1 Revised 3/2018 RESIDENTIAL SEWER CONNECTION APPLICATION PROCEDURE The following procedure shall be followed for all residential sewer connection applications: 1. Obtain a Residential Sewer Connection Application Packet on-line at www.twwd.org or at the Tiverton Wastewater District (TWWD) Office at the above address. The application packet includes these instructions and the following: a. Sewer Tie-In Flow Chart b. TWWD Sewer Betterment Assessment Agreement c. TWWD Sewer Connection Application 2. Betterment assessment fees apply to properties abutting sewer lines for which public funds were expended to construct the sewer system. Confirm with TWWD if your property you wish to connect to the sewer system is a betterment assessed property. a. If yes, complete the Sewer Betterment Assessment Agreement and submit to TWWD along with $2,700 check made payable to Tiverton Wastewater District. If full payment of the assessment will not be made at the time of application, TWWD provides options for quarterly payments over 1 and 3 year terms. See assessment agreement form for additional information. b. If property you wish to connect to the sewer system does not require a betterment assessment fee, you will be required to pay TWWD permitting and inspection fees. See latest connection application for these fees. Check shall be made payable to the Tiverton Wastewater District. 3. Complete, sign, and date the sewer connection application. When completing the application, you will also need to do the following: a. Submit proof of proposed Contractor’s Rhode Island Underground Utility License, Master Plumber, or Master Pipefitter License. b. For new building construction, provide two (2) copies of your building floor plan. c. For new and existing building construction, provide two (2) copies of your exterior site plan and profile showing proposed sewer service connection. d. For new building construction, provide a check for the sewer impact fee as calculated by the TWWD. Check shall be made payable to the City of Fall River. 4. If your installation requires any excavation within the street, your contractor will be required to obtain a Street Opening Permit from the Tiverton DPW. Forms and information can be found on www.tiverton.ri.gov . If your installation includes excavation in Fall River, you will be required to obtain a Fall River Street Opening Permit. If your installation includes excavation within a State right 400 Fish Road, Tiverton, RI Phone 401.625.6701 Fax 401.816.5946 www.twwd.org

Transcript of )LVK 5RDG 7LYHUWRQ 5, 3KRQH )D[ ZZZ WZZG RUJ · 5hylvhg 5(6,'(17,$/ 6(:(5 &211(&7,21 $33/,&$7,21...

Page 1: )LVK 5RDG 7LYHUWRQ 5, 3KRQH )D[ ZZZ WZZG RUJ · 5hylvhg 5(6,'(17,$/ 6(:(5 &211(&7,21 $33/,&$7,21 352&('85( 7kh iroorzlqj surfhgxuh vkdoo eh iroorzhg iru doo uhvlghqwldo vhzhu frqqhfwlrq

1 Revised 3/2018

RESIDENTIAL SEWER CONNECTION APPLICATION PROCEDURE

The following procedure shall be followed for all residential sewer connection applications:

1. Obtain a Residential Sewer Connection Application Packet on-line at www.twwd.org or at the Tiverton Wastewater District (TWWD) Office at the above address. The application packet includes these instructions and the following:

a. Sewer Tie-In Flow Chart b. TWWD Sewer Betterment Assessment Agreement c. TWWD Sewer Connection Application

2. Betterment assessment fees apply to properties abutting sewer lines for which public funds were expended to construct the sewer system. Confirm with TWWD if your property you wish to connect to the sewer system is a betterment assessed property.

a. If yes, complete the Sewer Betterment Assessment Agreement and submit to TWWD along with $2,700 check made payable to Tiverton Wastewater District. If full payment of the assessment will not be made at the time of application, TWWD provides options for quarterly payments over 1 and 3 year terms. See assessment agreement form for additional information.

b. If property you wish to connect to the sewer system does not require a betterment assessment fee, you will be required to pay TWWD permitting and inspection fees. See latest connection application for these fees. Check shall be made payable to the Tiverton Wastewater District.

3. Complete, sign, and date the sewer connection application. When completing the application, you will also need to do the following:

a. Submit proof of proposed Contractor’s Rhode Island Underground Utility License, Master Plumber, or Master Pipefitter License.

b. For new building construction, provide two (2) copies of your building floor plan. c. For new and existing building construction, provide two (2) copies of your exterior site plan

and profile showing proposed sewer service connection. d. For new building construction, provide a check for the sewer impact fee as calculated by the

TWWD. Check shall be made payable to the City of Fall River. 4. If your installation requires any excavation within the street, your contractor will be required to obtain

a Street Opening Permit from the Tiverton DPW. Forms and information can be found on www.tiverton.ri.gov . If your installation includes excavation in Fall River, you will be required to obtain a Fall River Street Opening Permit. If your installation includes excavation within a State right

400 Fish Road, Tiverton, RI Phone 401.625.6701 Fax 401.816.5946

www.twwd.org

Page 2: )LVK 5RDG 7LYHUWRQ 5, 3KRQH )D[ ZZZ WZZG RUJ · 5hylvhg 5(6,'(17,$/ 6(:(5 &211(&7,21 $33/,&$7,21 352&('85( 7kh iroorzlqj surfhgxuh vkdoo eh iroorzhg iru doo uhvlghqwldo vhzhu frqqhfwlrq

2 Revised 3/2018

of way, you will be required to obtain a Physical Alteration Permit from the Rhode Island Department of Transportation. PAP information can be found on www.dot.ri.gov

5. Once your Sewer Connection Application is approved by TWWD and a copy of the fully executed road opening permit from Town of Tiverton has been filed with TWWD, the District will issue to you in writing a Notice-To-Proceed with the installation of your sewer connection.

6. You must contact the TWWD a minimum of forty-eight (48) hours prior to installation of your sewer service to schedule an inspection. Your contractor will not be allowed to backfill the pipe until it is inspected, a sketch of the installation is completed, and photographs of the installation are taken. Inspections can be scheduled for Monday through Friday 9:00 am to 4:00 pm.

7. Your contractor will be required to forward an As-Built submittal of your sewer connection to the TWWD after he/she has completed the sewer connection work. The As-Built submittal must include the following information:

a. The sketch of the installation, including ties to the connection point as well as all bends in the pipe. Depth to pipe at the connection point, at the foundation wall as well as at 75-foot intervals shall also be included on the sketch.

b. He/she must also include enough photographs to properly document all segments of the installation.

8. Once the TWWD receives your As-Built submittal, we will issue you a Residential Wastewater Discharge Permit and TWWD account number. TWWD will submit a copy of the Permit to the Town of Tiverton Building Inspector and Tax Assessor offices as well as the appropriate water authority. NOTE: You will not get your Certificate of Occupancy (CO) until after the Permit is submitted to the Building Inspector’s office.

CHECK LIST

Betterment Assessment Agreement and Sewer Connection Application:

a. ( ) TWWD Sewer Betterment Assessment Agreement b. ( ) Betterment Assessment Check made payable to Tiverton Wastewater District c. ( ) TWWD Sewer Connection Application d. ( ) 2 copies of your building floor plan (new construction only) e. ( ) 2 copies of your engineer’s plan & profile f. ( ) Impact Fee Check made payable to City of Fall River (new construction only)

Sewer Connection Installation:

a. ( ) Application approved by TWWD b. ( ) Obtain all necessary street opening permits c. ( ) TWWD written Notice-To-Proceed received by homeowner d. ( ) Call for inspection at least 48 hours prior to installation e. ( ) Document the installation with AS-BUILT sketch and photographs f. ( ) Submit AS-BUILT package to TWWD g. ( ) Receive Wastewater Discharge Permit

Page 3: )LVK 5RDG 7LYHUWRQ 5, 3KRQH )D[ ZZZ WZZG RUJ · 5hylvhg 5(6,'(17,$/ 6(:(5 &211(&7,21 $33/,&$7,21 352&('85( 7kh iroorzlqj surfhgxuh vkdoo eh iroorzhg iru doo uhvlghqwldo vhzhu frqqhfwlrq

YESNO

NO

YESYES APPROVED APPROVED

YES

YESAUTHORIZE CONTRACTOR TO

BEGIN

SIGN BETTERMENT

AND APPLY FOR

SEWER PERMIT

I know how much it will cost me to tie into the sewer

SEWER TIE-IN FLOW CHART

SEWER TIE-IN COMPLETED

APPLY TO CHURCH

COMMUNITY HOUSING

REQUEST FINANCIAL HARDSHIP

EXTENSION

APPLY FOR

STILF LOAN

SEWER TIE-IN NOTIFICATION

OBTAIN QUOTE FROM CONTRACTOR

HAVE FUNDS FOR TIE-IN

PAY FOR BETTERMENT

AND SEWER

CONNECTION TIE-IN FEE

(TBD BY SUPT)

NOTAPPROVED

NOT APPROVED

Page 4: )LVK 5RDG 7LYHUWRQ 5, 3KRQH )D[ ZZZ WZZG RUJ · 5hylvhg 5(6,'(17,$/ 6(:(5 &211(&7,21 $33/,&$7,21 352&('85( 7kh iroorzlqj surfhgxuh vkdoo eh iroorzhg iru doo uhvlghqwldo vhzhu frqqhfwlrq

TIVERTON WASTEWATER DISTRICT400 FISH ROADTIVERTON, RI 02878PHONE: (401) 625-6701 FAX: (401) 816-5946SEWER BETTERMENT ASSESSMENT AGREEMENT

1. Name and Address of Property Owner:Owner's Name:

Connection Address:

Mailing Address:

2. Telephone Number:

PROPERTY INFORMATION3. Type of Property ( ) RESIDENTIAL ( ) INDUSTRIAL ( ) COMMERCIAL

4. For Multi-Unit Residential: Number of Units: Total Number of bedrooms:

5. For Commercial or Industrial: TYPE OF ESTABLISHMENT:

SQUARE FOOTAGE OF BLDG.

# SEATS IF RESTAURANT

6. BETTERMENT FEE : $2,700

7. BETTERMENT PAYMENT SELECTION:( ) FULL PAYMENT AT TIME OF APPLICATION ( ) FUNDS FROM THE SEWER TIE-IN

FOR SINGLE FAMILY RESIDENTIAL: LOAN FUND (STILF) WILL BE USED ( ) FOUR QUARTERLY PAYMENTS OF $675.00 OVER TO PAY BETTERMENT FEE

ONE YEAR (Total $2,700.00)( ) TWELVE QUARTERLY PAYMENTS OF $240.00 OVER

THREE YEARS (Total $2,880.00). EACH PAYMENT SHALL

This Sewer Betterment Assessment (Assessment) shall constitute a lien upon the real property that is served and benifitted by the connection to the sewer main Please be aware that you are liable for the full and complete sum ofthe Assessment.

By signing below you acknowledge that you have read and understand the terms of this Assessment andpromise to pay said Assessment in accordance with the terms of your selection in Section 7 above. Failure to pay the Assessment according to the terms thereof, may result in the addition of penalties and interest. The real property subject to the assessment may be sold by the Tiverton Wastewater District due to unpaid and delinquent Assessment payment or payments.

Failure to sign below does not relieve you from the Assessment. If you do not sign this form, you will automatically be assigned the three-year payment schedule.Late payments are subject to a 1% monthly penalty on total outstanding balance.

APPLICANT'S SIGNATURE:

(PLEASE PRINT YOUR NAME):

DATE: AMOUNT: CHECK NUMBER:

APPROVED BY:Superintendent: DATE:

CONSIST OF $225 PRINCIPLE PAYMENT PLUS $15 PAYMENT SURCHARGE.

OFFICIAL USE ONLY

4/2015

Page 5: )LVK 5RDG 7LYHUWRQ 5, 3KRQH )D[ ZZZ WZZG RUJ · 5hylvhg 5(6,'(17,$/ 6(:(5 &211(&7,21 $33/,&$7,21 352&('85( 7kh iroorzlqj surfhgxuh vkdoo eh iroorzhg iru doo uhvlghqwldo vhzhu frqqhfwlrq

TIVERTON WASTEWATER DISTRICT400 FISH ROAD

TIVERTON, RI 02878

PHONE: (401) 625-6701 FAX: (401) 816-5946

SEWER CONNECTION APPLICATION

PROPERTY ADDRESS ASSESSORS PARCEL ID

OWNER'S INFORMATION

NAME MAILING ADDRESS

PHONE NUMBER CITY STATE ZIP

PROJECT INFORMATIONPROJECT TYPE ( ) RESIDENTIAL ( ) COMMERCIAL ( ) INDUSTRIAL ( ) NEW CONSTRUCTIONWATER SOURCE ( ) CITY WATER ( ) WELL

WATER SUPPLIER: ACCOUNT #

PROPOSED CONTRACTOR (to be completed before issuance of connection permit)

CONTACT: COMPANY NAME:

PHONE: ADDRESS:

STATE OF RI UNDERGROUND UTILITY CONTRACTOR OR MASTER PLUMBER LICENSE #:

NOTES: RI DIG SAFE 1 Call TWWD to schedule an inspection of service installation

at least 48 hours in advance of the start date.TWWD 2 DPW Director's written approval of any road patchTIVERTON DPW & and AS-BUILT drawing must be submitted to and approved by

TWWD before Sewer Discharge Permit will be issued.

I (We) hereby agree to be bound by the provisions of the §18 Sewers and Sewage Disposal Ordinance of theTiverton Code, RIGL Title 5 Chapter 65.3 RI Underground Utility Contractors Licensing Law,and to such special conditions, restrictions, and regulations as may be imposed by the Tiverton Wastewater District, the Town of Tiverton, and the applicable State and Federal agencies.

SIGNATURE OF OWNER DATE:SIGNATURE OF APPLICANT DATE:

ASSESSORS Application Checklist: Parcel ID No. __________ - __________ Application Form CompleteResidential - New Construction (Existing Structure Exempt) Application Fee Check to FRNumber of bedrooms per Tax Card Betterment AgreementEstimated Flow gpd Betterment Check to TWWD

( ___ # of bedrooms x 110 gallons per day) Assessor Property CardCommercial/Industrial-New Construction Assessor Plat MapType of establishment _____________________________ Building Floor PlanUsage Type* per Unit # of Units Total Flow Site Plan and Profile

1.) __________ x = GPD Valid RI UUC or MP License2.) __________ x = GPD STREET OPENING PERMITS INITIALS3.) __________ x = GPD TIVERTON DPW ( ) Y ( ) N _____4.) __________ x = GPD FALL RIVER DPW: ( ) Y ( ) N _____

(*MA Title 5 use tables)

Fall River Connection Fee : (Estimated Flow GPD X $1.00 ) =

PERMIT TO CONSTRUCT SEWER CONNECTIONAPPROVED DISAPPROVED

SUPERINTENDENT'S SIGNATURE DATE:

FALL RIVER SEWER COMMISSION DATE:

$ ___________

( ) FUNDS FROM SEWER TIE-IN LOAN WILL BE USED TO PAY FALL RIVER CONNECTION FEE.

(BETTERMENT ASSESSED PROPERTY)

( ) FUNDS FROM SEWER TIE-IN LOAN WILL BE USED TO PAY TWWD BETTERMENT FEE.

(800) 225-4977

(401) 625-6701(401) 625-6760

FOR OFFICIAL USE ONLY

rev 1/2016

Page 6: )LVK 5RDG 7LYHUWRQ 5, 3KRQH )D[ ZZZ WZZG RUJ · 5hylvhg 5(6,'(17,$/ 6(:(5 &211(&7,21 $33/,&$7,21 352&('85( 7kh iroorzlqj surfhgxuh vkdoo eh iroorzhg iru doo uhvlghqwldo vhzhu frqqhfwlrq

TIVERTON WASTEWATER DISTRICT400 FISH ROADTIVERTON, RI 02878PHONE: (401) 625-6701 FAX: (401) 816-5946

SEWER CONNECTION APPLICATIONTO PRIVATELY DEVELOPED SEWER

PROPERTY ADDRESS ASSESSORS PARCEL ID

OWNER'S INFORMATION TWWD Application Fee $325.00

TWWD Inspection Fee $275.00*

NAME MAILING ADDRESS Fall River Connection Fee - TBD

PHONE NUMBER CITY STATE ZIP

PROJECT INFORMATIONPROJECT TYPE ( ) RESIDENTIAL ( ) COMMERCIAL ( ) INDUSTRIAL ( ) NEW CONSTRUCTIONWATER SOURCE ( ) CITY WATER ( ) WELL

WATER SUPPLIER: ACCOUNT #

PROPOSED CONTRACTOR (to be completed before issuance of connection permit)

CONTACT: COMPANY NAME:PHONE: ADDRESS:

STATE OF RI UNDERGROUND UTILITY CONTRACTOR OR MASTER PLUMBER LICENSE #

NOTES: RI DIG SAFE 1 Call TWWD to schedule an inspection of service installation

at least 48 hours in advance of the start date.TWWD 2 DPW Director's written approval of any road patchTIVERTON DPW & and AS-BUILT drawing must be submitted to and approved by

TWWD before Sewer Discharge Permit will be issued.

I (We) hereby agree to be bound by the provisions of the §18 Sewers and Sewage Disposal Ordinance of theTiverton Code, RIGL Title 5 Chapter 65.3 RI Underground Utility Contractors Licensing Law, and to such special conditions, restrictions, and regulations as may be imposed by the Tiverton Wastewater District, the Town of Tiverton, and the applicable State and Federal agencies. I have enclosed herewith payment for the TWWD ConnectionApplication fee of $325 to TWWD, theTWWD On-Site inspection fee of $275, and the Fall River application fee ascalculated by TWWD below.

SIGNATURE OF OWNER DATE:SIGNATURE OF APPLICANT DATE:

ASSESSORS Application Checklist: Parcel ID No. __________ - __________ Application Form CompleteResidential - New Construction (Existing Structure Exempt) Connection Fee Check to FRNumber of bedrooms per Tax Card Applicaton Fee Check to TWWDEstimated Flow gpd Inspection Fee Check to TWWD

( ___ # of bedrooms x 110 gallons per day) Assessor Property CardCommercial/Industrial - New Construction Assessor Plat MapType of establishment _____________________________ Building Floor PlanUsage Type* per Unit # of Units Total Flow Site Plan and Profile1.) __________ x = GPD Valid RI UUC or MP License2.) __________ x = GPD STREET OPENING PERMITS INITIALS3.) __________ x = GPD TIVERTON DPW ( ) Y ( ) N _____4.) __________ x = GPD FALL RIVER DPW: ( ) Y ( ) N _____

(*MA Title 5 use tables)

Fall River Connection Fee : (Estimated Flow GPD X $1.00 ) =

PERMIT TO CONSTRUCT SEWER CONNECTIONAPPROVED DISAPPROVED

SUPERINTENDENT'S SIGNATURE DATE:

FALL RIVER SEWER COMMISSION DATE:

FOR OFFICIAL USE ONLY

$ ___________

(401) 625-6701(401) 625-6760

(800) 225-4977

*Fee is per property per site visit for 3 hours max. of inspection. If additional site visit required, applicant will be invoiced $275.00 for each subsequent inspection.

rev 11/20/2017