C-C-01

N

E

5

1

s

t S

tre

e

t

148th A

venue N

E

Microsoft Redwest Road (Private)

C-C-03 C-C-04

C-C-06C-C-05

C-C-02

(NOT SHOWN)

150th A

venue

NE

ARTIFICIAL TURFPLAYFIELD(1.59 AC = 69,260 SF)

EQUIVALENTPERMEABLEPAVEMENT SIDEWALK

C-C-07

S

t

a

t

e

R

o

u

t

e

5

2

0

O

f

f

R

a

m

p

SAND VOLLEYBALL COURT(0.09 AC = 3,811 SF)

ADA RAMP WITHHANDRAILS

20' ASPHALTACCESS ROAD

EXISTING GRAVELACCESS ROAD TOREMAIN

EXISTINGWETLAND D(CATEGORY IV)

EXISTING WETLAND F(CATEGORY IV)

EXISTING WETLANDB (CATEGORY III)

EXISTING WETLAND K(CATEGORY IV)

EXISTING ASPHALTPARKING LOT TOREMAIN

EXISTING DETENTIONAND WATER QUALITYPOND

EXISTING WETLAND J(CATEGORY III)

ASPHALT BASKETBALL COURT(0.11 AC = 4,661 SF)

ARTIFICIAL TURF PLAYFIELD(2.86 AC = 124,582 SF)

REGRADE AND RESTOREGRAVEL ACCESS ROAD

148th Ave NE & NE 51st St

Redmond, WA 98052

RED WEST

SOUTH FIELDS

MIKE BEHN

33708

STAT

E OF WASHINGTON

R E G I S T E R E D

PROFESSIONAL ENGINEE

R

CORB.BYHTOMIT YAWK

Sheet Title/Number

Senior Project Manager

Development Manager

Project Manager

Quality Control Reviewer

Quality Control FF&E

No. Date

Revisions

Description

M.S. Project No.

CPL Project No.

Microsoft Mechanical Engineer

Microsoft Cable Engineeer

Microsoft Electrical Engineer

Engineering Manager

Security Manager

Project Planner

Project Manager

FF&E

CUSTOMER

Checked

Date

Design

Drawn

Key Plan

Registration

Date

Date

Date

02/12/2019

BSB

Approvals

OPERATIONS

PROJECT MANAGEMENT

Design Team

P18BSB-001

JRT

BSB

O

UO

U

NRG

DTH

EEL

ER

I

N

NC

LP

801 SECOND AVENUE, SUITE 900

(206) 343-0460

SEATTLE, WA 98104

www.cplinc.com

THIS DEVELOPMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITYOF REDMOND STANDARD SPECIFICATIONS AND DETAILS, CURRENT EDITION.

This approval is for the design concept only. These plans appear to be in conformancewith the City Of Redmond design standardsfor construction.  This approval shall not beconstrued as authorizing construction not inaccordance with applicable City standards. The City reserves the right to requirerevisions to the approved plans to assureconformance with City of Redmond designstandards for construction at any time that itis discovered that the proposed constructiondoes not otherwise meet the applicableconstruction standards.  The owner isrequired to provide designs and plans inaccordance with applicable City standardsand assures that construction isaccomplished in accordance with thosestandards.  The owner and/or designengineer and/or developer may be requiredto make necessary approved field revisionsto correct any errors or omissions found onthe approved plan.

APPROVED FOR CONSTRUCTION

FOR: Director of Public WorksCity of Redmond

Date:

Plan Check Engineer:

Planning:

Trans / Engr:

Fire:

Utility:

Storm:

Section 14, Township 25 N, Range 5 E, W.M.

02/12/2019 PREP REVISION01

Transportation

Plan Overall

C-C-00