Planning for Energy Adrian Lea – Technical Director · Adrian Lea – Technical Director ....

27
Planning for Energy Adrian Lea – Technical Director

Transcript of Planning for Energy Adrian Lea – Technical Director · Adrian Lea – Technical Director ....

Planning for Energy Adrian Lea – Technical Director

Renewable Energy in the SW Region

Source; RegenSW Progress Report 2015

The Capacity Issues

• Landscape Capacity • Site Capacity • Grid Capacity • Planning Capacity

Source; Cornwall Council

The Target Issue

The UK’s First Solar PV Farm

Roof Mounted Solar PV

• Government Support • Permitted Development • Ownership • Structural Suitability • Orientation • We need more……….

Agricultural Impact

Wind Resource Assessment

To create new slide, copy and paste this slide before inserting text

Wind Resource and Radar Clearance

Typical Wind Constraints Map

The ‘golden thread’ of sustainable development ‘Encourage multiple benefits from the use of land in urban and rural areas, recognising that some open land can perform many functions (such as for wildlife, recreation, flood risk mitigation, carbon storage or food production’ (para 17). ‘To help increase the use and supply of renewable and low carbon energy, local planning authorities should recognise the responsibility on all communities to contribute to energy generation from renewable or low carbon sources. They should: • identify opportunities where development can draw its energy supply from

decentralised, renewable or low carbon energy supply systems and for co-locating potential heat consumers and suppliers’ (para 97).

National Planning Policy Framework

Energy Options

We need an energy source that is; • reliable; • affordable; • commercially

competitive; and • easy to maintain.

Aggregate Industries Melbur Blockworks 1,862MWh average annual electricity consumption 500kW EWT wind turbine 1,314MWh annual electricity generation 70% of annual electricity demand

The Solar Car Park

Source; SolarCentury

The Solar Car Park

Source; SolarCentury

Insert Title

Glint & Glare

Opportunities………….

• Hospitals • Airports • Supermarkets • Park & Ride • Universities

and did you know………….

• 17,000 public non-residential car parks in GB (BPA 2011)