The Capacity Issues
• Landscape Capacity • Site Capacity • Grid Capacity • Planning Capacity
Source; Cornwall Council
Roof Mounted Solar PV
• Government Support • Permitted Development • Ownership • Structural Suitability • Orientation • We need more……….
To create new slide, copy and paste this slide before inserting text
Wind Resource and Radar Clearance
The ‘golden thread’ of sustainable development ‘Encourage multiple benefits from the use of land in urban and rural areas, recognising that some open land can perform many functions (such as for wildlife, recreation, flood risk mitigation, carbon storage or food production’ (para 17). ‘To help increase the use and supply of renewable and low carbon energy, local planning authorities should recognise the responsibility on all communities to contribute to energy generation from renewable or low carbon sources. They should: • identify opportunities where development can draw its energy supply from
decentralised, renewable or low carbon energy supply systems and for co-locating potential heat consumers and suppliers’ (para 97).
National Planning Policy Framework
Energy Options
We need an energy source that is; • reliable; • affordable; • commercially
competitive; and • easy to maintain.
Aggregate Industries Melbur Blockworks 1,862MWh average annual electricity consumption 500kW EWT wind turbine 1,314MWh annual electricity generation 70% of annual electricity demand
Adrian Lea Technical Director [email protected] 01872 560738 www.wardell-armstrong.com