UP
-6' -
0" -5' - 0"
-4' - 0"
-3' - 0"
-2' - 0"
-1' - 0"
0' - 0"
1' - 0"
2' - 0"
3' - 0"
4' - 0" 5' - 0"
6' - 0"
7' - 0"
8' - 0"
9' - 0"
10' - 0" 1
1' - 0
"
1
2' - 0"
3' - 0"
4' - 0" 5' - 0"
6' - 0"
0"
UP
DN
PINE STR
EET
SHERWOOD COURT
Magnetic North
Solar South
3 1/2" structural stud wall
Rock woll in service cavity
OSB
Dashed line of air control layer
Vycor flashing tape
Spray foam insulation
11 7/8" TJI vertical
Dense pack cellulose insulation
Extension jamb
Dashed line of thermal control layer
Tyvek=water control layer
3/4" furring and air space
Painted gypbd
1 1/4" Timberstrand
Blocking / furring
2x4 stud
Vycor flashing tape
1 1/4" #12 screws
Window installation clip
Fiberboard sheathing
Intus eforte triple paneinswing casement window
EPS insulation
Dashed line of thermal control layer
Extension jamb
3M 8067 flashing tape
Aluminum window sill beyond
1' - 4 7/8"
Vented wood siding
3/4" furring strips
Fiberboard
Tyvek
11 7/8" dense pack cellulose
11 7/8" TJI @ 2'-0"O.C.fastened to 2x4 withGRK structural screws
2x4 wall stud @ 2'-0" O.C.
Flashing tape at TJI to OSB
5/8" gypbd
GREEN - Air and vapor control layer
RED - Thermal control layer
BLUE - Water control layer
2x4 at corner
1' -
6 5
/8" EPS insulation
Wall r-value = 50.7
Timberstrand LSL
2x4
2x4
OSB
First Floor Plan0' - 0"
Second Floor Plan10' - 0"
Roof18' - 0"
Bottom of SlabInsulation
-2' - 2"
Control Layers Legend
1. Thermal Control Layer2. Water Control Layer3. Vapor Control Layer4. Air Control Layer
Thermal bridge free to0.006 BTU/HRFT2F
TJI Wall Assembly (R=60.7)11 7/8" TJI @ 24" O.C.Gypbd wall finish3 1/2" rock wool batts in 2x4 wall cavity1/2" OSB caulked and taped - air seal11 7/8" dense pack cellulose in TJI cavity1/2" celotex fiberboardTyvek3/4" furringBoard and batten siding
Triple pane Intuscasement windowsU =.15
Roof Assembly (R=85.4)30" raised heel wood trussGypbd ceiling finish1/2" OSB caulked and taped - air sealWood truss24" blown in cellulose isulationRoof sheathingTyvek3/4" furringMetal roof
EPS frost skirt
Slab Assembly (R=75.8)6" Reinforced concrete floor finishTaped polyethylene water and vapor barrier8" perlite12" rigid under slab insulation2" flowable fill8" perlite
SOUTH
NORTH
6 / 12
All control layers are to be continuous
5 8' -
0"
10' -
0"
Hall
7
Bath 1
11
Mudroom
1
Living Room
4
Mechanicalchase
8' -
10
3/4"
30" raised heel energy truss
2x4 top plate
5/8" gypbd
11 7/8" TJI joists @ 2'-0" O.C.
EPS insulation
2x4 plate
3/4" floor sheathing
3/4" T&G wood flooring
GREEN - Air and vapor control layer
RED - Thermal control layer
BLUE - Water control layer
11 7/8" LVL continuous rim joistwith stl hangers above openings
Continuous 2x10 blockingbehind 2x10 ledger
Continuous 2x10 ledger withSDS screws and STL hangers
2x8 porch roof rafter
2x4 top plate
5/8" Gypbd
OSB glued to truss withseams caulked and taped
6" OSB strip beforetruss with seamsblocked and taped
Screened cladding vent
Vented soffit
Metal roof
Insulation baffle
2'-0" loose fill insulation
5/8" Roof sheathing
30" Raised heel truss
OSB continuous to top chord
Undisturbed soil
8" of compacted #2B stone
12" of EPS insulation withseams sealed
8" of Perlite in bags
Grade
2" EPS frost wing
2' - 0"
0' -
6"
Parged fibercement
Screened cladding vent
Continuous 1 1/4" PSL
6" poured concrete slab
2x4 plate with anchor bolts4'-0" O.C. and sill seal
10 mil poly wrapedto OSB and taped
5/8" gypbd
Structural 2x4 stud wall @ 24" O.C.
OSB glued to frame - caulked and taped
1' -
2"
11 7/8" TJI @ 2'-0" O.C.
11 7/8" dense pack cellulose insulation
Fiberboard sheathing
Tyvek housewrapwith seams taped
RED - Thermal control layer
3/4" furring and air space
Painted wood cladding
3.5" mineral wool insulation
(3) #4 bars @ 3" fromedges and bent WWF
Termite shield
Header as per structural drawings
3/4" window jamb extension
1 1/4" Timberstrand
1 1/4" #12 wood screws
Triple pane Intus Eforte windowsInswing casement window
Under sill profile by Intus
Window installation clip
1 1/4" #12 wood screws
Vycor
Tyvek=water control layer
3/4" window jamb extension
3M 8067 tape over tyvek
EPS insulation
Metal window sill
Spray foam or foam tape
Window jamb beyond
Extension jamb
EPS insulation
Spray foam or foam tape
Spray foam or foam tape
3M 8067 over Tyvek
Tyvek=water control layer
Vycor prior to setting roof truss
Dashed line is air control layer
OSB
Window clip
Vycor
Vycor
1 1/4" Timberstrand
11 7/8" TJI vertical
Dense pack cellulose
Dashed line of air control layer =OSB
Rock wool insulation in service cavity
3 1/2" structural stud wall
0' - 0 3/4"0' - 0 3/4"0' - 0 1/2" 0' - 11 7/8" 0' - 0 1/2" 0' - 3 1/2" 0' - 0 1/2"
3/4" furring and air space
Dashed line of thermalcontrol layer
Cor o vent
3M 8067 tape
11 7/8" TJI vertical
3/4" furring and air space
Dashed line of thermalcontrol layer
Cor o vent
Metal drip cap
Dense pack cellulose insulation
Capillary break
Equal Equal
Install window at centerof thermal enclosure
1' - 6 3/8"
0' - 9 3/4"
0' - 10 3/4"
0' -
2 2
5/32
"
OSB strip before setting roof truss
Taped seam at OSB
DESCRIPTIONA NEW 2 STORY RESIDENCE FOR A FAMILY OF 4 IN SCRANTONPENNSYLVANIA ON A CITY LOT 100’ X 180’
LOCATION SCRANTON, PA
PRECERTIFIED JULY 2013
CONSTRUCTION NOVEMBER 2013
PHPP VERIFICATION
ANNUAL HEAT DEMAND 4.52 KBTU/(FT2YR)
HEAT LOAD 2.75 BTU/(FT2HR)
PRIMARY ENERGY 31.5 KBTU/(FT2YR)
TRANSMISSION LOSSES 11,632 KBTU/YRHEAT GAIN SOLAR RADIATION 12,148 KBTU/YRENCLOSURE R-VALUE 36.2ENVELOPE AREA TO TFA 3ENVELOPE AREA TO GLAZING 16%
TREATED FLOOR AREA (TFA)FIRST FLOOR 888SECOND FLOOR 885TOTAL TFA 1,773
NET AIR VOLUME 16,326 CU/FT
GROSS BUILDING VOLUME 25,299 CU/FT
CLIMATE DATA CLIMATE ZONE 6HEATING DEGREE DAYS 6291COOLING DEGREE DAYS 539MEAN DAYS CLEAR 70MEAN DAYS RAIN 140MEAN DAYS SNOW 13PERCENT POSSIBLE SUNSHINE 51%AVERAGE PRECIPITATION YR 36”AVERAGE SNOWFALL YR 47”
OUTLINE SPECIFICATION
FLOOR R=75.86" REINFORCED CONCRETE SLAB OVER 8" OF PERLITE WITH 12"TYPE IX EPS SUB SLAB INSULATION.
EXTERIOR WALL R=60.7LOAD BEARING OVE 2X4 INTERIOR WALLS INSULATED WITHROCK WOOL AND SHEATHED WITH ½” OSB CAULKED ANDTAPED AS AIR BARRIER. 11 7/8” TJI SCREWED TO STRUCTURAL2X4 WALLS WITH DENSE PACKED CELLULOSE TO 3.5 PCF ANDSHEATHED WITH CELOTEX FIBERBOARD, TYVEK, AND VENTEDWOOD CLADDING.
ROOF R=85.430" RAISED HEEL ENGINEERED ROOF TRUSS WITH INTERIOR1/2" OSB CAULKED AND TAPED AS AIR SEAL. 24" OF BLOWNCELLULOSE.
WINDOW FRAME U=0.17 BTU/HR.FT2FINTUS EFORTE
WINDOW GLAZING U=0.09 BTU/HR.FT2FINTUS STANDARD GLAZING SHGC=0.529
VENTILATIONULTIMATE AIR 200 DX ERV, 83% EFFICIENT, 0.72W/CFM
HEATING AND COOLINGMITSUBISHI INVERTER MSZ-FE09NA & MUZ-FE09NA
DOMENSTIC HOT WATERRINNAI RL75I TANKLESS GAS HOT WATER HEATER
129 SAWKILL AVENUE MILFORD, PA 18337
OFFICE (570) 296-0466
MOBILE(267) 294-9818
WWW.RICHARDPEDRANTI.COM
KARPIAK MULHALL PASSIVE HOUSE
FIRST FLOOR PLAN SECOND FLOOR PLAN
1. MUDROOM2. LIVING ROOM3. KITCHEN / DINING4. LAUNDRY / POWDER5. MECHANICAL6. OFFICE7. SCREEN PORCH8. FRONT PORCH9. GARDEN TERRACE10. HALL11. LIBRARY12. MASTER BEDROOM13. MASTER BATH14. BEDROOM15. BEDROOM16. BATH
SOUTH ELEVATION EAST ELEVATION
NORTH ELEVATION WEST ELEVATION
1
2
3
456
7
8
9
10
11
12
13
14
15
16
SITE PLANBUILDING CROSS SECTIONWINDOW HEAD AND SILL DETAILS
WINDOW JAMB DETAILS
TYPICAL WALL SECTION
TYPICAL PLAN CORNER DETAIL
VIEW FROM THE SOUTHWEST VIEW FROM THE SOUTHEAST VIEW FROM THE NORTHEAST VIEW FROM THE NORTHWEST
Top Related