Status of KEKB EP System

S.Mitsunobu,Y.Funahashi,T.Furuya,A. Kabe,Y. Morita,M. Nishiwaki, M. Sawabe,S. Takano and K.Ueno

KEK

Page 2: Mitsunobu - Status of KEKB EP System

New EP system

• KEK SC cavities were processed by Electro Polish at Nomura Plating Co..

• For more reliable EP for ILC cavity, KEK decided to have in-house new EP system.

• One L-band system and universal system for 500 MHz and L band system are gathered in one place.

• 500 MHz system reuse old one as possible and move from Nomura to KEK.

Page 3: Mitsunobu - Status of KEKB EP System

Conceptual drawing of EP

(Proff.Kojima’s car battery)

Teflon

Page 4: Mitsunobu - Status of KEKB EP System

Vertical EP Furuya et al

Page 5: Mitsunobu - Status of KEKB EP System

Saito et al

Page 6: Mitsunobu - Status of KEKB EP System
Page 7: Mitsunobu - Status of KEKB EP System

KEKB Superconducting Cavity

Page 8: Mitsunobu - Status of KEKB EP System

Nb Cavity

Page 9: Mitsunobu - Status of KEKB EP System

Rotating Equipment for EP at Nomura Plating Co.

超伝導空洞の電解研磨

Page 10: Mitsunobu - Status of KEKB EP System

New EP bed at KEK

Page 11: Mitsunobu - Status of KEKB EP System

First test using TRISTAN Single Cell

(TM110 mode test)

Page 12: Mitsunobu - Status of KEKB EP System

Ultrasonic tank and shower tank

Page 13: Mitsunobu - Status of KEKB EP System

New acid tank (500 L)

Page 14: Mitsunobu - Status of KEKB EP System

New EP area

Page 15: Mitsunobu - Status of KEKB EP System

Acid gas cleaning system

Page 16: Mitsunobu - Status of KEKB EP System

Modification

• Automatic controlling system• Separating Heat Exchanger • Exchange Z- seal• Move air intake valve on rotational Joint• Add Water over flow pipe• Add Butterfly type valves over flow line

Page 17: Mitsunobu - Status of KEKB EP System
Page 18: Mitsunobu - Status of KEKB EP System

EP condition

• Acid Temperature 20~30 degC• Cathode Voltage -20 ~ -30 V• Current density 30~50mA(EP1>EP2)• Acid flow rate 40L/min• 10 mm over center• KEKB cavity use O3 rinsing

Page 19: Mitsunobu - Status of KEKB EP System
Page 20: Mitsunobu - Status of KEKB EP System

4 bar shower rinsing

O3 rinsing

Hotwater and U sonic rinsing

Page 21: Mitsunobu - Status of KEKB EP System
Page 22: Mitsunobu - Status of KEKB EP System

Conclusion of New EP system

• New EP system has been constructed in KEK.• KEKB Test cavity was successfully treated by new

EP system.• KEKB Test Cavity reached Eacc>12.7MV/m.• Three NSRRC KEKB Type cavities will use this EP

system next year.• L-band cavity and crab cavity(CERN upgrade) also

can be use this system by small modification.