(NOT SHOWN) State Route 520 OffRamp 148th Avenue NE
Transcript of (NOT SHOWN) State Route 520 OffRamp 148th Avenue NE
C-C-01
N
E
5
1
s
t S
tre
e
t
148th A
venue N
E
Microsoft Redwest Road (Private)
C-C-03 C-C-04
C-C-06C-C-05
C-C-02
(NOT SHOWN)
150th A
venue
NE
ARTIFICIAL TURFPLAYFIELD(1.59 AC = 69,260 SF)
EQUIVALENTPERMEABLEPAVEMENT SIDEWALK
C-C-07
S
t
a
t
e
R
o
u
t
e
5
2
0
O
f
f
R
a
m
p
SAND VOLLEYBALL COURT(0.09 AC = 3,811 SF)
ADA RAMP WITHHANDRAILS
20' ASPHALTACCESS ROAD
EXISTING GRAVELACCESS ROAD TOREMAIN
EXISTINGWETLAND D(CATEGORY IV)
EXISTING WETLAND F(CATEGORY IV)
EXISTING WETLANDB (CATEGORY III)
EXISTING WETLAND K(CATEGORY IV)
EXISTING ASPHALTPARKING LOT TOREMAIN
EXISTING DETENTIONAND WATER QUALITYPOND
EXISTING WETLAND J(CATEGORY III)
ASPHALT BASKETBALL COURT(0.11 AC = 4,661 SF)
ARTIFICIAL TURF PLAYFIELD(2.86 AC = 124,582 SF)
REGRADE AND RESTOREGRAVEL ACCESS ROAD
148th Ave NE & NE 51st St
Redmond, WA 98052
RED WEST
SOUTH FIELDS
MIKE BEHN
33708
STAT
E OF WASHINGTON
R E G I S T E R E D
PROFESSIONAL ENGINEE
R
CORB.BYHTOMIT YAWK
Sheet Title/Number
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
CPL Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineeer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
Checked
Date
Design
Drawn
Key Plan
Registration
Date
Date
Date
02/12/2019
BSB
Approvals
OPERATIONS
PROJECT MANAGEMENT
Design Team
P18BSB-001
JRT
BSB
O
UO
U
NRG
DTH
EEL
ER
I
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
THIS DEVELOPMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITYOF REDMOND STANDARD SPECIFICATIONS AND DETAILS, CURRENT EDITION.
This approval is for the design concept only. These plans appear to be in conformancewith the City Of Redmond design standardsfor construction. This approval shall not beconstrued as authorizing construction not inaccordance with applicable City standards. The City reserves the right to requirerevisions to the approved plans to assureconformance with City of Redmond designstandards for construction at any time that itis discovered that the proposed constructiondoes not otherwise meet the applicableconstruction standards. The owner isrequired to provide designs and plans inaccordance with applicable City standardsand assures that construction isaccomplished in accordance with thosestandards. The owner and/or designengineer and/or developer may be requiredto make necessary approved field revisionsto correct any errors or omissions found onthe approved plan.
APPROVED FOR CONSTRUCTION
FOR: Director of Public WorksCity of Redmond
Date:
Plan Check Engineer:
Planning:
Trans / Engr:
Fire:
Utility:
Storm:
Section 14, Township 25 N, Range 5 E, W.M.
02/12/2019 PREP REVISION01
Transportation
Plan Overall
C-C-00