Msa.sharul.doc 4

download Msa.sharul.doc 4

of 6

Transcript of Msa.sharul.doc 4

  • 8/3/2019 Msa.sharul.doc 4

    1/6

    PERSONAL PARTICULARS

    FULL NAME : MOHD SHARUL AZHAR B. SURATKUN

    AGE : 30 YEARS OLD

    NRIC : 80728-01-5607D.O.B : 28 JULY 1980

    P.O.B : BATU PAHAT, JOHOR

    NATIONALITY : MALAYSIANRACE : MALAY

    RELIGION : ISLAM

    GENDER : MALEMARITIAL STATUS : MARRIDE

    HEALTH : EXCELLENT

    CURRENT ADDRESS : NO 12, JALAN CAMAR 4, TAMAN SCIENTEX81700 PASIR GUDANG, JOHOR.

    CONTACT NUMBER : 013-7055552

    EMAIL ADD. : [email protected]

    EDUCATIONAL BACKGROUND

    TERTIARY EDUCATION

    1. POLITEKNIK PORT DICKSON, N.SEMBILAN (NOV. 2001- DEC. 2OO2)

    DIPLOMA IN MECHANICAL ENGINEERING (MANUFACTURING)

    2. POLITEKNIK JOHOR BAHRU JUNE 1998 - JULY 2000

    CERTIFICATE IN MECHANICAL ENGINEERING (MANUFACTRING)

    1

    mailto:[email protected]:[email protected]
  • 8/3/2019 Msa.sharul.doc 4

    2/6

    SECONDARY EDUCATION

    1. SEK. MEN. TEKNIK TANJUNG PUTRI, JOHOR BAHRU, JOHOR (1995 1997)

    FORM 4 - 5

    SIJIL PELAJARAN MALAYSIA (SPMV)

    2. SEK.MEN. PT. BETAK, PONTIAN, JOHOR (1993 1995)FORM 1 3PENILAIAN MENENGAH RENDAH (PMR)

    LANGUAGE SKILLS

    MALAY & ENGLISH (Written & spoken)

    WORKING EXPERIENCE

    COMPANY : SIME DARBY ENGINEERING SDN. BHD.

    POSITION : MECHANICAL SUPERVISOR DEPARMENT : PMT (PROJECT MANAGEMENT TEAM)

    SCOPE OF WORK

    1. Discussion and arrangement work to sub-contractor.

    2. Check material received as per order and up dating.

    3. Ensure material received must be inspection by client and clear GIIR.4. Coordinate and discuss with engineering about drawing clashing with other discipline.

    5. Check material outstanding and raise RQ/order.

    6. Review drawing and prepare the support fabrication and installation.

    7. Monitoring for fabrication activities.8. Check documentation was complete and approved by client.

    9. Solve sub-contractor problem, clear punch list and settle carry over work at offshore.10. Monitoring support fabrication, installation and blasting painting progress.

    11. Ensure all equipment is cleaning and preservation mast be follow the requirement.

    12. Up dating daily progress and check list.

    13. Arrangement for shiploose material to packing and deliver14. Joined HUC-UP and Commesionning (Offshore).

    Assist Mech. and Pipng Engineer preparation for commissioning andreinstatment test activities.

    Review all equipment documents such as manufacturing data reports,mil

    certificates and testing as per manufacturers recommended and clienrequirement during factory accptance test(FAT) before all mech.equipment sendto yard for installation.

    Monitoring installation team to install for all mechanical equipment

    levellness,position,verticality and physically check before precomm. Start.

    Perform and organize load testing activities on material handling equipment

    such as monorail and pedestal crane together with vendor and clients

    representative and ensuring that these activities are done with high safety inmind.

    2

  • 8/3/2019 Msa.sharul.doc 4

    3/6

    Monitoring piping installation attch to all mechanical equipment and clearpunchlist.

    To carried out levelling and alignment for all rotaing equipment , liaised with

    vendor and inspector if any equipment problem and record for all pre-

    alignment(without piping attchment) and final alignment(with piping)

    Monitoring internal cleaning and visual inspection internal and external all

    vessel and tank.

    Organize and monitoring preparation for lube oil flushing activities on TurbineCompressor , Turbine Generator(bypass bearing and thru bearing) and lube oil

    cooler before start up.Ensure all piping connection to turbine meet the ISO

    standards.

    Monitoring piping installation and line work with inspector to ensure all piping

    system as per specification and before leaktest ativities start.

    Assist operation maintanance to do preparation ,line works as per P&ID,maintanance and trouble shoot during and after start-up activities at offshore.

    Install and testing all safety and life saving equipment.

    Involve in platform start-up activities. Monitoring and record all progress for all mechanical commissioning activities.

    Review final documentation before submitting to client.

    Equipment

    o Lifting equipment

    Pedestal Crane(Favlle Favco)

    Monorailhoist

    o Turbine Compressor

    Solar Turbine

    Rolls Royce

    o Turbine Generator

    Solar Turbine

    o Centifugle Pump

    Potable Water Pump

    Diesel Transfer Pump

    Hot Oil Transfer Pump

    o Reciprocating Pump

    HP Flare KO Drum Pump

    Closed Drain Transfer Pump

    Open Drain Pump

    Glycol Recycle Pump

    o Firefighting Equipment Hosereel

    Fire Water Pump

    Fire monitor

    Helideck Foam Skid

    Deluge System

    Vent Snuffing System

    o Life Saving Equipment

    Life Boat

    3

  • 8/3/2019 Msa.sharul.doc 4

    4/6

    Life Raft

    o Vessel or tank

    o Others

    Air Compressor

    Air Dryer

    Nitrogen Generation skid

    Water Maker

    Membrane Service Units

    Diesel Centrifuge

    Produced Water Threatment Skid

    Hypochlorite

    Fuel Gas Skid

    Glycol Regenaration Skid

    Hot Water System

    Emergency Diesel Generator

    Hot Water Skid Hot Oil System

    PROJECT INVOLVE

    1. PROJECT : 05 WELL HEAD PLATFORM FOR B-193 PROJECT

    CLIENT : OIL AND NATURAL GAS COPARATION LIMITED

    YEAR : MAC 2011 PRESENT

    2. PROJECT : 05 WELL HEAD PLATFORM FOR B-193 PROJECT

    CLIENT : OIL AND NATURAL GAS COPARATION LIMITED

    YEAR : SEPTEMBRT 2010 FEBUARY 2011

    3. PROJECT : FABRICATION OF KUMANG CLUSTER DEVELOPMENT

    PROJECT KAKG-A, F9JT-A & KUJT-A TOPSIDE (PHASE 1)

    PROCESS PLATFORM

    CLIENT : PETRONAS CARIGALI

    YEAR : APRIL 2010 SEPTEMBRT 2010

    (DCC FOR PETRONAS CARIGALI)

    4. PROJECT : MEARSK OIL QATAR BE & BG UTILITIES &

    PROCESS PLATFORM

    CLIENT : MOQYEAR : JULY 2009 - MARCH 2010

    (CONTRACTION, HUC & COMMESIONNING)

    5. PROJECT : BO-A CENTRAL PROCESS PLATFORM

    CLIENT : TALISMAN ENERGY

    YEAR : DEC 2006 - JULY 2008

    (CONTRACTION)

    6. PROJECT : EPIC WELLHEAD TOPSIDES IN BH FIELDS OFFSHORE

    4

  • 8/3/2019 Msa.sharul.doc 4

    5/6

    CLIENT : QATAR PETROLEUM

    YEAR : SEPTEMBER 2006 OCTOBER 2007

    (CONTRACTION)

    7. PROJECT : PETROBRASS ESPADARTE SUL FPSO RJS 409

    CLIENT : MODEC INTERNATIONAL LLC

    YEAR : APRIL 2006 - AUGUST 2006(CONTRACTION)

    8. PROJECT : GUNTONG-E

    CLIENT : EXXON MOBILE

    YEAR : OCT 2004 - MARCH 2006

    (CONTRACTION, HUC & COMMESIONNING)

    9. COMPANY : DYANANENTIAL ENGINEERING SDN. BHD.

    DURATION : NOVEMBER 2003 JUNE 2004

    POSITION : NDT TECHNICIAN

    10. DURATION : DECEMBER 2002 SEPTEMBRT 2003

    PROJECT : B11 DR-A TOPSIDE

    CLIENT : SARAWAK SHELL

    YEAR : DEC 2002 - SEPT 2003

    11. COMPANY : SPHERETECH ENGINEERING SDN. BHD.

    DURATION : JUNE 1999 DIC 1999

    POSITION : QC INSPECTOR (TRAINEE)

    SCOPE OF WORK

    1. Fully controlling report to summit for client.

    2. Duties To material verification report, fit up report, dimensional check with site team. 3.3. visual inspection on complete welment, to coordinate and request RT work as per CODE and

    client requirements, witness PWHT of crown plates for sphere tank. 4.4. To prepare and compile final inspection report.

    HOBBIES

    Outdoor activities, cycle ling (trail & downhill) and motocross (trail).

    EXTRA CURRICULUR ACTIVITES

    - Committee Members of Kelab Bimbingan & Kaunseling (2000) .- Committee Members of English Society. (2001)- Committee Members of Sidang Redaksi (School magazine) (2001)

    - Committee and mentor for new student year 1999

    - Committee members for Orientation Week (1999)

    - Chairman of Recreation Club (1998)- Treasurer of club Persatuan Seni Silat Gayung Malaysia (1996 & 1997)

    - Committee members and performing for Merdeka day celebration Johor

    state (1997).- Participate in performing for opening ceremony Junior World Cup League

    5

  • 8/3/2019 Msa.sharul.doc 4

    6/6

    at Larkin Stadium.

    - Participate in Seni Silat Olahraga Johor state 1996 & 1997

    COURSES TAKEN

    Construction Industry Development Board Malaysia (CIDB) COURSE AUGUST 2005

    HUET, Sea survival, Fire fighting, H2S and first aid course.NIOSH OSFAM Safety CourseConfine Space course

    PERSONAL TRAITS

    - Independent.- Time management skills.

    - Energetic, creative and resourceful.

    - Able to work individually or group.- Sense of responsibility and fast learner.

    - Possess excellent communication skills.

    - Self-motivated.- Friendly.

    REFERENCE

    1. Marzuki Maaruf

    Project ManagerSime Darby Engr. Sdn. Bhd

    Pasir Gudang, Johor.

    Tel. No. 019-6692855

    2. Mohd Rashidi Abd Razak

    Asst. ManagerSime Darby Engr. Sdn. Bhd

    Pasir Gudang, Johor.

    Tel. No. 0197545779

    3. Haidin b. Abdul hairun

    Mechanical Engineer

    Sime Darby Engr. Sdn. Bhd.Pasir Gudang, Johor.

    Tel. No. 0137733398

    3. Wahyudi Yusof

    Mechanical Engineer

    Sime Darby Engr. Sdn. Bhd.

    Pasir Gudang, Johor.Tel. No. 0173575727

    6