8/3/2019 Msa.sharul.doc 4
1/6
PERSONAL PARTICULARS
FULL NAME : MOHD SHARUL AZHAR B. SURATKUN
AGE : 30 YEARS OLD
NRIC : 80728-01-5607D.O.B : 28 JULY 1980
P.O.B : BATU PAHAT, JOHOR
NATIONALITY : MALAYSIANRACE : MALAY
RELIGION : ISLAM
GENDER : MALEMARITIAL STATUS : MARRIDE
HEALTH : EXCELLENT
CURRENT ADDRESS : NO 12, JALAN CAMAR 4, TAMAN SCIENTEX81700 PASIR GUDANG, JOHOR.
CONTACT NUMBER : 013-7055552
EMAIL ADD. : [email protected]
EDUCATIONAL BACKGROUND
TERTIARY EDUCATION
1. POLITEKNIK PORT DICKSON, N.SEMBILAN (NOV. 2001- DEC. 2OO2)
DIPLOMA IN MECHANICAL ENGINEERING (MANUFACTURING)
2. POLITEKNIK JOHOR BAHRU JUNE 1998 - JULY 2000
CERTIFICATE IN MECHANICAL ENGINEERING (MANUFACTRING)
1
mailto:[email protected]:[email protected]8/3/2019 Msa.sharul.doc 4
2/6
SECONDARY EDUCATION
1. SEK. MEN. TEKNIK TANJUNG PUTRI, JOHOR BAHRU, JOHOR (1995 1997)
FORM 4 - 5
SIJIL PELAJARAN MALAYSIA (SPMV)
2. SEK.MEN. PT. BETAK, PONTIAN, JOHOR (1993 1995)FORM 1 3PENILAIAN MENENGAH RENDAH (PMR)
LANGUAGE SKILLS
MALAY & ENGLISH (Written & spoken)
WORKING EXPERIENCE
COMPANY : SIME DARBY ENGINEERING SDN. BHD.
POSITION : MECHANICAL SUPERVISOR DEPARMENT : PMT (PROJECT MANAGEMENT TEAM)
SCOPE OF WORK
1. Discussion and arrangement work to sub-contractor.
2. Check material received as per order and up dating.
3. Ensure material received must be inspection by client and clear GIIR.4. Coordinate and discuss with engineering about drawing clashing with other discipline.
5. Check material outstanding and raise RQ/order.
6. Review drawing and prepare the support fabrication and installation.
7. Monitoring for fabrication activities.8. Check documentation was complete and approved by client.
9. Solve sub-contractor problem, clear punch list and settle carry over work at offshore.10. Monitoring support fabrication, installation and blasting painting progress.
11. Ensure all equipment is cleaning and preservation mast be follow the requirement.
12. Up dating daily progress and check list.
13. Arrangement for shiploose material to packing and deliver14. Joined HUC-UP and Commesionning (Offshore).
Assist Mech. and Pipng Engineer preparation for commissioning andreinstatment test activities.
Review all equipment documents such as manufacturing data reports,mil
certificates and testing as per manufacturers recommended and clienrequirement during factory accptance test(FAT) before all mech.equipment sendto yard for installation.
Monitoring installation team to install for all mechanical equipment
levellness,position,verticality and physically check before precomm. Start.
Perform and organize load testing activities on material handling equipment
such as monorail and pedestal crane together with vendor and clients
representative and ensuring that these activities are done with high safety inmind.
2
8/3/2019 Msa.sharul.doc 4
3/6
Monitoring piping installation attch to all mechanical equipment and clearpunchlist.
To carried out levelling and alignment for all rotaing equipment , liaised with
vendor and inspector if any equipment problem and record for all pre-
alignment(without piping attchment) and final alignment(with piping)
Monitoring internal cleaning and visual inspection internal and external all
vessel and tank.
Organize and monitoring preparation for lube oil flushing activities on TurbineCompressor , Turbine Generator(bypass bearing and thru bearing) and lube oil
cooler before start up.Ensure all piping connection to turbine meet the ISO
standards.
Monitoring piping installation and line work with inspector to ensure all piping
system as per specification and before leaktest ativities start.
Assist operation maintanance to do preparation ,line works as per P&ID,maintanance and trouble shoot during and after start-up activities at offshore.
Install and testing all safety and life saving equipment.
Involve in platform start-up activities. Monitoring and record all progress for all mechanical commissioning activities.
Review final documentation before submitting to client.
Equipment
o Lifting equipment
Pedestal Crane(Favlle Favco)
Monorailhoist
o Turbine Compressor
Solar Turbine
Rolls Royce
o Turbine Generator
Solar Turbine
o Centifugle Pump
Potable Water Pump
Diesel Transfer Pump
Hot Oil Transfer Pump
o Reciprocating Pump
HP Flare KO Drum Pump
Closed Drain Transfer Pump
Open Drain Pump
Glycol Recycle Pump
o Firefighting Equipment Hosereel
Fire Water Pump
Fire monitor
Helideck Foam Skid
Deluge System
Vent Snuffing System
o Life Saving Equipment
Life Boat
3
8/3/2019 Msa.sharul.doc 4
4/6
Life Raft
o Vessel or tank
o Others
Air Compressor
Air Dryer
Nitrogen Generation skid
Water Maker
Membrane Service Units
Diesel Centrifuge
Produced Water Threatment Skid
Hypochlorite
Fuel Gas Skid
Glycol Regenaration Skid
Hot Water System
Emergency Diesel Generator
Hot Water Skid Hot Oil System
PROJECT INVOLVE
1. PROJECT : 05 WELL HEAD PLATFORM FOR B-193 PROJECT
CLIENT : OIL AND NATURAL GAS COPARATION LIMITED
YEAR : MAC 2011 PRESENT
2. PROJECT : 05 WELL HEAD PLATFORM FOR B-193 PROJECT
CLIENT : OIL AND NATURAL GAS COPARATION LIMITED
YEAR : SEPTEMBRT 2010 FEBUARY 2011
3. PROJECT : FABRICATION OF KUMANG CLUSTER DEVELOPMENT
PROJECT KAKG-A, F9JT-A & KUJT-A TOPSIDE (PHASE 1)
PROCESS PLATFORM
CLIENT : PETRONAS CARIGALI
YEAR : APRIL 2010 SEPTEMBRT 2010
(DCC FOR PETRONAS CARIGALI)
4. PROJECT : MEARSK OIL QATAR BE & BG UTILITIES &
PROCESS PLATFORM
CLIENT : MOQYEAR : JULY 2009 - MARCH 2010
(CONTRACTION, HUC & COMMESIONNING)
5. PROJECT : BO-A CENTRAL PROCESS PLATFORM
CLIENT : TALISMAN ENERGY
YEAR : DEC 2006 - JULY 2008
(CONTRACTION)
6. PROJECT : EPIC WELLHEAD TOPSIDES IN BH FIELDS OFFSHORE
4
8/3/2019 Msa.sharul.doc 4
5/6
CLIENT : QATAR PETROLEUM
YEAR : SEPTEMBER 2006 OCTOBER 2007
(CONTRACTION)
7. PROJECT : PETROBRASS ESPADARTE SUL FPSO RJS 409
CLIENT : MODEC INTERNATIONAL LLC
YEAR : APRIL 2006 - AUGUST 2006(CONTRACTION)
8. PROJECT : GUNTONG-E
CLIENT : EXXON MOBILE
YEAR : OCT 2004 - MARCH 2006
(CONTRACTION, HUC & COMMESIONNING)
9. COMPANY : DYANANENTIAL ENGINEERING SDN. BHD.
DURATION : NOVEMBER 2003 JUNE 2004
POSITION : NDT TECHNICIAN
10. DURATION : DECEMBER 2002 SEPTEMBRT 2003
PROJECT : B11 DR-A TOPSIDE
CLIENT : SARAWAK SHELL
YEAR : DEC 2002 - SEPT 2003
11. COMPANY : SPHERETECH ENGINEERING SDN. BHD.
DURATION : JUNE 1999 DIC 1999
POSITION : QC INSPECTOR (TRAINEE)
SCOPE OF WORK
1. Fully controlling report to summit for client.
2. Duties To material verification report, fit up report, dimensional check with site team. 3.3. visual inspection on complete welment, to coordinate and request RT work as per CODE and
client requirements, witness PWHT of crown plates for sphere tank. 4.4. To prepare and compile final inspection report.
HOBBIES
Outdoor activities, cycle ling (trail & downhill) and motocross (trail).
EXTRA CURRICULUR ACTIVITES
- Committee Members of Kelab Bimbingan & Kaunseling (2000) .- Committee Members of English Society. (2001)- Committee Members of Sidang Redaksi (School magazine) (2001)
- Committee and mentor for new student year 1999
- Committee members for Orientation Week (1999)
- Chairman of Recreation Club (1998)- Treasurer of club Persatuan Seni Silat Gayung Malaysia (1996 & 1997)
- Committee members and performing for Merdeka day celebration Johor
state (1997).- Participate in performing for opening ceremony Junior World Cup League
5
8/3/2019 Msa.sharul.doc 4
6/6
at Larkin Stadium.
- Participate in Seni Silat Olahraga Johor state 1996 & 1997
COURSES TAKEN
Construction Industry Development Board Malaysia (CIDB) COURSE AUGUST 2005
HUET, Sea survival, Fire fighting, H2S and first aid course.NIOSH OSFAM Safety CourseConfine Space course
PERSONAL TRAITS
- Independent.- Time management skills.
- Energetic, creative and resourceful.
- Able to work individually or group.- Sense of responsibility and fast learner.
- Possess excellent communication skills.
- Self-motivated.- Friendly.
REFERENCE
1. Marzuki Maaruf
Project ManagerSime Darby Engr. Sdn. Bhd
Pasir Gudang, Johor.
Tel. No. 019-6692855
2. Mohd Rashidi Abd Razak
Asst. ManagerSime Darby Engr. Sdn. Bhd
Pasir Gudang, Johor.
Tel. No. 0197545779
3. Haidin b. Abdul hairun
Mechanical Engineer
Sime Darby Engr. Sdn. Bhd.Pasir Gudang, Johor.
Tel. No. 0137733398
3. Wahyudi Yusof
Mechanical Engineer
Sime Darby Engr. Sdn. Bhd.
Pasir Gudang, Johor.Tel. No. 0173575727
6