW
DN
SLX 756,000
0 0 0 0 0 0 756,000
227.2
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLX 8,200,000
0 0 0 0 0 8,200,000 0
227.21
FAYETTE -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLX 8,200,000
0 0 0 0 0 0 8,200,000
227.22
83
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL IN LEXINGTON (PRIORITY SECTION 2); FROM JOSEPH BRYAN WAY THROUGH NS RAILROAD TUNNEL TO WAVELAND HISTORIC SITE (ALL WORK BY LFUCG). (FUNDING
PL
Project Cost:
CN
UT
RW
DN
SLX 400,000
400,000 0 0 0 0 0 0
229.2
FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL(PRIORITY SECTION 3); FROM LOCHDALE TERRACE, EXTENDING NORTHERLY UNDER MAN O' WAR BOULEVARD TO SHILLITO PARK.(LOCAL MATCH)
PL
Project Cost:
CN
UT
RW
DN
SLX 625,000
625,000 0 0 0 0 0 0
229.3
FAYETTE KY-922 MAJOR WIDENING(O) IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
2,000,000
3,000,000
4,950,000
0 5,000,000 0 4,950,000 0 0 0
252
FAYETTE KY-922 PREFINANCD CONVRSN(O)
IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 10,050,000
0 0 0 10,050,000 0 0 0
252.02
FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2019.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 330,000
0 330,000 0 0 0 0 0
357.16
84
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2020.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 330,000
0 0 330,000 0 0 0 0
357.17
FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2021.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 180,000
0 0 0 180,000 0 0 0
357.18
FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2022.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 180,000
0 0 0 0 180,000 0 0
357.19
FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 180,000
0 0 0 0 0 180,000 0
357.2
FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 180,000
0 0 0 0 0 0 180,000
357.21
85
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE KY-4 MAJOR WIDENING(O) WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TO BOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION AT NEWTOWN PIKE
PL
Project Cost:
CN
UT
RW
DN
NH 10,000,000
0 0 10,000,000 0 0 0 0
366
FAYETTE KY-4 PREFINANCD CONVRSN(O)
WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TO BOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION AT NEWTOWN PIKE
PL
Project Cost:
CN
UT
RW
DN
NH 22,300,000
0 0 0 22,300,000 0 0 0
366.02
FAYETTE US-27 RECONSTRUCTION(O)REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGE AND TYPICAL SECTION ON US 27 (NORTH BROADWAY)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
2,440,000
1,550,000
12,040,000
0 0 2,440,000 1,550,000 0 12,040,000 0
412
FAYETTE CS-4524 RECONSTRUCTION(O)CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND RICHMOND ROAD (US-25).
PL
Project Cost:
CN
UT
RW
DN
SLX 262,000
262,000 0 0 0 0 0 0
428
FAYETTE KY-4 MAJOR WIDENING(O) REDUCE CONGESTION ON KY-4 (NEW CIRCLE RD) FROM TRADE CENTER DR TO WOODHILL DR.
PL
Project Cost:
CN
UT
RW
DN NH 2,000,000
0 0 0 0 0 0 2,000,000
438
86
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE KY-4 MINOR WIDENING(O) NEW CIRCLE RD: IMPROVE SAFETY AND REDUCE CONGESTION FROM US-68 (HARRODSBURG RD) TO US-60 (VERSAILLES RD). SEE SEGMENTS 2A & 2B IN AUGUST, 1998 ADVANCE
PL
Project Cost:
CN
UT
RW
DN NH 2,200,000
0 0 0 0 0 0 2,200,000
439
FAYETTE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 421 OVER FORK OF TOWN BRANCH AT INTERSECTION OF US 421 AND BRACKTOWN RD (CS 4008) (034B00018N)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 800,000
0 800,000 0 0 0 0 0
1129
FAYETTE CS-3605 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCH HICKMAN CREEK AT JCT WITH TATES CREEK ROAD (KY 1974) 034C00038N
PL
Project Cost:
CN
UT
RW
DN
BR 427,000
427,000 0 0 0 0 0 0
1132
FAYETTE CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF NORTH ELKHORN CREEK ON HUME ROAD (CR 1001) 0.7 MI NW OF US 60 (034C00001N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
735,000
0 210,000 735,000 0 0 0 0
1141
FAYETTE CS-7038 MATCHED FED FUNDS(O)
REPLACE DETERIORATED WEST BOUND LANE BRIDGE SECTION OF WILSON DOWNING ROAD BRIDGE ACROSS WEST HICKMAN CREEK.
PL
Project Cost:
CN
UT
RW
DN SLX
SLX
75,000
275,000
350,000 0 0 0 0 0 0
1145
87
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE US-60 SCOPING STUDY(O) SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD TO FOUR LANES. (06CCN)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 280,000
0 0 0 280,000 0 0 0
8340
FAYETTE CS-2548 NEW ROUTE(O) COMPLETE CONSTRUCTION ON POLO CLUB BOULEVARD AT DEERHAVEN LANE AND TODDS ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)(LET
PL
Project Cost:
CN
UT
RW
DN
SLX 1,600,000
1,600,000 0 0 0 0 0 0
8507
FAYETTE KY-4 TRANSP ENHANCEMENT(P)
SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATES CREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,300,000
0 0 2,300,000 0 0 0 0
8801
FAYETTE KY-4 AIR QUALITY(P) SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATES CREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,300,000
0 0 0 2,300,000 0 0 0
8801.1
FAYETTE KY-1927 MAJOR WIDENING(O) IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROAD AND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
1,000,000
1,730,000
6,190,000
0 0 0 1,000,000 1,730,000 0 6,190,000
8902
88
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE KY-1927 PREFINANCD CONVRSN(O)
IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROAD AND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
3,300,000
2,600,000
0 0 0 3,300,000 0 2,600,000 0
8902.01
FAYETTE I-75 MAJOR WIDENING(O) REDUCE CONGESTION ON I-64/I-75 FROM THE C&O RAILROAD BRIDGE TO THE NORTHERN SPLIT (SECTION 1). (16CCN)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
3,000,000
1,000,000
1,000,000
25,000,000
0 0 0 5,000,000 25,000,000 0 0
8909
FAYETTE CR-1121 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MCCALLS MILL RD BRIDGE OVER BOGGS FORK(034C00009N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
360,500
0 157,500 360,500 0 0 0 0
10009
FAYETTE I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 71 TO MILEPOINT 73.94
PL
Project Cost:
CN
UT
RW
DN PM
PM
390,000
3,900,000
0 0 0 0 4,290,000 0 0
20008
FAYETTE I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 CARDINAL DIRECTION(S) FROM MILEPOINT 73.94 TO MILEPOINT 74.729
PL
Project Cost:
CN
UT
RW
DN PM
PM
30,000
3,000,000
0 3,030,000 0 0 0 0 0
20009
89
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-064 BOTH DIRECTION(S) FROM MILEPOINT 81.037 TO MILEPOINT 82.19
PL
Project Cost:
CN
UT
RW
DN PM
PM
175,000
1,750,000
0 0 0 0 0 1,925,000 0
20010
FAYETTE I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 82.19 TO MILEPOINT 89.48
PL
Project Cost:
CN
UT
RW
DN PM
PM
870,000
8,700,000
0 0 0 9,570,000 0 0 0
20011
FAYETTE I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 107.453 TO MILEPOINT 110.213
PL
Project Cost:
CN
UT
RW
DN PM
PM
330,000
3,300,000
0 0 0 3,630,000 0 0 0
20013
FAYETTE I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 110.264 TO MILEPOINT 111.82
PL
Project Cost:
CN
UT
RW
DN PM
PM
190,000
1,900,000
0 0 0 0 2,090,000 0 0
20014
FAYETTE I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 111.82 TO MILEPOINT 120.792
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,080,000
10,800,000
0 0 11,880,000 0 0 0 0
20015
90
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FAYETTE US-421 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 550,000 0 0 0 0 0
20016
FAYETTE US-25 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-25 FROM MILEPOINT 19.10 TO MILEPOINT 22.29
PL
Project Cost:
CN
UT
RW
DN
PM 1,440,000
0 0 0 0 1,440,000 0 0
20025
FAYETTE KY-1974 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-1974 FROM MILEPOINT 7.50 TO MILEPOINT 11.55
PL
Project Cost:
CN
UT
RW
DN
PM 2,748,000
0 0 0 0 0 2,748,000 0
20026
Total for FAYETTE county PL
Total Amounts:
CN
UT
RW
DN 75,000
16,719,000
447,500
2,000,000
4,900,000
24,386,000
1,080,000
2,440,000
33,481,500
280,000
4,200,000
6,600,000
5,550,000
60,736,000
580,000
1,730,000
25,674,000
175,000
2,600,000
41,376,000
4,200,000
76,306,000
16,794,000 31,733,500 37,001,500 77,366,000 43,686,000 28,449,000 80,506,000
FLEMING KY-32 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILES W OF CRAINTOWN RD (CR 1302)035B00038N
PL
Project Cost:
CN
UT
RW
DN
BR 560,000
0 0 560,000 0 0 0 0
1084
91
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER ALLISON CREEK ON KY 111 1.2 MI N OF KY 156. (035B00016N)(EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
455,000
2,135,000
0 455,000 2,135,000 0 0 0 0
1091
FLEMING CR-1240 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER FLEMING CREEK ON MCINTIRE ROAD (CR 1240) AT THE JCT WITH PIKE BLUFF (CR 1305)(035C00065N)
PL
Project Cost:
CN
UT
RW
DN
BR
BR
BR
75,000
50,000
600,000
0 125,000 600,000 0 0 0 0
1092
FLEMING KY-111 BRIDGE REHAB(P) RESTORATION OF GRANGE CITY COVERED BRIDGE LOCATED ON KY-111 BETWEEN FLEMINGSBURG AND GRANGE CITY. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
TE 1,200,000
0 1,200,000 0 0 0 0 0
8804
FLEMING KY-11 SAFETY(P) IMPROVE ACCESS AND RESPONSE TIMES FOR THE FLEMINGSBURG FIRE DEPARTMENT TO THE BYPASS AT MP 11.574.
PL
Project Cost:
CN
UT
RW
DN
SPP 80,000
0 80,000 0 0 0 0 0
8902
FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-111 BRIDGE OVER BR OF HILLSBORO CREEK. (035B00018N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
455,000
1,015,000
0 455,000 1,015,000 0 0 0 0
10005
92
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FLEMING KY-367 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-367 BRIDGE OVER JOHNSON CREEK. (035B00074N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
375,000
980,000
0 375,000 980,000 0 0 0 0
10006
FLEMING KY-2508 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2508 BRIDGE OVER TOWN BRANCH. (035B00030N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
315,000
875,000
0 315,000 875,000 0 0 0 0
10019
FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 111 BRIDGE OVER DAVIS BRANCH. (035B00075N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
315,000
752,500
0 315,000 752,500 0 0 0 0
10020
FLEMING KY-681 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 681 BRIDGE OVER DELANEY CREEK. (035B00103N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
315,000
822,500
0 315,000 822,500 0 0 0 0
10021
FLEMING KY-32 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,250,000
12,500,000
0 13,750,000 0 0 0 0 0
20009
93
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FLEMING US-32 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ON KY-32 BEGINNING AT 0.MILES WEST OF FLEMING/ROWAN CO LINE AND ENDING 0.3 MILES EAST OF THE LINE.
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
SPP
SPP
50,000
800,000
1,000,000
750,000
7,000,000
0 0 50,000 800,000 0 1,750,000 7,000,000
80051
Total for FLEMING county PL
Total Amounts:
CN
UT
RW
DN 3,480,000
75,000
50,000
13,780,000
50,000
7,740,000
800,000
1,000,000
750,000
7,000,000
0 17,385,000 7,790,000 800,000 0 1,750,000 7,000,000
FLOYD US-23 SAFETY(P) IMPROVE SAFETY AND ACCESS ON US-23 BETWEEN KY-80 AND KY-3384.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
420,000
520,000
1,880,000
0 940,000 0 1,880,000 0 0 0
191
FLOYD KY-979 SPOT IMPROVEMENTS(O)
SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBO SCHOOL.(12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 5,540,000
0 0 0 0 5,540,000 0 0
195
FLOYD KY-979 PREFINANCD CONVRSN(O)
SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBO SCHOOL.(12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,370,000
0 0 0 0 0 2,370,000 0
195.01
94
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FLOYD KY-680 NEW ROUTE(O) IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TO THE MOUTH OF TACKETT CREEK (ALT.3B SEC.2)(08CCN)(10CCR)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 13,310,000
0 0 0 13,310,000 0 0 0
301.2
FLOYD KY-680 PREFINANCD CONVRSN(O)
IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TO THE MOUTH OF TACKETT CREEK (ALT.3B SEC.2)(08CCN)(10CCR)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 19,970,000
0 0 0 0 19,970,000 0 0
301.22
FLOYD KY-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1100 OVER LITTLE PAINT CREEK NEAR FLOYD/JOHNSON COUNTY LINE 036B00002N
PL
Project Cost:
CN
UT
RW
DN
BR 322,000
322,000 0 0 0 0 0 0
1111
FLOYD KY-2557 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON KY 2557 AT JCT US 23 IN JUSTELL. (036B00040N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
525,000
3,010,000
0 525,000 3,010,000 0 0 0 0
1119
FLOYD KY-550 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRUSH CREEK ON KY 550 AT JCT WITH KY 850. (036B00015N)(EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
1,050,000
0 210,000 1,050,000 0 0 0 0
1121
95
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FLOYD KY-122 SAFETY(P) CURVE REVISION TO INCLUDE IMPROVED SIGHT DISTANCE AND A LEFT TURN LANE ON KY-122 AT THE KY-680 INTERSECTION IN MCDOWELL(02CCN)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,950,000
0 3,950,000 0 0 0 0 0
8100
FLOYD KY-80 CONGESTION MITIGTN(O)
IMPROVE ACCESS TO KY 80 AT GARRETT EASTBOUND AND ELIMINATE NECESSITY FOR CROSSING WESTBOUND LANES TO MERGE INTO EASTBOUND LANES. MP 1.527 TO MP
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
500,000
3,000,000
0 0 0 500,000 3,000,000 0 0
8703
FLOYD CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRYANT BRANCH LEFT FORK OF CLEAR CREEK ROAD BRIDGE OVER LEFT FK OF BEAVER CREEK. (036C00017N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
384,000
0 175,000 384,000 0 0 0 0
10000
FLOYD KY-466 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 466 BRIDGE OVER LEFT FORK BEAVER CREEK. (036B00032N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
274,750
0 140,000 274,750 0 0 0 0
10014
FLOYD KY-80 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,225,000
12,250,000
0 13,475,000 0 0 0 0 0
20000
96
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FLOYD US-23 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.18 TO MILEPOINT 15.79
PL
Project Cost:
CN
UT
RW
DN
PM 2,557,000
0 0 0 0 0 2,557,000 0
20004
FLOYD US-23 SAFETY(P) CONSTRUCT NEW INTERSECTION ON US-23 AT THE ENTRANCE TO BETSY LANE HIGH SCHOOL
PL
Project Cost:
CN
UT
RW
DN SPP 250,000
0 0 250,000 0 0 0 0
80000
Total for FLOYD county PL
Total Amounts:
CN
UT
RW
DN
322,000
2,275,000
420,000
520,000
16,200,000
250,000
4,718,750
500,000
15,190,000 4,927,00028,510,000
322,000 19,415,000 4,968,750 15,690,000 28,510,000 4,927,000 0
FRANKLIN I-64 MAJOR WIDENING(O) IMPROVE SAFETY, TRUCK MOBILITY, AND REDUCE CONGESTION ALONG I-64 FROM DIRECTLY EAST OF US-127 TO US-60 SOUTH OF FRANKFORT.
PL
Project Cost:
CN
UT
RW
DN NH 4,300,000
0 0 0 0 4,300,000 0 0
551
FRANKLIN KY-3506 AM-BRIDGE (P) DEMOLITION OF THE CLOSED ROADWAY SECTION OF THE BROADWAY BRIDGE IN FRANKFORT.
PL
Project Cost:
CN
UT
RW
DN
BR 300,000
0 300,000 0 0 0 0 0
805
97
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FRANKLIN CR-1230 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BENSON CREEK ON CRAB ORCHARD ROAD (CR 1230) 200 FT NW OF KY 151 NEAR I-64 EXIT 48 (037C00010N) (EBRP)(16CCR)
PL
Project Cost:
CN
UT
RW
DN BR
BR
105,000
633,500
105,000 633,500 0 0 0 0 0
1078
FRANKLIN I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6 LANES FROM KY-151 TO WEST OF THE KY-420 BRIDGE. (2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)(16CCN)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
120,000
120,000
20,330,000
0 0 0 0 240,000 0 20,330,000
2035.7
FRANKLIN KY-420 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 420 BRIDGE OVER CEDAR RUN CREEK. (037B00011N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
350,000
0 210,000 350,000 0 0 0 0
10000
FRANKLIN KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER TRIB TO N. ELKHORN CREEK. (037B00034N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
332,500
0 210,000 332,500 0 0 0 0
10001
FRANKLIN US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
200,000
2,000,000
0 0 0 2,200,000 0 0 0
20001
98
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FRANKLIN US-127 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 11.90 TO MILEPOINT 19.00
PL
Project Cost:
CN
UT
RW
DN
PM 1,228,000
0 0 0 0 1,228,000 0 0
20038
Total for FRANKLIN county PL
Total Amounts:
CN
UT
RW
DN 105,000 420,000
933,500 682,500
200,000
2,000,000
4,300,000
120,000
120,000
1,228,000 20,330,000
105,000 1,353,500 682,500 2,200,000 5,768,000 0 20,330,000
FULTON JC-9003 RECONSTRUCTION(O)IMPROVE THE PURCHASE PARKWAY AT THE KENTUCKY/TENNESSEE LINE TO SOUTHWEST OF THE US-51 INTERCHANGE.(I-69 CORRIDOR IMPROVEMENT)(2012BOP)
PL
Project Cost:
CN
UT
RW
DN
NH 2,500,000
0 0 0 0 0 0 2,500,000
25
FULTON JC-9003 RECONSTRUCTION(O)IMPROVE THE PURCHASE PARKWAY FROM SOUTHWEST OF THE US-51 INTERCHANGE TO CARDINAL ROAD NEAR MAYFIELD INCLUDING THE KY-339 INTERCHANGE IN WINGO, KY.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,000,000
500,000
0 0 0 0 0 1,500,000 0
26
FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2019.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 126,000
0 126,000 0 0 0 0 0
320.16
99
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2020.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 126,000
0 0 126,000 0 0 0 0
320.17
FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
SPP 126,000
0 0 0 126,000 0 0 0
320.18
FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
SPP 126,000
0 0 0 0 126,000 0 0
320.19
FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 126,000
0 0 0 0 0 126,000 0
320.2
FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 126,000
0 0 0 0 0 0 126,000
320.21
100
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
FULTON KY-1099 SAFETY(P) SAFETY IMPROVEMENT AT INTERSECTION OF KY-1099 AND KY-125. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
500,000
780,000
1,460,000
0 0 0 1,280,000 0 1,460,000 0
8853
FULTON KY-1909 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1909 BRIDGE OVER LITTLE BAYOU DE CHIEN CR. (038B00075N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
490,000
0 175,000 490,000 0 0 0 0
10009
FULTON JC-9003 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.78
PL
Project Cost:
CN
UT
RW
DN PM
PM
175,000
1,750,000
0 1,925,000 0 0 0 0 0
20002
Total for FULTON county PL
Total Amounts:
CN
UT
RW
DN 350,000
1,876,000 616,000
500,000
780,000
126,000 1,586,000
1,000,000
500,000
126,000
2,500,000
126,000
0 2,226,000 616,000 1,406,000 126,000 3,086,000 2,626,000
GALLATIN -0 NEW ROUTE(O) STUDY NEW CORRIDOR BETWEEN I-71 IN GALLATIN COUNTY AND AA HIGHWAY IN CAMPBELL COUNTY.
PL
Project Cost:
CN
UT
RW
DN
STP 2,000,000
0 0 0 2,000,000 0 0 0
458
101
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GALLATIN I-71 RECONSTRUCTION(O)IMPROVE GEOMETRICS ON I-71 FROM US-127 TO MP 64. (16CCN).
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
2,200,000
1,500,000
500,000
0 0 0 2,200,000 2,000,000 0 0
8910
GALLATIN I-71 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 53.433 TO MILEPOINT 56.763
PL
Project Cost:
CN
UT
RW
DN PM
PM
500,000
5,000,000
0 0 0 0 0 0 5,500,000
20021
GALLATIN I-71 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 59.673 TO MILEPOINT 69.89
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,025,000
10,250,000
0 0 0 0 11,275,000 0 0
20022
Total for GALLATIN county PL
Total Amounts:
CN
UT
RW
DN
2,000,000
2,200,000 1,025,000
1,500,000
500,000
10,250,000
500,000
5,000,000
0 0 0 4,200,000 13,275,000 0 5,500,000
GARRARD US-27 RELOCATION(O) IMPROVE US-27 FROM WEST LANCASTER BYPASS TO KY-34. (2006BOPC) (16CCN)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
500,000
10,000,000
9,000,000
38,000,000
0 500,000 10,000,000 9,000,000 38,000,000 0 0
196.3
102
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GARRARD KY-563 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39; 040B00034N
PL
Project Cost:
CN
UT
RW
DN
BR 406,000
406,000 0 0 0 0 0 0
1122
GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER GILBERTS CREEK ON KY 1972 1.4 MI E OF CRAB ORCHARD ROAD (CR 1226) AT SECL OF LANCASTER. (040B00024N)(EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
647,500
0 210,000 647,500 0 0 0 0
1138
GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1972 BRIDGE OVER BRANCH OF GILBERTS CREEK. (040B00025N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
416,500
0 175,000 416,500 0 0 0 0
10010
Total for GARRARD county PL
Total Amounts:
CN
UT
RW
DN
406,000
885,000
10,000,000
1,064,000
9,000,000
38,000,000
406,000 885,000 11,064,000 9,000,000 38,000,000 0 0
GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3 MILES NORTHEAST OF US 25. 041C00012N (12CCN)
PL
Project Cost:
CN
UT
RW
DN
BR 1,141,000
0 1,141,000 0 0 0 0 0
8714
103
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF BLANCHET ROAD 0.2 MILES SOUTHEAST OF THE JUNCTION WITH US 25. 041C00014N (12CCN)
PL
Project Cost:
CN
UT
RW
DN
BR 2,604,000
0 0 2,604,000 0 0 0 0
8715
GRANT CR-1142 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILE NORTH OF THE JUNCTION WITH US 25. 041C00016N (12CCN)
PL
Project Cost:
CN
UT
RW
DN
BR 2,240,000
0 0 2,240,000 0 0 0 0
8716
GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGE OVER CLARKS CRK+BATON ROUGE R. (041B00011N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
1,732,500
0 210,000 1,732,500 0 0 0 0
10001
GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGES OVER EAGLE CREEK (041B00014N) AND RATTLESNAKE CREEK (041B00013N).
PL
Project Cost:
CN
UT
RW
DN BR
BR
577,500
4,165,000
0 577,500 4,165,000 0 0 0 0
10002
GRANT CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CYNTHIANA ROAD BRIDGE OVER COOPERTOWN CREEK. (041C00008N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
367,500
0 175,000 367,500 0 0 0 0
10003
104
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 22 BRIDGE OVER CLARKS CRK+BATON ROUGE R. (041B00011N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
420,000
2,940,000
0 420,000 2,940,000 0 0 0 0
10010
GRANT I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 143.239 TO MILEPOINT 145.5
PL
Project Cost:
CN
UT
RW
DN PM
PM
90,000
900,000
0 0 990,000 0 0 0 0
20023
GRANT I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 145.5 TO MILEPOINT 152.122
PL
Project Cost:
CN
UT
RW
DN PM
PM
275,000
2,750,000
0 0 0 0 3,025,000 0 0
20024
GRANT I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 152.112 TO MILEPOINT 157.7
PL
Project Cost:
CN
UT
RW
DN PM
PM
970,000
9,700,000
0 10,670,000 0 0 0 0 0
20025
GRANT I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 162.52 TO MILEPOINT 164
PL
Project Cost:
CN
UT
RW
DN PM
PM
220,000
2,200,000
0 2,420,000 0 0 0 0 0
20027
105
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GRANT I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 164.4 TO MILEPOINT 166.263
PL
Project Cost:
CN
UT
RW
DN PM
PM
125,000
1,250,000
0 0 0 0 0 1,375,000 0
20028
GRANT KY-22 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
47,500
475,000
0 0 0 522,500 0 0 0
20029
Total for GRANT county PL
Total Amounts:
CN
UT
RW
DN 2,572,500
13,041,000
90,000
14,949,000
47,500
475,000
275,000
1,250,000
125,000
2,750,000
0 15,613,500 15,039,000 522,500 3,025,000 1,375,000 0
GRAVES KY-80 NEW ROUTE(O) MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303 SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY (PURCHASE PARKWAY).
PL
Project Cost:
CN
UT
RW
DN
SPP 7,280,000
0 0 7,280,000 0 0 0 0
181.5
GRAVES KY-80 PREFINANCD CONVRSN(O)
MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303 SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY (PURCHASE PARKWAY).
PL
Project Cost:
CN
UT
RW
DN
SPP 7,280,000
0 0 0 7,280,000 0 0 0
181.51
106
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GRAVES CR-1088 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER PANTHER CREEK ON MCKENDREE CHURCH RD (CR 1088) 0.3 MI E OF KY 301 042C00010N
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
553,000
0 280,000 0 0 553,000 0 0
1157
GRAVES KY-1890 AM-BRIDGE (P) REPLACE KY-1890 BRIDGE OVER LITTLE MAYFIELD CREEK. (042B00191N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
507,500
0 140,000 507,500 0 0 0 0
10001
GRAVES CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MARTIN ROAD BRIDGE OVER BRANCH-OBION CREEK. (042C00250N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
200,000
423,500
0 200,000 0 423,500 0 0 0
10002
GRAVES KY-1485 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1485 BRIDGE OVER TERRAPIN CREEK. (042B00136N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
875,000
0 210,000 875,000 0 0 0 0
10010
GRAVES JC-9003 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 22 TO MILEPOINT 34.49
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,000,000
1,000,000
0 0 0 0 2,000,000 0 0
20004
107
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GRAVES KY-94 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 10.49 TO MILEPOINT 15.78
PL
Project Cost:
CN
UT
RW
DN
PM 825,000
0 0 0 0 825,000 0 0
20028
GRAVES KY-339 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-339 FROM MILEPOINT 6.04 TO MILEPOINT 13.40
PL
Project Cost:
CN
UT
RW
DN
PM 1,274,000
0 0 0 0 0 1,274,000 0
20029
Total for GRAVES county PL
Total Amounts:
CN
UT
RW
DN 830,000
8,662,500 7,703,500
1,000,000
1,274,0002,378,000
0 830,000 8,662,500 7,703,500 3,378,000 1,274,000 0
GRAYSON US-62 MINOR WIDENING(O) IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY3155) TO JUST EAST OF BEEHIVE CURVE. CONSTRUCTION SEGMENT 1.
PL
Project Cost:
CN
UT
RW
DN
STP 2,000,000
0 0 2,000,000 0 0 0 0
8502.1
GRAYSON US-62 PREFINANCD CONVRSN(O)
IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY3155) TO JUST EAST OF BEEHIVE CURVE. CONSTRUCTION SEGMENT 1.
PL
Project Cost:
CN
UT
RW
DN
STP 2,000,000
0 0 0 2,000,000 0 0 0
8502.11
108
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GRAYSON US-62 MINOR WIDENING(O) IMPROVE US 62 FROM JUST EAST OF BEEHIVE CURVE TO KY224. CONSTRUCTION SEGMENT 2.
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 0 0 0 0 5,000,000
8502.2
GRAYSON KY-3155 NEW ROUTE(O) EXTEND THE WILLIAM THOMASON BYWAY (KY 3155) FROM THE SOUTHERN INTERSECTION AT KY 259 WESTERLY TO KY 54
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
2,500,000
1,500,000
14,500,000
0 1,000,000 0 4,000,000 14,500,000 0 0
8954
GRAYSON CR-1161 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HORNTOWN RD BRIDGE OVER ROCK CREEK. (043C00011N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
100,000
220,000
0 100,000 220,000 0 0 0 0
10000
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 108.00 TO MILEPOINT 111.(110.50 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
230,000
2,300,000
0 0 2,530,000 0 0 0 0
20000
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 111.25 TO MILEPOINT 112.48
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 0 550,000 0 0
20001
109
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 112.4 TO MILEPOINT 114.8
PL
Project Cost:
CN
UT
RW
DN PM
PM
190,000
1,900,000
0 0 0 2,090,000 0 0 0
20002
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 114.8 TO MILEPOINT 116.95
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 0 0 1,100,000 0
20003
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 88.433 TO MILEPOINT 91.2
PL
Project Cost:
CN
UT
RW
DN
PM 2,590,000
0 0 2,590,000 0 0 0 0
20004
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY NON-CARDINAL DIRECTION(S) FROM MILEPOINT 91.2 TO MILEPOINT 95
PL
Project Cost:
CN
UT
RW
DN PM
PM
150,000
1,500,000
0 0 1,650,000 0 0 0 0
20006
GRAYSON US-62 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 14.49 TO MILEPOINT 20.79
PL
Project Cost:
CN
UT
RW
DN
PM 999,000
0 0 0 0 0 0 999,000
20027
110
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for GRAYSON county PL
Total Amounts:
CN
UT
RW
DN 1,100,000 380,000
8,610,000
190,000
2,500,000
1,500,000
3,900,000
50,000
1,000,000
100,000
15,000,000 5,999,000
0 1,100,000 8,990,000 8,090,000 15,050,000 1,100,000 5,999,000
GREEN US-68 RECONSTRUCTION(O)US68 IMPROVEMENTS FROM T DAVIS RD TO CLOVER LICK CREEK (MP 6.425 TO 11.744) AS PER 3-203 SCOPING STUDY (SPOT IMPROVEMENTS #11, 12 & 13). (DESIGN UNDER 4-397)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
2,000,000
2,000,000
9,000,000
0 0 0 2,000,000 2,000,000 9,000,000 0
397.1
GREEN US-68 RECONSTRUCTION(O)ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG US 68 FROM 1600 FEET WEST OF SOUTH THURLOW RD(MP 9.682) EXTENDING TO THE
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
250,000
720,000
2,740,000
0 970,000 2,740,000 0 0 0 0
397.12
GREEN -0 NEW ROUTE(O) CONSTRUCT NEW CONNECTOR FROM VAUGHN CURVE ON US-68 BYPASS EAST OF GREENSBURG CROSSING KY-61 AND KY-417 AND CONNECTING WITH KY-3535 NORTH OF
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
2,000,000
3,000,000
2,000,000
0 0 0 2,000,000 0 3,000,000 2,000,000
398
GREEN KY-61 MAJOR WIDENING(O) IMPROVE SAFETY AND MOBILITY ON KY-61 FROM PITMAN CREEK BRIDGE TO DOC WARD RD (CR 1314). (12CCN)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
2,000,000
2,750,000
6,000,000
0 0 0 0 2,000,000 2,750,000 6,000,000
8712
111
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GREEN KY-88 SPOT IMPROVEMENTS(O)
SPOT IMPROVEMENTS & IMPROVE EXISTING ALIGNMENT ON KY 88 FROM 0.20 MILES WEST OF AKIN NARROWS OF PITMAN RD (MP 8.996) TO KY 61 (MP 11.232). (14CCN)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
500,000
2,900,000
1,000,000
3,000,000
0 0 0 500,000 2,900,000 1,000,000 3,000,000
8853
GREEN CR-1347 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JONES SCHOOL RD BRIDGE OVER BRUSH CREEK. (044C00023N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
100,000
203,000
0 100,000 203,000 0 0 0 0
10001
GREEN US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 BRIDGE OVER GREASY CREEK. (044B00013N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
105,000
402,500
0 105,000 402,500 0 0 0 0
10009
Total for GREEN county PL
Total Amounts:
CN
UT
RW
DN 205,000
250,000
720,000
3,345,500
2,500,000
2,000,000 4,900,000
2,000,000
9,000,000
3,000,000
3,750,000 2,000,000
9,000,000
0 1,175,000 3,345,500 4,500,000 6,900,000 15,750,000 11,000,000
GREENUP KY-2 PE & ENVIRONMENTAL(O)
RECONSTRUCT KY-2 FROM MP 13.2 TO US-23 (MP 17.2)(08CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
6,070,000
3,380,000
36,000,000
0 0 0 6,070,000 0 3,380,000 36,000,000
132
112
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GREENUP CS-3060 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS-PHASE B ALONG GESLING RD (CS-3060) FROM INTERSECTION OF CARDINAL RD (CS-3061) & SEATON DR (KY-750) TO KENWOOD DR (CS-3054/KY-1093) &
PL
Project Cost:
CN
UT
RW
DN SAH
SAH
SAH
SAH
68,000
20,000
80,000
444,000
88,000 524,000 0 0 0 0 0
401
GREENUP KY-750 MATCHED FED FUNDS(O)
DESIGN AND CONSTRUCTION OF SIDEWALKS ALONG POWELL LANE (KY-750) IN FLATWOODS, KY BEGINNING AT END OF THE EXISTING SIDEWALK AT MP 1.74 AND
PL
Project Cost:
CN
UT
RW
DN
SAH
SAH
SAH
32,000
64,000
370,000
466,000 0 0 0 0 0 0
402
GREENUP KY-244 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCT US 23; 045B00039N (16CCR)
PL
Project Cost:
CN
UT
RW
DN
BR 11,655,000
11,655,000 0 0 0 0 0 0
1073
GREENUP CS-4041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POND RUN ON WILLIAMS AVE (CS 4041) IN RACELAND 250 FT NW OF POND RUN ROAD (CS 4001) (045C00119N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
840,000
0 245,000 840,000 0 0 0 0
1094
GREENUP KY-207 NEW ROUTE(O) IMPROVE KY-207 FROM THE INDUSTRIAL PARKWAY TO THE KY-693 INTERSECTION IN FLATWOODS.(08CCN)(16CCR)
PL
Project Cost:
CN
UT
RW
DN STP 2,000,000
0 0 0 0 0 0 2,000,000
8509
113
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
GREENUP KY-503 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-503 BRIDGE OVER INDIAN RUN CREEK. (045B00033N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
753,000
0 245,000 753,000 0 0 0 0
10007
GREENUP CR-1018 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SMITH BRANCH RD BRIDGE OVER LEFT FK SMITH BRANCH. (045C00114N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
595,000
0 280,000 595,000 0 0 0 0
10008
GREENUP LA-1000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MUSKETEER DRIVE BRIDGE OVER SLASH BRANCH. (045C00150N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
300,000
0 245,000 300,000 0 0 0 0
10009
GREENUP KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1 BRIDGE OVER LOST CREEK. (045B00006N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
1,015,000
0 350,000 1,015,000 0 0 0 0
10022
Total for GREENUP county PL
Total Amounts:
CN
UT
RW
DN 68,000
52,000
64,000
12,025,000
1,365,000
80,000
444,000 3,503,000
6,070,000
3,380,000
2,000,000
36,000,000
12,209,000 1,889,000 3,503,000 6,070,000 0 3,380,000 38,000,000
114
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HANCOCK US-60 MINOR WIDENING(O) IMPROVE THE WESTBOUND LANES OF US-60 FROM KY-1957 TO 0.2 MILE WEST OF KY-6106. (12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
90,000
960,000
6,090,000
0 90,000 960,000 6,090,000 0 0 0
226
HANCOCK US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
525,000
5,250,000
0 0 0 0 5,775,000 0 0
20022
Total for HANCOCK county PL
Total Amounts:
CN
UT
RW
DN90,000
960,000
6,090,000
525,000
5,250,000
0 90,000 960,000 6,090,000 5,775,000 0 0
HARDIN KY-251 PHASE I DESIGN(O) KY 251 IMPROVEMENTS FROM KY 3005 TO KY 434.
PL
Project Cost:
CN
UT
RW
DN
BR2
BR2
4,200,000
8,700,000
0 4,200,000 0 8,700,000 0 0 0
153.01
HARDIN US-31 CONGESTION MITIGTN(O)
IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-31WB TO CS-2255 (WILSON ROAD). (10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
500,000
1,000,000
1,000,000
9,000,000
0 0 0 500,000 0 0 11,000,000
154
115
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARDIN KY-313 MAJOR WIDENING(O) WIDEN KY 313 TO 4 LANES BETWEEN PATRIOT PARKWAY (MP 10.598) AND THE BULLION BOULEVARD CONNECTOR (MP 14.534). (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
BR2
BR2
750,000
12,000,000
0 750,000 12,000,000 0 0 0 0
170
HARDIN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO 36.8 IN WEST POINT) (047B00007N).(16CCR)
PL
Project Cost:
CN
UT
RW
DN
BR 10,500,000
0 10,500,000 0 0 0 0 0
199
HARDIN US-62 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON US-62 FROM I-65 TO UPPER COLESBURG ROAD (CR-1038)
PL
Project Cost:
CN
UT
RW
DN STP 1,500,000
0 0 0 0 1,500,000 0 0
442
HARDIN US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER ROLLING FORK AT THE HARDIN-NELSON CO LINE. 047B00023N
PL
Project Cost:
CN
UT
RW
DN
BR 3,381,000
0 0 3,381,000 0 0 0 0
1093
HARDIN KY-361 SAFETY(P) RELOCATE INTERSECTION OF WOODLAND DRIVE AT US-31W. (98CCN)(06CCR)(REMAINING FUNDS FOR AGREEMENT)(12CCR)(LET BY KYTC)
PL
Project Cost:
CN
UT
RW
DN
BR2 2,500,000
0 0 2,500,000 0 0 0 0
7020
116
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARDIN KY-1357 SAFETY(P) IMPROVE SAFETY, GEOMETRICS, DRAINAGE AND MAINTENANCE ISSUES ALONG KY-1357 (ST. JOHNS RD) FROM US-31W BYPASS TO KY-3005 (RING ROAD). (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
3,000,000
2,500,000
9,000,000
0 0 3,000,000 2,500,000 0 0 9,000,000
8801
HARDIN KY-220 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 220 BRIDGE OVER MARTINS BRANCH CREEK. (047B00080N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
87,500
192,500
0 87,500 192,500 0 0 0 0
10010
HARDIN KY-2212 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2212 BRIDGE OVER PAWLEY CREEK. (047B00134N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
91,000
206,500
0 91,000 206,500 0 0 0 0
10011
HARDIN KY-2800 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2800 BRIDGE OVER SANDY CREEK. (047B00137N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
87,500
206,500
0 87,500 206,500 0 0 0 0
10012
HARDIN CR-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEWLEY HOLLOW RD BRIDGE OVER MILL CREEK. (047C00014N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
91,000
227,500
0 91,000 227,500 0 0 0 0
10013
117
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARDIN BG-9002 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 5.82 TO MILEPOINT 8.837
PL
Project Cost:
CN
UT
RW
DN PM
PM
240,000
2,400,000
0 2,640,000 0 0 0 0 0
20007
HARDIN US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
550,000
5,500,000
0 6,050,000 0 0 0 0 0
20011
HARDIN US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
250,000
2,500,000
0 2,750,000 0 0 0 0 0
20012
HARDIN US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
325,000
3,250,000
0 0 0 3,575,000 0 0 0
20013
HARDIN US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
25,000
250,000
0 0 275,000 0 0 0 0
20014
118
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARDIN WK-9001 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 119.649 TO MILEPOINT 120.649
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 0 0 0 1,100,000
20015
HARDIN WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 120.93 (120.65 NON-CARDINAL) TO MILEPOINT 132.4
PL
Project Cost:
CN
UT
RW
DN PM
PM
920,000
9,200,000
0 0 0 10,120,000 0 0 0
20016
HARDIN WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 132.4 TO MILEPOINT 134.923
PL
Project Cost:
CN
UT
RW
DN PM
PM
200,000
2,000,000
0 2,200,000 0 0 0 0 0
20018
HARDIN WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 134.923 TO MILEPOINT 135.923
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 0 0 0 1,100,000
20019
HARDIN US-62 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 9.57 TO MILEPOINT 13.77
PL
Project Cost:
CN
UT
RW
DN
PM 689,000
0 0 0 0 689,000 0 0
20028
119
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for HARDIN county PL
Total Amounts:
CN
UT
RW
DN 1,597,000
4,950,000
22,900,000
25,000
3,000,000
18,964,000
1,745,000
2,500,000
21,150,000
1,500,000
689,000
200,000
1,000,000
1,000,000
20,000,000
0 29,447,000 21,989,000 25,395,000 2,189,000 0 22,200,000
HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WALLINS CREEK ON KY 219 3.0 MILE SOUTH OF SCL OF WALLINS CREEK. (048B00047N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
510,000
0 175,000 510,000 0 0 0 0
1097
HARLAN US-119 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 119 OVER KY 160/MAIN ST IN HARLAN COUNTY, KY. 048B00126N
PL
Project Cost:
CN
UT
RW
DN BR
BR
560,000
5,460,000
0 560,000 5,460,000 0 0 0 0
1101
HARLAN CR-1328 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SWEET BALL RD (CR-1328) (0.175) OVER AGES BRANCH. 048C00072N
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
455,000
0 175,000 455,000 0 0 0 0
1107
HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00046N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
490,000
0 175,000 490,000 0 0 0 0
10010
120
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00048N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
367,500
0 175,000 367,500 0 0 0 0
10011
HARLAN KY-72 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-72 BRIDGE OVER CLOVER FK CUMBERLAND RVR. (048B00095N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
910,000
0 245,000 910,000 0 0 0 0
10012
HARLAN KY-179 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-179 BRIDGE OVER FUGETT CREEK. (048B00097N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
612,500
0 175,000 612,500 0 0 0 0
10013
HARLAN KY-3451 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3451 BRIDGE OVER EWING CREEK. (048B00146N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
525,000
0 175,000 525,000 0 0 0 0
10014
HARLAN KY-2007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2007 BRIDGE OVER WALLINS CREEK. (048B00179N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
469,000
0 192,500 469,000 0 0 0 0
10015
121
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARLAN CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RASNICK RD BRIDGE OVER POOR FK CUMBERLAND RVR. (048C00008N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
630,000
0 192,500 630,000 0 0 0 0
10016
HARLAN CR-1218 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BLUE LN BRIDGE OVER PATH FK OF PUCKETT CREEK. (048C00043N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
581,000
0 175,000 581,000 0 0 0 0
10017
HARLAN CS-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KENTUCKY AV BRIDGE OVER MARTINS FK CUMBERLAND RV. (048C00067N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
647,500
0 175,000 647,500 0 0 0 0
10018
HARLAN CR-1082 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PRICE LN BRIDGE OVER CLOVER FK CUMBERLAND RVR. (048C00094N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
598,500
0 192,500 598,500 0 0 0 0
10019
HARLAN CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BANNER FORK RD BRIDGE OVER WALLINS CREEK. (048C00138N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
427,000
0 175,000 427,000 0 0 0 0
10020
122
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARLAN KY-1604 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1601 BRIDGE OVER JONES CREEK. (048B00073N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
740,600
0 175,000 740,600 0 0 0 0
10040
Total for HARLAN county PL
Total Amounts:
CN
UT
RW
DN 3,132,500
13,423,600
0 3,132,500 13,423,600 0 0 0 0
HARRISON KY-32 SAFETY(P) IMPROVE SAFETY ON KY-32 AT THE ENTRANCE TO HARRISON MEMORIAL HOSPITAL IN CYNTHIANA.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,290,000
0 0 0 2,290,000 0 0 0
908
HARRISON CR-1124 BRIDGE REPLACEMENT(P)
REPLACE BRIDGE ON OLD LAIR RD (CR-1124) (0.071) OVER S. FORK LICKING RIVER. (SR=14.2) 049C00035N
PL
Project Cost:
CN
UT
RW
DN SPP 500,000
0 0 0 500,000 0 0 0
1093
HARRISON US-62 RECONSTRUCTION(O)IMPROVE US-62 FROM SALEM PIKE (CR-1005) TO APPROXIMATELY MP 12.3. (12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,920,000
0 0 0 0 2,920,000 0 0
8707
123
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HARRISON US-27 RECONSTRUCTION(O)RECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4. (12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
500,000
5,500,000
0 0 0 500,000 0 5,500,000 0
8708
Total for HARRISON county PL
Total Amounts:
CN
UT
RW
DN 500,000
500,000
2,290,000 5,500,0002,920,000
0 0 0 3,290,000 2,920,000 5,500,000 0
HART KY-335 ECONOMIC DEVEL(O)IMPROVE MOBILITY, CONNECTIVITY AND SAFETY BY ADDRESSING COMMERCIAL AND INDUSTRIAL TRAFFIC MOVEMENT FROM US-31W SOUTH OF KY-218 TO I-65. (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,500,000
1,000,000
0 0 1,500,000 1,000,000 0 0 0
441
HART US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-31E FROM MILEPOINT 13.18 TO MILEPOINT 21.58
PL
Project Cost:
CN
UT
RW
DN
PM 964,000
0 0 0 0 0 964,000 0
20029
Total for HART county PL
Total Amounts:
CN
UT
RW
DN1,500,000
1,000,000
964,000
0 0 1,500,000 1,000,000 0 964,000 0
124
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HENDERSON US-60 RECONSTRUCTION(O)WATHEN LANE: UPGRADE WITH WIDENED LANES, CURB, GUTTER AND SIDEWALK FROM US 60 TO CITY LIMITS.
PL
Project Cost:
CN
UT
RW
DN SHN 304,000
304,000 0 0 0 0 0 0
382
HENDERSON CS-1372 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON CS-1372 (WATSON LANE)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
400,000
1,400,000
1,400,000
5,000,000
0 400,000 1,400,000 1,400,000 5,000,000 0 0
383
HENDERSON -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2018. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SHN 1,176,000
1,176,000 0 0 0 0 0 0
700.13
HENDERSON -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2019. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
PL
Project Cost:
CN
UT
RW
DN
SHN 700,000
0 700,000 0 0 0 0 0
700.14
HENDERSON -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2020. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
PL
Project Cost:
CN
UT
RW
DN
SHN 700,000
0 0 700,000 0 0 0 0
700.15
125
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HENDERSON -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2021. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
PL
Project Cost:
CN
UT
RW
DN
SHN 700,000
0 0 0 700,000 0 0 0
700.16
HENDERSON -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2022. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
PL
Project Cost:
CN
UT
RW
DN
SHN 700,000
0 0 0 0 700,000 0 0
700.17
HENDERSON -0 MATCHED FED FUNDS(O)
FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2023. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
PL
Project Cost:
CN
UT
RW
DN
SHN 700,000
0 0 0 0 0 700,000 0
700.18
HENDERSON US-41 SAFETY(P) US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20% MATCH.(TOLL
PL
Project Cost:
CN
UT
RW
DN
SHN
SHN
SHN
50,000
100,000
950,000
1,100,000 0 0 0 0 0 0
711
HENDERSON CS-1453 AM-BRIDGE (P) WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FT PRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPA PROJECT. CITY TO PROVIDE MATCH.
PL
Project Cost:
CN
UT
RW
DN
SHN
SHN
20,000
160,000
180,000 0 0 0 0 0 0
713
126
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HENDERSON KY-2183 MATCHED FED FUNDS(O)
KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCT THE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUND APPROACH. (2012BOP
PL
Project Cost:
CN
UT
RW
DN
SHN
SHN
SHN
150,000
400,000
600,000
550,000 600,000 0 0 0 0 0
714
HENDERSON US-41 MATCHED FED FUNDS(O)
US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADD DEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASING TO BE MODIFIED OR
PL
Project Cost:
CN
UT
RW
DN
SHN
SHN
SHN
50,000
100,000
500,000
150,000 500,000 0 0 0 0 0
715
HENDERSON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078 051B00015N.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
BR 6,000,000
0 6,000,000 0 0 0 0 0
1080
HENDERSON US-60 PREFINANCD CONVRSN(O)
ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078. (SR 39051B00015N (ADDITIONAL FUNDING FOR C PHASE)
PL
Project Cost:
CN
UT
RW
DN
BR 6,000,000
0 0 6,000,000 0 0 0 0
1080.01
HENDERSON I-69 NEW ROUTE(O) DEVELOP ALIGNMENT FOR I-69 HENDERSON/EVANSVILLE OHIO RIVER CROSSING (TO BE DEVELOPED IN CONCERT WITH 2-1088.00).(16CCR)(C-COST=$1.0 BILLION; KYTC SHARE
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
500,000
19,900,000
8,000,000
0 500,000 0 19,900,000 8,000,000 0 0
1088.1
127
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HENDERSON US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING ON US 41 BRIDGES OVER OHIO RIVERJOINT PROJECT WITH INDIANA. (051B0002R, 051B0007L)(BSBP)
PL
Project Cost:
CN
UT
RW
DN
BR 21,200,000
0 0 0 0 21,200,000 0 0
2091.1
HENDERSON I-69 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 142.146 TO MILEPOINT 148.09 (150.142 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
640,000
6,400,000
0 0 0 7,040,000 0 0 0
20023
Total for HENDERSON county PL
Total Amounts:
CN
UT
RW
DN 304,000
250,000
620,000
2,286,000
900,000
7,800,000
1,400,000
6,700,000
640,000
19,900,000
1,400,000
7,100,000
8,000,000
700,00026,900,000
3,460,000 8,700,000 8,100,000 29,040,000 34,900,000 700,000 0
HENRY I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY-53 TO KY-153.
PL
Project Cost:
CN
UT
RW
DN NH 5,600,000
0 0 0 0 0 5,600,000 0
552
HENRY KY-146 RECONSTRUCTION(O)MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 AND PENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK (1/2 MILE EAST
PL
Project Cost:
CN
UT
RW
DN
SPP 6,930,000
0 6,930,000 0 0 0 0 0
8300
128
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HENRY KY-146 PREFINANCD CONVRSN(O)
MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 AND PENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY-153) TO LOST CREEK (1/2 MILE
PL
Project Cost:
CN
UT
RW
DN
SPP 6,930,000
0 0 0 0 0 6,930,000 0
8300.01
HENRY KY-997 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 997 BRIDGE OVER WHITE SULPHUR CREEK(052B00060N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
266,000
0 192,500 266,000 0 0 0 0
10002
HENRY KY-3175 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3175 BRIDGE OVER WHITE SULPHUR FORK(052B00064N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
262,500
574,000
0 262,500 574,000 0 0 0 0
10003
HENRY KY-3320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3320 BRIDGE OVER TRIB OF HARRODS CREEK. (052B00070N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
287,000
0 210,000 287,000 0 0 0 0
10004
HENRY CR-1027 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GULLION RUN RD BRIDGE OVER TRIB OF GULLION RUN. (052C00045N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
231,000
0 175,000 231,000 0 0 0 0
10006
129
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HENRY KY-1606 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1606 BRIDGE OVER WHITE SULPHUR FORK(052B00048N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
1,022,000
0 245,000 1,022,000 0 0 0 0
10017
HENRY I-71 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 24.727 TO MILEPOINT 28.173.
PL
Project Cost:
CN
UT
RW
DN PM
PM
450,000
4,500,000
0 4,950,000 0 0 0 0 0
20002
HENRY I-71 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-071 CARDINAL DIRECTION(S) FROM MILEPOINT 37.183 TO MILEPOINT 38.086
PL
Project Cost:
CN
UT
RW
DN PM
PM
40,000
400,000
0 0 440,000 0 0 0 0
20007
Total for HENRY county PL
Total Amounts:
CN
UT
RW
DN 1,535,000
11,430,000
40,000
2,780,000 6,930,000
5,600,000
0 12,965,000 2,820,000 0 0 12,530,000 0
HICKMAN KY-1826 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON KY-1826 OVER TOWN CREEK (B79) IN CLINTON. (053B00079N)
PL
Project Cost:
CN
UT
RW
DN
BR 1,400,000
0 1,400,000 0 0 0 0 0
1062
130
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HICKMAN CR-1011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER IC RR ON BALTIMORE RD (CR 1011) 0.3 MI NW OF HICKMAN/GRAVES CO LINE 053C00003N
PL
Project Cost:
CN
UT
RW
DN BR
BR
266,000
1,613,500
0 266,000 1,613,500 0 0 0 0
1156
HICKMAN KY-2206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2206 BRIDGE OVER CANE CR FK -OBION CRK. (053B00090N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
875,000
0 210,000 875,000 0 0 0 0
10011
Total for HICKMAN county PL
Total Amounts:
CN
UT
RW
DN 476,000
1,400,000 2,488,500
0 1,876,000 2,488,500 0 0 0 0
HOPKINS US-41 MAJOR WIDENING(O) US 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR "STP" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
HPP 2,879,680
2,879,680 0 0 0 0 0 0
137.02
HOPKINS US-41 MAJOR WIDENING(O) IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1) (2012BOP)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 5,000,000
0 0 5,000,000 0 0 0 0
137.1
131
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HOPKINS US-41 PREFINANCD CONVRSN(O)
IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1) (2012BOP)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 5,000,000
0 0 0 5,000,000 0 0 0
137.11
HOPKINS US-41 MAJOR WIDENING(O) WIDEN US-41A FROM YORKWOOD PLACE TO US-41 / KY-281. (SECTION 2) (2012BOP)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 8,000,000
8,000,000 0 0 0 0 0 0
137.2
HOPKINS KY-281 MAJOR WIDENING(O) IMPROVE KY-281 FROM ISLAND PARK DRIVE TO CARRIAGE LANE (KY-2281).
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
500,000
1,000,000
1,000,000
0 0 0 0 0 500,000 2,000,000
384
HOPKINS -0 NEW ROUTE(O) CONSTRUCTION OF THE CENTER STREET CONNECTOR ROAD BEGINNING AT CENTER STREET AND PROCEEDING TO THE CSX RAILROADSECTION 1, A DISTANCE 5,173 LINEAR
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
400,000
200,000
800,000
4,000,000
0 600,000 800,000 4,000,000 0 0 0
804
HOPKINS KY-260 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20 MI EAST OF PENNYRILE PARKWAY; 054B00022N (14CCR)
PL
Project Cost:
CN
UT
RW
DN
BR 1,085,000
1,085,000 0 0 0 0 0 0
1072
132
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HOPKINS US-41 MAJOR WIDENING(O) IMPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281. (06CCN)(12CCR)
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
900,000
1,180,000
1,440,000
8,860,000
0 0 0 2,080,000 1,440,000 0 8,860,000
8305
HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER SUGAR CREEK. (054B00088N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
1,242,500
0 210,000 1,242,500 0 0 0 0
10005
HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER CLEAR CREEK. (054B00182N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
1,295,000
0 210,000 1,295,000 0 0 0 0
10006
HOPKINS KY-138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 138 BRIDGE OVER POND RIVER. (054B00009N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
35,000
245,000
0 35,000 245,000 0 0 0 0
10024
HOPKINS KY-109 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 109 BRIDGE OVER TRADEWATER RIVER. (054B00079N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
35,000
175,000
0 35,000 175,000 0 0 0 0
10025
133
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HOPKINS EB-9004 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 32.825 TO MILEPOINT 34.256
PL
Project Cost:
CN
UT
RW
DN PM
PM
170,000
1,700,000
0 0 0 1,870,000 0 0 0
20025
HOPKINS I-69 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 114.254 TO MILEPOINT 117.936
PL
Project Cost:
CN
UT
RW
DN PM
PM
290,000
2,900,000
0 0 0 0 0 3,190,000 0
20029
HOPKINS I-69 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 124.946 TO MILEPOINT 133.677
PL
Project Cost:
CN
UT
RW
DN PM
PM
875,000
8,750,000
0 0 0 0 0 9,625,000 0
20031
HOPKINS I-69 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 93.724 TO MILEPOINT 95.604
PL
Project Cost:
CN
UT
RW
DN PM
PM
150,000
1,500,000
0 0 0 0 1,650,000 0 0
20033
HOPKINS I-69 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 95.604 TO MILEPOINT 105.046
PL
Project Cost:
CN
UT
RW
DN PM
PM
760,000
7,600,000
0 0 0 8,360,000 0 0 0
20034
134
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
HOPKINS WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 42.807 TO MILEPOINT 43.424
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 0 0 550,000 0
20035
HOPKINS US-41 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-41A FROM MILEPOINT 0.00 TO MILEPOINT 9.69
PL
Project Cost:
CN
UT
RW
DN
PM 1,069,000
0 0 0 0 0 1,069,000 0
20048
Total for HOPKINS county PL
Total Amounts:
CN
UT
RW
DN
11,964,680
890,000
200,000
800,000
7,957,500
1,830,000
1,180,000
18,300,000
150,000
1,440,000
13,219,000
1,715,000
1,500,000
1,000,000
1,000,000
8,860,000
11,964,680 1,090,000 8,757,500 21,310,000 3,090,000 14,934,000 10,860,000
JACKSON KY-30 RECONSTRUCTION(O)IMPROVE KY-30 FROM US-421 TO THE OWSLEY COUNTY LINE. (14CCR)(SEE 10-279.60 FOR PE & ENVIR)(16CCR)(TO BE LET WITH 10-279.61)
PL
Project Cost:
CN
UT
RW
DN
STP 18,500,000
0 18,500,000 0 0 0 0 0
278.3
JACKSON KY-89 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 89 BRIDGE OVER HORSE LICK CREEK. (055B00028N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
1,820,000
0 175,000 1,820,000 0 0 0 0
10041
135
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for JACKSON county PL
Total Amounts:
CN
UT
RW
DN 175,000
18,500,000 1,820,000
0 18,675,000 1,820,000 0 0 0 0
JEFFERSON I-71 RECONSTRUCTION(O)ADDITION OF NB AND SB AUXILIARY LANES ON I-71 NEAR KENNEDY, INCLUDING OPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (2004BOPC)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
800,000
1,500,000
1,000,000
12,380,000
0 800,000 2,500,000 0 12,380,000 0 0
48.1
JEFFERSON I-71 PREFINANCD CONVRSN(O)
ADDITION OF NB AND SB AUX. LANES ON I-71 NEAR KENNEDY, INCLUDING OPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (ADDITIONAL FUNDING FOR C PHASE)
PL
Project Cost:
CN
UT
RW
DN
NH 12,380,000
0 0 0 0 0 12,380,000 0
48.11
JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)(BSBP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
2,000,000
5,000,000
0 2,000,000 5,000,000 0 0 0 0
64
JEFFERSON I-64 PREFINANCD CONVRSN(O)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
PL
Project Cost:
CN
UT
RW
DN
BR 10,000,000
0 0 0 10,000,000 0 0 0
64.01
136
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-64 PREFINANCD CONVRSN(O)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
PL
Project Cost:
CN
UT
RW
DN
BR 10,000,000
0 0 0 0 10,000,000 0 0
64.02
JEFFERSON I-64 PREFINANCD CONVRSN(O)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
PL
Project Cost:
CN
UT
RW
DN
BR 10,000,000
0 0 0 0 0 10,000,000 0
64.03
JEFFERSON I-64 PREFINANCD CONVRSN(O)
ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)
PL
Project Cost:
CN
UT
RW
DN
BR 10,000,000
0 0 0 0 0 0 10,000,000
64.04
JEFFERSON CS-1001 MAJOR WIDENING(O) WIDEN RIVER ROAD FROM 2 TO 4 LANES FROM EAST OF BEARGRASS CREEK NEAR POPE AVENUE TO ZORN AVENUE. TO INCLUDE BIKE LANES. PROJECT LENGTH 1.3 MILES.
PL
Project Cost:
CN
UT
RW
DN
SLO 11,500,000
0 11,500,000 0 0 0 0 0
91.02
JEFFERSON CS-1001 NEW ROUTE(O) EXTENSION OF RIVER ROAD, LOUISVILLE. (2006KYD)(SEE 5-512.00 FOR PROJECT INFORMATION)
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
SLO
550,000
540,000
540,000
550,000 540,000 540,000 0 0 0 0
91.08
137
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-265 AM-BRG PAINTING(P) CLEAN AND PAINT ALL STEEL BRIDGES AND STEEL BEARINGS ON THE GENE SNYDER FREEWAY(10CCR)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 3,790,000
0 0 0 3,790,000 0 0 0
136
JEFFERSON I-64 RECONSTRUCTION(O)IMPROVE RAMP CAPACITY OF THE I-64 WESTBOUND RAMP TO I-264 WESTBOUND FROM ONE TO TWO LANES FOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO
PL
Project Cost:
CN
UT
RW
DN
NH 10,130,000
0 10,130,000 0 0 0 0 0
159
JEFFERSON KY-1450 MAJOR WIDENING(O) WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.) (SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 4,500,000
0 0 4,500,000 0 0 0 0
247.1
JEFFERSON KY-1450 PREFINANCD CONVRSN(O)
WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.) (SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 6,500,000
0 0 0 6,500,000 0 0 0
247.11
JEFFERSON KY-1931 MAJOR WIDENING(O) WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)
PL
Project Cost:
CN
UT
RW
DN
SPP 4,860,000
0 0 0 0 4,860,000 0 0
323.01
138
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON KY-1931 PREFINANCD CONVRSN(O)
WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)
PL
Project Cost:
CN
UT
RW
DN
SPP 4,860,000
0 0 0 0 0 4,860,000 0
323.03
JEFFERSON CR-1006 MINOR WIDENING(O) WIDEN ENGLISH STATION ROAD FROM 2 TO 3 LANES (3RD LANE WILL BE A CENTER TURN LANE) FROM AIKEN ROAD TO AVOCA ROAD.(FUNDING SUBJECT TO FISCAL CONSTRAINT
PL
Project Cost:
CN
UT
RW
DN
SLO 6,408,000
0 0 6,408,000 0 0 0 0
353
JEFFERSON KY-22 SAFETY(P) RECONSTRUCT KY-22 AT SPRINGCREST DRIVE. (06CCN) (2004BOPC)(14CCR)(EMERGENCY CULVERT REPLACEMENT AWARDED UNDER 5-371.12)
PL
Project Cost:
CN
UT
RW
DN
STP 1,740,000
0 0 0 0 1,740,000 0 0
371.1
JEFFERSON KY-22 SAFETY(P) RECONSTRUCT KY-22 AT GOOSE CREEK ROAD. (06CCN) (2004BOPC)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 1,320,000
0 0 1,320,000 0 0 0 0
371.13
JEFFERSON I-65 RECONSTRUCTION(O)EXTEND AND RECONSTRUCT I-65 SB RAMP TO BROOK STREET AND FLOYD STREET. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
750,000
750,000
750,000 750,000 0 0 0 0 0
378.1
139
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON -0 NEW ROUTE(O) PHASE 3.EXTEND AND CONSTRUCT 2 LANE ROADWAY WITH CONTINUOUS CENTER-TURN LANE FROM KY 864 (BEULAH CHURCH RD) TO US 31E (BARDSTOWN RD) AT BARDSTOWN
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
3,200,000
1,500,000
4,700,000 0 0 0 0 0 0
404.01
JEFFERSON US-150 SAFETY(P) ALIGN INTERSECTION OF BROADWAY AND 18TH STREET BY MOVING THE SOUTH LEG OF 18TH STREET TO THE EAST. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SLO 1,000,000
1,000,000 0 0 0 0 0 0
413
JEFFERSON -0 BIKE/PED FACIL(O) REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS IN LOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).
PL
Project Cost:
CN
UT
RW
DN
SLO 100,000
100,000 0 0 0 0 0 0
439.05
JEFFERSON CS-1014 RECONSTRUCTION(O)CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAY TRAFFIC (MAIN,JEFFERSON,LIBERTY, MUHAMMAD ALI, CHESTNUT,3RD
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
195,000
4,000,000
4,195,000 0 0 0 0 0 0
470
JEFFERSON CS-1049 RECONSTRUCTION(O)CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAY TRAFFIC (8TH, 7TH, SHELBY, CAMPBELL STREETS). PHASE 2
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
60,000
600,000
60,000 600,000 0 0 0 0 0
470.1
140
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON US-31 SAFETY(P) DIXIE HIGHWAY ADDITIONAL DESIGN FUNDS. IMPROVE DIXIE HIGHWAY BETWEEN CRUMS LANE (KY 2049) AND ROCKFORD LANE (KY 2051)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SLO 4,000,000
4,000,000 0 0 0 0 0 0
478
JEFFERSON CR-1005 RECONSTRUCTION(O)WIDEN HUBBARDS LANE FROM 2 TO LANES (3RD LANE WILL BE A CENTER TURN LANE) FROM US 60 (SHELBYVILLE ROAD) TO KY 1447 (WESTPORT ROAD). ADD BIKE LANES
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
260,000
350,000
2,900,000
610,000 2,900,000 0 0 0 0 0
479
JEFFERSON KY-864 MATCHED FED FUNDS(O)
KY 864 - WIDEN BEULAH CHURCH ROAD FROM 2 TO 3 LANES FROM I-265 TO CEDAR CREEK ROAD.(2010BOP)
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
2,950,000
1,975,000
2,950,000 1,975,000 0 0 0 0 0
481
JEFFERSON I-71 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
500,000
500,000
15,000,000
1,000,000 15,000,000 0 0 0 0 0
483
JEFFERSON I-71 PREFINANCD CONVRSN(O)
SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 15,000,000
0 0 15,000,000 0 0 0 0
483.01
141
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-71 PREFINANCD CONVRSN(O)
SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 30,000,000
0 0 0 30,000,000 0 0 0
483.02
JEFFERSON -0 BIKE/PED FACIL(O) GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL CONNECTOR:CONSTRUCT A MULTI-USE BICYCLE & PEDESTRIAN TRAIL ALONG OLD TAYLORSVILLE ROAD &
PL
Project Cost:
CN
UT
RW
DN
SLO 1,300,000
1,300,000 0 0 0 0 0 0
486
JEFFERSON -0 BIKE/PED FACIL(O) DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEAD FACILITIES THRU JEFFERSON MEMORIAL FOREST FROM NORTH END OF SAND QUARRY TUNNEL AT GENE
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
100,000
55,000
2,000,000
155,000 2,000,000 0 0 0 0 0
489
JEFFERSON -0 BIKE/PED FACIL(O) MISCELLANEOUS SIDEWALKS AND HANDICAP RAMPS: CONSTRUCT AND REPLACE VARIOUS SIDEWALKS AND HANDICAP RAMPS THROUGHOUT THE CITY ON A REOCCURRING ANNUAL
PL
Project Cost:
CN
UT
RW
DN
SLO 37,800
37,800 0 0 0 0 0 0
493
JEFFERSON KY-1020 BIKE/PED FACIL(O) OLMSTED PARKWAYS MULTI-USE PATH SYSTEM-SOUTHERN PKWY: CONSTRUCTION OF A 2.5 MILE SHARED USE PATH SYSTEM ALONG SOUTHERN PARKWAY BETWEEN
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
400,000
100,000
4,672,877
400,000 100,000 0 4,672,877 0 0 0
495
142
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.5 MILE SHARED USE PATH SYSTEM ALONG ALGONQUIN PARKWAY BETWEEN WILSON AVENUE AND CYPRESS STREET.
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
160,000
80,000
1,500,000
160,000 80,000 1,500,000 0 0 0 0
496
JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.45 MILE SHARED USE PATH SYSTEM ALONG ALGONQUIN PARKWAY BETWEEN CYPRESS STREET AND DIXIE HWY.
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
160,000
80,000
1,148,945
240,000 1,148,945 0 0 0 0 0
497
JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 1.2 MILE SHARED USE PATH SYSTEM ALONG ALGONQUIN PARKWAY BETWEEN DIXIE HIGHWAY AND SHARP AVE.
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
200,000
160,000
3,063,854
200,000 160,000 3,063,854 0 0 0 0
498
JEFFERSON CR-1001 BIKE/PED FACIL(O) RIVER ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM DOWNTOWN LOUISVILLE TO THE CITY OF PROSPECT (US 42), 8.5 MILES. (SEE 5-3036.00)
PL
Project Cost:
CN
UT
RW
DN SLO 200,000
0 0 200,000 0 0 0 0
499
JEFFERSON -0 BIKE/PED FACIL(O) OHIO RIVER LEVEE TRAIL PHASE III. CONSTRUCT BICYCLE/PEDESTRIAN FACILITIES ALONG CAMPGROUND ROAD FROM END OF SHARED USE PATH AT THE RAILROAD CROSSING ON
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
800,000
750,000
3,000,000
800,000 750,000 3,000,000 0 0 0 0
505
143
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON CR-1004 MINOR WIDENING(O) WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM RUCKRIEGEL PARKWAY TO MAPLE ROAD, AND WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM OLD TAYLORSVILLE
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
264,000
352,000
1,232,000
616,000 1,232,000 0 0 0 0 0
518
JEFFERSON I-64 AM-BRIDGE (P) REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE OVER N.S. RAILROAD AND THE LEVEE AND REPAIR THE LEVEE.(056B00284N)(2014BOP)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 400,000
0 0 400,000 0 0 0 0
521
JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOP TRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROM BLEVINS GAP ROAD TO NORTH END
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
55,000
60,000
2,000,000
115,000 2,000,000 0 0 0 0 0
523
JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOP TRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROM PENDLETON RD AT MEDORA RD TO
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
100,000
1,000,000
100,000 1,000,000 0 0 0 0 0
524
JEFFERSON KY-2841 MATCHED FED FUNDS(O)
NORTHEAST LOUISVILLE LOOP SECTION II. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM EASTWOOD CUTOFF TO EASTWOOD RECREATION CENTER. (METRO PARKS
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
533,333
45,000
450,000
578,333 450,000 0 0 0 0 0
525
144
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON -0 BIKE/PED FACIL(O) CONST MULTIUSE PATH THRU AB SAWYER PK CONNECT TO SURROUNDING NEIGHBORHOODS INCLUDE: UNDERPASS/BRIDGE/SITE AMENITIES/CONSTRUCTION OF
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
50,000
300,000
1,500,000
350,000 1,500,000 0 0 0 0 0
529
JEFFERSON KY-1932 MATCHED FED FUNDS(O)
IMPROVE THE SAFETY AND CONGESTION OF KY 1932 (CHENOWETH LANE) FROM US 60 (SHELBYVILLE ROAD) TO US 42 (BROWNSBORO ROAD)
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
650,000
215,000
865,000 0 0 0 0 0 0
531
JEFFERSON KY-1931 MINOR WIDENING(O) WIDEN KY 1931 (MANSLICK ROAD) FROM 2 TO 3 LANES FROM US 31W (DIXIE HWY) TO DOSS HIGH SCHOOL. 1.7 MILES (2014BOP)
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
3,000,000
6,000,000
3,000,000 6,000,000 0 0 0 0 0
536
JEFFERSON I-265 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
5,800,000
1,580,000
2,080,000
15,000,000
5,800,000 0 3,660,000 0 15,000,000 0 0
537
JEFFERSON I-265 PREFINANCD CONVRSN(O)
SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
1,580,000
2,080,000
15,000,000
0 0 0 3,660,000 0 15,000,000 0
537.01
145
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-265 PREFINANCD CONVRSN(O)
SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.
PL
Project Cost:
CN
UT
RW
DN
NH 25,000,000
0 0 0 0 0 0 25,000,000
537.02
JEFFERSON I-71 RECONSTRUCTION(O)PROVIDE COLLECTOR-DISTRIBUTOR LANE ON SOUTHBOUND I-71 TO FACILITATE RAMP MOVEMENTS TO AND FROM I-265.
PL
Project Cost:
CN
UT
RW
DN
NH 5,400,000
0 5,400,000 0 0 0 0 0
539
JEFFERSON CS-1002 MATCHED FED FUNDS(O)
BLUEGRASS COMMERCE PARK BICYCLE/PEDESTRIAN TRAIL PROJECT PHASE II ALONG BLUEGRASS PARKWAY FROM WATTERSON TRAIL TO TUCKER STATION ROAD AND
PL
Project Cost:
CN
UT
RW
DN
SLO 1,300,000
1,300,000 0 0 0 0 0 0
543
JEFFERSON I-265 I-CHANGE RECONST(O)
RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
1,000,000
1,000,000
1,000,000
10,000,000
1,000,000 2,000,000 10,000,000 0 0 0 0
549
JEFFERSON I-265 I-CHANGE RECONST(O)
RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
NH 15,000,000
0 0 0 15,000,000 0 0 0
549.01
146
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-64 CONGESTION MITIGTN(O)
IMPROVEMENTS WITHIN THE I-64 CORRIDOR FROM THE KENNEDY INTERCHANGE TO I-264 (WATTERSON EXPRESSWAY) ADDRESSING SAFETY AND CONGESTION ISSUES. THE
PL
Project Cost:
CN
UT
RW
DN
NH
NH
250,000
2,550,000
0 250,000 0 0 2,550,000 0 0
553
JEFFERSON I-265 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM I-65 TO US-31E.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,000,000
3,000,000
0 0 0 1,000,000 0 3,000,000 0
554
JEFFERSON KY-1747 CONGESTION MITIGTN(O)
REDUCE CONGESTION AND IMPROVE SAFETY ALONG KY-1747 (HURSTBOURNE PARKWAY) FROM STONY BROOK DRIVE TO I-64.
PL
Project Cost:
CN
UT
RW
DN
NH 250,000
0 250,000 0 0 0 0 0
555
JEFFERSON I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM ZORN AVE TO I-264.
PL
Project Cost:
CN
UT
RW
DN NH 2,000,000
0 0 0 0 0 2,000,000 0
556
JEFFERSON I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM I-264 TO I-265.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
2,000,000
3,000,000
0 2,000,000 0 0 3,000,000 0 0
557
147
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-265 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM US-31E (BARDSTOWN RD) TO KY-155 (TAYLORSVILLE RD).
PL
Project Cost:
CN
UT
RW
DN NH 7,500,000
0 0 0 0 0 7,500,000 0
558
JEFFERSON I-65 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSON EXPRESSWAY) INTERCHANGE.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
500,000
3,000,000
0 500,000 0 3,000,000 0 0 0
559
JEFFERSON I-65 PREFINANCD CONVRSN(O)
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSON EXPRESSWAY) INTERCHANGE.
PL
Project Cost:
CN
UT
RW
DN NH 3,000,000
0 0 0 0 3,000,000 0 0
559.01
JEFFERSON I-65 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-265 (GENE SNYDER FREEWAY) INTERCHANGE.
PL
Project Cost:
CN
UT
RW
DN
NH 400,000
0 0 0 400,000 0 0 0
560
JEFFERSON -0 RECONSTRUCTION(O)INTERSECTION RE-BUILD AT MAIN STREET/ STORY AVENUE / BAXTER AVENUE INCLUDING TRANSITIONS BETWEEN WENTZEL STREET TO THE WEST AND JOHNSON STREET TO THE
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
SLO
176,000
176,000
3,314,319
176,000 176,000 0 3,314,319 0 0 0
561
148
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON -0 SCOPING STUDY DD (O)
A COMPREHENSIVE OPERATIONAL ANALYSIS (COA) TO ANALYZE AND EVALUATE EXISTING TARC SERVICE IN COMPARISON WITH COMMUNITY GROWTH, ECONOMIC AND LAND USE
PL
Project Cost:
CN
UT
RW
DN
SLO 354,000
354,000 0 0 0 0 0 0
562
JEFFERSON -0 SCOPING STUDY DD (O)
PLANNING STUDY:EXAMINE NEED FOR BICYCLE/PED/VEHICULAR ACCESS IMPROVEMENTS TO PROPOSED DIXIE BRT IN CORRIDORS: KY 907 FR US 31W TO STONESTREET RD,
PL
Project Cost:
CN
UT
RW
DN
SLO 352,000
352,000 0 0 0 0 0 0
563
JEFFERSON I-264 RECONSTRUCTION(O)RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORT ROAD (KY-1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS A SPUI.(PROJECT INCLUDES 5-594
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
5,280,000
1,270,000
23,590,000
0 0 0 6,550,000 0 0 23,590,000
804
JEFFERSON KY-155 DESIGN ENGINEERING(O)
SAFETY PROJECT FOR RECONSTRUCTION OF TAYLORSVILLE ROAD AND SOUTH POPE LICK ROAD INTERSECTION AND BRIDGE OVER POPE LICK CREEK. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
180,000
150,000
1,800,000
0 2,130,000 0 0 0 0 0
808
JEFFERSON -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLO 24,007,000
24,007,000 0 0 0 0 0 0
965.16
149
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLO 11,670,000
0 0 0 11,670,000 0 0 0
965.19
JEFFERSON -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLO 23,500,000
0 0 0 0 23,500,000 0 0
965.2
JEFFERSON -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLO 9,262,000
0 0 0 0 0 9,262,000 0
965.21
JEFFERSON -0 MATCHED FED FUNDS(O)
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCAL
PL
Project Cost:
CN
UT
RW
DN
SLO 23,500,000
0 0 0 0 0 0 23,500,000
965.22
JEFFERSON CR-1038 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1038L OVER BEE LICK CREEK 056C00104N
PL
Project Cost:
CN
UT
RW
DN
BR 231,000
231,000 0 0 0 0 0 0
1061
150
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON US-150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E BROADWAY (US 150) OVER SOUTH FORK BEARGRASS CREEK AT INTERSECTION WITH BRENT STREET (CS 1312G)056B00348N (SD)
PL
Project Cost:
CN
UT
RW
DN
BR 850,000
0 850,000 0 0 0 0 0
1067
JEFFERSON CS-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTH FORK BEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G) 056C00083N
PL
Project Cost:
CN
UT
RW
DN
BR 497,000
0 497,000 0 0 0 0 0
1070
JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NORTHERN DITCH ON GRADE LANE (CR 1001G) 0.34 MI S OF KY 1747 (FERN VALLEY ROAD) (056C00064N)
PL
Project Cost:
CN
UT
RW
DN
BR
BR
BR
20,000
50,000
850,000
0 70,000 850,000 0 0 0 0
1077
JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER GOOSE CREEK ON RIVER ROAD (CR 1001B) 0.2 MI N OF LIME KILN ROAD (CR 1002B) (056C00130N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
315,000
917,000
0 315,000 917,000 0 0 0 0
1079
JEFFERSON US-60 TRANSP ENHANCEMENT(P)
NORTHEAST LOUISVILLE LOOP MET SECTION 1 BECKLEY WOODS TO BECKLEY STATION. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEY WOODS TO BECKLEY
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
50,000
700,000
750,000 0 0 0 0 0 0
3030.1
151
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON US-60 TRANSP ENHANCEMENT(P)
NORTHEAST LOUISVILLE LOOP MET SECTION 2 BECKLEY STATION TO BIRCHAM ROAD. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEY STATION TO BIRCHAM
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
300,000
200,000
800,000
300,000 1,000,000 0 0 0 0 0
3030.2
JEFFERSON US-60 TRANSP ENHANCEMENT(P)
NORTHEAST LOUISVILLE LOOP MET SECTION 3 BIRCHAM ROAD TO BECKLEY CREEK PARK. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BIRCHAM ROAD TO BECKLEY
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
50,000
75,000
2,000,000
125,000 2,000,000 0 0 0 0 0
3030.3
JEFFERSON US-60 TRANSP ENHANCEMENT(P)
NORTHEAST LOUISVILLE LOOP MET SECTION 4 BECKLEY CREEK PARK TO EASTWOOD CUTOFF. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEY CREEK PARK TO
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
350,000
150,000
1,000,000
350,000 150,000 0 1,000,000 0 0 0
3030.4
JEFFERSON CS-1073 TRANSP ENHANCEMENT(P)
WATTERSON TRAIL PHASE I- IMPROVE STREETSCAPE, RECONSTRUCT SIDEWALKS AND ENHANCE LANDSCAPING FROM MAPLE ROAD TO OLD TAYLORSVILLE ROAD IN
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
792,000
1,856,800
792,000 1,856,800 0 0 0 0 0
3031
JEFFERSON CS-1367 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS ALONG KRATZ LANE FOR .35 MILES BETWEEN SHELBYVILLE RD. AND OLD SHELBYVILLE RD./MAIN ST., INCLUDING SOME DRAINAGE
PL
Project Cost:
CN
UT
RW
DN
SLO 234,382
234,382 0 0 0 0 0 0
3039
152
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON CS-2048 BIKE/PED FACIL(O) CONSTRUCT A SIDEWALK ALONG CANNONS LANE BETWEEN WILLIS AVE. AND BOWMAN FIELD (SENECA LOOP), 1.0 MILES (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
100,000
100,000
500,000
100,000 100,000 0 500,000 0 0 0
3212
JEFFERSON KY-1819 RECONSTRUCTION(O)RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TO SOUTH OF EASUM ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,700,000
0 0 0 0 0 0 2,700,000
8203
JEFFERSON KY-1931 MINOR WIDENING(O) THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH SCHOOL ENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION IMPROVEMENTS WITH PALATKA ROAD
PL
Project Cost:
CN
UT
RW
DN
STP
STP
2,630,000
4,160,000
0 0 0 0 6,790,000 0 0
8810
JEFFERSON I-265 TRANSP ENHANCEMENT(P)
ERECT SOUND WALL ON NORTH SIDE OF GENE SNYDER FREEWAY FROM MP 15.3 TO MP 16.1. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,000,000
0 3,000,000 0 0 0 0 0
8855
JEFFERSON I-71 TRANSP ENHANCEMENT(P)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71 FROM MP 5.4 TO MP 6.3 FOR APPROX. 4700 FEET. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,961,000
0 0 0 0 0 0 2,961,000
8858
153
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-71 TRANSP ENHANCEMENT(P)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE SOUTH SIDE OF I-71 FROM MP 7.5 TO MP 7.8 (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 1,152,000
0 0 0 0 0 1,152,000 0
8859
JEFFERSON I-71 TRANSP ENHANCEMENT(P)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71 FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,304,000
0 0 2,304,000 0 0 0 0
8860
JEFFERSON I-71 TRANSP ENHANCEMENT(P)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71 FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,304,000
0 0 0 2,304,000 0 0 0
8860.1
JEFFERSON KY-155 MINOR WIDENING(O) WIDEN TAYLORSVILLE RD. TO 3 LANES FROM I-265 TO KY-148
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
SPP
SPP
915,000
1,495,000
1,000,000
500,000
15,930,000
0 915,000 1,495,000 0 1,500,000 15,930,000 0
8908
JEFFERSON I-64 SPOT IMPROVEMENTS(O)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON I-64 WESTBOUND BETWEEN MILEPOINTS 13.7 AND 14.2
PL
Project Cost:
CN
UT
RW
DN
SPP 2,100,000
0 2,100,000 0 0 0 0 0
8951
154
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON US-60 MINOR WIDENING(O) WIDEN US-60 TO THREE LANES FROM EASTWOOD CUTOFF (MP 14.7) TO ROCKCREST WAY (MP 15.1). (16CCN) (LOCALS WILL DO DESIGN FOR $330,000)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
410,000
460,000
1,000,000
0 410,000 460,000 1,000,000 0 0 0
8952
JEFFERSON I-265 SPOT IMPROVEMENTS(O)
DESIGN AND BUILD A NOISE BARRIER WALL ON THE NORTH SIDE OF I-265 BETWEEN MP 15.3 AND MP 16.1 FOR APPROXIMATELY 4700 FEET.
PL
Project Cost:
CN
UT
RW
DN SPP 250,000
250,000 0 0 0 0 0 0
8957
JEFFERSON CR-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLARK STATION RD BRIDGE OVER S LONG RUN. (056C00091N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
350,000
0 280,000 350,000 0 0 0 0
10007
JEFFERSON CS-1079 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD WESTPORT RD BRIDGE OVER GOOSE CREEK. (056C00113N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
301,000
0 175,000 301,000 0 0 0 0
10008
JEFFERSON CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PENDLETON RD BRIDGE OVER POND CREEK. (056C00118N)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
1,106,000
0 245,000 1,106,000 0 0 0 0
10009
155
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON CR-1005 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF S WATTERSON TRL BRIDGE OVER FERN CREEK. (056C00159N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
301,000
0 245,000 301,000 0 0 0 0
10010
JEFFERSON CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STONEBRIDGE RD BRIDGE OVER TRIB MUDDY FK BEARGRASS. (056C00240N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
266,000
0 210,000 266,000 0 0 0 0
10011
JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 RIVERSIDE EXPRESSWAY BRIDGES. (056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B001
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
4,600,000
0 4,950,000 0 0 0 0 0
10015
JEFFERSON I-64 AM-BRG PAINTING(P) BRIDGE PAINTING OF I-64 RIVERSIDE EXPRESSWAY BRIDGES.(056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B001
PL
Project Cost:
CN
UT
RW
DN
BR 30,000,000
0 0 0 30,000,000 0 0 0
10016
JEFFERSON US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31E BRIDGE OVER S FK BEARGRASS CREEK. (056B00137N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
966,000
0 350,000 966,000 0 0 0 0
10018
156
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON CS-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SCENIC LOOP BRIDGE OVER MID FK BEARGRASS CREEK. (056C00027N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
406,000
0 140,000 406,000 0 0 0 0
10019
JEFFERSON CS-3396 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARK BOUNDARY RD BRIDGE OVER MID FK BEARGRASS CREEK. (056C00033N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
441,000
0 140,000 441,000 0 0 0 0
10020
JEFFERSON CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CHAMPIONS TRACE LN BRIDGE OVER S FK BEARGRASS CREEK. (056C00096N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
1,190,000
0 280,000 1,190,000 0 0 0 0
10021
JEFFERSON CS-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD CLARK STATION BRIDGE OVER BRUSH RUN. (056C00167N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
357,000
0 140,000 357,000 0 0 0 0
10022
JEFFERSON CS-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KIMBERLY WAY BRIDGE OVER LITTLE CEDAR CREEK. (056C00182N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
217,000
0 140,000 217,000 0 0 0 0
10023
157
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 6 TO MILEPOINT 11.57
PL
Project Cost:
CN
UT
RW
DN PM
PM
575,000
5,750,000
0 0 0 0 0 0 6,325,000
20009
JEFFERSON I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-064 CARDINAL DIRECTION(S) FROM MILEPOINT 0.65 TO MILEPOINT 0.828
PL
Project Cost:
CN
UT
RW
DN PM
PM
10,000
100,000
0 110,000 0 0 0 0 0
20010
JEFFERSON I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 128.13 TO MILEPOINT 131.24
PL
Project Cost:
CN
UT
RW
DN PM
PM
620,000
6,200,000
0 0 6,820,000 0 0 0 0
20012
JEFFERSON I-71 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 11.32
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,150,000
11,500,000
0 0 0 0 0 0 12,650,000
20014
JEFFERSON I-264 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-264 CARDINAL DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 0.46
PL
Project Cost:
CN
UT
RW
DN PM
PM
30,000
300,000
0 330,000 0 0 0 0 0
20015
158
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-264 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTH DIRECTION(S) FROM MILEPOINT 12.7 TO MILEPOINT 18.41
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,150,000
11,500,000
0 0 0 0 0 0 12,650,000
20016
JEFFERSON I-264 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-264 BOTH DIRECTION(S) FROM MILEPOINT 20.7 TO MILEPOINT 22.927
PL
Project Cost:
CN
UT
RW
DN PM
PM
450,000
4,500,000
0 0 0 0 0 4,950,000 0
20017
JEFFERSON I-264 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTH DIRECTION(S) FROM MILEPOINT 0.46 TO MILEPOINT 12.7
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,220,000
12,200,000
0 0 13,420,000 0 0 0 0
20018
JEFFERSON I-265 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTH DIRECTION(S) FROM MILEPOINT 15.66 TO MILEPOINT 18.8
PL
Project Cost:
CN
UT
RW
DN PM
PM
325,000
3,250,000
0 0 0 0 3,575,000 0 0
20019
JEFFERSON I-265 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTH DIRECTION(S) FROM MILEPOINT 18.8 TO MILEPOINT 23.364
PL
Project Cost:
CN
UT
RW
DN PM
PM
460,000
4,600,000
0 5,060,000 0 0 0 0 0
20020
159
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-265 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-265 BOTH DIRECTION(S) FROM MILEPOINT 23.364 TO MILEPOINT 26.6
PL
Project Cost:
CN
UT
RW
DN PM
PM
350,000
3,500,000
0 0 0 0 3,850,000 0 0
20021
JEFFERSON KY-841 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
725,000
7,250,000
0 0 0 0 7,975,000 0 0
20022
JEFFERSON KY-864 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
325,000
3,250,000
0 3,575,000 0 0 0 0 0
20023
JEFFERSON KY-913 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 550,000 0 0 0
20024
JEFFERSON KY-1020 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
75,000
750,000
0 0 0 825,000 0 0 0
20025
160
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON KY-1065 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
200,000
2,000,000
0 2,200,000 0 0 0 0 0
20026
JEFFERSON KY-1932 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 550,000 0 0 0
20027
JEFFERSON KY-1934 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
325,000
3,250,000
0 0 0 3,575,000 0 0 0
20028
JEFFERSON KY-1934 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
375,000
3,750,000
0 0 0 0 4,125,000 0 0
20029
JEFFERSON KY-2048 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 0 1,100,000 0 0
20030
161
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON KY-2052 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
300,000
3,000,000
0 0 0 3,300,000 0 0 0
20031
JEFFERSON US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
75,000
750,000
0 0 825,000 0 0 0 0
20032
JEFFERSON US-31 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TO MILEPOINT 7.25
PL
Project Cost:
CN
UT
RW
DN
PM 965,000
0 0 0 0 965,000 0 0
20039
JEFFERSON KY-1531 NEW INTERCHANGE(O)
EASTWOOD FISHERSVILLE CONNECTOR TO I-64
PL
Project Cost:
CN
UT
RW
DN
SPP 750,000
750,000 0 0 0 0 0 0
80000
JEFFERSON US-60 MAJOR WIDENING(O) WIDEN US-60 TO 6 LANES FROM OLD SHELBYVILLE RD. TO NORTH ENGLISH STATION RD.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,255,000
550,000
720,000
1,500,000
0 1,255,000 0 550,000 720,000 1,500,000 0
80001
162
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON I-64 NEW INTERCHANGE(O)
NEW INTERCHANGE ON I-64E EAST OF THE GENE SNYDER FREEWAY
PL
Project Cost:
CN
UT
RW
DN
SPP 650,000
0 0 0 650,000 0 0 0
80002
JEFFERSON AIR QUALITY(P) EXTEND PLANTSIDE DRIVE FROM REHL ROAD TO TAYLORSVILLE ROAD
PL
Project Cost:
CN
UT
RW
DN SPP 750,000
0 0 750,000 0 0 0 0
80003
JEFFERSON KY-841 ECONOMIC DEVEL(O)CONSTRUCT NEW INTERCHANGE ON KY-841 AT THE RENAISSANCE SOUTH BUSINESS PARK
PL
Project Cost:
CN
UT
RW
DN
SPP 12,500,000
0 0 0 12,500,000 0 0 0
80006
JEFFERSON I-264 SPOT IMPROVEMENTS(O)
EXTEND EXISTING SOUND WALL ON I-264 NEAR NEWBURG RD. APPROXIMATELY 750' WEST.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
50,000
325,000
0 0 0 375,000 0 0 0
80051
JEFFERSON I-64 SPOT IMPROVEMENTS(O)
DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE WESTBOUND SIDE OF I-64 FROM MP 10.3 TO MP 11.FOR APPROXIMATELY 4800 FEET
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
250,000
3,206,000
0 0 0 250,000 3,206,000 0 0
80052
163
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM FIRST ST TO JOHNSON ST TO IMPROVE PEDESTRIAN SAFETY AND ENHANCE ECONOMIC DEVELOPMENT
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 5,000,000 0 0 0 0 0
80053
JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM FIRST ST TO JOHNSON ST TO IMPROVE PEDESTRIAN SAFETY AND ENHANCE ECONOMIC DEVELOPMENT
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 5,000,000 0 0 0 0
80053.1
Total for JEFFERSON county PL
Total Amounts:
CN
UT
RW
DN
1,456,000
9,431,000
13,647,333
4,259,000
36,910,182
3,915,000
8,090,000
2,150,000
11,641,000
87,614,745
4,360,000
3,080,000
4,080,000
84,313,854
2,050,000
4,100,000
7,410,000
3,350,000
140,576,196
10,425,000
3,630,000
5,380,000
74,584,000
12,950,000
90,401,000
2,875,000
116,501,000
65,703,515 113,410,745 95,833,854 157,486,196 109,836,000 87,534,000 119,376,000
JESSAMINE -0 NEW ROUTE(O) EAST NICHOLASVILLE BYPASS SECTION IA: IMPROVE CONNECTIVITY AND MOBILITY EAST AROUND NICHOLASVILLE FROM SOUTH OF KY-39 TO NORTH OF KY-169.
PL
Project Cost:
CN
UT
RW
DN
SPP 7,800,000
0 0 0 0 0 0 7,800,000
87.2
JESSAMINE KY-1980 SAFETY(P) IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAY HAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RDTO US 27 (NICHOLASVILLE RD)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
5,500,000
5,000,000
12,000,000
0 0 0 5,500,000 0 5,000,000 12,000,000
414
164
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JESSAMINE KY-1980 SAFETY(P) IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAY HAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RDTO US 27 (NICHOLASVILLE RD)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,000,000
0 0 2,000,000 0 0 0 0
414.1
JESSAMINE US-68 SAFETY(P) IMPROVE INTERSECTION OF KY-29 NORTH OF WILMORE.(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
650,000
1,080,000
0 650,000 1,080,000 0 0 0 0
915
JESSAMINE KY-39 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER HICKMAN CREEK AT BLACK BRIDGE ON KY 39 1.3 MI N OF KY 1268. (057B00002N)(EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
1,365,000
0 350,000 1,365,000 0 0 0 0
1136
JESSAMINE CR-1238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1238 (0.88) OVER NS SYSTEM. 057R00605N
PL
Project Cost:
CN
UT
RW
DN BR
BR
260,000
805,000
0 260,000 805,000 0 0 0 0
1144
JESSAMINE KY-169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BRIDGE ON KY 169 (NORTH 3RD STREET) BETWEEN MEADOWLARK LANE & ILHARDT AVENUE. (057R00603N)(14CCN)(16CCR)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 1,500,000
0 0 1,500,000 0 0 0 0
8851
165
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
JESSAMINE KY-1268 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1268 BRIDGE OVER HICKMAN CREEK. (057B00022N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
308,000
1,232,000
0 308,000 1,232,000 0 0 0 0
10011
Total for JESSAMINE county PL
Total Amounts:
CN
UT
RW
DN 918,000
650,000
2,000,000
5,982,000
5,500,000
5,000,000
19,800,000
0 1,568,000 7,982,000 5,500,000 0 5,000,000 19,800,000
JOHNSON KY-172 RECONSTRUCTION(O)FEDERAL HIGHWAY FUNDS DEDICATED TO RECONSTRUCT STONE COAL ROAD IN JOHNSON COUNTY. ("KYD" FUNDS NOT AVAILABLE FOR ADDITIONAL AMOUNT NEEDED TO
PL
Project Cost:
CN
UT
RW
DN
KYD 203,005
203,005 0 0 0 0 0 0
134.02
JOHNSON KY-40 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINT CREEK 0.38 MILE NE OF JOHNSON/MAGOFFIN COUNTY LINE 058B00012N
PL
Project Cost:
CN
UT
RW
DN
BR 665,000
665,000 0 0 0 0 0 0
1114
Total for JOHNSON county PL
Total Amounts:
CN
UT
RW
DN
868,005
868,005 0 0 0 0 0 0
166
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON I-75 AM-BRIDGE (P) KY 143 HPP EARMARK "ADDRESS DEFICIENCIES OF BRENT SPENCE BRIDGE, KENTON COUNTY, KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR ADDITIONAL 2005HPP
PL
Project Cost:
CN
UT
RW
DN
HPP 1,439,840
1,439,840 0 0 0 0 0 0
17.05
KENTON I-75 AM-BRIDGE (P) BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FOR MAINTENANCE, REPAIR AND PAINTING(10CCR)(12CCR)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 30,000,000
0 30,000,000 0 0 0 0 0
17.09
KENTON KY-1303 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON KY-1303 FROM KY-536 TO BEECHGROVE ELEMENTARY (PRIORITY SECTION 4). DESIGN PHASE UNDER PARENT NO.
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
3,000,000
3,000,000
9,000,000
0 0 0 0 0 6,000,000 9,000,000
162.1
KENTON KY-536 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST END OF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 1). DESIGN PHASE UNDER
PL
Project Cost:
CN
UT
RW
DN
STP
STP
1,000,000
5,410,000
0 1,000,000 5,410,000 0 0 0 0
162.2
KENTON KY-536 PREFINANCD CONVRSN(O)
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST END OF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 1). DESIGN PHASE UNDER
PL
Project Cost:
CN
UT
RW
DN
STP 5,410,000
0 0 0 5,410,000 0 0 0
162.21
167
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON KY-536 AIR QUALITY(P) IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM KY 1303 TO WILLIAMSWOOD ROAD/CALVARY DRIVE (PRIORITY SECTION 2). DESIGN PHASE UNDER
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
3,000,000
1,500,000
13,500,000
0 0 4,500,000 0 13,500,000 0 0
162.3
KENTON KY-536 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM WILLIAMSWOOD ROAD/CALVARY DRIVE TO KY-17 (PRIORITY SECTION 3). DESIGN PHASE UNDER PARENT
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
12,080,000
1,560,000
0 0 0 0 12,080,000 0 1,560,000
162.4
KENTON CR-1316 MATCHED FED FUNDS(O)
PHASE I MULTI-USE PATH ALONG BROMLEY CRESCENT SPRINGS RD FROM ANDERSON ROAD TO AMSTERDAM ROAD. (2012BOP)
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
400,000
800,000
4,045,000
1,200,000 4,045,000 0 0 0 0 0
419
KENTON CS-3806 MATCHED FED FUNDS(O)
PHASE 2 BROMLEY CRESCENT SPRINGS ROAD BETWEEN THE TWO SEGMENTS OF AMSTERDAM ROAD. RECONSTRUCT BROMLEY CRESCENT SPRINGS ROAD AND IMPROVE
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
SNK
SNK
269,600
504,000
560,000
276,000
269,600 1,064,000 276,000 0 0 0 0
419.01
KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM WINDING TRAILS TO THOMAS MORE PARKWAY (PHASE 1). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).
PL
Project Cost:
CN
UT
RW
DN
SNK 1,044,000
1,044,000 0 0 0 0 0 0
428.1
168
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM THOMAS MORE PARKWAY TO CATHERINE DRIVE (PHASE 2). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).
PL
Project Cost:
CN
UT
RW
DN
SNK 924,000
924,000 0 0 0 0 0 0
428.2
KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 3. ROADWAY RESURFACING AND STABILIZATION. CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROM CATHERINE DRIVE TO THE SUMMIT
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
178,000
1,080,000
178,000 1,080,000 0 0 0 0 0
428.3
KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 4. ROADWAY RESURFACING AND STABILIZATION. CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROM SUMMIT HILLS COUNTRY CLUB
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
271,000
1,636,800
0 271,000 1,636,800 0 0 0 0
428.4
KENTON CS-2023 RECONSTRUCTION(O)WIDEN SIDEWALK FOR ADA COMPLIANCE AND ROADWAY RECONSTRUCTION ON JOHNSON ST W RIVERCENTER BLVD FROM 3RD STREET TO THE EXISTING CONCRETE
PL
Project Cost:
CN
UT
RW
DN
SNK 677,800
677,800 0 0 0 0 0 0
430
KENTON US-25 SAFETY(P) CONSTRUCT LEFT TURN LANE ON NB APPROACH AT THE INTERSECTION OF US 25 AND BEECHWOOD RD JUST S OF I-75. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
100,000
250,000
1,600,000
1,950,000 0 0 0 0 0 0
432
169
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON -0 MATCHED FED FUNDS(O)
LUDLOW RIVERFRONT COMMONS TRAIL- CONSTRUCT A ONE-MILE MULTI-USE PATH ALONG THE OHIO RIVER FROM HOOPER STREET TO ASH STREET IN THE CITY OF LUDLOW
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
5,000
240,133
245,133 0 0 0 0 0 0
435
KENTON CS-6142 SAFETY(P) IMPROVE SAFETY, TRAFFIC FLOW AND DRAINAGE ISSUES ALONG BUTTERMILK PIKE (CS 6142) FROM ROGERS ROAD TO COLLINS ROAD IN THE CITY OF VILLA HILLS. A
PL
Project Cost:
CN
UT
RW
DN
SNK 313,857
313,857 0 0 0 0 0 0
437
KENTON CS-9004 RECONSTRUCTION(O)RECONSTRUCT AMSTERDAM ROAD FROM GENERAL DRIVE TO REDWOOD DRIVE WITH CURB, GUTTER, STORM SEWERS AND SIDEWALK (2016BOP).
PL
Project Cost:
CN
UT
RW
DN
SNK
SNK
SNK
56,000
32,000
2,080,000
88,000 2,080,000 0 0 0 0 0
438
KENTON KY-17 CONGESTION MITIGTN(O)
IMPROVE SAFETY AND REDUCE CONGESTION ON KY-17 AT THE I-275 INTERCHANGE.
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
450,000
200,000
350,000
0 450,000 550,000 0 0 0 0
449
KENTON KY-1303 CONGESTION MITIGTN(O)
IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-1303 (TURKEYFOOT RD) FROM DUDLEY RD TO US-25 (DIXIE HWY).
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
1,500,000
2,000,000
1,000,000
0 3,500,000 1,000,000 0 0 0 0
450
170
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON CS-1560 RESURFACING(P) ADELA AVENUE. CURB-LINE MILLING, ASPHALT RESURFACING, REPLACE SIDEWALK/CURBING AND NEW SIDEWALK AS NEEDED FROM KY 1072 (SLEEPY HOLLOW ROAD/DEVERILL
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
SNK
35,000
20,000
200,000
255,000 0 0 0 0 0 0
454
KENTON CS-1045 DRAINAGE IMPROVE(P)
CODY ROAD. REPLACE CULVERT FOR BANKLICK CREEK. MILL AND OVERLAY WITH NEW ASPHALT FROM BANKLICK CREEK TO INDEPENDENCE STATION ROAD.
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
SNK
57,000
120,000
346,000
57,000 466,000 0 0 0 0 0
455
KENTON -0 TRANSP ENHANCEMENT(P)
MADISON AVENUE. UNDERGROUND UTILITIES, STREET TREES, MAST ARM POLES, STREETLIGHTS, RESURFACING, SIGNAL IMPROVEMENTS FROM 11TH STREET
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
SNK
280,000
240,000
1,650,000
280,000 1,890,000 0 0 0 0 0
456
KENTON CS-2217 TRANSP ENHANCEMENT(P)
7TH STREET. SIDEWALK REPLACEMENT, UNDERGROUND UTILITIES, STREET TREES, MAST ARM TRAFFIC SIGNALS, LIGHTING, RESURFACING FROM WASHINGTON
PL
Project Cost:
CN
UT
RW
DN SNK
SNK
SNK
280,000
240,000
2,450,000
280,000 2,690,000 0 0 0 0 0
457
KENTON CS-2097 AM-BRIDGE (P) WEST 15TH STREET; ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES OVER CSX RR IN COVINGTON. (059C00029N)(12CCR)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR
BR
BR
830,000
550,000
2,110,000
3,490,000 0 0 0 0 0 0
1070
171
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON KY-1120 AM-BRIDGE (P) EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OF RUSSELL ST; 059B00083N
PL
Project Cost:
CN
UT
RW
DN
BR 520,000
520,000 0 0 0 0 0 0
1075
KENTON KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LICKING RIVER ON WEST 4TH STREET (KY 8) IN COVINGTON/NEWPORT AT KENTON/CAMPBELL CO LN.
PL
Project Cost:
CN
UT
RW
DN BR
BR
BR
BR
3,900,000
2,440,000
1,170,000
32,900,000
0 0 0 3,900,000 3,610,000 0 32,900,000
1086
KENTON KY-1501 RECONSTRUCTION(O)IMPROVE HANDS PIKE (KY-1501) FROM KY-17 TO CRYSTAL LAKE DRIVE.(12CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 8,010,000
0 8,010,000 0 0 0 0 0
8307.1
KENTON NEW ROUTE(O) EXTEND HOUSTON ROAD TO CINEMA PROPERTY
PL
Project Cost:
CN
UT
RW
DN SPP 250,000
0 250,000 0 0 0 0 0
8916
KENTON US-25 REALIGNMENT IMPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE, ORPHANAGE ROAD, AND US 25. FT. MITCHELL WILL PAY $50,000 TOWARD DESIGN.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
250,000
5,000,000
2,000,000
5,000,000
0 250,000 0 5,000,000 2,000,000 5,000,000 0
8951
172
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON KY-17 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON JOHN A. ROEBLING BRIDGE OVER OHIO RIVER(059B00048N)(BSBP)
PL
Project Cost:
CN
UT
RW
DN
BR 1,200,000
0 1,200,000 0 0 0 0 0
10005
KENTON US-25 AM-BRIDGE (P) JOINT REPLACEMENT AND PREVENTIVE MAINTENANCE ON CLAY WADE BAILEY BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (059B00049N)
PL
Project Cost:
CN
UT
RW
DN
BR 350,000
350,000 0 0 0 0 0 0
10006
KENTON KY-177 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 177 BRIDGE OVER BOWMAN CREEK. (059B00011N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
420,000
2,695,000
0 420,000 2,695,000 0 0 0 0
10011
KENTON KY-2045 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2045 BRIDGE OVER BRUSHY CREEK. (059B00025N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
3,605,000
0 350,000 3,605,000 0 0 0 0
10012
KENTON I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 166.263 TO MILEPOINT 169.439
PL
Project Cost:
CN
UT
RW
DN PM
PM
390,000
3,900,000
0 0 0 4,290,000 0 0 0
20030
173
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 166.263 TO MILEPOINT 169.439
PL
Project Cost:
CN
UT
RW
DN PM
PM
390,000
3,900,000
0 0 0 0 0 4,290,000 0
20031
KENTON I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-075 BOTH DIRECTION(S) FROM MILEPOINT 186.95 TO MILEPOINT 190.721
PL
Project Cost:
CN
UT
RW
DN PM
PM
750,000
7,500,000
0 0 0 0 0 0 8,250,000
20032
KENTON I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 190.68 TO MILEPOINT 191.22
PL
Project Cost:
CN
UT
RW
DN PM
PM
30,000
300,000
0 330,000 0 0 0 0 0
20033
KENTON I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 190.721 TO MILEPOINT 191.777
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 0 1,100,000 0 0
20034
KENTON I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.582 (1.05 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,420,000
14,200,000
0 15,620,000 0 0 0 0 0
20035
174
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 1.054 TO MILEPOINT 1.582
PL
Project Cost:
CN
UT
RW
DN PM
PM
40,000
400,000
0 0 0 440,000 0 0 0
20036
KENTON I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 77.759 TO MILEPOINT 79.796
PL
Project Cost:
CN
UT
RW
DN PM
PM
300,000
3,000,000
0 0 0 0 0 0 3,300,000
20037
KENTON I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 80.12 TO MILEPOINT 82.475
PL
Project Cost:
CN
UT
RW
DN PM
PM
350,000
3,500,000
0 0 0 0 0 0 3,850,000
20038
KENTON I-275 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 82.475 TO MILEPOINT 83.78
PL
Project Cost:
CN
UT
RW
DN PM
PM
200,000
2,000,000
0 2,200,000 0 0 0 0 0
20039
KENTON KY-16 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
400,000
4,000,000
0 0 0 4,400,000 0 0 0
20040
175
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON KY-16 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
75,000
750,000
0 0 0 825,000 0 0 0
20041
KENTON KY-16 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 550,000 0 0 0
20042
KENTON KY-17 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
880,000
8,800,000
0 0 0 9,680,000 0 0 0
20043
KENTON KY-236 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
30,000
300,000
0 0 0 330,000 0 0 0
20044
KENTON KY-1072 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
20,000
200,000
0 0 0 220,000 0 0 0
20045
176
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KENTON US-25 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
325,000
3,250,000
0 0 0 3,575,000 0 0 0
20046
KENTON KY-177 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-177 FROM MILEPOINT 9.17 TO MILEPOINT 15.99
PL
Project Cost:
CN
UT
RW
DN
PM 893,000
0 0 0 0 893,000 0 0
20051
KENTON KY 236 AIR QUALITY(P) RECONSTRUCT KY 236 (STEVENSON ROAD) FROM ALICE STREET TO JACQUELINE DRIVE
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
800,000
1,000,000
1,000,000
5,300,000
0 800,000 1,000,000 1,000,000 5,300,000 0 0
80002
Total for KENTON county PL
Total Amounts:
CN
UT
RW
DN 1,104,600
1,406,000
1,632,000
9,419,630
5,941,000
2,504,000
2,160,000
67,361,000
4,200,000
2,850,000
13,622,800
6,110,000
5,000,000
1,000,000
27,510,000
100,000
14,520,000
3,170,000
8,900,000
390,000
3,000,000
3,000,000
20,693,000
1,400,000
1,560,000
55,900,000
13,562,230 77,966,000 20,672,800 39,620,000 38,483,000 15,290,000 58,860,000
KNOTT CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOON CREEK AT INTERSECTION WITH COON CREEK (CR 1371) (060C00006N)
PL
Project Cost:
CN
UT
RW
DN
BR 420,000
420,000 0 0 0 0 0 0
1116
177
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KNOTT CS-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER RIGHT FORK TROUBLESOME CREEK ON FIELDWOOD DRIVE (CS1016) IN HINDMAN (060C00060N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
455,000
0 210,000 455,000 0 0 0 0
1124
KNOTT KY-3209 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BALLS FORK ON KY 3209. (16CCN) 060B00053N
PL
Project Cost:
CN
UT
RW
DN
BR 700,000
700,000 0 0 0 0 0 0
8904
KNOTT KY-1098 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1098 BRIDGE OVER LAUREL FK OF QUICKSAND C. (060B00035N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
680,000
0 175,000 680,000 0 0 0 0
10001
KNOTT CR-1130 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF COLLINS BRANCH RD BRIDGE OVER CARR FORK. (060C00029N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
398,650
0 157,500 398,650 0 0 0 0
10002
KNOTT CR-1565 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FRANKIE JANE DR BRIDGE OVER CANEY CREEK. (060C00071N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
337,890
0 175,000 337,890 0 0 0 0
10015
178
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for KNOTT county PL
Total Amounts:
CN
UT
RW
DN
1,120,000
717,500
1,871,540
1,120,000 717,500 1,871,540 0 0 0 0
KNOX US-25 MAJOR WIDENING(O) IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 2,300,000
0 0 2,300,000 0 0 0 0
188
KNOX US-25 PREFINANCD CONVRSN(O)
IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 6,920,000
0 0 0 6,920,000 0 0 0
188.01
KNOX CR-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD HWY 25 (CR 1325) JUST WEST OF US 25E. 061C00063N
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
350,000
0 175,000 350,000 0 0 0 0
1102
KNOX CR-1353 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SPIDER CREEK RD BRIDGE OVER EAST FORK LYNN CAMP CREEK. (061C00048N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
469,000
0 192,500 469,000 0 0 0 0
10021
179
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KNOX CR-1162 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DETHERAGE CEMETERY BRIDGE OVER BRUSH CREEK. (061C00056N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
367,500
0 157,500 367,500 0 0 0 0
10022
KNOX CR-1065 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BURTON BRANCH RD BRIDGE OVER BURTON BRANCH. (061C00086N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
360,000
0 175,000 360,000 0 0 0 0
10023
KNOX KY-6 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
30,000
300,000
0 0 330,000 0 0 0 0
20007
KNOX US-25 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
125,000
1,250,000
0 1,375,000 0 0 0 0 0
20008
KNOX US-25 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 21.72 TO MILEPOINT 26.20
PL
Project Cost:
CN
UT
RW
DN
PM 2,267,000
0 0 0 0 0 2,267,000 0
20022
180
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
KNOX US 25E AIR QUALITY(P) US 25E VARIOUS TURNING LANES. CROSSOVER AND TURNING LANE AT THE PALLET STORE. LEFT TURNING LANE AT THE SAWMILL AT THE KNOX/BELL COUNTY LINE. RIGHT
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
30,000
270,000
0 300,000 0 0 0 0 0
80000
KNOX US 25E AIR QUALITY(P) CONDUCT A TRAFFIC SAFETY STUDY ON US 25E AT HEIDRICK, KY IN KNOX COUNTY
PL
Project Cost:
CN
UT
RW
DN
SPP 50,000
0 50,000 0 0 0 0 0
80009
Total for KNOX county PL
Total Amounts:
CN
UT
RW
DN
50,000
855,000
1,520,000
30,000
4,146,500 6,920,000 2,267,000
0 2,425,000 4,176,500 6,920,000 0 2,267,000 0
LARUE KY-222 CONGESTION MITIGTN(O)
CONNECTOR IMPROVEMENTS HODGENVILLE TO I-65
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
125,000
50,000
100,000
400,000
0 175,000 500,000 0 0 0 0
8909
LARUE KY-84 SPOT IMPROVEMENTS(O)
SPOT IMPROVEMENTS ON KY 84 FROM HODGENVILLE TO I-65.
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
450,000
0 0 500,000 0 0 0 0
8911
181
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LARUE KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-61 BRIDGE OVER SOUTH FORK BRANCH(062B00008N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
87,500
605,500
0 87,500 605,500 0 0 0 0
10002
Total for LARUE county PL
Total Amounts:
CN
UT
RW
DN 212,500
50,000
50,000
100,000
1,455,500
0 262,500 1,605,500 0 0 0 0
LAUREL I-75 MAJOR WIDENING(O) IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
70,000
50,000
10,000,000
0 120,000 10,000,000 0 0 0 0
9.1
LAUREL I-75 PREFINANCD CONVRSN(O)
IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 20,000,000
0 0 0 20,000,000 0 0 0
9.14
LAUREL I-75 PREFINANCD CONVRSN(O)
IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 18,500,000
0 0 0 0 18,500,000 0 0
9.15
182
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LAUREL I-75 PREFINANCD CONVRSN(O)
IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 18,500,000
0 0 0 0 0 18,500,000 0
9.16
LAUREL I-75 MAJOR WIDENING(O) IMPROVE I-75 FROM KY 80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.
PL
Project Cost:
CN
UT
RW
DN
NH 20,750,000
0 0 0 0 20,750,000 0 0
11
LAUREL I-75 PREFINANCD CONVRSN(O)
IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.
PL
Project Cost:
CN
UT
RW
DN
NH 20,750,000
0 0 0 0 0 20,750,000 0
11.02
LAUREL I-75 PREFINANCD CONVRSN(O)
IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.
PL
Project Cost:
CN
UT
RW
DN
NH 20,750,000
0 0 0 0 0 0 20,750,000
11.03
LAUREL US-25 MAJOR WIDENING(O) REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVE CONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROM THE NEW CONNECTOR NORTH
PL
Project Cost:
CN
UT
RW
DN
STP 10,000,000
0 0 0 0 10,000,000 0 0
147
183
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LAUREL US-25 PREFINANCD CONVRSN(O)
REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVE CONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROM THE NEW CONNECTOR NORTH
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 0 0 0 5,000,000 0
147.01
LAUREL KY-363 MAJOR WIDENING(O) ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON KY-363 FROM KY-1006 TO KY-192. (06CCR)(2006BOPC).(10CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,000,000
3,000,000 0 0 0 0 0 0
147.1
LAUREL US-25 MAJOR WIDENING(O) IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770 (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 4,580,000
0 0 4,580,000 0 0 0 0
185
LAUREL US-25 PREFINANCD CONVRSN(O)
IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770 (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 6,860,000
0 0 0 6,860,000 0 0 0
185.01
LAUREL KY-192 MAJOR WIDENING(O) IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; AND REDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
NH
1,000,000
2,500,000
6,000,000
3,500,000 0 0 0 6,000,000 0 0
187
184
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LAUREL KY-192 PREFINANCD CONVRSN(O)
IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; AND REDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 12,000,000
0 0 0 0 0 12,000,000 0
187.01
LAUREL HR-9006 MAJOR WIDENING(O) REDUCE CONGESTION ON THE HAL ROGERS PARKWAY FROM RELOCATED KY-30 TO KY-192.
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
1,870,000
2,080,000
1,250,000
4,510,000
0 0 0 1,870,000 3,330,000 4,510,000 0
365
LAUREL CR-1341 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON DOG BRANCH SCHOOL RD (CR 1341) OVER SINKING CREEK 0.56 MILE NW OF SINKING CREEK RD (FD 781) 063C00025N
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
770,000
0 175,000 770,000 0 0 0 0
1094
LAUREL KY-312 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CRAIG CREEK ON KY 312 1.8 MILE SE OF KY 192. (063B00053N)(14CCR)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 1,200,000
1,200,000 0 0 0 0 0 0
1096
LAUREL I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER LAUREL RIVER (SR 34.1) (B00043R AND B00043L)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 2,800,000
2,800,000 0 0 0 0 0 0
1105.01
185
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LAUREL US-25 DESIGN ENGINEERING(O)
IMPROVE CONNECTIVITY BETWEEN CORBIN AND LONDON FROM KY-1006 TO US-25E. (08CCN)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
500,000
3,000,000
0 0 500,000 0 3,000,000 0 0
8515
LAUREL CR-1221 BRIDGE REPLACEMENT(P)
REPLACE BRIDGE LOCATED ON LILY ROAD (CR 1221) (MP 1.045) (AREA ADJACENT TO FARISTON INDUSTRIAL PARK WITH NEW ROADWAY ALIGNMENT). (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 1,343,900
0 1,343,900 0 0 0 0 0
8811
LAUREL HR-9006 RECONSTRUCTION(O)IMPROVE THE HAL ROGERS PARKWAY TO INTERSTATE STANDARDS FROM 4MI EAST OF KY 192 TO LAUREL/CLAY CO. LINE. (I-75 TO HAZARD) (16CCN).
PL
Project Cost:
CN
UT
RW
DN NH
SPP
SPP
SPP
1,000,000
2,200,000
1,000,000
27,000,000
0 0 0 1,000,000 2,200,000 1,000,000 27,000,000
8909
LAUREL KY-1223 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1223 BRIDGE OVER HORSE CREEK. (063B00007N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
378,000
0 175,000 378,000 0 0 0 0
10024
LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER LICK FORK CREEK. (063B00013N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
525,000
0 210,000 525,000 0 0 0 0
10025
186
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER HOOPPOLE CREEK. (063B00017N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
507,500
0 175,000 507,500 0 0 0 0
10026
LAUREL KY-490 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 490 BRIDGE OVER ROCKCASTLE RIVER. (063B00004N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
2,492,000
0 245,000 2,492,000 0 0 0 0
10042
LAUREL KY-638 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 638 BRIDGE OVER BIG RACCOON CREEK(063B00061N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
829,500
0 192,500 829,500 0 0 0 0
10043
LAUREL HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 3.877
PL
Project Cost:
CN
UT
RW
DN PM
PM
310,000
3,100,000
0 3,410,000 0 0 0 0 0
20009
LAUREL I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 29.39 TO MILEPOINT 32.49 (33.2 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
300,000
3,000,000
0 0 0 0 0 3,300,000 0
20010
187
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LAUREL I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 32.485 TO MILEPOINT 32.9
PL
Project Cost:
CN
UT
RW
DN PM
PM
120,000
1,200,000
0 1,320,000 0 0 0 0 0
20011
LAUREL I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 41.4 TO MILEPOINT 50.524 (49.87 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,100,000
11,000,000
0 0 0 0 0 12,100,000 0
20012
LAUREL I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 50.524 (49.87 NON-CARDINAL) TO MILEPOINT 50.714
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 1,100,000 0 0 0 0 0
20013
LAUREL KY-490 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-490 FROM MILEPOINT 0.00 TO MILEPOINT 6.14
PL
Project Cost:
CN
UT
RW
DN
PM 924,000
0 0 0 0 924,000 0 0
20023
Total for LAUREL county PL
Total Amounts:
CN
UT
RW
DN1,000,000
2,500,000
7,000,000
1,702,500
70,000
50,000
6,643,900
500,000
20,082,000
2,870,000
26,860,000
3,000,000
4,280,000
1,250,000
74,760,000
1,400,000
1,000,000
56,174,000 47,750,000
10,500,000 8,466,400 20,582,000 29,730,000 64,704,000 77,160,000 47,750,000
188
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LAWRENCE KY-2565 RECONSTRUCTION(O)RECONSTRUCT KY 2565 FROM APPROX. 550' NW OF CR 1529/KY2565/KY2563 INTERSECTION TO APPROX. 1150' SE OF THE INTERSECTION (SECTION 2).
PL
Project Cost:
CN
UT
RW
DN
SPP 790,000
790,000 0 0 0 0 0 0
196.1
LAWRENCE CR-1044 SPOT IMPROVEMENTS(O)
SPOT IMPROVEMENTS ON SPANKEM BRANCH ROAD (CR 1044).
PL
Project Cost:
CN
UT
RW
DN
SPP 500,000
0 500,000 0 0 0 0 0
8951
LAWRENCE CR-1234 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MAXIE BRANCH RD BRIDGE OVER RT FORK-BLAINE CREEK. (064C00076N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
478,000
0 140,000 478,000 0 0 0 0
10003
LAWRENCE KY-644 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 644 BRIDGE OVER LEVISA FORK OF BIG SANDY. (064B00038N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
560,000
2,880,500
0 560,000 2,880,500 0 0 0 0
10016
Total for LAWRENCE county PL
Total Amounts:
CN
UT
RW
DN
790,000
700,000
500,000 3,358,500
790,000 1,200,000 3,358,500 0 0 0 0
189
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LEE KY-11 RECONSTRUCTION(O)I-75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY-11 FROM KY-30 AT LEVI IN OWSLEY COUNTY TO 0.5 MILE SOUTH OF KY-587 IN LEE COUNTY. START AT KY-30 AT LEVI IN OWSLEY
PL
Project Cost:
CN
UT
RW
DN
SPP 22,620,000
0 0 0 22,620,000 0 0 0
292.1
LEE CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GOOSE CREEK RD BRIDGE OVER CSX RAILROAD. (065R00604N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
770,000
0 245,000 770,000 0 0 0 0
10013
Total for LEE county PL
Total Amounts:
CN
UT
RW
DN 245,000
770,000 22,620,000
0 245,000 770,000 22,620,000 0 0 0
LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON US-421 OVER STINNET CREEK 0.028 MILE SOUTH OF KY-406 NEAR STINNETT(10CCR)(066B00008N)
PL
Project Cost:
CN
UT
RW
DN
BR 2,128,000
0 2,128,000 0 0 0 0 0
1078
LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER MUNCY CREEK ON US 421 0.5 MILE SOUTH OF TAYLOR MORGAN ROAD (CR 1090).(066B00006N)
PL
Project Cost:
CN
UT
RW
DN
BR 612,500
0 0 612,500 0 0 0 0
1095
190
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LESLIE CR-1528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WOLF CREEK ON COON CREEK ROAD (CR 1528) AT JCT WITH KY 3427 (066C00039N) (EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
123,000
445,000
0 123,000 445,000 0 0 0 0
1100
LESLIE CR-1219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MILE BRANCH RD (CR 1219) (MP 0.022OVER BEECH FORK. 066C00048N
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
613,000
0 245,000 613,000 0 0 0 0
1104
LESLIE CR-1207 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON WILLIAMS BRANCH RD (CR-1207) (0.028) OVER MIDDLE FORK KENTUCKY RIVER. 066C00020N
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
560,000
0 245,000 560,000 0 0 0 0
1106
LESLIE KY-1482 NEW ROUTE(O) CONSTRUCT A NEW APPROACH FROM KY-1482 ONTO THE HAL ROGERS PARKWAY AT MP 39. (08CCN)(10CCR)(2011BOPP)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
920,000
420,000
5,300,000
0 0 0 1,000,000 1,340,000 5,300,000 0
8516
LESLIE HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM CLAY/LESLIE LINE TO HYDEN SPUR, MP 35.929 TO MP 44.188 (SEGMENT 9)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
12,000,000
9,000,000
94,400,000
0 0 0 1,000,000 21,000,000 94,400,000 0
8912
191
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LESLIE HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM HYDEN SPUR TO LESLIE/PERRY LINE (SEGMENT 10)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
10,000,000
7,000,000
61,600,000
0 0 0 1,000,000 17,000,000 0 61,600,000
8913
LESLIE US-421 CONGESTION MITIGTN(O)
CONSTRUCT RIGHT TURN LANE ON US 421 AT INTERSECTION WITH KY 80.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
500,000
100,000
250,000
1,200,000
0 0 0 500,000 350,000 1,200,000 0
8951
LESLIE KY-1780 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1780 BRIDGE OVER BEECH FORK. (066B00027N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
857,500
0 210,000 857,500 0 0 0 0
10027
LESLIE KY-699 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-699 BRIDGE OVER MAGGARDS BRANCH. (066B00031N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
525,000
0 175,000 525,000 0 0 0 0
10028
LESLIE KY-2431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2431 BRIDGE OVER MIDDLE FORK OF KY RIVER. (066B00039N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
BR
BR
300,000
75,000
180,000
1,100,000
0 0 0 300,000 255,000 0 1,100,000
10029
192
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LESLIE CR-1006 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1006 BRIDGE OVER RACCOON CREEK. (066C00002N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
451,500
0 192,500 451,500 0 0 0 0
10030
LESLIE CR-1271 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1271 BRIDGE OVER MIDDLE FK KENTUCKY RVR. (066C00023N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
525,000
0 210,000 525,000 0 0 0 0
10031
LESLIE KY 3424 AIR QUALITY(P) SAFETY IMPROVEMENTS ON KY 3424 FROM MP 1.1 TO MP 1.5
PL
Project Cost:
CN
UT
RW
DN
SPP 1,300,000
0 0 0 1,300,000 0 0 0
80002
LESLIE KY 2009 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 2009 FROM MP 13.418 TO MP 14.767
PL
Project Cost:
CN
UT
RW
DN
SPP 500,000
0 0 0 500,000 0 0 0
80003
LESLIE KY 1482 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 1482 FROM MP 0 TO MP 1.9
PL
Project Cost:
CN
UT
RW
DN
SPP 107,000
0 0 0 107,000 0 0 0
80004
193
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LESLIE KY 257 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 257 FROM MP 5.723 TO MP 5.853
PL
Project Cost:
CN
UT
RW
DN
SPP 22,000
0 0 0 22,000 0 0 0
80005
LESLIE KY 1807 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 1807 FROM MP 0.914 TO MP 1.256
PL
Project Cost:
CN
UT
RW
DN
SPP 45,000
0 0 0 45,000 0 0 0
80006
LESLIE KY 118 AIR QUALITY(P) CONSTRUCT A SECONDARY RUNAWAY TRUCK RAMP ON KY 118 (HYDEN SPUR) JUST BEFORE THE INTERSECTION WITH KY 80/US 421 TO INCLUDE A NEW BOX CULVERT OR
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
400,000
300,000
50,000
1,300,000
0 0 0 400,000 1,650,000 0 0
80007
Total for LESLIE county PL
Total Amounts:
CN
UT
RW
DN 1,400,500
2,128,000 4,589,500
4,200,000
1,974,000
23,395,000
16,900,000
100,900,0001,300,000 62,700,000
0 3,528,500 4,589,500 6,174,000 41,595,000 100,900,000 62,700,000
LETCHER US-119 RECONSTRUCTION(O)IMPROVE US-119 FROM NORTH OF KY-15 TO BRASS DRIVE (SOUTH).(16CCN)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,300,000
1,200,000
0 0 0 2,500,000 0 0 0
199.1
194
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LETCHER US-119 RECONSTRUCTION(O)IMPROVE US-119 FROM NORTH OF KY-15 TO THE KY 2034/COUGAR DRIVE INTERSECTION.(16CCN)(SEE 12-199.10 FOR D, R, U)
PL
Project Cost:
CN
UT
RW
DN
NH 1,000,000
1,000,000 0 0 0 0 0 0
199.11
LETCHER US-119 RECONSTRUCTION(O)IMPROVE US-119 FROM KY 2034/COUGAR DRIVE TO BRASS DRIVE (SOUTH).(16CCN)(SEE 12-199.10 FOR D, R, U)
PL
Project Cost:
CN
UT
RW
DN
NH 6,000,000
0 0 0 6,000,000 0 0 0
199.15
LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 E OF US 119 067B00121N
PL
Project Cost:
CN
UT
RW
DN
BR 973,000
973,000 0 0 0 0 0 0
1113
LETCHER KY-3404 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POOR FORK OF CUMBERLAND RIVER ON KY 3404 100 FT SOUTH OF US 119. (067B00114N)
PL
Project Cost:
CN
UT
RW
DN
BR 420,000
0 0 420,000 0 0 0 0
1120
LETCHER CR-1226 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON HAMPTON BRANCH (CR 1226) (MP 0.01) OVER COWAN CREEK. 067C00021N
PL
Project Cost:
CN
UT
RW
DN
BR 385,000
0 0 385,000 0 0 0 0
1125
195
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LETCHER CR-1225 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1225 (0.034) OVER COWAN CREEK. 067C00020N
PL
Project Cost:
CN
UT
RW
DN BR
BR
420,000
385,000
0 420,000 385,000 0 0 0 0
1126
LETCHER KY-805 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-805 BRIDGE OVER POTTERS FORK. (067B00022N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
616,840
0 210,000 616,840 0 0 0 0
10004
LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2034 BRIDGE OVER CRAFTS COLLY CREEK(067B00069N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
406,105
0 140,000 406,105 0 0 0 0
10005
LETCHER CR-1433 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CORNFIELD DR BRIDGE OVER BOONE FORK. (067C00004N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
427,840
0 140,000 427,840 0 0 0 0
10006
LETCHER CR-1386 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF TURKEY CRK BRIDGE OVER TURKEY CREEK. (067C00050N)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
697,000
0 175,000 697,000 0 0 0 0
10007
196
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LETCHER KY-7 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 7 BRIDGE OVER CSX RR & N FK KY RIVER. (067B00038N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
525,000
4,900,000
0 525,000 4,900,000 0 0 0 0
10017
LETCHER KY-343 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 343 BRIDGE OVER WRIGHT FORK. (067B00078N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
378,560
0 175,000 378,560 0 0 0 0
10018
LETCHER CS-3000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF E POTTER RD BRIDGE OVER YONTS FORK. (067C00007N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
372,400
0 157,500 372,400 0 0 0 0
10019
LETCHER CR-1149 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOLBROOK TOWN BRIDGE OVER N.FK.KENTUCKY RVR. (067C00017N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
516,810
0 210,000 516,810 0 0 0 0
10020
LETCHER CR-1799 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARADISE LN BRIDGE OVER KINGDOM COME CREEK. (067C00051N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
269,500
0 140,000 269,500 0 0 0 0
10021
197
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LETCHER CR-1737 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ORCHARD RD BRIDGE OVER NORTH FORK KY RIVER. (067C00065N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
655,900
0 210,000 655,900 0 0 0 0
10022
LETCHER US-119 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-119 FROM MILEPOINT 17.00 TO MILEPOINT 22.63
PL
Project Cost:
CN
UT
RW
DN
PM 1,477,000
0 0 0 0 1,477,000 0 0
20005
Total for LETCHER county PL
Total Amounts:
CN
UT
RW
DN
1,973,000
2,502,500
10,430,955
1,300,000
1,200,000
6,000,000 1,477,000
1,973,000 2,502,500 10,430,955 8,500,000 1,477,000 0 0
LEWIS KY-59 RECONSTRUCTION(O)RECONSTRUCT KY-59 FROM KY-9 (AA) IN VANCEBURG TO JUNCTION OF KY-344 MP 18.1 TO MP 23.19
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
6,000,000
5,000,000
3,000,000
40,000,000
0 0 0 6,000,000 5,000,000 3,000,000 40,000,000
231
LEWIS KY-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LAUREL FORK ON KY 1068 30 FT S OF DEEP HOLE BRANCH ROAD (CR 1125).(068B00057N)(16CCR)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR
BR
BR
75,000
75,000
900,000
150,000 900,000 0 0 0 0 0
1090
198
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LEWIS KY-57 AM-BRIDGE (P) CONSTRUCT A NEW BRIDGE CROSSING THE NORTH FORK OF THE LICKING RIVER AT THE LEWIS-FLEMING COUNTY LINE. (08CCN): (068B00027N)
PL
Project Cost:
CN
UT
RW
DN
BR 3,640,000
0 3,640,000 0 0 0 0 0
8507
LEWIS KY-8 NEW ROUTE(O) RECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICK ROAD
PL
Project Cost:
CN
UT
RW
DN SPP 500,000
0 0 0 500,000 0 0 0
8806.1
LEWIS KY-57 RECONSTRUCTION(O)RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE. (14CCN)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
2,100,000
5,200,000
3,400,000
20,000,000
0 0 0 0 2,100,000 8,600,000 20,000,000
8807
LEWIS KY-344 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-344 BRIDGE OVER GRASSY BRANCH. (068B00015N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
1,540,000
0 350,000 1,540,000 0 0 0 0
10010
LEWIS KY-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1021 BRIDGE OVER BRIERY CREEK. (068B00075N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
315,000
857,500
0 315,000 857,500 0 0 0 0
10023
199
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LEWIS KY-9 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
210,000
2,100,000
0 0 0 2,310,000 0 0 0
20010
LEWIS KY-9 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-9 FROM MILEPOINT 15.77 TO MILEPOINT 21.03
PL
Project Cost:
CN
UT
RW
DN
PM 1,070,000
0 0 0 0 1,070,000 0 0
20017
Total for LEWIS county PL
Total Amounts:
CN
UT
RW
DN75,000
75,000
665,000
4,540,000 2,397,500
6,710,000
2,100,000
2,100,000
5,000,000 5,200,000
6,400,000
1,070,000 60,000,000
150,000 5,205,000 2,397,500 8,810,000 8,170,000 11,600,000 60,000,000
LINCOLN US-27 RECONSTRUCTION(O)US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
4,720,000
3,000,000
0 0 0 0 7,720,000 0 0
167
LINCOLN US-27 PREFINANCD CONVRSN(O)
US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
7,080,000
4,500,000
0 0 0 0 0 11,580,000 0
167.01
200
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LINCOLN US-27 MAJOR WIDENING(O) IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEW GOSHEN CUT-OFF ROAD)(2005HPP-KY115)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
1,400,000
1,100,000
3,250,000
0 2,500,000 3,250,000 0 0 0 0
196
LINCOLN US-27 PREFINANCD CONVRSN(O)
IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEW GOSHEN CUT-OFF ROAD)(2005HPP-KY115)
PL
Project Cost:
CN
UT
RW
DN
NH 3,250,000
0 0 0 3,250,000 0 0 0
196.01
LINCOLN KY-1247 AM-BRIDGE (P) REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4) 069B00055N
PL
Project Cost:
CN
UT
RW
DN
BR 567,000
567,000 0 0 0 0 0 0
1055
LINCOLN CR-1043 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1043 (0.643) OVER LOGAN CREEK. (SR=20.2) 069C00008N
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
497,000
0 175,000 497,000 0 0 0 0
1066
LINCOLN US 127 NEW INTERCHANGE(O)
NEW TURNING LANE AT ARCADIA VIEW DRIVE
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
100,000
50,000
50,000
800,000
0 1,000,000 0 0 0 0 0
80000
201
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LINCOLN US 150 NEW INTERCHANGE(O)
US 150 NEW TURNING LANE NEAR HOBBLE ROAD AND CRAWFORD LANE
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
100,000
50,000
350,000
500,000 0 0 0 0 0 0
80001
LINCOLN US 127 NEW INTERCHANGE(O)
US 127 NEW TURNING LANE AT KY 1194
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
100,000
50,000
50,000
800,000
0 1,000,000 0 0 0 0 0
80002
LINCOLN US 150 AIR QUALITY(P) ADD A TURNING LANE ON US 150 AT WILDERNESS TRAIL ROAD
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
100,000
50,000
350,000
0 500,000 0 0 0 0 0
80008
LINCOLN US-27 MINOR WIDENING(O) EXPAND US-27 TO FOUR LANES FROM THE WALMART IN STANFORD TO THE DIX RIVER
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
2,100,000
7,500,000
6,500,000
24,300,000
0 0 0 2,100,000 7,500,000 6,500,000 24,300,000
80009
Total for LINCOLN county PL
Total Amounts:
CN
UT
RW
DN 100,000
50,000
917,000
475,000
1,500,000
1,250,000
1,950,000 3,747,000
2,100,000
3,250,000
12,220,000
3,000,000
7,080,000
11,000,000
24,300,000
1,067,000 5,175,000 3,747,000 5,350,000 15,220,000 18,080,000 24,300,000
202
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LIVINGSTON US-60 RELOCATION(O) PADUCAH-HENDERSON; RELOCATE US-60 FROM EAST OF THE TENNESSEE RIVER BRIDGE TO EAST OF RUDD-SPEES ROAD (00CCR)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,580,000
1,560,000
0 0 0 3,140,000 0 0 0
330
LIVINGSTON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70 070B00017N.
PL
Project Cost:
CN
UT
RW
DN
BR 16,000,000
0 16,000,000 0 0 0 0 0
1142
LIVINGSTON US-60 PREFINANCD CONVRSN(O)
ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70 (SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)
PL
Project Cost:
CN
UT
RW
DN
BR 16,000,000
0 0 16,000,000 0 0 0 0
1142.01
LIVINGSTON I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 29.543 TO MILEPOINT 33.88
PL
Project Cost:
CN
UT
RW
DN PM
PM
350,000
3,500,000
0 0 0 0 0 3,850,000 0
20007
LIVINGSTON KY-453 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-453 FROM MILEPOINT 0.00 TO MILEPOINT 4.57
PL
Project Cost:
CN
UT
RW
DN
PM 879,000
0 0 0 0 879,000 0 0
20030
203
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for LIVINGSTON county PL
Total Amounts:
CN
UT
RW
DN
16,000,000 16,000,000
1,580,000
1,560,000
3,500,000
350,000
879,000
0 16,000,000 16,000,000 3,140,000 879,000 3,850,000 0
LOGAN KY-2349 SAFETY(P) IMPROVE SAFETY BY IMPROVING SIGHT LINES CROSSING RAILROAD BETWEEN STOCKYARDS AND INDUSTRIAL PARK
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
150,000
100,000
150,000
850,000
0 0 0 150,000 250,000 850,000 0
8908
LOGAN US-79 AM-BRIDGE (P) IMPROVE SAFETY AND BRIDGE CONDITION ON WHIPPORWILL CREEK BRIDGE NEAR KY-1151. BRIDGE ID 071B00025 (SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
250,000
1,715,000
0 250,000 1,715,000 0 0 0 0
10010
LOGAN US-79 MINOR WIDENING(O) WIDEN US-79 TO 3 LANES FROM TODD COUNTY LINE TO INTERSECTION WITH RUSSELLVILLE BYPASS.
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
4,300,000
6,500,000
10,700,000
28,100,000
0 0 0 4,300,000 6,500,000 10,700,000 28,100,000
80050
Total for LOGAN county PL
Total Amounts:
CN
UT
RW
DN 250,000
1,715,000
4,450,000
6,600,000
150,000
850,000
10,700,000
28,100,000
0 250,000 1,715,000 4,450,000 6,750,000 11,550,000 28,100,000
204
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LYON I-24 WEIGH STA REHAB(P)ADD RESTROOM FACILITY TO I-24 EASTBOUND & WESTBOUND WEIGH STATIONS IN LYON COUNTY (DESIGN FUNDS AUTHORIZED UNDER ITEM NO99-44.00)
PL
Project Cost:
CN
UT
RW
DN
NH 1,900,000
0 0 0 0 0 1,900,000 0
7
LYON US-641 RELOCATION(O) RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THE LYON/CALDWELL COUNTY LINE.
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
2,500,000
2,000,000
500,000
6,000,000
0 2,500,000 2,500,000 0 6,000,000 0 0
187.5
LYON US-641 PREFINANCD CONVRSN(O)
RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THE LYON/CALDWELL COUNTY LINE.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
2,000,000
500,000
6,000,000
0 0 0 2,500,000 0 6,000,000 0
187.51
LYON US-641 PREFINANCD CONVRSN(O)
RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THE LYON/CALDWELL COUNTY LINE. (ADDITIONAL FUNDING FOR 1-187.50)
PL
Project Cost:
CN
UT
RW
DN
NH 6,000,000
0 0 0 0 0 0 6,000,000
187.52
LYON US-641 RELOCATION(O) RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES.
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
STP
1,800,000
2,000,000
800,000
7,500,000
0 1,800,000 2,800,000 0 7,500,000 0 0
187.6
205
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LYON US-641 PREFINANCD CONVRSN(O)
RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
STP
2,000,000
800,000
7,500,000
0 0 0 2,800,000 0 7,500,000 0
187.61
LYON US-641 PREFINANCD CONVRSN(O)
RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (ADDITIONAL FUNDING FOR 1-187.60)
PL
Project Cost:
CN
UT
RW
DN
STP 7,500,000
0 0 0 0 0 0 7,500,000
187.62
LYON I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 33.988 TO MILEPOINT 45.133
PL
Project Cost:
CN
UT
RW
DN PM
PM
900,000
9,000,000
0 0 0 0 0 0 9,900,000
20008
LYON I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 45.133 TO MILEPOINT 51.886
PL
Project Cost:
CN
UT
RW
DN PM
PM
270,000
2,700,000
0 0 2,970,000 0 0 0 0
20009
LYON I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 45.171 TO MILEPOINT 51
PL
Project Cost:
CN
UT
RW
DN PM
PM
300,000
3,000,000
0 0 0 0 0 0 3,300,000
20010
206
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
LYON I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 BOTH DIRECTION(S) FROM MILEPOINT 51.89 (51.0 NON-CARDINAL) TO MILEPOINT 54.862
PL
Project Cost:
CN
UT
RW
DN PM
PM
400,000
4,000,000
0 0 0 0 0 0 4,400,000
20011
Total for LYON county PL
Total Amounts:
CN
UT
RW
DN 4,300,000 270,000
4,000,000
1,300,000
2,700,000
4,000,000
1,300,000
15,400,00013,500,000
1,600,000
29,500,000
0 4,300,000 8,270,000 5,300,000 13,500,000 15,400,000 31,100,000
MADISON -0 NEW ROUTE(O) CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TO KY-21. (2004BOPC)(08CCR)(12CCR) PHASE 1 - BEREA BYPASS FROM US-25 TO KY-1016.
PL
Project Cost:
CN
UT
RW
DN
SPP 12,000,000
0 12,000,000 0 0 0 0 0
192.2
MADISON -0 NEW ROUTE(O) CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TO KY-21. (2004BOPC)(08CCR)(12CCR) PHASE 2 - BEREA BYPASS FROM KY-1016 TO KY-21.
PL
Project Cost:
CN
UT
RW
DN
SPP 12,000,000
0 0 0 12,000,000 0 0 0
192.21
MADISON KY-52 RECONSTRUCTION(O)IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
4,000,000
4,000,000
4,000,000
0 4,000,000 8,000,000 0 0 0 0
235
207
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MADISON KY-52 RECONSTRUCTION(O)IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 9,000,000
0 0 0 9,000,000 0 0 0
235.1
MADISON KY-52 RECONSTRUCTION(O)IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 10,000,000
0 0 0 0 10,000,000 0 0
235.2
MADISON KY-595 SCOPING STUDY(O) COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET AND BEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA). (16CCR)(LET BY CITY)
PL
Project Cost:
CN
UT
RW
DN
HPP 266,952
266,952 0 0 0 0 0 0
236
MADISON US-25 MAJOR WIDENING(O) WIDEN US-25 FROM US-421 NORTH TO KY-876. STATE TO PROVIDE DESIGN AND PLANS, AND FUNDS FOR THIS PROJECT ARE REQUESTED TO BE PAID TO THE MADISON COUNTY FISCAL
PL
Project Cost:
CN
UT
RW
DN
HPP 719,921
719,921 0 0 0 0 0 0
251.01
MADISON US-25 MAJOR WIDENING(O) PRIORITY SECTION II & III: WIDEN US-FROM US-421 TO PUMPKIN RUN.(SEE 7-251.10 FOR SEC III UTIL & CONST) (2006BOPC)(08CCR)(10CCR)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 3,750,000
0 0 0 0 0 0 3,750,000
251.4
208
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MADISON US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421) OVER COWBELL CREEK AT JCT WITH HIGHWAY 21 E (KY 21)076B00021
PL
Project Cost:
CN
UT
RW
DN
BR
BR
BR
90,000
90,000
625,000
805,000 0 0 0 0 0 0
1130
MADISON CR-1158 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD HAYS FORK LN (CR 1158) OVER BRANCH OF HAYS FORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421) 076C00023N
PL
Project Cost:
CN
UT
RW
DN
BR 336,000
0 336,000 0 0 0 0 0
1131
MADISON KY-3376 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER TERRILL BRANCH ROAD ON KY 3376 IN BEREA 200 FT N OF PEACHTREE DRIVE (CS 2072).(076B00085N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
857,500
0 210,000 857,500 0 0 0 0
1137
MADISON CR-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1017 (3.405) OVER MUDDY CREEK076C00004N (SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
190,000
420,000
0 190,000 420,000 0 0 0 0
1142
MADISON CR-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1044 (0.007) OVER BR OF MUDDY CREEK. 076C00066N
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
455,000
0 210,000 455,000 0 0 0 0
1143
209
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MADISON KY-627 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75. (INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 5,000,000
5,000,000 0 0 0 0 0 0
8403
MADISON KY-627 PREFINANCD CONVRSN(O)
IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75. (INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 5,000,000
0 5,000,000 0 0 0 0 0
8403.01
MADISON US-25 SAFETY(P) IMPROVE ROADWAY, SIDEWALKS, AND BIKE PATHS ON US-25 BETWEEN ELLIPSE STREET TO GLADES ROAD AND THEN CONTINUES ON TO THE BEREA BYPASS. (08CCN)(10CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 7,200,000
7,200,000 0 0 0 0 0 0
8505
MADISON KY-2881 SPOT IMPROVEMENTS(O)
PROPOSED ROADWAY IMPROVEMENTS FROM DUNCANNON RD TO THE MADISON CO AIRPORT TO INCLUDE CALEAST RD (KY 2881 MP.783-MP 2.780), JOHN BALLARD RD
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
500,000
2,700,000
9,000,000
0 1,000,000 500,000 2,700,000 9,000,000 0 0
8853
MADISON KY-1984 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1984 BRIDGE OVER TATES CREEK. (076B00071N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
665,000
0 210,000 665,000 0 0 0 0
10001
210
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MADISON CR-1056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER E. FK. OTTER CREEK. (076C00011N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
665,000
0 210,000 665,000 0 0 0 0
10002
MADISON I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 73.408 TO MILEPOINT 83.4
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,200,000
12,000,000
0 0 0 13,200,000 0 0 0
20017
Total for MADISON county PL
Total Amounts:
CN
UT
RW
DN90,000
90,000
13,811,873
2,030,000
4,000,000
17,336,000
500,000
4,000,000
7,062,500
1,200,000
2,700,000
33,000,000 19,000,000 3,750,000
13,991,873 23,366,000 11,562,500 36,900,000 19,000,000 0 3,750,000
MAGOFFIN KY-9009 MAJOR WIDENING(O) MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).
PL
Project Cost:
CN
UT
RW
DN
NH 15,000,000
0 15,000,000 0 0 0 0 0
126.4
MAGOFFIN KY-9009 PREFINANCD CONVRSN(O)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).
PL
Project Cost:
CN
UT
RW
DN
NH 10,000,000
0 0 10,000,000 0 0 0 0
126.41
211
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MAGOFFIN KY-9009 PREFINANCD CONVRSN(O)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).
PL
Project Cost:
CN
UT
RW
DN
NH 30,000,000
0 0 0 30,000,000 0 0 0
126.42
MAGOFFIN KY-9009 PREFINANCD CONVRSN(O)
MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).
PL
Project Cost:
CN
UT
RW
DN
NH 25,000,000
0 0 0 0 25,000,000 0 0
126.43
MAGOFFIN US-460 RECONSTRUCTION(O)IMPROVE US-460 IN MAGOFFIN COUNTY AT IVY POINT HILL WEST OF SALYERSVILLE. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
1,660,000
220,000
2,490,000
0 0 0 0 1,880,000 0 2,490,000
8901
MAGOFFIN KY-1635 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1635 BRIDGE OVER OAKLEY CREEK. (077B00029N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
595,000
0 140,000 595,000 0 0 0 0
10002
MAGOFFIN KY-30 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-30 BRIDGE OVER LICKING RIVER. (077B00059N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
945,000
0 175,000 945,000 0 0 0 0
10003
212
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MAGOFFIN KY-3049 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3049 BRIDGE OVER JOHNSON CREEK. (077B00069N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
402,500
0 175,000 402,500 0 0 0 0
10014
MAGOFFIN CR-1032 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE BRANCH BRIDGE OVER STATE ROAD FORK. (077C00036N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
437,500
0 175,000 437,500 0 0 0 0
10015
MAGOFFIN KY-9009 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 63.123 TO MILEPOINT 69.98
PL
Project Cost:
CN
UT
RW
DN PM
PM
400,000
4,000,000
0 0 4,400,000 0 0 0 0
20000
MAGOFFIN US-460 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-460 FROM MILEPOINT 14.57 TO MILEPOINT 20.37
PL
Project Cost:
CN
UT
RW
DN
PM 1,485,000
0 0 0 0 1,485,000 0 0
20013
Total for MAGOFFIN county PL
Total Amounts:
CN
UT
RW
DN 665,000
15,000,000
400,000
16,380,000 30,000,000
1,660,000
220,000
26,485,000 2,490,000
0 15,665,000 16,780,000 30,000,000 28,365,000 0 2,490,000
213
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MARION KY-49 SPOT IMPROVEMENTS(O)
SPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO MP 21.830) AS PER THE KY-49 PLANNING STUDY. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
800,000
700,000
2,400,000
0 0 800,000 700,000 0 2,400,000 0
8802
MARION KY-49 SPOT IMPROVEMENTS(O)
IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON KY-49 NEAR SOUTHERN KY-52 INTERSECTION. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,300,000
0 0 3,300,000 0 0 0 0
8803
MARION KY-84 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 84 OVER HARDINS CREEK. (16CCN)(078B00025N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
94,500
616,000
94,500 616,000 0 0 0 0 0
8914
MARION KY-55 RECONSTRUCTION(O)HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TO BOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
350,000
350,000
5,000,000
0 700,000 0 0 5,000,000 0 0
8916
MARION KY-55 PREFINANCD CONVRSN(O)
HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TO BOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
NH 4,000,000
0 0 0 0 0 4,000,000 0
8916.01
214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MARION US-68 MAJOR WIDENING(O) HEARTLAND PARKWAY: MARION/TAYLOR LINE TO LEBANON BYPASS
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
600,000
900,000
900,000
11,000,000
0 0 0 600,000 0 900,000 11,900,000
8917
MARION CR-1127 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE OAK CRK RD BRIDGE OVER WHITE OAK CREEK. (078C00035N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
98,000
217,000
0 98,000 217,000 0 0 0 0
10003
Total for MARION county PL
Total Amounts:
CN
UT
RW
DN 94,500 98,000
350,000
350,000
616,000
800,000
3,517,000
600,000
700,000
6,400,000
900,000
5,000,000
900,000
11,000,000
94,500 1,414,000 4,317,000 1,300,000 5,000,000 7,300,000 11,900,000
MARSHALL US-62 MAJOR WIDENING(O) IMPROVE ACCESS AND REDUCE CONGESTION ON US-62 FROM KY-95 TO THE EXISTING FOUR-LANE HIGHWAY AT LONE VALLEY RD NEAR I-24 INTERCHANGE AND FUTURE I-69
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
750,000
250,000
500,000
3,500,000
0 0 0 750,000 0 750,000 3,500,000
398
MARSHALL KY-1949 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1949 BRIDGE OVER SMITH CREEK. (079B00110N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
250,000
455,000
0 250,000 0 455,000 0 0 0
10003
215
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MARSHALL I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 17.32 TO MILEPOINT 29.14
PL
Project Cost:
CN
UT
RW
DN PM
PM
950,000
9,500,000
0 0 0 0 0 10,450,000 0
20013
MARSHALL US-641 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
75,000
750,000
0 825,000 0 0 0 0 0
20016
Total for MARSHALL county PL
Total Amounts:
CN
UT
RW
DN 325,000
750,000
750,000
455,000 9,500,000
950,000
250,000
500,000
3,500,000
0 1,075,000 0 1,205,000 0 11,200,000 3,500,000
MARTIN KY-40 RECONSTRUCTION(O)IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUST BEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES BEFORE GORDON HOLLOW ROAD,
PL
Project Cost:
CN
UT
RW
DN
SPP 1,460,000
0 0 0 0 0 0 1,460,000
192
MARTIN CR-1324 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON PR-1015 OVER ROCKCASTLE CREEK (C26) 275 FEET WEST JCT. KY-3 JUST SOUTH OF CROOKED RUN ROAD. (080C00026N)
PL
Project Cost:
CN
UT
RW
DN
BR 60,000
60,000 0 0 0 0 0 0
1092
216
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MARTIN CR-1215 AM-BRIDGE (P) SETSER BRANCH ROAD BRIDGE AND APPROACHES OVER MIDDLE FORK OF ROCKCASTLE CREEK (C43) (OFF NHS) (FD04) (2000BOP): (080C00043N)
PL
Project Cost:
CN
UT
RW
DN
SPP 350,000
0 0 0 0 0 0 350,000
4093
MARTIN CR-1120 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WILLIS DIALS RD BRIDGE OVER PIGEONROOST FORK. (080C00053N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
467,880
0 157,500 467,880 0 0 0 0
10023
MARTIN KY-645 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-645 FROM MILEPOINT 0.00 TO MILEPOINT 6.11
PL
Project Cost:
CN
UT
RW
DN
PM 2,015,000
0 0 0 0 2,015,000 0 0
20006
Total for MARTIN county PL
Total Amounts:
CN
UT
RW
DN
60,000
157,500
467,880 2,015,000 1,810,000
60,000 157,500 467,880 0 2,015,000 0 1,810,000
MASON US-68 NEW ROUTE(O) NEW FULLY CONTROLLED ACCESS ROUTE FROM US 68 NEAR WASHINGTON EAST TO KY 11 INCLUDING A NEW I-CHNG AT KY 11. (PRIORITY SECTION)(2004BOPC)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
780,000
1,580,000
1,820,000
32,450,000
0 0 0 780,000 0 3,400,000 32,450,000
147.2
217
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MASON US-68 NEW ROUTE(O) NEW FULLY CONTROLLED ACCESS ROUTE FROM KY 11 NORTHEAST TO KY 9 (AA HWY) INCLUDING NEW I-CHNG AT KY 9. (2004BOPC)(06CCR)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
780,000
1,580,000
1,820,000
33,750,000
0 0 0 780,000 3,400,000 0 33,750,000
147.6
MASON US-68 AM-BRIDGE (P) REPAIR BRIDGE ON US 68 OVER LAWRENCE CREEK 0.13 MI SW OF KY 3056. (081B00067N)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
BR 1,400,000
1,400,000 0 0 0 0 0 0
1095
MASON KY-3056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 3056 OVER SOUTH FORK LAWRENCE CREEK. (16CCN)(081B00020N)
PL
Project Cost:
CN
UT
RW
DN
BR 1,120,000
0 0 1,120,000 0 0 0 0
8906
MASON CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON DAVIS LANE. (16CCN)(081C00022N)
PL
Project Cost:
CN
UT
RW
DN
BR 875,000
0 0 875,000 0 0 0 0
8910
MASON CR-1019 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON KENNEDY CREEK ROAD. (16CCN)(081C00009N)
PL
Project Cost:
CN
UT
RW
DN
BR 560,000
0 0 560,000 0 0 0 0
8911
218
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MASON CR-1122 AM-BRIDGE (P) REPAIR BRIDGE (081C00018N) ON DIXIE PIKE. (16CCN)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 60,000
60,000 0 0 0 0 0 0
8916
MASON US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON WILLIAM HARSHA BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (081B00069N)(BSBP)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
100,000
2,800,000
0 100,000 2,800,000 0 0 0 0
10013
MASON US-68 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
825,000
8,250,000
0 0 9,075,000 0 0 0 0
20011
Total for MASON county PL
Total Amounts:
CN
UT
RW
DN
1,460,000
100,000 825,000
13,605,000
1,560,000
1,580,000
1,820,000
1,580,000
1,820,000
66,200,000
1,460,000 100,000 14,430,000 1,560,000 3,400,000 3,400,000 66,200,000
MCCRACKEN I-24 AM-BRIDGE (P) I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITH ILLINOIS TO MITIGATE SCOUR (073B00100N)(BSBP)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 260,000
0 0 260,000 0 0 0 0
2
219
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MCCRACKEN US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,320,000
2,710,000
0 1,320,000 0 0 2,710,000 0 0
115.1
MCCRACKEN US-60 PREFINANCD CONVRSN(O)
PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 1,320,000
0 1,320,000 0 0 0 0 0
115.11
MCCRACKEN US-62 MAJOR WIDENING(O) MAJOR WIDENING OF US-62 FROM KY-998 TO PADUCAH INFORMATION AGE PARK. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
2,340,000
5,740,000
0 2,340,000 0 5,740,000 0 0 0
152
MCCRACKEN KY-1286 RECONSTRUCTION(O)IMPROVE KY-1286 (FRIENDSHIP ROADFROM MP 3.6 TO MP 6.4 IN PADUCAH. (PRELIMINARY ENGINEERING) (12CCR(14CCR)(16CCN)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,500,000
2,480,000
2,310,000
10,000,000
0 1,500,000 2,480,000 0 0 0 12,310,000
153
MCCRACKEN US-60 I-CHANGE RECONST(O)
CONSTRUCT A DOUBLE-CROSSOVER DIAMOND INTERCHANGE ON US-60 AT THE I-24 INTERCHANGE NEAR KENTUCKY OAKS MALL.
PL
Project Cost:
CN
UT
RW
DN
NH 3,960,000
0 3,960,000 0 0 0 0 0
154
220
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MCCRACKEN KY-1954 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BOTTOM DITCH ON KY 1954 0.7 MILE NORTH OF KY 348 (073B00096N) .
PL
Project Cost:
CN
UT
RW
DN
BR 574,000
0 0 574,000 0 0 0 0
1152
MCCRACKEN KY-994 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF BOTTOM DITCH ON KY 994 0.8 MI NW OF KY 348 (073B00015N)(EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
168,000
791,000
0 168,000 791,000 0 0 0 0
1154
MCCRACKEN KY-305 NEW ROUTE(O) NEW ACCESS ROAD FROM KY-305 NEAR KY-998, EXTENDING WEST TO THE OHIO RIVER MEGAPARK. (2-LANE INITIAL, 4-LANE ULTIMATE)(12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
4,200,000
3,250,000
16,230,000
0 0 0 4,200,000 0 3,250,000 16,230,000
8702
MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-24 BRIDGE OVER OHIO RIVER. JOINT PROJECT WITH ILLINOIS. (073B00100N(BSBP)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 2,000,000
0 0 2,000,000 0 0 0 0
10006
MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH BRIDGE LIGHTING ON I-24 BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH ILLINOIS. (073B000100N)(BSBP)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 375,000
0 375,000 0 0 0 0 0
10007
221
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MCCRACKEN KY-339 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 339 BRIDGE OVER MASSAC CREEK. (073B00058N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
892,500
0 210,000 892,500 0 0 0 0
10012
MCCRACKEN I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 16.172 TO MILEPOINT 17.32
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 0 0 0 0 1,100,000 0
20017
MCCRACKEN US-45 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
1,000,000
0 1,100,000 0 0 0 0 0
20019
MCCRACKEN US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 2.22 TO MILEPOINT 7.70
PL
Project Cost:
CN
UT
RW
DN
PM 853,000
0 0 0 0 853,000 0 0
20031
Total for MCCRACKEN county PL
Total Amounts:
CN
UT
RW
DN 1,978,000
2,640,000
2,340,000
5,335,000
2,480,000
4,517,500
4,200,000
5,740,000
2,710,000
1,000,000
100,000
3,250,000
853,000
2,310,000
26,230,000
0 12,293,000 6,997,500 9,940,000 3,563,000 4,350,000 28,540,000
222
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MCCREARY KY-92 RELOCATION(O) IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)
PL
Project Cost:
CN
UT
RW
DN
STP 8,000,000
0 8,000,000 0 0 0 0 0
261.3
MCCREARY KY-92 PREFINANCD CONVRSN(O)
IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)
PL
Project Cost:
CN
UT
RW
DN
STP 7,000,000
0 0 7,000,000 0 0 0 0
261.31
MCCREARY KY-92 PREFINANCD CONVRSN(O)
IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)
PL
Project Cost:
CN
UT
RW
DN
STP 9,000,000
0 0 0 9,000,000 0 0 0
261.32
MCCREARY CR-1239 AM-BRIDGE (P) BRIDGE OVER ROCK CREEK ON OLD FIDELITY-BELL FARM ROAD (CR 1239) 0.25 MI W OF ROCK CREEK ROAD (CR 1236) (074C00008N)(SR=22)
PL
Project Cost:
CN
UT
RW
DN BR
BR
196,000
448,000
0 196,000 448,000 0 0 0 0
1065
MCCREARY KY-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1044 BRIDGE OVER MARSH CREEK. (074B00023N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
451,500
0 175,000 451,500 0 0 0 0
10002
223
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MCCREARY KY-700 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-700 BRIDGE OVER INDIAN CREEK. (074B00026N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
1,155,000
0 210,000 1,155,000 0 0 0 0
10003
MCCREARY KY-478 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-478 BRIDGE OVER MARSH CREEK. (074B00027N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
521,500
0 175,000 521,500 0 0 0 0
10004
Total for MCCREARY county PL
Total Amounts:
CN
UT
RW
DN 756,000
8,000,000 9,576,000 9,000,000
0 8,756,000 9,576,000 9,000,000 0 0 0
MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OVERFLOW STRUCTURE ON US-431 AT THE MUHLENBERG-MCLEAN CO LINE B00056N.
PL
Project Cost:
CN
UT
RW
DN
BR 2,500,000
2,500,000 0 0 0 0 0 0
1078
MCLEAN KY-2385 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF POND DRAIN CREEK ON KY 2385 0.9 MI SW OF KY 81 (075B00066N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
308,000
784,000
0 308,000 784,000 0 0 0 0
1090
224
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MCLEAN US-431 SPOT IMPROVEMENTS(O)
SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND KY-250. (08CCN)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
200,000
180,000
500,000
0 380,000 500,000 0 0 0 0
8400
MCLEAN KY-56 RECONSTRUCTION(O)CORRECT LINE OF SIGHT WITH INTERSECTION OF KY 56 & KY 1233. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 450,000
0 0 450,000 0 0 0 0
8852
MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US-431 BRIDGE OVER DRAIN TO CYPRESS CREEK. (075B00019N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
3,010,000
0 280,000 3,010,000 0 0 0 0
10007
MCLEAN KY-81 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-81 BRIDGE OVER SLOUGH. (075B00026N
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
892,500
0 245,000 892,500 0 0 0 0
10008
Total for MCLEAN county PL
Total Amounts:
CN
UT
RW
DN
2,500,000
833,000
200,000
180,000
5,636,500
2,500,000 1,213,000 5,636,500 0 0 0 0
225
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MEADE KY-823 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CULVERT OVER UNNAMED STREAM ON KY 823 0.5 MILE WEST OF KY 2734.(082B00008N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
105,000
560,000
0 105,000 560,000 0 0 0 0
1088
MEADE KY-79 RECONSTRUCTION(O)RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,040,000
3,250,000
1,770,000
11,410,000
0 0 0 1,040,000 0 3,250,000 13,180,000
8702
MEADE KY-79 RECONSTRUCTION(O)RECONSTRUCT KY 79 FROM KY 144 TO KY 1051. (12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
2,030,000
13,530,000
0 0 0 2,030,000 0 13,530,000 0
8705
Total for MEADE county PL
Total Amounts:
CN
UT
RW
DN 105,000
560,000
1,040,000
2,030,000
13,530,000
3,250,000
1,770,000
11,410,000
0 105,000 560,000 3,070,000 0 16,780,000 13,180,000
MENIFEE KY-77 FOREST HIGHWAY(P) RESURFACING AND WIDENING EXISTING GRAVEL PARKING PULL-OFFS AND INSTALLATION OF GUARDRAIL ALONG KY 77 AND KY 715 IN THE RED RIVER GORGE AREA IN
PL
Project Cost:
CN
UT
RW
DN
FH 765,000
765,000 0 0 0 0 0 0
371
226
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 NORTH OF THE LONG BOW BOAT RAMP IN MENIFEE COUNTY. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
FH
FH
FH
100,000
100,000
2,625,000
2,825,000 0 0 0 0 0 0
372
MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 SOUTH OF THE MENIFEE/ROWAN COUNTY LINE. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
FH
FH
FH
250,000
250,000
4,010,000
4,510,000 0 0 0 0 0 0
373
MENIFEE US-460 SAFETY(P) IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELL HILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
2,180,000
1,000,000
6,020,000
0 0 3,180,000 6,020,000 0 0 0
8802
MENIFEE US-460 PREFINANCD CONVRSN(O)
IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELL HILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 6,020,000
0 0 0 0 6,020,000 0 0
8802.01
Total for MENIFEE county PL
Total Amounts:
CN
UT
RW
DN350,000
350,000
7,400,000
2,180,000
1,000,000
6,020,000 6,020,000
8,100,000 0 3,180,000 6,020,000 6,020,000 0 0
227
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MERCER US-127 SAFETY(P) SAFETY IMPROVEMENTS ON US 127 SALVISA. (14CCN)
PL
Project Cost:
CN
UT
RW
DN SPP 200,000
0 200,000 0 0 0 0 0
8858
MERCER KY-1941 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1941 BRIDGE OVER CHAPLIN RIVER. (084B00030N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
300,000
682,000
0 300,000 682,000 0 0 0 0
10003
MERCER CR-1322 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRATTON RD BRIDGE OVER BRUSH CREEK. (084C00029N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
595,000
0 192,500 595,000 0 0 0 0
10004
Total for MERCER county PL
Total Amounts:
CN
UT
RW
DN 692,500
1,277,000
0 692,500 1,277,000 0 0 0 0
METCALFE KY-496 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER OIL WELL BRANCH ON KY 496 0.5 MILE SE OF KY 533.(085B00025N) EBRP)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
287,000
0 175,000 287,000 0 0 0 0
1087
228
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
METCALFE KY-163 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES OVER ROGERS CREEK AT MP 7.307. (DESIGN HANDLED UNDER 3-8506.00) 085B00010N (2014BOP)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 3,000,000
3,000,000 0 0 0 0 0 0
8506.2
METCALFE US-68 SCOPING STUDY(O) SPOT IMPROVEMENTS ON US-68 FROM THE CUMBERLAND PARKWAY TO THE GREEN/METCALFE COUNTY LINE.(12CCN)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
775,000
970,000
8,650,000
0 0 0 775,000 970,000 8,650,000 0
8706
METCALFE KY-163 RECONSTRUCTION(O)RECONSTRUCT KY 163 AS A NEW ROUTE ON THE WEST SIDE OF EDMONTON FROM KY 163 AT GARY BELL RD (MP 10.0) S OF EDMONTON, CROSSING US 68 (STOCKTON ST)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,000,000
3,000,000
2,190,000
11,945,000
0 0 1,000,000 3,000,000 2,190,000 11,945,000 0
8859
METCALFE KY-163 CONGESTION MITIGTN(O)
IMPROVE HIGHWAY SAFETY AND SYSTEMS MOBILITY IN THE KY 163 CORRIDOR BETWEEN KY 90 (MP 2.907AND THE PROPOSED WEST EDMONTON BYPASS (MP 9.777)
PL
Project Cost:
CN
UT
RW
DN SPP 2,500,000
0 0 0 2,500,000 0 0 0
8955
METCALFE KY-1243 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1243 BRIDGE OVER KNOB LICK SPRINGS. (085B00034N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
262,500
0 157,500 262,500 0 0 0 0
10005
229
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
METCALFE CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOSBY RIDGE RD BRIDGE OVER E FORK LITTLE BARREN RVR. (085C00005N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
896,000
0 210,000 896,000 0 0 0 0
10006
METCALFE LN-9008 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 22.357 TO MILEPOINT 36.16
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,100,000
11,000,000
0 0 0 12,100,000 0 0 0
20013
Total for METCALFE county PL
Total Amounts:
CN
UT
RW
DN
3,000,000
542,500 1,000,000
1,445,500
3,600,000
3,775,000
11,000,000
3,160,000
20,595,000
3,000,000 542,500 2,445,500 18,375,000 3,160,000 20,595,000 0
MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2019.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 444,000
0 444,000 0 0 0 0 0
128.1
MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2020.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 444,000
0 0 444,000 0 0 0 0
128.11
230
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2021.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 444,000
0 0 0 444,000 0 0 0
128.12
MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2022.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 444,000
0 0 0 0 444,000 0 0
128.13
MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 444,000
0 0 0 0 0 444,000 0
128.14
MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 444,000
0 0 0 0 0 0 444,000
128.15
MONROE -0 NEW ROUTE(O) CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACING ONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BE SUPPLEMENTAL TO THE
PL
Project Cost:
CN
UT
RW
DN
STP 730,000
0 730,000 0 0 0 0 0
7020.17
231
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MONROE -0 PREFINANCD CONVRSN(O)
CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACING ONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BE SUPPLEMENTAL TO THE
PL
Project Cost:
CN
UT
RW
DN
STP 6,580,000
0 0 6,580,000 0 0 0 0
7020.18
MONROE KY-100 BRIDGE REPLACEMENT(P)
REPLACE BRIDGE ON KY-100 BETWEEN MP 14.7 AND 14.9
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
250,000
150,000
500,000
700,000
0 250,000 650,000 700,000 0 0 0
80003
Total for MONROE county PL
Total Amounts:
CN
UT
RW
DN 250,000
1,174,000
150,000
500,000
7,024,000 1,144,000 444,000444,000 444,000
0 1,424,000 7,674,000 1,144,000 444,000 444,000 444,000
MONTGOMERY KY-1991 MAJOR WIDENING(O) WIDEN KY 1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK, MONTGOMERY COUNTY (SEE 7-8501.00 FOR "SPB" FUNDS)(2005HPP-KY129)
PL
Project Cost:
CN
UT
RW
DN
HPP 559,899
559,899 0 0 0 0 0 0
240.01
MONTGOMERY US-460 RECONSTRUCTION(O)IMPROVE US-460 AT LUCKY STOP HILL. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 9,450,000
9,450,000 0 0 0 0 0 0
250.1
232
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MONTGOMERY KY-1991 MINOR WIDENING(O) UPGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND TRAIL TO THE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES EXTENSION OF INDUSTRIAL ACCESS ROAD TO
PL
Project Cost:
CN
UT
RW
DN
SPP 4,010,000
0 4,010,000 0 0 0 0 0
411
MONTGOMERY US-60 MAJOR WIDENING(O) WIDEN EXISTING PAVEMENT AND IMPROVE VERTICAL AND HORIZONTAL CURVES FROM EXISTING MOUNT STERLING BYPASS (KY 686) TO 500' WEST OF BENTBROOK SUBDIVISION.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
800,000
1,500,000
1,500,000
8,000,000
0 0 800,000 0 3,000,000 0 8,000,000
8810
MONTGOMERY I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 104.26 TO MILEPOINT 112.
PL
Project Cost:
CN
UT
RW
DN PM
PM
650,000
6,500,000
0 0 0 0 0 0 7,150,000
20018
Total for MONTGOMERY county PL
Total Amounts:
CN
UT
RW
DN
10,009,899 4,010,000
800,000
1,500,000
1,500,000
650,000
14,500,000
10,009,899 4,010,000 800,000 0 3,000,000 0 15,150,000
MORGAN KY-7 RECONSTRUCTION(O)RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN WEST LIBERTY BEGINNING AT RIVERSIDE DR. (CS 1058) AND EXTENDING NORTH TO 0.159 MILES NORTH OF INTERSECTION WITH CEDAR
PL
Project Cost:
CN
UT
RW
DN
STP 3,300,000
3,300,000 0 0 0 0 0 0
293.1
233
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WHITE OAK CREEK ON US 460 0.5 MILE NW OF KY 1000. (088B00021N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
224,000
1,239,000
0 224,000 1,239,000 0 0 0 0
1111
MORGAN KY-2498 RECONSTRUCTION(O)IMPROVE KY-2498 FROM US-460 TO THE ARH HOSPITAL. (14CCN)(16CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
1,580,000
350,000
2,560,000
0 0 0 0 1,580,000 350,000 2,560,000
8804
MORGAN KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 191 OVER CANEY CREEK .5 MILES WEST OF KY 1162. (16CCN)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
182,000
756,000
0 182,000 756,000 0 0 0 0
8902
MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 460 BRIDGE OVER BIG SPRING BRANCH. (088B00022N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
472,500
0 175,000 472,500 0 0 0 0
10016
MORGAN KY-9009 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 57.72 TO MILEPOINT 63.08
PL
Project Cost:
CN
UT
RW
DN PM
PM
210,000
2,100,000
0 2,310,000 0 0 0 0 0
20001
234
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MORGAN KY-7 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-7 FROM MILEPOINT 3.90 TO MILEPOINT 8.14
PL
Project Cost:
CN
UT
RW
DN
PM 1,207,000
0 0 0 0 1,207,000 0 0
20014
MORGAN KY-519 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-519 FROM MILEPOINT 0.00 TO MILEPOINT 3.94
PL
Project Cost:
CN
UT
RW
DN
PM 1,981,000
0 0 0 0 0 1,981,000 0
20015
Total for MORGAN county PL
Total Amounts:
CN
UT
RW
DN
3,300,000
791,000
2,100,000 2,467,500
1,580,000
1,981,000
350,000
1,207,000 2,560,000
3,300,000 2,891,000 2,467,500 0 2,787,000 2,331,000 2,560,000
MUHLENBERG US-62 MAJOR WIDENING(O) WIDEN US-62 FROM WAL-MART TO US-431. (08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES 2-8301)
PL
Project Cost:
CN
UT
RW
DN
SPP 7,500,000
7,500,000 0 0 0 0 0 0
8506
MUHLENBERG KY-181 MINOR WIDENING(O) WIDEN KY-181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION 601 TO WENDELL FORD CENTER. (14CCN
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
530,000
1,820,000
2,710,000
0 0 530,000 1,820,000 2,710,000 0 0
8802
235
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
MUHLENBERG KY-2533 RECONSTRUCTION(O)STRAIGHTEN DEAN ROAD INTERSECTION OF 189 BYPASS TO KY 181 NORTH NEAR THE INTERSECTION WITH THE WKY PARKWAY, WENDELL FORD NATIONAL GUARD CENTER, AND
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
780,000
500,000
820,000
4,500,000
0 780,000 500,000 820,000 4,500,000 0 0
8803
MUHLENBERG CR-1141 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF UNION RIDGE RD BRIDGE OVER ROCKY CREEK. (089C00004N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
647,500
0 175,000 647,500 0 0 0 0
10009
MUHLENBERG WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 43.424 TO MILEPOINT 45.95
PL
Project Cost:
CN
UT
RW
DN PM
PM
200,000
2,000,000
0 0 0 0 0 2,200,000 0
20036
Total for MUHLENBERG county PL
Total Amounts:
CN
UT
RW
DN
7,500,000
955,000
1,030,000
647,500
2,640,000
2,000,000
200,000
7,210,000
7,500,000 955,000 1,677,500 2,640,000 7,210,000 2,200,000 0
NELSON US-150 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM THE BLUEGRASS PARKWAY TO THE NELSON/WASHINGTON COUNTY LINE(2016BOP)
PL
Project Cost:
CN
UT
RW
DN STP 600,000
0 0 600,000 0 0 0 0
396.1
236
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
NELSON US-150 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM THE BLUEGRASS PARKWAY TO THE NELSON/WASHINGTON COUNTY LINE(2016BOP)
PL
Project Cost:
CN
UT
RW
DN STP
STP
600,000
2,450,000
0 0 0 600,000 0 0 2,450,000
396.12
NELSON US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGES ON US 62 (HINKLE CREEK) AND KY 48 IN BLOOMFIELD 090B00096N (SR 28.2090B00095N (12CCR)
PL
Project Cost:
CN
UT
RW
DN
BR 1,260,000
1,260,000 0 0 0 0 0 0
1078
NELSON KY-509 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER FROMAN CREEK ON KY 509 0.9 MI W OF US 31E (090B00068N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
105,000
756,000
0 105,000 756,000 0 0 0 0
1089
NELSON US-150 MAJOR WIDENING(O) IMPROVE US-150 FROM WEST OF KY-245 THROUGH THE BLUEGRASS PARKWAY INTERCHANGE TO EAST OF LESLIE BALLARD LN (CR 1110). (06CCN)(2006BOPC)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
1,000,000
4,000,000
0 1,000,000 4,000,000 0 0 0 0
8309.1
NELSON US-150 MAJOR WIDENING(O) IMPROVE US-150 FROM WEST OF KY-245 THROUGH THE BLUEGRASS PARKWAY INTERCHANGE TO EAST OF LESLIE BALLARD LN (CR 1110). (06CCN)(2006BOPC)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 4,800,000
0 0 0 4,800,000 0 0 0
8309.2
237
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
NELSON -0 NEW ROUTE(O) NEW ROUTE BETWEEN US 62 AND KY 245 WEST OF BARDSTOWN.
PL
Project Cost:
CN
UT
RW
DN SPP 500,000
0 0 500,000 0 0 0 0
8809
NELSON KY-52 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-52 BRIDGE OVER MONKS CREEK. (090B00033N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
105,000
1,015,000
0 105,000 1,015,000 0 0 0 0
10004
NELSON CS-4003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DEPOT ST BRIDGE OVER SIMPSON CREEK. (090C00045N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
98,000
406,000
0 98,000 406,000 0 0 0 0
10005
NELSON CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF POTTERSHOP LOOP BRIDGE OVER ROWAN CREEK. (090C00021N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
91,000
227,500
0 91,000 227,500 0 0 0 0
10014
NELSON BG-9002 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 24.24 TO MILEPOINT 35.15
PL
Project Cost:
CN
UT
RW
DN PM
PM
875,000
8,750,000
0 0 0 0 9,625,000 0 0
20022
238
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
NELSON BG-9002 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 8.837 TO MILEPOINT 10.172
PL
Project Cost:
CN
UT
RW
DN PM
PM
110,000
1,100,000
0 1,210,000 0 0 0 0 0
20023
NELSON KY-49 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-49 FROM MILEPOINT 0.00 TO MILEPOINT 4.52
PL
Project Cost:
CN
UT
RW
DN
PM 484,000
0 0 0 0 484,000 0 0
20030
NELSON US-62 CONGESTION MITIGTN(O)
CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF US-31E AND US-62(NELSON COUNTY FISCAL COURT WILL DO DESIGN AND BUILD ROUNDABOUT)
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 0 1,500,000 0 0 0 0
80050
Total for NELSON county PL
Total Amounts:
CN
UT
RW
DN
1,260,000
509,000
1,000,000
1,100,000
1,100,000
7,904,500
600,000
4,800,000
875,000
9,234,000 2,450,000
1,260,000 2,609,000 9,004,500 5,400,000 10,109,000 0 2,450,000
NICHOLAS KY-36 SAFETY(P) IMPROVE THE KY-36/KY-32 INTERSECTION NEAR THE NICHOLAS COUNTY SCHOOL PROPERTY. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
1,380,000
890,000
0 0 0 0 0 0 2,270,000
205
239
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
NICHOLAS US-68 MAJOR WIDENING(O) PARIS-MAYSVILLE ROAD; RECONSTRUCT FROM MILLERSBURG TO KY-1455 AT CARLISLE (SECTION 3).(08CCR)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 17,000,000
0 0 0 17,000,000 0 0 0
310.3
NICHOLAS KY-36 RECONSTRUCTION(O)RECONSTRUCT KY 36/KY 928 INTERSECTION. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
200,000
150,000
1,400,000
0 0 0 350,000 0 1,400,000 0
8811
NICHOLAS KY-32 SAFETY(P) SAFETY IMPROVEMENTS ALONG KY 32 FROM LAKE ROAD (MP 9.5) TO SCRUBGRASS CREEK (MP 12.5) TO CORRECT HORIZONTAL, VERTICAL, PAVEMENT WITH DEFICIENCIES.
PL
Project Cost:
CN
UT
RW
DN
SPP 100,000
0 0 0 0 100,000 0 0
8812
NICHOLAS CR-1010 BRIDGE REPLACEMENT(P)
REPLACE BRIDGE ON ABNER'S MILL ROAD (CR 1010) 2.4 MILES NORTH OF KY 32.
PL
Project Cost:
CN
UT
RW
DN
BR 100,000
0 0 0 100,000 0 0 0
8951
NICHOLAS KY-36 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-36 BRIDGE OVER BRUSHY FORK. (091B00018N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
525,000
1,610,000
0 525,000 1,610,000 0 0 0 0
10011
240
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
NICHOLAS CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DORSEY AVE BRIDGE OVER BRUSH FORK. (091C00029N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
595,000
0 280,000 595,000 0 0 0 0
10012
Total for NICHOLAS county PL
Total Amounts:
CN
UT
RW
DN 805,000
2,205,000
200,000
150,000
17,100,000
100,000
1,400,000
1,380,000
890,000
0 805,000 2,205,000 17,450,000 100,000 1,400,000 2,270,000
OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER BRANCH OF THREE LICK FORK 0.23 MILE E OF GREEN MEADOWS DR (CS 6068)092B00032 (SD)
PL
Project Cost:
CN
UT
RW
DN
BR 1,148,000
1,148,000 0 0 0 0 0 0
1083
OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER THREELICK FORK ON US 62 0.4 MILE E OF GREEN MEADOWS DRIVE (CS 6068) IN BEAVER DAM. (092B00033N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
308,000
1,029,000
0 308,000 1,029,000 0 0 0 0
1091
OHIO WN-9007 I-CHANGE RECONST(O)
I-65 SPUR CORRIDOR; RECONSTRUCT THE EXISTING NATCHER PARKWAY/KY-69 INTERCHANGE (EXIT 50) IN OHIO COUNTY. (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
1,350,000
1,250,000
8,700,000
0 2,600,000 0 8,700,000 0 0 0
2092.2
241
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OHIO KY-136 RECONSTRUCTION(O)REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETY ISSUES WITH BRIDGES ON KY-136 FROM KY-56 IN MCLEAN COUNTY TO US-231 IN OHIO
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
450,000
1,250,000
6,540,000
0 0 0 0 1,700,000 0 6,540,000
8812
OHIO KY-54 MINOR WIDENING(O) IMPROVE SAFETY ON KY 54 BY UPGRADING MP 7.0 TO MP 8.0 TO THREE LANES INCLUDING CURB AND GUTTER AND ADDRESSING TWO SHARP TURNS
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
750,000
1,000,000
2,000,000
7,000,000
0 0 0 750,000 0 1,000,000 9,000,000
8951
OHIO KY-85 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-85 BRIDGE OVER BR OF W FK LEWIS CREEK. (092B00053N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
962,500
0 210,000 962,500 0 0 0 0
10010
OHIO CR-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST HALLS CREEK R BRIDGE OVER BRANCH OF HALLS CREEK. (092C00001N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
630,000
0 175,000 630,000 0 0 0 0
10011
OHIO CR-1067 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SUNNYDALE RD BRIDGE OVER BRANCH OF ROUGH RIVER. (092C00020N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
630,000
0 175,000 630,000 0 0 0 0
10012
242
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OHIO CR-1036 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BED RD BRIDGE OVER WFK ADAMS CREEK. (092C00067N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
735,000
0 210,000 735,000 0 0 0 0
10013
OHIO CR-1414 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JOHNSON SCHOOL RD BRIDGE OVER BARASS DITCH. (092C00080N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
647,500
0 175,000 647,500 0 0 0 0
10014
OHIO CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCK CREEK LN BRIDGE OVER BR-S.FK PANTHER CK. (092C00097N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
840,000
0 210,000 840,000 0 0 0 0
10015
OHIO CR-1510 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF QUARTERHORSE LN BRIDGE OVER N FK PANTHER CREEK. (092C00133N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
892,500
0 245,000 892,500 0 0 0 0
10016
OHIO US-62 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
500,000
5,000,000
0 0 0 0 5,500,000 0 0
20038
243
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OHIO WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 65.68 TO MILEPOINT 83.3
PL
Project Cost:
CN
UT
RW
DN
PM 16,596,000
0 0 16,596,000 0 0 0 0
20039
OHIO WK-9001 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 83.3 TO MILEPOINT 87.544
PL
Project Cost:
CN
UT
RW
DN
PM 4,282,000
0 0 4,282,000 0 0 0 0
20040
OHIO WN-9007 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 49.8 TO MILEPOINT 59.86 (61.553 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN
PM 11,064,000
0 0 11,064,000 0 0 0 0
20041
OHIO KY-136 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-136 FROM MILEPOINT 0.00 TO MILEPOINT 9.60
PL
Project Cost:
CN
UT
RW
DN
PM 1,177,000
0 0 0 0 1,177,000 0 0
20049
Total for OHIO county PL
Total Amounts:
CN
UT
RW
DN
1,148,000
1,708,000
1,350,000
1,250,000
38,308,500
750,000
8,700,000
500,000
450,000
1,250,000
1,000,000
6,177,000
2,000,000
13,540,000
1,148,000 4,308,000 38,308,500 9,450,000 8,377,000 1,000,000 15,540,000
244
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OLDHAM -0 NEW ROUTE(O) EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 10,000,000
0 0 0 10,000,000 0 0 0
367.2
OLDHAM -0 NEW ROUTE(O) EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 8,500,000
0 0 0 0 8,500,000 0 0
367.21
OLDHAM -0 BIKE/PED FACIL(O) INTER-URBAN GREENWAY: CONSTRUCT A NON-MOTORIZED CORRIDOR FROM LAGRANGE TO JEFFERSON COUNTY LINE. (LOU T.I.P(LOCAL MATCH)(ALL WORK BY
PL
Project Cost:
CN
UT
RW
DN SLO 500,000
0 0 0 500,000 0 0 0
410
OLDHAM -0 BIKE/PED FACIL(O) OLDHAM COUNTY BICYCLE & PEDESTRIAN TRAIL - OLD LAGRANGE RD. CONSTRUCT A BICYCLE AND PEDESTRIAN TRAIL ALONG OLD LAGRANGE ROAD FROM KY 146 TO
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
250,000
500,000
0 250,000 500,000 0 0 0 0
410.01
OLDHAM CR-1002 SAFETY(P) CONSTRUCT A 4-LANE UNINTERRUPTED RAIL UNDERPASS WEST OF LAGRANGE. (LOCAL MATCH)(ALL WORK BY OLDHAM COUNTY) (FUNDING SUBJECT TO
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
100,000
10,000,000
100,000 10,000,000 0 0 0 0 0
434
245
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OLDHAM KY-1793 SAFETY(P) CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERS POINT TRAIL.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SLO 100,000
100,000 0 0 0 0 0 0
440.1
OLDHAM US-42 RECONSTRUCTION(O)RECONSTRUCT US 42 AND WIDEN FROM 2 LANES TO 3 LANES (3RD LANE WILL BE A CENTER TURN LANE) FROM JEFFERSON/OLDHAM COUNTY LINE TO RIDGEMOOR DRIVE. PROJECT
PL
Project Cost:
CN
UT
RW
DN
SLO 5,320,000
5,320,000 0 0 0 0 0 0
441.01
OLDHAM KY-22 RECONSTRUCTION(O)INTERSECTION IMPROVEMENT AT KY 22 AND KY 329 IN CRESTWOOD. (ALL WORK BY KYTC)(2006BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)
PL
Project Cost:
CN
UT
RW
DN
SLO 300,000
300,000 0 0 0 0 0 0
449
OLDHAM CS-2102 CONGESTION MITIGTN(O)
CONSTRUCTION OF A PARK AND RIDE FACILITY INCLUDING A PARKING LOT, SHELTER, PLAYGROUND, BIKE LOCKERS, WALKWAYS, AND A 1000' ACCESS ROAD LOCATED ON APPLE
PL
Project Cost:
CN
UT
RW
DN
SLO 1,174,800
1,174,800 0 0 0 0 0 0
468.1
OLDHAM I-71 MAJOR WIDENING(O) WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-329 (MP 14.1) TO KY-393 (MP 18.0). (16CCN)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
3,500,000
1,900,000
1,700,000
24,000,000
0 3,500,000 0 0 3,600,000 0 24,000,000
483.1
246
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OLDHAM I-71 MAJOR WIDENING(O) WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4). (16CCN)
PL
Project Cost:
CN
UT
RW
DN NH 2,750,000
0 0 0 0 0 2,750,000 0
483.2
OLDHAM I-71 PREFINANCD CONVRSN(O)
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4), INCLUDING A NEW INTERCHANGE AT MP 20.6. (16CCN)
PL
Project Cost:
CN
UT
RW
DN NH 2,750,000
0 0 0 0 0 0 2,750,000
483.21
OLDHAM I-71 NEW INTERCHANGE(O)
CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVE CONGESTION IN LAGRANGE
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
1,500,000
3,000,000
1,900,000
6,000,000
1,500,000 4,900,000 6,000,000 0 0 0 0
483.3
OLDHAM I-71 PREFINANCD CONVRSN(O)
CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVE CONGESTION IN LAGRANGE
PL
Project Cost:
CN
UT
RW
DN
NH 6,000,000
0 0 0 6,000,000 0 0 0
483.31
OLDHAM CR-1209 SAFETY-HAZARD ELIM(P)
OLD FLOYDSBURG ROAD SAFETY IMPROVEMENTS: REPLACE NARROW ONE-LANE CULVERT CROSSING; CLEAR TREES AND VEGETATION OUT OF RIGHT-OF-WAY; ADD SHOULDER
PL
Project Cost:
CN
UT
RW
DN
SLO 700,000
700,000 0 0 0 0 0 0
494
247
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OLDHAM KY-329 RECONSTRUCTION(O)INTERSECTION REALIGNMENT/RECONSTRUCTION AT KY 329 AND KY 329 BYPASS (2016BOP).
PL
Project Cost:
CN
UT
RW
DN SLO
SLO
SLO
120,000
100,000
100,000
120,000 100,000 100,000 0 0 0 0
542
OLDHAM -0 NEW ROUTE(O) CONSTRUCTION OF A NEW CONNECTION FROM OLD LAGRANGE ROAD TO KY 393 AT BUCKNER. LPA CONTRACT. (BOP2012)
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
SLO
714,500
228,000
2,300,000
714,500 2,528,000 0 0 0 0 0
754
OLDHAM CS-2030 BIKE/PED FACIL(O) CONSTRUCT 5' CONCRETE SIDEWALKS IN THE EXISTING RIGHT-OF-WAY ALONG BOTH SIDES OF SPRING HILL TRACE FROM KY 329 TO THE END OF THE EXISTING
PL
Project Cost:
CN
UT
RW
DN
SLO
SLO
75,000
445,000
75,000 445,000 0 0 0 0 0
757
OLDHAM KY-53 DESIGN ENGINEERING(O)
DESIGN FOR IMPROVING KY-53 FROM ZHALE SMITH ROAD TO KY-22 (TOTAL 3.2 MILES). (14CCN)
PL
Project Cost:
CN
UT
RW
DN SPP 2,000,000
0 0 0 2,000,000 0 0 0
8852
OLDHAM KY-1488 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1488 BRIDGE OVER ORGAN CREEK. (093B00048N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
343,000
0 280,000 343,000 0 0 0 0
10012
248
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OLDHAM KY 329 AIR QUALITY(P) IMPROVE THE INTERCHANGE OF I 71 AND KY 329
PL
Project Cost:
CN
UT
RW
DN SPP 250,000
0 250,000 0 0 0 0 0
80005
OLDHAM KY 329 AIR QUALITY(P) CONSTRUCT A TURN LANE ON KY 329 BYPASS AT DOVEFIELD DRIVE
PL
Project Cost:
CN
UT
RW
DN
SPP 300,000
0 0 0 0 300,000 0 0
80050
Total for OLDHAM county PL
Total Amounts:
CN
UT
RW
DN 1,720,000
714,500
75,000
7,594,800
4,280,000
3,100,000
2,128,000
12,745,000
500,000
100,000
6,343,000
2,500,000
16,000,000
1,900,000
1,700,000
2,750,000
8,800,000
2,750,000
24,000,000
10,104,300 22,253,000 6,943,000 18,500,000 12,400,000 2,750,000 26,750,000
OWEN KY-22 RECONSTRUCTION(O)IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845. (06CCR)(08CCN)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,500,000
0 0 3,500,000 0 0 0 0
198
OWEN KY-22 PREFINANCD CONVRSN(P)
IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845. (06CCR)(08CCN)(12CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 3,500,000
0 0 0 3,500,000 0 0 0
198.01
249
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OWEN CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CEDAR CREEK ON SAWDRIDGE CREEK W ROAD (CR 1214) 0.2 MI N OF US 127 (094C00011N)
PL
Project Cost:
CN
UT
RW
DN
BR 672,000
0 0 672,000 0 0 0 0
1088
OWEN KY-3102 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3102 BRIDGE OVER BRUSH CREEK. (094B00034N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
1,942,500
0 280,000 1,942,500 0 0 0 0
10013
OWEN KY-22 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-22 FROM MILEPOINT 11.33 TO MILEPOINT 18.56
PL
Project Cost:
CN
UT
RW
DN
PM 947,000
0 0 0 0 947,000 0 0
20052
Total for OWEN county PL
Total Amounts:
CN
UT
RW
DN 280,000
6,114,500 3,500,000 947,000
0 280,000 6,114,500 3,500,000 947,000 0 0
OWSLEY KY-30 RECONSTRUCTION(O)IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTY LINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE & ENVIR)(AR/W)
PL
Project Cost:
CN
UT
RW
DN
STP 14,500,000
0 14,500,000 0 0 0 0 0
279.61
250
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
OWSLEY KY-30 PREFINANCD CONVRSN(P)
IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTY LINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE & ENVIR)(AR/W)
PL
Project Cost:
CN
UT
RW
DN
STP 14,500,000
0 0 0 14,500,000 0 0 0
279.62
Total for OWSLEY county PL
Total Amounts:
CN
UT
RW
DN
14,500,000 14,500,000
0 14,500,000 0 14,500,000 0 0 0
PENDLETON US-27 MAJOR WIDENING(O) IMPROVE SAFETY ON US-27 FROM BUTLER IN PENDLETON COUNTY TO SOUTH OF KY-154 IN CAMPBELL COUNTY.(12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 5,000,000
0 0 5,000,000 0 0 0 0
8706
PENDLETON KY-159 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-159 BRIDGE OVER NORTH LITTLE KINCAID CRE. (096B00006N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
490,000
0 210,000 490,000 0 0 0 0
10004
Total for PENDLETON county PL
Total Amounts:
CN
UT
RW
DN 210,000
5,490,000
0 210,000 5,490,000 0 0 0 0
251
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PERRY KY-15 RECONSTRUCTION(O)IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUES FOR KY-15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY-15 BYPASS
PL
Project Cost:
CN
UT
RW
DN
NH 47,000,000
47,000,000 0 0 0 0 0 0
158
PERRY KY-476 RECONSTRUCTION(O)IMPROVE KY-476 FROM KY-15X IN WALKERTOWN TO NORTH OF WALKER CORNETT ROAD IN WABACO.
PL
Project Cost:
CN
UT
RW
DN STP 600,000
0 0 0 600,000 0 0 0
209
PERRY CR-1114 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NORTH FORK KENTUCKY RIVER ON KENMONT ROAD (CR 1114) 380 FT SE OF KY 7 (097C00005N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
224,000
1,400,000
0 224,000 1,400,000 0 0 0 0
1113
PERRY CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER STRAIGHT FORK ON LITTLE LEATHERWOOD CREEK ROAD (CR 1140) AT JCT WITH KY 3348 (097C00013N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
182,000
504,000
0 182,000 504,000 0 0 0 0
1114
PERRY HR-9006 NEW INTERCHANGE(O)
NEW INTERCHANGE OFF OF A NEW EXIT 55 HAL ROGERS PARKWAY
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
1,200,000
320,000
1,632,000
0 1,200,000 320,000 1,632,000 0 0 0
8903
252
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PERRY KY-80 SAFETY(P) SAFETY IMPROVEMENTS ON KY-80 FROM LESLIE COUNTY LINE TO KY-451. (16CCN)
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
700,000
350,000
280,000
5,400,000
0 700,000 630,000 0 5,400,000 0 0
8906
PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-1166 OVER RT. FK. MACES CREEK(16CCN) 097B00110N
PL
Project Cost:
CN
UT
RW
DN
BR 938,000
0 0 938,000 0 0 0 0
8910
PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1166 OVER MACES CREEK. (16CCN) 097B00072N (SD)
PL
Project Cost:
CN
UT
RW
DN
BR
BR
BR
155,000
103,000
742,000
155,000 103,000 742,000 0 0 0 0
8913
PERRY CR-1150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LEATHERWOOD CREEK. (16CCN) 097C00021N
PL
Project Cost:
CN
UT
RW
DN
BR 455,000
0 0 455,000 0 0 0 0
8915
PERRY CR-1115 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GEORGES BRANCH RD BRIDGE OVER GEORGES BRANCH. (097C00007N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
390,000
0 140,000 390,000 0 0 0 0
10004
253
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PERRY CR-1145 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OWENS BR RD BRIDGE OVER OWENS BRANCH. (097C00018N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
340,000
0 140,000 340,000 0 0 0 0
10005
PERRY CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HALL OLD HOME PLACE BRIDGE OVER BIG CREEK. (097C00084N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
613,000
0 175,000 613,000 0 0 0 0
10006
PERRY KY-476 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 476 BRIDGE OVER BALL FORK. (097B00007N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
840,000
0 210,000 840,000 0 0 0 0
10017
PERRY HR-9006 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 55.966 TO MILEPOINT 57.166
PL
Project Cost:
CN
UT
RW
DN PM
PM
50,000
500,000
0 0 0 0 0 0 550,000
20002
PERRY KY-80 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
100,000
100,000
0 200,000 0 0 0 0 0
20003
254
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for PERRY county PL
Total Amounts:
CN
UT
RW
DN155,000
47,000,000
1,871,000
1,200,000
103,000
100,000
350,000
600,000
6,222,000
600,000
1,632,000 5,400,000
50,000
500,000
47,155,000 3,274,000 7,172,000 2,232,000 5,400,000 0 550,000
PIKE KY-194 RECONSTRUCTION(O)IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TO NEAR DESKINS BRANCH CULVERT
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
2,100,000
1,560,000
6,760,000
0 0 0 3,660,000 0 6,760,000 0
198
PIKE KY-194 PREFINANCD CONVRSN(O)
IMPROVE KY-194 FROM US-119 RAMP NEAR SMITH FARMS BOTTOM (CR-1458) TO NEAR DESKINS BRANCH CULVERT
PL
Project Cost:
CN
UT
RW
DN
SPP 6,760,000
0 0 0 0 0 0 6,760,000
198.01
PIKE US-460 RELOCATION(O) PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 10,000,000
0 0 0 10,000,000 0 0 0
263.67
PIKE US-460 SURFACE(O) PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-195 TO DUNLEARY HOLLOW. (SURFACING FOR SECTIONS 6A & 6B) (2000BOP)(14CCN)
PL
Project Cost:
CN
UT
RW
DN
NH 9,000,000
0 0 0 0 0 0 9,000,000
263.69
255
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PIKE US-460 PREFINANCD CONVRSN(O)
PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)(ADDITIONAL
PL
Project Cost:
CN
UT
RW
DN
NH 10,000,000
0 0 0 0 10,000,000 0 0
263.95
PIKE US-460 PREFINANCD CONVRSN(O)
PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)(ADDITIONAL
PL
Project Cost:
CN
UT
RW
DN
NH 10,000,000
0 0 0 0 0 10,000,000 0
263.96
PIKE US-460 PREFINANCD CONVRSN(O)
PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)(ADDITIONAL
PL
Project Cost:
CN
UT
RW
DN
NH 10,000,000
0 0 0 0 0 0 10,000,000
263.97
PIKE US-460 MINOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION AT THE US-460 AND KY-1460 INTERSECTION.
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
NH
240,000
400,000
160,000
1,470,000
0 0 0 240,000 560,000 0 1,470,000
346
PIKE -0 NEW ROUTE(O) MARION BRANCH INDUSTRIAL PARK ACCESS ROAD.
PL
Project Cost:
CN
UT
RW
DN
SPP 7,000,000
0 7,000,000 0 0 0 0 0
347
256
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PIKE -0 PREFINANCD CONVRSN(O)
MARION BRANCH INDUSTRIAL PARK ACCESS ROAD. (ADDITIONAL FUNDING FOR 12-347.00)
PL
Project Cost:
CN
UT
RW
DN
SPP 7,000,000
0 0 7,000,000 0 0 0 0
347.01
PIKE KY-610 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-610 (MP 8.146) OVER LONG FORK; .1 MI S OF JCT KY-1469; (AR/W)098B00069N
PL
Project Cost:
CN
UT
RW
DN
BR 770,000
770,000 0 0 0 0 0 0
1104
PIKE KY-1441 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOON CREEK AT INTERSECTION WITH COON CREEK (CR 1371) 098B00093N
PL
Project Cost:
CN
UT
RW
DN
BR 665,000
665,000 0 0 0 0 0 0
1115
PIKE CR-1181 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON SOUTH RIVER ROAD CONNECTOR (CR 1181-70) AT JCT WITH US 460 NEAR VIRGINIA STATE LN (098C00088N)
PL
Project Cost:
CN
UT
RW
DN
BR 980,000
0 980,000 0 0 0 0 0
1122
PIKE CR-1801 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BLACKBERRY CREEK ON BIG BLUE SPRINGS ROAD (CR 1801) AT JCT WITH KY 1056 (098C00028N)
PL
Project Cost:
CN
UT
RW
DN
BR 210,000
0 210,000 0 0 0 0 0
1123
257
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PIKE CS-1215 NEW ROUTE(O) IMPROVE CONNECTIVITY BETWEEN THOMPSON ROAD AND US-23 AT STONECOAL.(12CCN)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
600,000
5,290,000
0 0 0 0 0 0 5,890,000
8705
PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER PINSONS CREEK. (098B00032N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
484,400
0 175,000 484,400 0 0 0 0
10008
PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER POND CREEK. (098B00036N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
331,100
0 140,000 331,100 0 0 0 0
10009
PIKE KY-3419 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3419 BRIDGE OVER LEFT FK BLACKBERRY CR. (098B00180N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
618,450
0 210,000 618,450 0 0 0 0
10010
PIKE CR-1517 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PIGEON ROOST RD BRIDGE OVER BIG CREEK(098C00005N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
389,200
0 157,500 389,200 0 0 0 0
10011
258
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PIKE CR-1545 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MULLEN FRK BRIDGE OVER POND CREEK. (098C00021N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
567,280
0 140,000 567,280 0 0 0 0
10012
PIKE CR-1906 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEEFHIDE CRK BRIDGE OVER BEEFHIDE CREEK(098C00119N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
506,100
0 175,000 506,100 0 0 0 0
10013
PIKE CR-1789 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ELWOOD RD BRIDGE OVER SHELBY CREEK. (098C00080N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
930,580
0 192,500 930,580 0 0 0 0
10024
PIKE CR-1360 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIGHT FORK OF BRUS BRIDGE OVER LEFT FK.BRUSHY FORK. (098C00091N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
444,500
0 157,500 444,500 0 0 0 0
10025
PIKE CR-1911 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CANEY HWY #1 BRIDGE OVER CANEY CREEK(098C00113N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
530,250
0 140,000 530,250 0 0 0 0
10026
259
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PIKE CR-1460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DESKINS RD BRIDGE OVER JOHNS CREEK. (098C00170N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
227,500
875,000
0 227,500 875,000 0 0 0 0
10027
PIKE US-23 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
525,000
5,250,000
0 0 5,775,000 0 0 0 0
20002
PIKE US-119 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
175,000
1,750,000
0 0 0 1,925,000 0 0 0
20003
Total for PIKE county PL
Total Amounts:
CN
UT
RW
DN
1,435,000
1,715,000
8,190,000
525,000
17,926,860
415,000
2,100,000
1,560,000
11,750,000
400,000
160,000
16,760,00010,000,000
600,000
32,520,000
1,435,000 9,905,000 18,451,860 15,825,000 10,560,000 16,760,000 33,120,000
POWELL KY-213 SAFETY(P) IMPROVE SAFETY AND GEOMETRICSAND REDUCE CONGESTION KY-213 FROM KY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
4,000,000
1,100,000
2,000,000
0 5,100,000 2,000,000 0 0 0 0
163
260
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
POWELL KY-213 PREFINANCD CONVRSN(O)
IMPROVE SAFETY AND GEOMETRICSAND REDUCE CONGESTION KY-213 FROM KY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 6,000,000
0 0 0 6,000,000 0 0 0
163.01
POWELL KY-213 SAFETY-HAZARD ELIM(P)
IMPROVE SAFETY AND LEVEL OF SERVICE ON KY-213 IN POWELL COUNTY FROM SONS ROAD TO REED COURT.
PL
Project Cost:
CN
UT
RW
DN STP 520,000
0 0 0 0 0 520,000 0
210
POWELL KY-2026 RECONSTRUCTION(O)CORRECT FLOODING ISSUES ON KY-2026 FROM KY-11 TO THE RED RIVER IN CLAY CITY.
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
500,000
200,000
150,000
1,100,000
0 500,000 350,000 1,100,000 0 0 0
211
POWELL KY-599 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-599 BRIDGE OVER CANE CREEK. (099B00069N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
770,000
0 175,000 770,000 0 0 0 0
10007
POWELL KY-2026 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2026 BRIDGE OVER RED RIVER. (099B00090N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
1,120,000
0 210,000 1,120,000 0 0 0 0
10008
261
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
POWELL KY-3354 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3354 BRIDGE OVER CAT CREEK. (099B00081N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
560,000
0 175,000 560,000 0 0 0 0
10018
POWELL KY-9000 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 11.91 TO MILEPOINT 19.15
PL
Project Cost:
CN
UT
RW
DN PM
PM
580,000
5,800,000
0 0 0 0 6,380,000 0 0
20004
POWELL KY-9000 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 19.15 TO MILEPOINT 22.307
PL
Project Cost:
CN
UT
RW
DN PM
PM
250,000
2,500,000
0 0 0 0 0 2,750,000 0
20005
POWELL KY-9000 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 22.307 TO MILEPOINT 27.376
PL
Project Cost:
CN
UT
RW
DN PM
PM
410,000
4,100,000
0 4,510,000 0 0 0 0 0
20006
POWELL KY-9000 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 27.376 TO MILEPOINT 32.788
PL
Project Cost:
CN
UT
RW
DN
PM 5,416,000
0 0 5,416,000 0 0 0 0
20007
262
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
POWELL KY-9000 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 32.788 TO MILEPOINT 36
PL
Project Cost:
CN
UT
RW
DN PM
PM
275,000
2,750,000
0 0 0 0 0 3,025,000 0
20008
Total for POWELL county PL
Total Amounts:
CN
UT
RW
DN 1,470,000
4,000,000
1,100,000
4,100,000
200,000
150,000
9,866,000 7,100,000
580,000
5,250,000
1,045,000
5,800,000
0 10,670,000 10,216,000 7,100,000 6,380,000 6,295,000 0
PULASKI KY-461 MAJOR WIDENING(O) IMPROVE KY-461 FROM KY-80 TO BUCK CREEK BRIDGE, INCLUDING INTERCHANGE AT KY-80.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
3,000,000
1,500,000
13,000,000
0 3,000,000 1,500,000 13,000,000 0 0 0
59.25
PULASKI KY-461 PREFINANCD CONVRSN(O)
IMPROVE KY-461 FROM KY-80 TO BUCK CREEK BRIDGE, INCLUDING INTERCHANGE AT KY-80.
PL
Project Cost:
CN
UT
RW
DN
NH
NH
3,000,000
1,500,000
0 3,000,000 1,500,000 0 0 0 0
59.26
PULASKI KY-635 SAFETY-RR SEPARATN(P)
SAFETY PROJECT TO RECONSTRUCT KY 635 TO ELIMINATE AT GRADE RAILROAD CROSSING AND REPLACE WITH RAILROAD SEPARATION CROSSING AT SCIENCE HILL,
PL
Project Cost:
CN
UT
RW
DN
RRS
RRS
RRS
1,800,000
1,300,000
6,500,000
0 0 3,100,000 0 6,500,000 0 0
9010
263
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
PULASKI US-27 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-27 FROM MILEPOINT 0.00 TO MILEPOINT 6.78
PL
Project Cost:
CN
UT
RW
DN
PM 2,708,000
0 0 0 0 2,708,000 0 0
20008
Total for PULASKI county PL
Total Amounts:
CN
UT
RW
DN6,000,000 1,800,000
4,300,000
13,000,000 9,208,000
0 6,000,000 6,100,000 13,000,000 9,208,000 0 0
ROBERTSON KY-616 RECONSTRUCTION(O)IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE NEW ROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
250,000
210,000
2,820,000
0 0 460,000 2,820,000 0 0 0
8711
ROBERTSON US-62 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 0.00 TO MILEPOINT 11.00
PL
Project Cost:
CN
UT
RW
DN
PM 863,000
0 0 0 0 863,000 0 0
20053
Total for ROBERTSON county PL
Total Amounts:
CN
UT
RW
DN250,000
210,000
2,820,000 863,000
0 0 460,000 2,820,000 863,000 0 0
264
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ROCKCASTLE I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 6 LANES FROM 1MI N SAND HILL ROAD UNDERPASS N TO 1.1 MILES N OF THE US-25 I-CHNG AT MTVERNON. (16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 41,110,000
41,110,000 0 0 0 0 0 0
6.1
ROCKCASTLE KY-461 RECONSTRUCTION(O)IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
1,200,000
1,450,000
2,230,000
0 1,200,000 1,450,000 2,230,000 0 0 0
8952
ROCKCASTLE KY-461 PREFINANCD CONVRSN(O)
IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
1,450,000
1,120,000
0 0 0 1,450,000 1,120,000 0 0
8952.01
ROCKCASTLE KY-1326 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1326 BRIDGE OVER LITTLE RENFRO CREEK(102B00026N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
70,000
210,000
0 70,000 210,000 0 0 0 0
10010
ROCKCASTLE I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 52.05 TO MILEPOINT 55.295
PL
Project Cost:
CN
UT
RW
DN PM
PM
390,000
3,900,000
0 4,290,000 0 0 0 0 0
20003
265
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ROCKCASTLE I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 71.668 TO MILEPOINT 73.408
PL
Project Cost:
CN
UT
RW
DN PM
PM
210,000
2,100,000
0 0 2,310,000 0 0 0 0
20004
ROCKCASTLE US-25 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION PL
Project Cost:
CN
UT
RW
DN PM
PM
175,000
1,750,000
0 0 1,925,000 0 0 0 0
20005
Total for ROCKCASTLE county PL
Total Amounts:
CN
UT
RW
DN
41,110,000
1,660,000
3,900,000
385,000
1,450,000
4,060,000
1,450,000
2,230,000 1,120,000
41,110,000 5,560,000 5,895,000 3,680,000 1,120,000 0 0
ROWAN KY-32 RECONSTRUCTION(O)IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
5,500,000
4,210,000
10,000,000
0 0 5,500,000 14,210,000 0 0 0
204
ROWAN KY-32 PREFINANCD CONVRSN(O)
IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 10,000,000
0 0 0 10,000,000 0 0 0
204.01
266
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ROWAN US-60 SAFETY(P) CONSTRUCT TURN LANES INTO LAKESIDE CHRISTIAN ACADEMY TO IMPROVE SAFETY.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 520,000
520,000 0 0 0 0 0 0
227
ROWAN CR-1140 BRIDGE REPLACEMENT(P)
REPLACE BRIDGE OVER BULL FORK ON HORSEMAN CEMETERY ROAD (CR 1140) AT JCT WITH BULLFORK ROAD (CR 1222) (103C00108N)(SR=32.5)(EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
BR
BR
350,000
50,000
50,000
400,000
0 0 0 350,000 500,000 0 0
1093
ROWAN US-60 SAFETY(P) RECONSTRUCT US-60 FROM WEST OF GLENWOOD HOLLOW ROAD TO EAST OF KY-3296. THE PROJECT SHALL INCLUDE 12' LANES, WIDE PAVED SHOULDERS, UNOBSTRUCTED CLEAR
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
830,000
700,000
5,500,000
0 0 0 830,000 700,000 0 5,500,000
8401
ROWAN KY-377 RECONSTRUCTION(O)IMPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION ON KY-377 FROM KY-32 TO NORTH OF KY-799. (08CCN)(10CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP
STP
STP
2,600,000
7,700,000
9,100,000
0 0 2,600,000 7,700,000 9,100,000 0 0
8406
ROWAN US-60 CONGESTION MITIGTN(O)
PROVIDE WEST TURN LANES ON US 60 AT SUNNYBROOK.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
300,000
250,000
400,000
2,500,000
0 0 0 300,000 650,000 0 2,500,000
8913
267
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ROWAN CR-1025 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON LITTLE PERRY ROAD OVER TRIPLETT CREEK.(16CCN)
PL
Project Cost:
CN
UT
RW
DN
BR 822,500
0 0 822,500 0 0 0 0
8914
ROWAN KY-801 MAJOR WIDENING(O) WIDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN FLEMING CO.
PL
Project Cost:
CN
UT
RW
DN
STP 100,000
0 100,000 0 0 0 0 0
8915
ROWAN I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 128.96 TO MILEPOINT 134.75
PL
Project Cost:
CN
UT
RW
DN PM
PM
475,000
4,750,000
0 0 0 0 0 5,225,000 0
20012
ROWAN I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 141.5 TO MILEPOINT 147.95
PL
Project Cost:
CN
UT
RW
DN PM
PM
525,000
5,250,000
0 0 0 0 5,775,000 0 0
20014
Total for ROWAN county PL
Total Amounts:
CN
UT
RW
DN
520,000
100,000
8,100,000
822,500
650,000
830,000
11,910,000
20,000,000
525,000
300,000
1,150,000
4,750,000
475,000
14,750,000 8,000,000
520,000 100,000 8,922,500 33,390,000 16,725,000 5,225,000 8,000,000
268
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
RUSSELL LN-9008 NEW INTERCHANGE(O)
CONSTRUCT A NEW INTERCHANGE AT THE CUMBERLAND PARKWAY INTERSECTION WITH KY-910 AT WINDSOR. (08CCN)(10CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 6,740,000
6,740,000 0 0 0 0 0 0
8502
RUSSELL US-127 RELOCATION(O) RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RD INTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OF CUMBERLAND RIVER. POTENTIAL
PL
Project Cost:
CN
UT
RW
DN
NH 9,320,000
0 9,320,000 0 0 0 0 0
8601.21
RUSSELL US-127 PREFINANCD CONVRSN(O)
RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RD INTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OF CUMBERLAND RIVER (SEE
PL
Project Cost:
CN
UT
RW
DN
NH 8,280,000
0 0 8,280,000 0 0 0 0
8601.23
RUSSELL US-127 PREFINANCD CONVRSN(O)
RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RD INTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OF CUMBERLAND RIVER (SEE
PL
Project Cost:
CN
UT
RW
DN
NH 8,280,000
0 0 0 8,280,000 0 0 0
8601.24
RUSSELL LN-9008 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 62.544 TO MILEPOINT 72.087
PL
Project Cost:
CN
UT
RW
DN PM
PM
775,000
7,750,000
0 0 0 0 0 8,525,000 0
20007
269
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
RUSSELL US-127 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 19.03 TO MILEPOINT 26.21
PL
Project Cost:
CN
UT
RW
DN
PM 1,549,000
0 0 0 0 1,549,000 0 0
20009
RUSSELL US 127 AIR QUALITY(P) ADD A RIGHT TURNING ON US 127 SOUTHBOUND BEGINNING AT THE EASTBOUND EXIT OF THE CUMBERLAND PARKWAY FOR 0.2 MILES
PL
Project Cost:
CN
UT
RW
DN
SPP 400,000
0 400,000 0 0 0 0 0
80007
Total for RUSSELL county PL
Total Amounts:
CN
UT
RW
DN
6,740,000 9,720,000 8,280,000 8,280,000 7,750,000
775,000
1,549,000
6,740,000 9,720,000 8,280,000 8,280,000 1,549,000 8,525,000 0
SCOTT -0 BYPASS(O) GEORGETOWN NORTHWEST BYPASSIMPROVE CONNECTIVITY AND MOBILITY NORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75. (04CCR)(2004BOPC)(SEE 7-102.01
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 5,000,000 0 0 0 0
102.5
SCOTT -0 PREFINANCD CONVRSN(O)
GEORGETOWN NORTHWEST BYPASSIMPROVE CONNECTIVITY AND MOBILITY NORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75. (04CCR)(2004BOPC)(SEE 7-102.01
PL
Project Cost:
CN
UT
RW
DN
STP 10,000,000
0 0 0 10,000,000 0 0 0
102.51
270
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46 MILE W OF KY 227105B00038N
PL
Project Cost:
CN
UT
RW
DN
BR 462,000
462,000 0 0 0 0 0 0
1127
SCOTT CR-1022 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON FIELDS ROAD (CR 1022) AT SCOTT/HARRISON CO LINE (105R00607N) (EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
1,120,000
210,000 1,120,000 0 0 0 0 0
1139
SCOTT KY-227 RECONSTRUCTION(O)RECONSTRUCT KY-227 FROM MP 2.98 TO MP 3.34 TO IMPROVE HORIZONTAL CURVE. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
STP 200,000
200,000 0 0 0 0 0 0
8907
SCOTT KY-620 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-620 BRIDGE OVER ROGERS GAP CREEK. (105B00095N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
665,000
0 210,000 665,000 0 0 0 0
10005
SCOTT CS-1010 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LEMONS MILL RD BRIDGE OVER NS (CNO&TP) SYSTEM. (105C00112N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
350,000
1,295,000
0 350,000 1,295,000 0 0 0 0
10006
271
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER LOCUST FORK. (105B00039N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
133,000
308,000
0 133,000 308,000 0 0 0 0
10012
SCOTT CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HINTON RD BRIDGE OVER NS (CNO&TP) SYSTEM(105R00605N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
238,000
511,000
0 238,000 511,000 0 0 0 0
10013
SCOTT I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 120.792 TO MILEPOINT 121.117
PL
Project Cost:
CN
UT
RW
DN PM
PM
40,000
400,000
0 0 440,000 0 0 0 0
20019
SCOTT I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 138.424 TO MILEPOINT 143.24
PL
Project Cost:
CN
UT
RW
DN PM
PM
575,000
5,750,000
0 0 0 0 0 0 6,325,000
20021
Total for SCOTT county PL
Total Amounts:
CN
UT
RW
DN 210,000
662,000
931,000
1,120,000
40,000
8,179,000 10,000,000
575,000
5,750,000
872,000 2,051,000 8,219,000 10,000,000 0 0 6,325,000
272
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SHELBY I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TO THE KY-1790 UNDERPASS. (2006BOPC)
PL
Project Cost:
CN
UT
RW
DN NH
NH
NH
2,000,000
2,000,000
19,800,000
0 2,000,000 2,000,000 0 19,800,000 0 0
65.4
SHELBY I-64 PREFINANCD CONVRSN(O)
WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TO THE KY-1790 UNDERPASS. (2006BOPC)
PL
Project Cost:
CN
UT
RW
DN
NH 19,800,000
0 0 0 0 0 19,800,000 0
65.41
SHELBY I-64 PREFINANCD CONVRSN(O)
WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY 55 INTERCHANGE TO THE KY 1790 UNDERPASS. (2006BOPC)
PL
Project Cost:
CN
UT
RW
DN
NH 19,800,000
0 0 0 0 0 0 19,800,000
65.42
SHELBY I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDING COVERS 5-2035.70 SECTION ALSO)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
100,000
100,000
16,330,000
0 0 0 200,000 0 16,330,000 0
2035.4
SHELBY I-64 PREFINANCD CONVRSN(P)
WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDING COVERS 5-2035.70 SECTION ALSO)(ADDITIONAL FUNDING FOR C PHASE)
PL
Project Cost:
CN
UT
RW
DN
NH 16,330,000
0 0 0 0 0 0 16,330,000
2035.41
273
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SHELBY KY-53 RECONSTRUCTION(O)WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN) (12CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 3,000,000
0 3,000,000 0 0 0 0 0
8511
SHELBY KY-53 PREFINANCD CONVRSN(O)
WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN) (12CCR)(14CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 7,700,000
0 0 7,700,000 0 0 0 0
8511.01
SHELBY US-60 RECONSTRUCTION(O)CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO ROCKET LANE. (12CCN)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,170,000
0 0 0 2,170,000 0 0 0
8713
SHELBY CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOODY PIKE BRIDGE OVER FOX RUN CREEK(106C00004N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
217,000
0 140,000 217,000 0 0 0 0
10024
SHELBY CR-1009 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLORE JACKSON RD BRIDGE OVER FOX RUN CREEK. (106C00007N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
406,000
0 140,000 406,000 0 0 0 0
10025
274
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SHELBY I-64 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 38.18 (38 NON-CARDINAL) TO MILEPOINT 43.33 (43.892 NON-CARDINAL)
PL
Project Cost:
CN
UT
RW
DN PM
PM
775,000
7,750,000
0 0 0 0 8,525,000 0 0
20033
SHELBY KY-53 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-53 FROM MILEPOINT 8.01 TO MILEPOINT 13.79
PL
Project Cost:
CN
UT
RW
DN
PM 943,000
0 0 0 0 0 943,000 0
20040
SHELBY KY 55X AIR QUALITY(P) FOUR RIGHT TURNING LANES AT THE INTERSECTION OF KY 55X AND KY 43 AND TWO LEFT TURNING LANES FROM KY 55X ONTO KY 43.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
150,000
22,000
22,000
500,000
0 194,000 500,000 0 0 0 0
80004
Total for SHELBY county PL
Total Amounts:
CN
UT
RW
DN 2,430,000
22,000
22,000
3,000,000
2,000,000
8,823,000
100,000
100,000
2,170,000
775,000
37,073,00027,550,000 36,130,000
0 5,474,000 10,823,000 2,370,000 28,325,000 37,073,000 36,130,000
SIMPSON -0 NEW ROUTE(O) GARVIN LANE EXTENSION TO HENDERSON INDUSTRIAL PARK. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 300,000
0 300,000 0 0 0 0 0
8810
275
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SIMPSON KY-1008 MAJOR WIDENING(O) IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
1,880,000
560,000
3,200,000
0 0 0 0 2,440,000 3,200,000 0
8855
SIMPSON KY-1008 PREFINANCD CONVRSN(O)
IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP 1,670,000
0 0 0 0 0 1,670,000 0
8855.01
SIMPSON US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM KY-1008 TO KY-621. (14CCN)(16CCR)
PL
Project Cost:
CN
UT
RW
DN STP
STP
1,000,000
2,000,000
0 0 0 1,000,000 0 2,000,000 0
8856
SIMPSON KY-621 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-621 BRIDGE OVER SINKING CREEK. (107B00018N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
332,500
0 157,500 332,500 0 0 0 0
10007
SIMPSON CR-1126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PLEASANT HILL ROAD BRIDGE OVER MAYS BRANCH. (107C00011N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
280,000
0 157,500 280,000 0 0 0 0
10008
276
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SIMPSON I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 13.71
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,650,000
16,500,000
0 0 0 0 0 0 18,150,000
20014
Total for SIMPSON county PL
Total Amounts:
CN
UT
RW
DN 315,000
300,000 612,500
1,000,000
1,880,000
560,000
3,200,000
2,000,000
1,670,000
1,650,000
16,500,000
0 615,000 612,500 1,000,000 2,440,000 6,870,000 18,150,000
SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BUCK CREEK ON KY 1169 75 FT EAST OF YODER TIPTON ROAD (CR 1142). (108B00022N)(EBRP)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
497,000
0 245,000 497,000 0 0 0 0
1076
SPENCER KY-155 MAJOR WIDENING(O) CONSTRUCT A 2+1 ROAD ON KY 55/155 (TAYLORSVILLE ROAD) IN SPENCER COUNTY AND KY 155 (TAYLORSVILLE LAKE ROAD) IN JEFFERSON COUNTY BY ADDING A
PL
Project Cost:
CN
UT
RW
DN SPP 4,750,000
0 0 0 0 0 0 4,750,000
8954
SPENCER KY-44 SAFETY(P) IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY-44 NEAR DUTCHMAN CREEK ROAD. (16CCN)
PL
Project Cost:
CN
UT
RW
DN STP 230,000
0 0 0 0 230,000 0 0
8955
277
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1169 BRIDGE OVER ELK CREEK. (108B00040N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
490,000
0 210,000 490,000 0 0 0 0
10013
SPENCER CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WASHBURN LANE BRIDGE OVER ELK CREEK. (108B00017N)(SD)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
248,500
0 192,500 248,500 0 0 0 0
10014
SPENCER CR-1155 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FEATHERBED HOLW RD BRIDGE OVER LITTLE PLUM CREEK. (108C00019N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
567,000
0 777,000 0 0 0 0 0
10026
SPENCER KY-44 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-44 FROM MILEPOINT 9.93 TO MILEPOINT 14.89
PL
Project Cost:
CN
UT
RW
DN
PM 808,000
0 0 0 0 0 808,000 0
20041
Total for SPENCER county PL
Total Amounts:
CN
UT
RW
DN 857,500
567,000 1,235,500
230,000
808,000
4,750,000
0 1,424,500 1,235,500 0 230,000 808,000 4,750,000
278
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
TAYLOR KY-555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEW CAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70. SECTION 1. (2010BOP)
PL
Project Cost:
CN
UT
RW
DN
NH 7,600,000
0 0 0 0 7,600,000 0 0
142.2
TAYLOR KY-555 PREFINANCD CONVRSN(O)
HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEW CAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70. SECTION 1. (2010BOP)
PL
Project Cost:
CN
UT
RW
DN
NH 7,600,000
0 0 7,600,000 0 0 0 0
142.21
TAYLOR KY-555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEW CAMPBELLSVILLE BYPASS FROM KY-70 TO US-68 EAST OF CAMPBELLSVILLE. SECTION 2.
PL
Project Cost:
CN
UT
RW
DN
NH 1,000,000
0 1,000,000 0 0 0 0 0
142.3
TAYLOR KY-70 RECONSTRUCTION(O)IMPROVE SAFETY, ACCESS, GEOMETRICS AND DRAINAGE ON KY-70 IN CAMPBELLSVILLE FROM US-68 TO COUNTRY VIEW COURT (CS-1305)
PL
Project Cost:
CN
UT
RW
DN STP 700,000
0 0 0 0 0 0 700,000
443
TAYLOR KY-55 RECONSTRUCTION(O)HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THE TAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
500,000
1,000,000
1,000,000
0 1,500,000 1,000,000 0 0 0 0
8920
279
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
TAYLOR KY-55 PREFINANCD CONVRSN(O)
HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THE TAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS. (16CCN)
PL
Project Cost:
CN
UT
RW
DN
NH 7,000,000
0 0 7,000,000 0 0 0 0
8920.01
TAYLOR KY-323 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST MAIN STREET BRIDGE OVER BUCKHORN CRK.. (109B00051N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
805,000
0 157,500 805,000 0 0 0 0
10006
TAYLOR CS-1241 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SOUTH JACKSON ST BRIDGE OVER BUCKHORN CREEK. (109C00028N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
105,000
367,500
0 105,000 367,500 0 0 0 0
10007
Total for TAYLOR county PL
Total Amounts:
CN
UT
RW
DN 262,500
500,000
2,000,000
16,772,500 7,600,000
700,000
0 2,762,500 16,772,500 0 7,600,000 0 700,000
TODD KY-181 RECONSTRUCTION(O)RECONSTRUCT KY-181 (ELKTON ROAD) FROM US-79 (MP 0.000) TO NORTH OF INTERSECTION WITH US-41 (MP 0.214) TO INCLUDE A NEW INTERSECTION WITH KY-294. (MP
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
250,000
670,000
2,600,000
0 0 0 920,000 0 2,600,000 0
8811
280
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
TODD CR-1333 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RATTLESNAKE RD BRIDGE OVER BUCK FORK. (110C00059N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
192,500
294,000
0 192,500 294,000 0 0 0 0
10009
TODD CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROGER Q MILL RD. BRIDGE OVER RED RIVER W FORK BRANCH. (110C00061N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
385,000
0 157,500 385,000 0 0 0 0
10013
TODD US 79 AIR QUALITY(P) US 79 WIDENING FROM MP 0 TO MP 3PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
1,200,000
2,000,000
3,000,000
8,000,000
0 1,200,000 0 5,000,000 8,000,000 0 0
80001
Total for TODD county PL
Total Amounts:
CN
UT
RW
DN 1,550,000
679,000
2,250,000
3,670,000
2,600,0008,000,000
0 1,550,000 679,000 5,920,000 8,000,000 2,600,000 0
TRIGG CR-1380 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1380 (0.014) OVER DYERS CREEK 111C00027N
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
381,500
0 140,000 381,500 0 0 0 0
1160
281
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
TRIGG I-24 AM-BRIDGE (P) OVERLAY BRIDGE DECK AND ADDRESS DEFICIENCIES OF EXPANSION JOINTS ON EASTBOUND I-24 BRIDGE OVER TRW RAILROAD EAST OF US 68 AT (MP 66.515).
PL
Project Cost:
CN
UT
RW
DN
BR 250,000
250,000 0 0 0 0 0 0
2039
TRIGG KY-139 REALIGNMENT REALIGN KY 124 APPROACH TO KY 139 TO IMPROVE INTERSECTION ANGLE AND SIGHT DISTANCE
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
200,000
150,000
150,000
600,000
0 200,000 900,000 0 0 0 0
8951
TRIGG KY-139 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-139 BRIDGE OVER BURGE CREEK. (111B00012N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
997,500
0 280,000 997,500 0 0 0 0
10005
TRIGG I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 57.39 TO MILEPOINT 69.83
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,220,000
12,200,000
0 0 0 0 0 0 13,420,000
20020
TRIGG I-24 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 57.389 TO MILEPOINT 69.389
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,220,000
12,200,000
0 0 0 0 0 0 13,420,000
20022
282
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
Total for TRIGG county PL
Total Amounts:
CN
UT
RW
DN
250,000
620,000
150,000
150,000
1,979,000
2,440,000
24,400,000
250,000 620,000 2,279,000 0 0 0 26,840,000
UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 0.971) OVER LOST CREEK; .95 MI N.E. OF JCT US-60; 113B00006N (LET W/ 2-1074)
PL
Project Cost:
CN
UT
RW
DN
BR 434,000
434,000 0 0 0 0 0 0
1073
UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK; 1.1 MI N.E. OF JCT US-60; 113B00007N (LET W/ 2-1073)
PL
Project Cost:
CN
UT
RW
DN
BR 511,000
511,000 0 0 0 0 0 0
1074
UNION US-60 RECONSTRUCTION(O)IMPROVE ROADWAY TO REDUCE FLOODING ON US-60 FROM EAST OF HOUSE BRIDGE ROAD (CR-1027) TO UNION/HENDERSON COUNTY LINE. (16CCN)
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
300,000
150,000
250,000
2,000,000
0 300,000 0 0 0 400,000 2,000,000
8955
UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-359 BRIDGE OVER LITTLE MASON CREEK(113B00008N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
682,500
0 210,000 682,500 0 0 0 0
10017
283
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
UNION KY-492 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 492 BRIDGE OVER WASH CREEK. (113B00054N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
70,000
350,000
0 70,000 350,000 0 0 0 0
10026
Total for UNION county PL
Total Amounts:
CN
UT
RW
DN
945,000
580,000
1,032,500
150,000
250,000
2,000,000
945,000 580,000 1,032,500 0 0 400,000 2,000,000
WARREN KY-185 RECONSTRUCTION(O)IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEAR RICHARDSVILLE TO THE BUTLER COUNTY LINE. (02CCR)(04CCR)(06CCR)(10CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 5,000,000 0 0 0 0
110
WARREN KY-185 PREFINANCD CONVRSN(P)
IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEAR RICHARDSVILLE TO THE BUTLER COUNTY LINE. (02CCR)(04CCR)(06CCR)(10CCR)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
0 0 0 5,000,000 0 0 0
110.01
WARREN US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 2,880,000
0 0 0 0 2,880,000 0 0
199
284
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WARREN US-31 PREFINANCD CONVRSN(O)
IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 6,730,000
0 0 0 0 0 6,730,000 0
199.01
WARREN US-31 BIKE/PED FACIL(O) CONSTRUCT A PEDESTRIAN UNDERPASS UNDER US-31W CONNECTING BUCHANON PARK TRAIL TO CHANEY'S DAIRY BARN.(16CCN)
PL
Project Cost:
CN
UT
RW
DN STP
STP
50,000
400,000
0 0 0 0 50,000 0 400,000
199.99
WARREN KY-526 MINOR WIDENING(O) IMPROVE KY-526 FROM NEAR KY-2630 TO US-31W. (2014BOP)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
70,000
180,000
160,000
0 250,000 160,000 0 0 0 0
322
WARREN WN-9007 SIGNING(P) I-65 SPUR CORRIDOR SIGNING; EXISTING NATCHER PARKWAY FROM I-65 INTERCHANGE (EXIT 2) IN WARREN CO. EXTENDING NORTH TO THE US 60 INTERCHANGE IN DAVIESS
PL
Project Cost:
CN
UT
RW
DN
NH 2,150,000
0 2,150,000 0 0 0 0 0
2042.11
WARREN WN-9007 I-CHANGE RECONST(O)
I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE (EXIT 9) ON THE WEST SIDE OF BOWLING GREEN. (SEE ITEM NO. 3-202 FOR DESIGN) (2016BOP)
PL
Project Cost:
CN
UT
RW
DN
NH 8,200,000
0 0 0 8,200,000 0 0 0
2042.2
285
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WARREN US-231 MAJOR WIDENING(O) IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
2,500,000
2,600,000
2,500,000 2,600,000 0 0 0 0 0
8702
WARREN US-231 PREFINANCD CONVRSN(O)
IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)
PL
Project Cost:
CN
UT
RW
DN
NH 870,000
0 0 0 870,000 0 0 0
8702.01
WARREN KY-884 NEW ROUTE(O) THREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE NATCHER PARKWAY INCLUDING BRIDGE OVER PARKWAY. (14CCN)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
4,000,000
2,800,000
8,930,000
0 4,000,000 0 2,800,000 0 8,930,000 0
8818
WARREN US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM CAMPBELL LANE (US-231) TO UNIVERSITY BOULEVARD (US-231X). (14CCN)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
1,750,000
2,000,000
4,250,000
0 3,750,000 0 0 4,250,000 0 0
8857
WARREN US-31W MINOR WIDENING(O) WIDEN US-31W FROM PARK AVE. TO FAIRVIEW AVE MP 13.7-14.25
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
500,000
1,500,000
1,750,000
4,500,000
0 500,000 3,250,000 4,500,000 0 0 0
8904.1
286
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WARREN US-31 RECONSTRUCTION(O)IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-68 TO MIZPAH. (16CCN)
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
800,000
900,000
400,000
2,800,000
0 0 2,100,000 0 2,800,000 0 0
8905
WARREN KY-2632 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HAMMET HILL ROAD BRIDGE OVER SALT LICK CREEK. (114B00071N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
157,500
350,000
0 157,500 350,000 0 0 0 0
10014
WARREN KY-1435 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1435 BRIDGE OVER GASPER RIVER. (114B00074N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
280,000
1,172,500
0 280,000 1,172,500 0 0 0 0
10015
WARREN I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 13.711 TO MILEPOINT 25
PL
Project Cost:
CN
UT
RW
DN PM
PM
1,350,000
13,500,000
0 0 0 0 0 14,850,000 0
20016
WARREN I-65 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 35.616 TO MILEPOINT 42.89
PL
Project Cost:
CN
UT
RW
DN PM
PM
870,000
8,700,000
0 9,570,000 0 0 0 0 0
20017
287
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WARREN WN-9007 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 2.473
PL
Project Cost:
CN
UT
RW
DN PM
PM
200,000
2,000,000
0 200,000 2,000,000 0 0 0 0
20018
WARREN WN-9007 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 9.2 TO MILEPOINT 20.246
PL
Project Cost:
CN
UT
RW
DN
PM 11,083,000
0 0 11,083,000 0 0 0 0
20019
WARREN US-68 NEW ROUTE(O) SOUTHWEST PARKWAY - NEW CONSTRUCTION FROM US-68 TO A CONNECTION AT KOBE WAY IN BOWLING GREEN
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
200,000
280,000
200,000
3,870,000
0 4,550,000 0 0 0 0 0
80000
WARREN KY 242 AIR QUALITY(P) ADD LEFT TURNING LANE ON KY 242 INTO RICHPOND ELEMENTARY SCHOOL AT MP 3.8 TO 3.95
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
50,000
125,000
250,000
200,000
0 50,000 575,000 0 0 0 0
80005
WARREN KY-3225 SAFETY(P) SAFETY IMPROVEMENTS AND REHABILITATION ON KY-3225. KEEP EXISTING FOOTPRINT BY REPLACING CURBLINE IN SAME LOCATION FROM MP 0 TO MP 1
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
200,000
1,110,000
100,000
1,200,000
0 0 200,000 1,210,000 1,200,000 0 0
80051
288
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WARREN US-234 MINOR WIDENING(O) EXTEND THE 5 LANE SECTION ON KY-234 FROM MP 11.9 TO 12.4. IMPROVEMENTS MAY INCLUDE A ROUNDABOUT, TURN LANE, AND A SIGNAL AT HAMPTON DR.
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
250,000
180,000
1,500,000
1,400,000
0 0 0 0 250,000 1,680,000 1,400,000
80052
Total for WARREN county PL
Total Amounts:
CN
UT
RW
DN
2,500,000
2,257,500
6,100,000
2,380,000
17,320,000
1,000,000
2,525,000
2,400,000
19,965,500
1,110,000
2,900,000
18,570,000
300,000
29,160,000
1,350,000
180,000
1,500,000
11,130,000 1,800,000
2,500,000 28,057,500 25,890,500 22,580,000 11,430,000 32,190,000 1,800,000
WASHINGTON US-150 RECONSTRUCTION(O)IMPROVE US-150 FROM SPRINGFIELD TO BARDSTOWN.
PL
Project Cost:
CN
UT
RW
DN STP 3,000,000
0 0 3,000,000 0 0 0 0
396
WASHINGTON US-150 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ALONG US-150 FROM WEST OF OLD FREDERICKTOWN-BARDSTOWN ROAD (KY-1872) THROUGH GRUNDY HOME
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
500,000
500,000
750,000
4,000,000
0 0 0 500,000 1,250,000 0 4,000,000
396.2
WASHINGTON KY-528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 528 (MP 1.437) OVER ROAD RUN BRANCH.(115B00043N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
1,302,000
0 175,000 1,302,000 0 0 0 0
1094
289
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WASHINGTON CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) AT MP 0.349 OVER LONG LICK CREEK(115C00039) (16CCN)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 175,000
0 0 175,000 0 0 0 0
8957
WASHINGTON US-150 SAFETY(P) ADDRESS SAFETY, MOBILITY, AND GEOMETRIC ISSUES ALONG US 150 IN WASHINGTON COUNTY FROM 400 FEET WEST OF OLD FREDERICKTOWN-BARDSTOWN ROAD
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
700,000
900,000
1,100,000
9,820,000
0 700,000 900,000 1,100,000 9,820,000 0 0
8958
WASHINGTON KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-55 BRIDGE OVER SEIBERT CREEK. (115B00026N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
87,500
511,000
0 87,500 511,000 0 0 0 0
10008
WASHINGTON KY-1920 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1920 BRIDGE OVER DEEP CREEK. (115B00061N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
87,500
262,500
0 87,500 262,500 0 0 0 0
10015
Total for WASHINGTON county PL
Total Amounts:
CN
UT
RW
DN 1,050,000 3,000,000
900,000
2,250,500
500,000
1,100,000
500,000
750,000
9,820,000 4,000,000
0 1,050,000 6,150,500 1,600,000 11,070,000 0 4,000,000
290
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WAYNE KY-90 SAFETY(P) IMPROVE KY-90 FROM OLD MILL SPRINGS ROAD TO THE BRIDGE AT MP 19.5. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 4,220,000
0 0 4,220,000 0 0 0 0
109.1
WAYNE KY-90 SAFETY(P) IMPROVE KY-90 FROM OLD MILL SPRINGS ROA TO THE BRIDGE AT MP 19.5. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 4,220,000
0 0 0 4,220,000 0 0 0
109.2
WAYNE CR-1136 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTH FORK RIVER; 0.25 MI SE OF JCT CR-5137; 116C00007N
PL
Project Cost:
CN
UT
RW
DN
BR 455,000
0 455,000 0 0 0 0 0
1050
WAYNE CR-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DODSON HOLLOW RD BRIDGE OVER MEADOW CREEK. (116C00028N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
466,000
0 175,000 466,000 0 0 0 0
10005
WAYNE KY-90 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-90X FROM MILEPOINT 0.00 TO MILEPOINT 3.54
PL
Project Cost:
CN
UT
RW
DN
PM 1,623,000
0 0 0 0 0 0 1,623,000
20010
291
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WAYNE KY-92 PLANNING-OKI(O) PRELIMINARY ENGINEERING AND ENVIRONMENTAL CORRIDOR STUDY FOR IMPROVING SAFETY AND MAKING KY-92 A SCENIC ROUTE FROM MONTICELLO TO STEARNS (FLEXIBLE
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 0 1,500,000 0 0 0 0
80004
WAYNE KY 1275 AIR QUALITY(P) IMPROVE CURVE ON KY 1275 AT KY 833/ROGERS GROVE ROAD AND RESURFACE FROM KY 1275 FROM BELL LANE TO KY 833/ROGERS GROVE ROAD
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
60,000
3,500
60,000
200,000
0 123,500 200,000 0 0 0 0
80005
WAYNE KY 1275 AIR QUALITY(P) WIDEN KY 1275 TO FOUR LANES WITH FOUR FOOT SHOULDERS AND FIVE FOOT SIDEWALKS FROM KY 90 TO BELL LANE
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
490,000
200,000
500,000
3,000,000
0 490,000 700,000 3,000,000 0 0 0
80006
Total for WAYNE county PL
Total Amounts:
CN
UT
RW
DN 725,000
3,500
60,000
455,000
1,500,000
200,000
500,000
4,886,000 7,220,000 1,623,000
0 1,243,500 7,086,000 7,220,000 0 0 1,623,000
WEBSTER KY-138 RECONSTRUCTION(O)RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS TO ALLEVIATE FLOODING. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP
SPP
SPP
100,000
250,000
1,200,000
0 350,000 1,200,000 0 0 0 0
228
292
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WEBSTER KY-1835 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1835 BRIDGE OVER SUGAR CAMP CREEK. (117B00023N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
210,000
665,000
0 210,000 665,000 0 0 0 0
10018
WEBSTER KY-132 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-132 BRIDGE OVER NALL DITCH. (117B00064N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
1,102,500
0 245,000 1,102,500 0 0 0 0
10019
Total for WEBSTER county PL
Total Amounts:
CN
UT
RW
DN 455,000
100,000
250,000
2,967,500
0 805,000 2,967,500 0 0 0 0
WHITLEY I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN (C-COST=$87,500,000)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
500,000
500,000
10,000,000
0 1,000,000 10,000,000 0 0 0 0
14.8
WHITLEY I-75 PREFINANCD CONVRSN(O)
TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.
PL
Project Cost:
CN
UT
RW
DN
NH 25,000,000
0 0 0 25,000,000 0 0 0
14.81
293
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WHITLEY I-75 PREFINANCD CONVRSN(O)
TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.
PL
Project Cost:
CN
UT
RW
DN
NH 25,000,000
0 0 0 0 25,000,000 0 0
14.82
WHITLEY I-75 PREFINANCD CONVRSN(O)
TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.
PL
Project Cost:
CN
UT
RW
DN
NH 25,000,000
0 0 0 0 0 25,000,000 0
14.83
WHITLEY KY-92 RELOCATION(O) RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTY LINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1)(14CCR)
PL
Project Cost:
CN
UT
RW
DN
STP 10,000,000
0 10,000,000 0 0 0 0 0
184.1
WHITLEY KY-92 PREFINANCD CONVRSN(O)
RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTY LINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1) (ADDITIONAL FUNDING FOR
PL
Project Cost:
CN
UT
RW
DN
STP 6,000,000
0 0 0 6,000,000 0 0 0
184.11
WHITLEY US-25 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH
NH
NH
2,770,000
4,160,000
3,330,000
0 0 0 6,930,000 3,330,000 0 0
186
294
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WHITLEY US-25 PREFINANCD CONVRSN(O)
IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 6,670,000
0 0 0 0 0 6,670,000 0
186.01
WHITLEY I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER LYNN CAMP CREEK (SR 34.1) (B00063R AND B00063L)(SD)
PL
Project Cost:
CN
UT
RW
DN
BR 2,800,000
2,800,000 0 0 0 0 0 0
1105
WHITLEY KY-904 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-904 BRIDGE OVER TYES FK OF BENNETTS BR. (118B00070N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
493,500
0 175,000 493,500 0 0 0 0
10032
WHITLEY KY-779 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-779 BRIDGE OVER BROWNS CREEK. (118B00079N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
448,000
0 175,000 448,000 0 0 0 0
10033
WHITLEY KY-204 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-204 BRIDGE OVER YOUNGS CREEK. (118B00084N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
262,500
910,000
0 262,500 910,000 0 0 0 0
10034
295
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WHITLEY KY-2996 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2996 BRIDGE OVER WOLF CREEK. (118B00101N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
455,000
0 175,000 455,000 0 0 0 0
10035
WHITLEY CR-1275 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BETHEL ROAD BRIDGE OVER PATTERSON CREEK. (118C00029N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
140,000
315,000
0 140,000 315,000 0 0 0 0
10036
WHITLEY CR-1461 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIVER ROAD BRIDGE OVER SANDERS CREEK. (118C00039N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
406,000
0 175,000 406,000 0 0 0 0
10037
WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RVR. (118B00041N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
1,890,000
0 245,000 1,890,000 0 0 0 0
10044
WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RIVER. (118B00042N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
245,000
1,645,000
0 245,000 1,645,000 0 0 0 0
10045
296
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WHITLEY I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 11.27
PL
Project Cost:
CN
UT
RW
DN PM
PM
900,000
9,000,000
0 0 0 0 9,900,000 0 0
20015
WHITLEY I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 20.2 TO MILEPOINT 24.645
PL
Project Cost:
CN
UT
RW
DN PM
PM
200,000
2,000,000
0 0 0 0 2,200,000 0 0
20018
WHITLEY I-75 AM-PAVEMENT (INT)(P)
ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 23.0 (25.26 NON-CARDINAL) TO MILEPOINT 28.872
PL
Project Cost:
CN
UT
RW
DN PM
PM
340,000
3,400,000
0 3,740,000 0 0 0 0 0
20019
WHITLEY KY-26 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-26 FROM MILEPOINT 5.46 TO MILEPOINT 13.33
PL
Project Cost:
CN
UT
RW
DN
PM 1,313,000
0 0 0 0 1,313,000 0 0
20024
WHITLEY KY-90 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-90 FROM MILEPOINT 2.78 TO MILEPOINT 8.33
PL
Project Cost:
CN
UT
RW
DN
PM 926,000
0 0 0 0 926,000 0 0
20025
297
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WHITLEY US-25 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON US-25W FROM MILEPOINT 26.17 TO MILEPOINT 32.43
PL
Project Cost:
CN
UT
RW
DN
PM 2,135,000
0 0 0 0 0 0 2,135,000
20026
WHITLEY KY 204 AIR QUALITY(P) INSTALL GUARDRAIL ON KY 204 BETWEEN MP 10.7 AND 10.8
PL
Project Cost:
CN
UT
RW
DN
SPP 15,000
0 15,000 0 0 0 0 0
80001
Total for WHITLEY county PL
Total Amounts:
CN
UT
RW
DN
2,800,000
1,932,500
500,000
500,000
13,415,000 16,562,500
2,770,000
4,160,000
31,000,000
1,100,000
31,670,00041,569,000 2,135,000
2,800,000 16,347,500 16,562,500 37,930,000 42,669,000 31,670,000 2,135,000
WOLFE KY-191 RECONSTRUCTION(O)IMPROVE THE KY-191 AND KY-1812 INTERSECTION.
PL
Project Cost:
CN
UT
RW
DN STP
STP
STP
STP
260,000
80,000
100,000
800,000
0 0 0 0 0 440,000 800,000
212
WOLFE KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-191 BRIDGE OVER LACEY CREEK. (119B00001N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
150,000
564,000
0 150,000 564,000 0 0 0 0
10009
298
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WOLFE KY-2491 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2491 BRIDGE OVER SWANGO FORK. (119B00058N)
PL
Project Cost:
CN
UT
RW
DN BR
BR
175,000
525,000
0 175,000 525,000 0 0 0 0
10019
WOLFE KY-9000 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 36 TO MILEPOINT 42.85
PL
Project Cost:
CN
UT
RW
DN PM
PM
550,000
5,500,000
0 0 0 6,050,000 0 0 0
20009
WOLFE KY-9009 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 42.853 TO MILEPOINT 46.208
PL
Project Cost:
CN
UT
RW
DN PM
PM
275,000
2,750,000
0 0 0 0 3,025,000 0 0
20010
WOLFE KY-9009 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 46.208 TO MILEPOINT 55.434
PL
Project Cost:
CN
UT
RW
DN PM
PM
370,000
3,700,000
0 0 0 4,070,000 0 0 0
20011
WOLFE KY-9009 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 55.434 TO MILEPOINT 57.72
PL
Project Cost:
CN
UT
RW
DN PM
PM
90,000
900,000
0 990,000 0 0 0 0 0
20012
299
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WOLFE KY-15 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-15S FROM MILEPOINT 0.00 TO MILEPOINT 0.93
PL
Project Cost:
CN
UT
RW
DN
PM 896,000
0 0 0 0 896,000 0 0
20016
WOLFE KY-11 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION ON KY-11 FROM MILEPOINT 0.35 TO MILEPOINT 5.32
PL
Project Cost:
CN
UT
RW
DN
PM 1,228,000
0 0 0 0 0 0 1,228,000
20017
Total for WOLFE county PL
Total Amounts:
CN
UT
RW
DN 415,000
900,000 1,089,000
920,000
9,200,000
275,000 260,000
80,000
100,000
3,646,000 2,028,000
0 1,315,000 1,089,000 10,120,000 3,921,000 440,000 2,028,000
WOODFORD US-60 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASS PARKWAY/HUNTERTOWN PIKE TO PISGAH PIKE.
PL
Project Cost:
CN
UT
RW
DN NH 500,000
0 0 0 500,000 0 0 0
117
WOODFORD KY-169 RECONSTRUCTION(O)IMPROVE KY-169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE COUNTY TO NORTH OF KY-1967 IN WOODFORD COUNTY.
PL
Project Cost:
CN
UT
RW
DN STP 800,000
0 0 0 0 0 800,000 0
440
300
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
WOODFORD CR-1015 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE WEISENBURG MILL ROAD BRIDGE AT THE WOODFORD/SCOTT COUNTY LINE. (10CCN)(120C00006N)
PL
Project Cost:
CN
UT
RW
DN
BR 966,000
0 0 966,000 0 0 0 0
8642
WOODFORD US-60 CONGESTION MITIGTN(O)
ACCESS MANAGEMENT IMPROVEMENTS ON US 60 FROM LEXINGTON ROAD AT WOODFORD FEED TO MARSAILLES DRIVE (MP 9.38 TO MP 9.70)
PL
Project Cost:
CN
UT
RW
DN SPP
SPP
SPP
SPP
400,000
950,000
750,000
2,000,000
0 0 400,000 950,000 750,000 2,000,000 0
8905
WOODFORD BG-9002 AM-PAVEMENT (PKY)(P)
ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 61.95 (62.05 NON-CARDINAL) TO MILEPOINT 70.70
PL
Project Cost:
CN
UT
RW
DN PM
PM
700,000
7,000,000
0 7,700,000 0 0 0 0 0
20022
WOODFORD US-60 AM-PAVEMENT (PRI)(P)
ADDRESS PAVEMENT CONDITION OF AC PAVEMENT
PL
Project Cost:
CN
UT
RW
DN PM
PM
350,000
3,500,000
0 0 3,850,000 0 0 0 0
20023
Total for WOODFORD county PL
Total Amounts:
CN
UT
RW
DN 700,000
7,000,000
750,000
4,466,000
500,000
950,000
750,000
2,000,000
800,000
0 7,700,000 5,216,000 1,450,000 750,000 2,800,000 0
301
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2018. (2009BOPP)
PL
Project Cost:
CN
UT
RW
DN
BR 2,000,000
2,000,000 0 0 0 0 0 0
65.15
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
BR 2,000,000
0 2,000,000 0 0 0 0 0
65.16
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
BR 2,000,000
0 0 2,000,000 0 0 0 0
65.17
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
BR 30,000,000
0 0 0 30,000,000 0 0 0
65.18
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
BR 30,000,000
0 0 0 0 30,000,000 0 0
65.19
302
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
BR 30,000,000
0 0 0 0 0 30,000,000 0
65.2
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
BR 30,000,000
0 0 0 0 0 0 30,000,000
65.21
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2018.
PL
Project Cost:
CN
UT
RW
DN
NH 2,000,000
2,000,000 0 0 0 0 0 0
66.13
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
NH 2,000,000
0 2,000,000 0 0 0 0 0
66.14
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
NH 2,000,000
0 0 2,000,000 0 0 0 0
66.15
303
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
NH 2,000,000
0 0 0 2,000,000 0 0 0
66.16
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
NH 2,000,000
0 0 0 0 2,000,000 0 0
66.17
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
NH 2,000,000
0 0 0 0 0 2,000,000 0
66.18
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
NH 2,000,000
0 0 0 0 0 0 2,000,000
66.19
ZVARIOUS -0 TRANSP ENHANCEMENT(P)
STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2018. (98CCR
PL
Project Cost:
CN
UT
RW
DN
TE 12,800,000
12,800,000 0 0 0 0 0 0
195.14
304
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 TRANSP ENHANCEMENT(P)
STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2019. (98CCR
PL
Project Cost:
CN
UT
RW
DN
TE 13,700,000
0 13,700,000 0 0 0 0 0
195.15
ZVARIOUS -0 TRANSP ENHANCEMENT(P)
STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2020 (98CCR
PL
Project Cost:
CN
UT
RW
DN
TE 13,700,000
0 0 13,700,000 0 0 0 0
195.16
ZVARIOUS -0 TRANSP ENHANCEMENT(P)
STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
TE 12,800,000
0 0 0 12,800,000 0 0 0
195.17
ZVARIOUS -0 TRANSP ENHANCEMENT(P)
STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
TE 12,800,000
0 0 0 0 12,800,000 0 0
195.18
ZVARIOUS -0 TRANSP ENHANCEMENT(P)
STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
TE 14,500,000
0 0 0 0 0 14,500,000 0
195.23
305
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 TRANSP ENHANCEMENT(P)
STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
TE 14,500,000
0 0 0 0 0 0 14,500,000
195.24
ZVARIOUS -0 CONGESTION MITIGTN(O)
NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2018.
PL
Project Cost:
CN
UT
RW
DN
CM 13,100,000
13,100,000 0 0 0 0 0 0
219.16
ZVARIOUS -0 CONGESTION MITIGTN(O)
NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
CM 13,100,000
0 13,100,000 0 0 0 0 0
219.17
ZVARIOUS -0 CONGESTION MITIGTN(O)
NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
CM 13,100,000
0 0 13,100,000 0 0 0 0
219.18
ZVARIOUS -0 CONGESTION MITIGTN(O)
NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
CM 17,800,000
0 0 0 17,800,000 0 0 0
219.19
306
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 CONGESTION MITIGTN(O)
NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
CM 17,800,000
0 0 0 0 17,800,000 0 0
219.2
ZVARIOUS -0 CONGESTION MITIGTN(O)
NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
CM 17,800,000
0 0 0 0 0 17,800,000 0
219.21
ZVARIOUS -0 CONGESTION MITIGTN(O)
NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
CM 17,800,000
0 0 0 0 0 0 17,800,000
219.22
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN KENTUCKY FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
PM 2,000,000
0 2,000,000 0 0 0 0 0
224.13
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN KENTUCKY FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
PM 9,000,000
0 0 0 9,000,000 0 0 0
224.14
307
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN KENTUCKY FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
PM 10,000,000
0 0 0 0 0 10,000,000 0
224.15
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2018.
PL
Project Cost:
CN
UT
RW
DN
BR 2,600,000
2,600,000 0 0 0 0 0 0
327.14
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
BR 2,600,000
0 2,600,000 0 0 0 0 0
327.15
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
BR 2,600,000
0 0 2,600,000 0 0 0 0
327.16
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
BR 2,600,000
0 0 0 2,600,000 0 0 0
327.17
308
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
BR 2,600,000
0 0 0 0 2,600,000 0 0
327.18
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
BR 2,600,000
0 0 0 0 0 2,600,000 0
327.19
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
BR 2,600,000
0 0 0 0 0 0 2,600,000
327.2
ZVARIOUS -0 FOREST HIGHWAY(P) STATEWIDE FEDERAL LANDS ACCESS PROGRAM FEDERAL HIGHWAY FUNDS FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
FH 1,641,000
0 0 0 0 1,641,000 0 0
333.15
ZVARIOUS -0 FOREST HIGHWAY(P) STATEWIDE FEDERAL LANDS ACCESS PROGRAM FEDERAL HIGHWAY FUNDS FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
FH 1,641,000
0 0 0 0 0 1,641,000 0
333.16
309
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 FOREST HIGHWAY(P) STATEWIDE FEDERAL LANDS ACCESS PROGRAM FEDERAL HIGHWAY FUNDS FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
FH 1,641,000
0 0 0 0 0 0 1,641,000
333.17
ZVARIOUS -0 AM-PAVEMENT (INT)(P)
STATEWIDE I-STATE ROUTES FOR FY 2019.(14CCR)
PL
Project Cost:
CN
UT
RW
DN
PM 2,000,000
0 2,000,000 0 0 0 0 0
337.14
ZVARIOUS -0 AM-PAVEMENT (INT)(P)
STATEWIDE I-STATE ROUTES FOR FY 2021.(14CCR)
PL
Project Cost:
CN
UT
RW
DN
PM 9,000,000
0 0 0 9,000,000 0 0 0
337.15
ZVARIOUS -0 AM-PAVEMENT (INT)(P)
STATEWIDE I-STATE ROUTES FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
PM 10,000,000
0 0 0 0 0 10,000,000 0
337.16
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2018
PL
Project Cost:
CN
UT
RW
DN
BR 1,100,000
1,100,000 0 0 0 0 0 0
346.14
310
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
BR 1,100,000
0 1,100,000 0 0 0 0 0
346.15
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
BR 1,100,000
0 0 1,100,000 0 0 0 0
346.16
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
BR 1,100,000
0 0 0 1,100,000 0 0 0
346.17
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
BR 1,100,000
0 0 0 0 1,100,000 0 0
346.18
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
BR 1,100,000
0 0 0 0 0 1,100,000 0
346.19
311
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
BR 1,100,000
0 0 0 0 0 0 1,100,000
346.2
ZVARIOUS -0 SAFETY-RR PROTECTN(P)
RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2018.
PL
Project Cost:
CN
UT
RW
DN
RRP 3,600,000
3,600,000 0 0 0 0 0 0
352.14
ZVARIOUS -0 SAFETY-RR PROTECTN(P)
RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
RRP 3,600,000
0 3,600,000 0 0 0 0 0
352.15
ZVARIOUS -0 SAFETY-RR PROTECTN(P)
RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
RRP 3,600,000
0 0 3,600,000 0 0 0 0
352.16
ZVARIOUS -0 SAFETY-RR PROTECTN(P)
RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
RRP 4,400,000
0 0 0 4,400,000 0 0 0
352.17
312
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 SAFETY-RR PROTECTN(P)
RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
RRP 4,400,000
0 0 0 0 4,400,000 0 0
352.18
ZVARIOUS -0 SAFETY-RR PROTECTN(P)
RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
RRP 4,400,000
0 0 0 0 0 4,400,000 0
352.19
ZVARIOUS -0 SAFETY-RR PROTECTN(P)
RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
RRP 4,400,000
0 0 0 0 0 0 4,400,000
352.2
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
PM 2,000,000
0 2,000,000 0 0 0 0 0
369.09
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
PM 9,000,000
0 0 0 9,000,000 0 0 0
369.1
313
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
PM 10,000,000
0 0 0 0 0 10,000,000 0
369.11
ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2018. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
BR 1,600,000
1,600,000 0 0 0 0 0 0
388.08
ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
BR 1,600,000
0 1,600,000 0 0 0 0 0
388.09
ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
BR 1,600,000
0 0 1,600,000 0 0 0 0
388.1
ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
BR 1,600,000
0 0 0 1,600,000 0 0 0
388.11
314
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
BR 1,600,000
0 0 0 0 1,600,000 0 0
388.12
ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
BR 1,600,000
0 0 0 0 0 1,600,000 0
388.13
ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
BR 1,600,000
0 0 0 0 0 0 1,600,000
388.14
ZVARIOUS -0 DESIGN ENGINEERING(O)
STATEWIDE STP HIGHWAY PROJECT ACTIVITIES.
PL
Project Cost:
CN
UT
RW
DN STP 2,000,000
0 2,000,000 0 0 0 0 0
391.04
ZVARIOUS -0 DESIGN ENGINEERING(O)
STATEWIDE HIGHWAY PROJECT DESIGN ACTIVITIES.
PL
Project Cost:
CN
UT
RW
DN STP 1,000,000
0 0 0 1,000,000 0 0 0
391.06
315
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 DESIGN ENGINEERING(O)
STATEWIDE HIGHWAY PROJECT DESIGN ACTIVITIES.
PL
Project Cost:
CN
UT
RW
DN STP 5,000,000
0 0 0 0 0 5,000,000 0
391.07
ZVARIOUS -0 AM-PAVEMENT (INT)(P)
PAVEMENT REPAIR AT INTERSECTIONS FOR VARIOUS ROADWAYS FOR FY 2019.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
PM 2,000,000
0 2,000,000 0 0 0 0 0
395.07
ZVARIOUS -0 AM-PAVEMENT (INT)(P)
PAVEMENT REPAIR AT INTERSECTIONS FOR VARIOUS ROADWAYS FOR FY 2021.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
PM 5,000,000
0 0 0 5,000,000 0 0 0
395.08
ZVARIOUS -0 AM-PAVEMENT (INT)(P)
PAVEMENT REPAIR AT INTERSECTIONS FOR VARIOUS ROADWAYS FOR FY 2023.(12CCR)
PL
Project Cost:
CN
UT
RW
DN
PM 10,000,000
0 0 0 0 0 10,000,000 0
395.09
ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR STREAMS AND WATERWAYS FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,000,000
0 1,000,000 0 0 0 0 0
400.06
316
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR STREAMS AND WATERWAYS FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,000,000
0 0 0 1,000,000 0 0 0
400.07
ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR STREAMS AND WATERWAYS FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,000,000
0 0 0 0 0 1,000,000 0
400.08
ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES(CANNOT BE MOVED).
PL
Project Cost:
CN
UT
RW
DN
BR 3,500,000
0 3,500,000 0 0 0 0 0
510.03
ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES(CANNOT BE MOVED).
PL
Project Cost:
CN
UT
RW
DN
BR 15,000,000
0 0 0 15,000,000 0 0 0
510.05
ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES(CANNOT BE MOVED).
PL
Project Cost:
CN
UT
RW
DN
BR 15,000,000
0 0 0 0 15,000,000 0 0
510.06
317
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES (CANNOT BE MOVED).
PL
Project Cost:
CN
UT
RW
DN
BR 15,000,000
0 0 0 0 0 15,000,000 0
510.07
ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES (CANNOT BE MOVED).
PL
Project Cost:
CN
UT
RW
DN
BR 15,000,000
0 0 0 0 0 0 15,000,000
510.08
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2018.
PL
Project Cost:
CN
UT
RW
DN
STP 5,000,000
5,000,000 0 0 0 0 0 0
511.02
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
STP 2,000,000
0 2,000,000 0 0 0 0 0
511.03
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 1,000,000 0 0 0 0
511.04
318
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 0 1,000,000 0 0 0
511.05
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
STP 2,000,000
0 0 0 0 2,000,000 0 0
511.06
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
STP 8,500,000
0 0 0 0 0 8,500,000 0
511.07
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 0 0 0 0 1,000,000
511.08
ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
BR 3,000,000
0 3,000,000 0 0 0 0 0
514
319
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
BR 10,000,000
0 0 0 10,000,000 0 0 0
514.01
ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
BR 10,000,000
0 0 0 0 0 10,000,000 0
514.02
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
NH 6,000,000
0 6,000,000 0 0 0 0 0
518
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
NH 1,000,000
0 0 1,000,000 0 0 0 0
518.01
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
NH 6,000,000
0 0 0 6,000,000 0 0 0
518.02
320
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
NH 7,000,000
0 0 0 0 7,000,000 0 0
518.03
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
NH 9,500,000
0 0 0 0 0 9,500,000 0
518.04
ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
NH 8,000,000
0 0 0 0 0 0 8,000,000
518.05
ZVARIOUS -0 SAFETY-HAZARD ELIM(P)
STATEWIDE SAFETY PROGRAM FOR FY 2019.(HSIP)
PL
Project Cost:
CN
UT
RW
DN
SAF 38,500,000
0 38,500,000 0 0 0 0 0
911.08
ZVARIOUS -0 SAFETY-HAZARD ELIM(P)
STATEWIDE SAFETY PROGRAM FOR FY 2020. (HSIP)
PL
Project Cost:
CN
UT
RW
DN
SAF 38,500,000
0 0 38,500,000 0 0 0 0
911.09
321
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 SAFETY-HAZARD ELIM(P)
STATEWIDE SAFETY PROGRAM FOR FY 2021. (HSIP)
PL
Project Cost:
CN
UT
RW
DN
SAF 47,500,000
0 0 0 47,500,000 0 0 0
911.1
ZVARIOUS -0 SAFETY-HAZARD ELIM(P)
STATEWIDE SAFETY PROGRAM FOR FY 2022. (HSIP)
PL
Project Cost:
CN
UT
RW
DN
SAF 47,500,000
0 0 0 0 47,500,000 0 0
911.11
ZVARIOUS -0 SAFETY-HAZARD ELIM(P)
STATEWIDE SAFETY PROGRAM FOR FY 2023. (HSIP)
PL
Project Cost:
CN
UT
RW
DN
SAF 47,500,000
0 0 0 0 0 47,500,000 0
911.12
ZVARIOUS -0 SAFETY-HAZARD ELIM(P)
STATEWIDE SAFETY PROGRAM FOR FY 2024. (HSIP)
PL
Project Cost:
CN
UT
RW
DN
SAF 47,500,000
0 0 0 0 0 0 47,500,000
911.13
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2018
PL
Project Cost:
CN
UT
RW
DN
BR 500,000
500,000 0 0 0 0 0 0
1063.14
322
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
BR 500,000
0 500,000 0 0 0 0 0
1063.15
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
BR 500,000
0 0 500,000 0 0 0 0
1063.16
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
BR 500,000
0 0 0 500,000 0 0 0
1063.17
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
BR 500,000
0 0 0 0 500,000 0 0
1063.18
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
BR 500,000
0 0 0 0 0 500,000 0
1063.19
323
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
BR 500,000
0 0 0 0 0 0 500,000
1063.2
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2018.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
1,500,000 0 0 0 0 0 0
1071.06
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 1,500,000 0 0 0 0 0
1071.07
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 0 1,500,000 0 0 0 0
1071.08
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 0 0 1,500,000 0 0 0
1071.09
324
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 0 0 0 1,500,000 0 0
1071.1
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 0 0 0 0 1,500,000 0
1071.11
ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,500,000
0 0 0 0 0 0 1,500,000
1071.12
ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
BR 3,000,000
0 3,000,000 0 0 0 0 0
1074.07
ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
BR 18,000,000
0 0 0 18,000,000 0 0 0
1074.08
325
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
BR 20,000,000
0 0 0 0 20,000,000 0 0
1074.09
ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
BR 20,000,000
0 0 0 0 0 20,000,000 0
1074.1
ZVARIOUS -0 ECONOMIC DEVEL(O)ECONOMIC DEVELOPMENT TRANSPORTATION IMPROVEMENT FACILITIES.
PL
Project Cost:
CN
UT
RW
DN
SPP 1,000,000
0 0 1,000,000 0 0 0 0
1084
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
PM 2,000,000
0 2,000,000 0 0 0 0 0
2700.13
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
PM 2,000,000
0 0 2,000,000 0 0 0 0
2700.14
326
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
PM 5,000,000
0 0 0 5,000,000 0 0 0
2700.15
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
PM 5,000,000
0 0 0 0 5,000,000 0 0
2700.16
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
PM 12,000,000
0 0 0 0 0 12,000,000 0
2700.17
ZVARIOUS -0 AM-PAVEMENT (PRI)(P)
PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
PM 12,000,000
0 0 0 0 0 0 12,000,000
2700.18
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 1,000,000 0 0 0 0 0
3011
327
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 1,000,000 0 0 0 0
3011.01
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 0 1,000,000 0 0 0
3011.02
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 0 0 1,000,000 0 0
3011.03
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 0 0 0 1,000,000 0
3011.04
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.
PL
Project Cost:
CN
UT
RW
DN
STP 1,000,000
0 0 0 0 0 0 1,000,000
3011.05
328
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. (08CCN)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 4,700,000
0 4,700,000 0 0 0 0 0
8500.15
ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. (08CCN)(12CCR)
PL
Project Cost:
CN
UT
RW
DN
SPP 5,000,000
0 0 0 0 5,000,000 0 0
8500.16
ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. PL
Project Cost:
CN
UT
RW
DN
SPP 5,000,000
0 0 0 0 0 0 5,000,000
8500.17
ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75; AND I-64 FOR FY 2018. (JM03-FD53 "IM" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 44,500,000
44,500,000 0 0 0 0 0 0
9050.08
ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75; AND I-64 FOR FY 2019. (JM03-FD53 "IM" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 44,500,000
0 44,500,000 0 0 0 0 0
9050.1
329
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2018. (079B00023N, 111B00020N)
PL
Project Cost:
CN
UT
RW
DN
NH 9,100,000
9,100,000 0 0 0 0 0 0
9068.03
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2019. (079B00023N, 111B00020N)
PL
Project Cost:
CN
UT
RW
DN
NH 9,100,000
0 9,100,000 0 0 0 0 0
9068.05
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2020. (12CCR)
PL
Project Cost:
CN
UT
RW
DN
NH 9,100,000
0 0 9,100,000 0 0 0 0
9068.61
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2018.
PL
Project Cost:
CN
UT
RW
DN
STP 9,100,000
9,100,000 0 0 0 0 0 0
9068.64
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2019.
PL
Project Cost:
CN
UT
RW
DN
STP 9,100,000
0 9,100,000 0 0 0 0 0
9068.65
330
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2020.
PL
Project Cost:
CN
UT
RW
DN
STP 9,100,000
0 0 9,100,000 0 0 0 0
9068.66
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
STP 9,100,000
0 0 0 9,100,000 0 0 0
9068.67
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
STP 9,100,000
0 0 0 0 9,100,000 0 0
9068.68
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2021.
PL
Project Cost:
CN
UT
RW
DN
NH 9,100,000
0 0 0 9,100,000 0 0 0
9068.69
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2022.
PL
Project Cost:
CN
UT
RW
DN
NH 9,100,000
0 0 0 0 9,100,000 0 0
9068.7
331
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
NH 21,000,000
0 0 0 0 0 21,000,000 0
9068.71
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
NH 21,000,000
0 0 0 0 0 0 21,000,000
9068.72
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2023.
PL
Project Cost:
CN
UT
RW
DN
STP 21,000,000
0 0 0 0 0 21,000,000 0
9068.74
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2024.
PL
Project Cost:
CN
UT
RW
DN
STP 21,000,000
0 0 0 0 0 0 21,000,000
9068.75
ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2018. (JZ1-FD53 "NH" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 34,300,000
34,300,000 0 0 0 0 0 0
9659.18
332
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2019. (JZ1-FD53 "NH" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 34,300,000
0 34,300,000 0 0 0 0 0
9659.21
ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2020. (JZ1-FD53 "NH" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 62,800,000
0 0 62,800,000 0 0 0 0
9659.23
ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2021. (JZ1-FD53 "NH" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 62,800,000
0 0 0 62,800,000 0 0 0
9659.25
ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2022. (JZ1-FD53 "NH" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 62,800,000
0 0 0 0 62,800,000 0 0
9659.27
ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES FOR FY 2023. (JZ1-FD53 "NH" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 30,000,000
0 0 0 0 0 30,000,000 0
9659.29
333
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024
2018 Enacted Road Plan
ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES FOR FY 2024. (JZ1-FD53 "NH" COMPONENT)
PL
Project Cost:
CN
UT
RW
DN
NH 30,000,000
0 0 0 0 0 0 30,000,000
9659.31
Total for ZVARIOUS county PL
Total Amounts:
CN
UT
RW
DN
142,800,000
2,000,000
211,400,000 167,200,000
1,000,000
291,800,000 314,141,000
5,000,000
259,441,000 239,141,000
142,800,000 213,400,000 167,200,000 292,800,000 259,441,000 319,141,000 239,141,000
334
Biennium Fund Summary
TotalFY 2020FY 2019Fund DescriptionBR 178,066,500 315,800,085FEDERAL BRIDGE REPLACEMENT 493,866,585
BR2 4,950,000 14,500,000BRAC BOND PROJECTS SECOND PROGRAM 19,450,000
CM 13,100,000 13,100,000FEDERAL CONGESTION MITIGATION FUNDS 26,200,000
NH 247,370,000 226,060,000FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS 473,430,000
PM 180,456,000 176,043,000PAVEMENT MANAGEMENT 356,499,000
RRP 3,600,000 3,600,000SAFETY-RAILROAD PROTECTION 7,200,000
RRS 0 3,100,000SAFETY-RAILROAD SEPARATION 3,100,000
SAF 38,500,000 38,500,000FEDERAL SAFETY FUNDS 77,000,000
SAH 1,724,000 1,200,000FEDERAL STP FUNDS DEDICATED TO ASHLAND 2,924,000
SHN 1,800,000 700,000FEDERAL STP FUNDS DEDICATED TO HENDERSON 2,500,000
SLO 53,511,745 15,311,854FEDERAL STP FUNDS DEDICATED TO LOUISVILLE 68,823,599
SLX 21,656,000 8,956,000FEDERAL STP FUNDS DEDICATED TO LEXINGTON 30,612,000
SNK 27,157,409 13,757,200FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY 40,914,609
SPP 123,907,800 162,970,400STATE CONSTRUCTION HIGH PRIORITY PROJECTS 286,878,200
STP 94,460,000 85,840,000FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS 180,300,000
TE 14,900,000 13,700,000FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS 28,600,000
Total Amount 1,005,159,454 1,093,138,539 2,098,297,993
2018 Enacted Road Plan
335
Fund Summary
Fund Description FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 TotalBR FEDERAL BRIDGE REPLACEMENT 54,023,500 178,066,500 315,800,085 148,118,500 134,635,000 141,400,000 144,300,000 1,116,343,585
BR2 BRAC BOND PROJECTS SECOND PROGRAM 0 4,950,000 14,500,000 8,700,000 0 0 0 28,150,000
CM FEDERAL CONGESTION MITIGATION FUNDS 13,100,000 13,100,000 13,100,000 17,800,000 17,800,000 17,800,000 17,800,000 110,500,000
FH FEDERAL FOREST HIGHWAY FUNDS 8,100,000 0 0 0 1,641,000 1,641,000 1,641,000 13,023,000
HPP HIGH PRIORITY PROJECTS 9,924,170 0 0 0 0 0 0 9,924,170
KYD FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY 1,771,005 0 0 0 0 0 0 1,771,005
NH FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS 235,170,000 247,370,000 226,060,000 448,380,000 368,090,000 297,800,000 292,090,000 2,114,960,000
PM PAVEMENT MANAGEMENT 0 180,456,000 176,043,000 217,427,500 188,881,000 191,095,000 198,860,000 1,152,762,500
RRP SAFETY-RAILROAD PROTECTION 3,600,000 3,600,000 3,600,000 4,400,000 4,400,000 4,400,000 4,400,000 28,400,000
RRS SAFETY-RAILROAD SEPARATION 0 0 3,100,000 0 6,500,000 0 0 9,600,000
SAF FEDERAL SAFETY FUNDS 0 38,500,000 38,500,000 47,500,000 47,500,000 47,500,000 47,500,000 267,000,000
SAH FEDERAL STP FUNDS DEDICATED TO ASHLAND 6,867,000 1,724,000 1,200,000 1,600,000 1,600,000 1,600,000 1,600,000 16,191,000
SHN FEDERAL STP FUNDS DEDICATED TO HENDERSON 3,460,000 1,800,000 700,000 700,000 700,000 700,000 0 8,060,000
SLO FEDERAL STP FUNDS DEDICATED TO LOUISVILLE 65,396,815 53,511,745 15,311,854 21,657,196 23,500,000 9,262,000 23,500,000 212,139,610
SLX FEDERAL STP FUNDS DEDICATED TO LEXINGTON 16,367,000 21,656,000 8,956,000 8,956,000 8,956,000 8,956,000 58,156,000 132,003,000
SNK FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY 57,934,140 27,157,409 13,757,200 10,770,000 9,300,000 9,200,000 9,200,000 137,318,749
SPP STATE CONSTRUCTION HIGH PRIORITY PROJECTS 54,210,000 123,907,800 162,970,400 336,374,400 366,817,400 367,533,400 835,637,400 2,247,450,800
STP FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS 42,780,000 94,460,000 85,840,000 136,617,000 132,660,000 152,090,000 141,130,000 785,577,000
TE FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS 12,800,000 14,900,000 13,700,000 12,800,000 12,800,000 14,500,000 14,500,000 96,000,000
Total Amount 585,503,630 1,005,159,454 1,093,138,539 1,421,800,596 1,325,780,400 1,265,477,400 1,790,314,400 8,487,174,419
2018 Enacted Road Plan
336
Top Related