LOAD SHEDDING
PHILOSOPHYPRESENTED BY BRIJESH SINGH
BHADAURIA
8/11/2019 Load Shedding Philosophy Ppt
2/35
WHY LOAD SHEDDING
In general, load shedding can be defined as theamount of load that must almost instantly beremoved from a power system to keep theremaining portion of the system operational. This
load reduction is in response to a systemdisturbance (and consequent possible additionaldisturbances) that results in a generationdeficiency condition. Common disturbances thatcan cause this condition to occur include faults,
loss of generation, switching errors, lightningstrikes, etc. Let us discuss how these transientseffects-
8/11/2019 Load Shedding Philosophy Ppt
3/35
TYPES OF TRANSIENTS
1. Surge Phenomena- ( extremely fast transients)
This type of transient is caused by lightning (
atmospheric discharge on overhead transmission
line ) and switching. Physically , such a transientinitiates an electromagnetic wave traveling with
almost the speed of light on transmission lines .
8/11/2019 Load Shedding Philosophy Ppt
4/35
TYPES OF TRANSIENT CONTD.
2. Short circuit phenomena- more then 50 % of the
short circuit takes place on exposed overhead lines
owing to the insulation failure resulting from the
over voltage surge , birds , unsymmetrical faultsetc The occurrence of the symmetrical faults
brings the power transfer across the line to zero
immediately whereas the impact is partial in case
of unsymmetrical faults
8/11/2019 Load Shedding Philosophy Ppt
5/35
TYPES OF TRANSIENT CONTD.
3. Transient stability
Whenever a short circuittakes place at any part of the integrated system ,there is an instantaneous total of partial collapse ofthe bus voltage of the system . This also results in
the reduction of generator power output .Since ininitially the for some time delay before thecontroller can initiate the corrective action , eachgenerator is subjected to positive acceleratingtorque. This condition if sustained for a long time ,
can result in in the most severe type of transientnamely mechanical oscillation of the synchronousmacnine.
8/11/2019 Load Shedding Philosophy Ppt
6/35
GTG GOVERNING LOOPS
When a power system is exposed to a disturbance,its dynamics and transient responses are mainlycontrolled through two major dynamic loops. Oneis the excitation (including AVR) loop that willcontrol the generator reactive power and systemvoltage. Another is the prime-mover loop, whichwill control the generator active power and systemfrequency. A brief discussion of these two
dynamic loops is given below
8/11/2019 Load Shedding Philosophy Ppt
7/35
LOOP DISCUSSION CONTD.
1.Excitation / GeneratorReactive Power
Voltage- During a fault condition, one of the direct
effects of a fault current is the drainage of reactive
power from the system. This reactive power isessential for the transfer of mechanical energy to
electrical energy (and vice versa) in the rotating
machines (generators and motors).
8/11/2019 Load Shedding Philosophy Ppt
8/35
LOOP DISCUSSION CONTD.
2. Prime Mover / Generator
Real Power
Frequency- Turbine governors and the type of
prime movers also have a dramatic impact on theperformance of the power system during major
disturbances. The frequency conditions of theoverall system directly depend on the amount ofreal power that the generator prime movers candeliver to the system. Also, the mechanical energyavailable to help the generators prime mover ride
through a fault or other disturbances plays animportant role on the system behavior.
8/11/2019 Load Shedding Philosophy Ppt
9/35
DEFINITION OF LOAD SHEDDING
Introductionthe ability of the power system tocontinue, albeit on reduced levels , after loss ofgeneration is an important consideration in thedesign of any load shedding scheme . for this
purpose under frequency load shedding schemehas been adopted . the basic criteria adopted forthe under frequency load shedding studies asconsidered in this report are based on the
following fact that the
8/11/2019 Load Shedding Philosophy Ppt
10/35
OBJECTIVE BEHING LOAD
SHEDDING
Amount of load selected to be shed at each stage
should in principle restore frequency to itsnominal value within ten seconds of the
maximum deviation .
8/11/2019 Load Shedding Philosophy Ppt
11/35
WAYS TO ACHIEVE LOAD SHEDDING
1.Breaker Interlock Scheme - A source breakerwould be interlocked via hardwired or remotesignals to a set of load breakers that have been
pre-selected to trip. When a generator breaker or a
grid connection is lost for any reason, signals areautomatically sent to load breakers to open. Thissystem is very fast since there is no processingrequired and all decisions about the amount ofload to be shed were made long before the fault
occurred.
8/11/2019 Load Shedding Philosophy Ppt
12/35
8/11/2019 Load Shedding Philosophy Ppt
13/35
DISADVANTAGE WITH BREAKER
INTERLOCK SCHEME
1.Difficult to change load priority since the actions for loadshedding are hardwired and amount of load shedding iscalculated for the worst-case scenario.
2.Only one stage of load shedding is available.
3.More loads are shed than necessary.4.The operation of this type of load shedding system willmost likely shut the entire industrial facility down in a non-orderly way. This unplanned outage may result in
processing equipment damage, reduced equipmentlifetime, or worse.
5.Plant restarting may be delayed because of the requirementto shut down and then restart other remote facilities thathave been affected by the loss of the main facility, beforethe main facility can be started
8/11/2019 Load Shedding Philosophy Ppt
14/35
Under Frequency Relay Scheme
Frequency relay sense the fault or deficiency in
generation by way of frequency . They detect
either a rapid change in frequency or gradual
frequency deterioration and initiate stagedoperation of interlocked breakers. It works in
stages i.e. it checks for underfrequency and sets
the stage for tripping after certain time dalay.
8/11/2019 Load Shedding Philosophy Ppt
15/35
8/11/2019 Load Shedding Philosophy Ppt
16/35
PLC BASED LOAD SHEDDING
With a common type of PLC-based load sheddingscheme, load shedding is initiated based on the systemfrequency deviations and/or other triggers. The circuit
breaker tripping can be programmed based on thesystem loading, available generation, and otherspecific logics. Each subsystem is equipped with aPLC that is programmed to shed a preset sequence of
loads. This static sequence is continued until thefrequency returns to a normal condition.
8/11/2019 Load Shedding Philosophy Ppt
17/35
OUR PLANT GENERATION VS DEMAND
SCENARIO
Following are the possible plant generation and load conditions
Case 1 : 5 GTG operating in parallel with the grid and grid trips
Case 2 : 4 GTG operating in parallel with the grid and grid trips
Case 3 : 3 GTG operating in parallel with the grid and grid trips.
Case 4 : 2 GTG operating in parallel with the grid and grid trips. Case 5 : 1 GTG operating in parallel with the grid and grid trips
Case 6 : 5 GTG operating in parallel and one GTG trips.
Case 7 : 4 GTG operating in parallel and one GTG trips.
Case 8 : 3 GTG operating in parallel and one GTG trips.
Case 9 : 2 GTG operating in parallel and one GTG trips.
8/11/2019 Load Shedding Philosophy Ppt
18/35
8/11/2019 Load Shedding Philosophy Ppt
19/35
PLANT LOAD PROFILE
Plant load profile for the purpose of load shedding
is considered to be as per attachment 1 , wherein
total plant load for 120% send out operating
condition is indicated. C:\Documents and
Settings\bbhadauria\Desktop\Attachment1-2.xls
http://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment1-2.xls8/11/2019 Load Shedding Philosophy Ppt
20/35
LNG VAPORIZER SOURCES
For vaporization following sources are available
4 SCV where 2 SCV in hot water mode ( hot water generated bycogeneration in GTG) and 2 SCV totally in burner backup.
14 STV
1 STV with Cogeneration heat recovery mode
8/11/2019 Load Shedding Philosophy Ppt
21/35
HOW TO SELECT THE PRIORITY OF
VAPORIZER
SCV/STV in service are selected according to the followingpriority based on minimizing of the running cost.
1.STV with cogeneration heat recovery mode.
2.STV3.One SCV in hot water mode
4.One SCV in combined mode.
5.Additional SCV in burner mode.
Whether to switch on all the above sources or switch onsome of the sources will depend upon the send out raterequired.
8/11/2019 Load Shedding Philosophy Ppt
22/35
LOAD SHEDDING OPERATION:
Power available under various operating conditions ofGTG and grid is tabulated in attachment II .Loadshedding requirements is described in remarks columnof the above attachments.
For all cases wherein GTG are operating in parallelwith grid and GTG trips , the GTG load will beautomatically transferred to the grid for the shortduration of approx 5 minutes . During this time
manual adjustment will be done from the DCS to limitthe import from the grid . C:\Documents andSettings\bbhadauria\Desktop\Attachment 6.xls
http://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xlshttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment%206.xls8/11/2019 Load Shedding Philosophy Ppt
23/35
FREQUENCY PROFILE STUDY
The computer program ETAP power station (electrical transient analyzer program) version 5.5.5 cdeveloped by operation technology inc. USA has beenutilized to carry out the frequency profile study .Frequency profile study has been carried out for eachcase except for case I and VI wherein in either case ofGTG / grid tripping no load shedding is envisaged .Result of the same are enclosed herewith attachmentIII. Attachment
Load shedding operation shall take place within 300ms from the instant of loss of the generationconsidering relay operating time , circuit breakeroperation time and PLC operating time .
8/11/2019 Load Shedding Philosophy Ppt
24/35
LOAD SHEDDING PRINCIPLES
For load shedding purpose ABB make SPAF 340 Crelay has been utilized. This relay has four differentfrequency stages with individual rate of change offrequency feature (df/dt).
For various cases described in Attachment 2, GTG
overload is sensed by frequency relay. The loadshedding command will be issued to dedicatedredundant PLC. Tripping command will be issued bydedicated redundant PLC to trip the pre-assigned loads.
It is envisaged to utilize two stage frequency protectionalong with df/dt feature to carry out the load sheddingoperation.
8/11/2019 Load Shedding Philosophy Ppt
25/35
For first two stages frequency setting with individual df/dtsetting shall be used.
For Third stage only frequency setting shall be used.
If frequency does not restore even after operation of Stage1&2, then third frequency stage shall operate trippingfurther additional load. (Block A) \Frequency relay settingexc.doc
http://localhost/var/www/apps/conversion/tmp/Frequency%20relay%20setting%20exc.dochttp://localhost/var/www/apps/conversion/tmp/Frequency%20relay%20setting%20exc.dochttp://localhost/var/www/apps/conversion/tmp/Frequency%20relay%20setting%20exc.dochttp://localhost/var/www/apps/conversion/tmp/Frequency%20relay%20setting%20exc.dochttp://localhost/var/www/apps/conversion/tmp/Frequency%20relay%20setting%20exc.doc8/11/2019 Load Shedding Philosophy Ppt
26/35
Load blocks
Depending upon the power deficit in case of grid / GTGtripping following load shedding blocks have beenconsidered
For Power Deficit up to 2 MW
Block A
Trip 1 No HP Pump.
Trip 2 Nos. Air heater banks.
8/11/2019 Load Shedding Philosophy Ppt
27/35
Load blocks contd.
For Power Deficit up to 4 MW
Block B
Trip 2 Nos HP Pumps. Trip 2 Nos.Intank pumps.
Trip 2 Nos air heater banks
This block has presently not been utilized for load shedding.
8/11/2019 Load Shedding Philosophy Ppt
28/35
Load blocks contd.
For Power Deficit up to 6 MW
Block C
Trip 3 Nos.HP Pumps. Trip 2 Nos Intank pumps.
Trip 3 Nos. Air heater banks
8/11/2019 Load Shedding Philosophy Ppt
29/35
Load blocks contd
Block D
- Trip 1 No HP Pump
- Trip 1 No. Intank Pump.
- Trip 12 Nos GW Pumps
- Trip 1 no. Hot Water Pump
- Trip 1 No. BOG compressor.
- Trip 7 Nos. Air heater banks.
8/11/2019 Load Shedding Philosophy Ppt
30/35
Flow chart of load shedding
C:\Documents and
Settings\bbhadauria\Desktop\Attachment-5.doc
http://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.dochttp://c/Documents%20and%20Settings/bbhadauria/Desktop/Attachment-5.doc8/11/2019 Load Shedding Philosophy Ppt
31/35
SCHEME FOR AIR HEATER PHASE 1 , GROUP RUN SIGNAL TO AIR HEATER TO
BE TAKEN FROM DCS TO LOAD SHEDDING PLC , GROUP TRIP COMMAND TO
AIR HEATER VIA DCS
8/11/2019 Load Shedding Philosophy Ppt
32/35
SCHEME FOR AIR HEATER BANK II , RUN SIGNAL TO BE CONNECTED TO LOAD
SHEDDING PLC AND THE SAME TO BE SEND TO DCS VIA SERIAL LINK , LOAD
SHEDDING TRIP COMMAND TO BE HARD WIRED DIRECTLY TO LOAD
SHEDDDING PLC
8/11/2019 Load Shedding Philosophy Ppt
33/35
SCHEME FOR HP /INTANK PUMP
8/11/2019 Load Shedding Philosophy Ppt
34/35
SCHEME FOR BOG AND SCV
8/11/2019 Load Shedding Philosophy Ppt
35/35
ILS and its advantage over under
frequency shedding
I can draw the drawing of phase 1 and 2 load
shedding