Status of KEKB EP System
S.Mitsunobu,Y.Funahashi,T.Furuya,A. Kabe,Y. Morita,M. Nishiwaki, M. Sawabe,S. Takano and K.Ueno
KEK
New EP system
• KEK SC cavities were processed by Electro Polish at Nomura Plating Co..
• For more reliable EP for ILC cavity, KEK decided to have in-house new EP system.
• One L-band system and universal system for 500 MHz and L band system are gathered in one place.
• 500 MHz system reuse old one as possible and move from Nomura to KEK.
Conceptual drawing of EP
(Proff.Kojima’s car battery)
Teflon
Vertical EP Furuya et al
Saito et al
KEKB Superconducting Cavity
Nb Cavity
Rotating Equipment for EP at Nomura Plating Co.
超伝導空洞の電解研磨
New EP bed at KEK
First test using TRISTAN Single Cell
(TM110 mode test)
Ultrasonic tank and shower tank
New acid tank (500 L)
New EP area
Acid gas cleaning system
Modification
• Automatic controlling system• Separating Heat Exchanger • Exchange Z- seal• Move air intake valve on rotational Joint• Add Water over flow pipe• Add Butterfly type valves over flow line
EP condition
• Acid Temperature 20~30 degC• Cathode Voltage -20 ~ -30 V• Current density 30~50mA(EP1>EP2)• Acid flow rate 40L/min• 10 mm over center• KEKB cavity use O3 rinsing
4 bar shower rinsing
O3 rinsing
Hotwater and U sonic rinsing
Conclusion of New EP system
• New EP system has been constructed in KEK.• KEKB Test cavity was successfully treated by new
EP system.• KEKB Test Cavity reached Eacc>12.7MV/m.• Three NSRRC KEKB Type cavities will use this EP
system next year.• L-band cavity and crab cavity(CERN upgrade) also
can be use this system by small modification.