8/13/2019 Life Assesment of Boilers
1/53
Bharat Heavy Electricals Limited, Tiruchirapalli
e come
Committed to making a better world
8/13/2019 Life Assesment of Boilers
2/53
Bharat Heavy Electricals Limited, Tiruchirapalli
resen a on rrangemen
. n ro uc on
2. Module of a typical RLA Study3. BHEL contribution in the area of RLA4. ni T t F iliti t BHE
5. Current developments in BHEL in the
Committed to making a better world
8/13/2019 Life Assesment of Boilers
3/53
Bharat Heavy Electricals Limited, Tiruchirapalli
LEP
N on-pres su re Part s Pres s ure Part s
RLAPETCondit ion As sessm en t
R&M Pro osal
Committed to making a better world
8/13/2019 Life Assesment of Boilers
4/53
Bharat Heavy Electricals Limited, Tiruchirapalli
RESIDUAL LIFE ASSESSMENT STUDY
s u y con uc e as ca y o n ou :
pressure parts and piping
To determine the remaining left out life of thepressure parts
Enable to take Run, Re air and Re lacement decisionsProvide technically sound and viable input for R&M
Committed to making a better world
8/13/2019 Life Assesment of Boilers
5/53
8/13/2019 Life Assesment of Boilers
6/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Why RLA Study
pera on o o er a e eva e
temperatures more than design limit Variations in coal quality
ev a ons n a er em s ry
Committed to making a better world
8/13/2019 Life Assesment of Boilers
7/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Why RLA Study
ros on on on e ou er sur ace o e rum ue o
steam leakage
Committed to making a better world
8/13/2019 Life Assesment of Boilers
8/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Why RLA Study
Sagged Header
Committed to making a better world
8/13/2019 Life Assesment of Boilers
9/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Why RLA Study
Foreign Body inside RH Inlet Header
Committed to making a better world
8/13/2019 Life Assesment of Boilers
10/53
Bharat Heavy Electricals Limited, Tiruchirapalli
y u ySeawater Corrosion in S-Panel
Committed to making a better world
8/13/2019 Life Assesment of Boilers
11/53
Bharat Heavy Electricals Limited, Tiruchirapalli
RLA Study Aims At
Evaluation of present condition of pressure
par s p p ng
Avoiding premature pressure parts failuresand associated unforeseen outages
Identification of problem areas
Analysis of root cause of problems
Providing technically sound and viable
Committed to making a better world
8/13/2019 Life Assesment of Boilers
12/53
Bharat Heavy Electricals Limited, Tiruchirapalli
RLA of What?
Pressure parts
Highly varying duty
Varying Load, Cyclic Load
Fuel Quality Variations
Carried out extensively
Structural parts Limited study
Need based
Visual examination gives good clue Non pressure parts
Mostly maintenance oriented
Committed to making a better world
an e assesse eas y
8/13/2019 Life Assesment of Boilers
13/53
Bharat Heavy Electricals Limited, Tiruchirapalli
RLA STUDY
Pre-Site Study Phase Site Study Post-Site Study Phase
Tender Review/
Review of requirements based
on available information
Review of Operational History Laboratory Analysis
-
Replica Evaluation
Discussions with Utility Scheduling of Activities Review & Finalisation
Scope Finalisation Preparatory Works Report Preparation &
o ecommen a ons
Submission of Offer Study & Preliminary proposals for improvement
Submission
Committed to making a better world
Report Submission
8/13/2019 Life Assesment of Boilers
14/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Steam Generating Unit
PRESSURE PARTS
HIGH TEMP (>400 C) HIGH THICKNESSSH HEADERS, DeSH
MS HRH & PRDS PIPINGS
LOW TEMP (
8/13/2019 Life Assesment of Boilers
15/53
Bharat Heavy Electricals Limited, Tiruchirapalli
erv ce ours enera on ecor s a n enance ecor s
o. o ar -ups va a y ep acemen ecor s
Transient Conditions PLF Design Changes
Steady State Conditions
Excursions
Failure History Inspection Records
RLA/CA/PET
Committed to making a better world
8/13/2019 Life Assesment of Boilers
16/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Stages of Residual Life Assessment
Re ie of ast o erational &
maintenance data of the plant including
water chemistry variations
Field testing
Laboratory testing
Committed to making a better world
8/13/2019 Life Assesment of Boilers
17/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Review Of Past Data
Plant operation
Number of start-ups & shut downs
O eratin conditions
Operating practice
a n enance an repa rFailures and repairs
Review of root cause analysis
Committed to making a better world
8/13/2019 Life Assesment of Boilers
18/53
Bharat Heavy Electricals Limited, Tiruchirapalli
sua nspec on
Erosion, corrosionSwelling, scaling
,
Supports, pipe hangers etc
Dimensional checks
ThicknessOutside diameter
Committed to making a better world
8/13/2019 Life Assesment of Boilers
19/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Field Testin
Non destructive examination
Penetrant testing including fluorescent type
Ma netic article ins ection Wetfluorescent & Dry)
Ultrasonic
In-situ hardness checks
Tube sampling - WW internal deposits
WW H2 embr ttlement
Committed to making a better world
8/13/2019 Life Assesment of Boilers
20/53
Bharat Heavy Electricals Limited, Tiruchirapalli
,
Metallography In situ metallographic examination
roscop c nspec on S ot chemical check when needed
Committed to making a better world
8/13/2019 Life Assesment of Boilers
21/53
Bharat Heavy Electricals Limited, Tiruchirapalli
T ical Tests Done for RLA
Hi h tem erature headers & i in
Ultrasonic, dye-penetrant tests
roscopy, rep cas
Other inspections like
Dimensions, Internal inspection
In-situ hardness
Committed to making a better world
8/13/2019 Life Assesment of Boilers
22/53
Bharat Heavy Electricals Limited, Tiruchirapalli
uper ea er e ea er u es
Tube samples, ultrasonic test OD & Thickness
Deposit Analysis
Steam side oxide scale thickness Life prediction
Attemperators
Ultrasonic, dye penetrant tests Replication, hardness
Fibroscopy
Committed to making a better world
8/13/2019 Life Assesment of Boilers
23/53
Bharat Heavy Electricals Limited, Tiruchirapalli
rums owncomers
Ultrasonic d e- enetrant tests
MPI (Wet fluorescent & Dry)
Fibroscopy
Tube samples, ultrasonic testDeposit analysis (Internal & External)
Committed to making a better world
8/13/2019 Life Assesment of Boilers
24/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Visual Inspection
ep ca on, n-s u ar ness
OD & thickness angers uppor s nspec on
Stress analysis to identify the most stressed points
enera gu e nes or se ect ng nspect on po nts High turbulence or velocity zones
on ensa on po n s
Dead ends & high stressed points
points
All su orts
Committed to making a better world
Bh H El l L d h ll
8/13/2019 Life Assesment of Boilers
25/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Tubes samples from high heat flux zone
Detailed dimensional measurements
Presence of internal deposits covering
epos con en
Constituents of deposit
o ven se ec on c ean ng s necessary
Presence of external and internal corrosion
Micro structure analysis (hydrogen damage)
Committed to making a better world
Bh t H El t i l Li it d Ti hi lli
8/13/2019 Life Assesment of Boilers
26/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Microscopy & SEM)
Deposit analysis ( Internal & External)
cce erate creep rupture test ng
Committed to making a better world
Bh t H El t i l Li it d Ti hi lli
8/13/2019 Life Assesment of Boilers
27/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Scope of RLA as per IBR 391 A
Component Visual
Ultrasonic
testing
particel
testing
penetrant
inspection Replication Sampling
Deposit
Analysis
Drum (Steam) Yes Yes No * Yes Yes No Yes
Water Drum Yes Yes No * Yes Yes No Yes
*
Attemperator Header Yes Yes No * Yes Yes No No
High Temp Header Yes No No * No No Yes No
Low temp eco tubes Yes No No * No No Yes No
Convection SH coils Yes No No * No No Yes Yes
Primary SH coils Yes No No * No No Yes No
Prefinal SH coils Yes No No * No No Yes No
Final SH Coils Yes No No * No No Yes No
Reheater coils Yes No No * No No Yes NoHigh temp header Yes Yes No * Yes Yes No No
Final SH header 'Yes Yes No * Yes Yes No No
Reheater Header Yes Yes No * Yes Yes No No
a n s eam p p ng es o o o es o o
Platen SH header Yes Yes No * Yes Yes No No
Primary SH header Yes Yes No * Yes Yes No No
Economizer header Yes No No * Yes No No No
Auxiliaries Yes No No * No No No No
Boiler bank tubes Yes No No * No No No NoWater wall Yes No No * No No Yes No
Furnace water walls Yes No No * No No Yes No
* MPI will be done on case to case basis
** Oxide scale based life prediction will be done based on operational history and failures
*** UT for checkin inte rit of butt welds
Committed to making a better world
$ Header internal inspection by fiberscope
Bharat Heavy Electricals Limited Tiruchirapalli
8/13/2019 Life Assesment of Boilers
28/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Microstructural Evaluation By Replication
Sampling Thick Walled Components Is
Non-destructive Technique Adopted
or va ua on s ep ca on. To examine s heroidisation and
cavitation level
Committed to making a better world
Bharat Heavy Electricals Limited Tiruchirapalli
8/13/2019 Life Assesment of Boilers
29/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Re lica Techni ue
The material surface preparation by
grinding, polishing and etching
e p as c se rep ca s app e rm y
to the surface
After curing, the replica can be removed
an go spu ere e opograp ca
image of the micro structure is examined
Committed to making a better world
Bharat Heavy Electricals Limited Tiruchirapalli
8/13/2019 Life Assesment of Boilers
30/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Committed to making a better world
Bharat Heavy Electricals Limited Tiruchirapalli
8/13/2019 Life Assesment of Boilers
31/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Committed to making a better world
Bharat Heavy Electricals Limited Tiruchirapalli
8/13/2019 Life Assesment of Boilers
32/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Committed to making a better world
Bharat Heavy Electricals Limited Tiruchirapalli
8/13/2019 Life Assesment of Boilers
33/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Committed to making a better world
o pu ere ep ca
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
34/53
Bharat Heavy Electricals Limited, Tiruchirapalli
Cree Cavit Level Classification S stem Pro osed
by Wedel & Neubauer
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
35/53
y , p
Indian Boiler Re ulationsASME
ANSI
DIN
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
36/53
y p
Organisation for RLA in BHEL
R&M department Supporting Depts Service After Sales
Scope of Work
Technical ,Report Preparation
FES, WRI
Central LabNDTL
Offer Submission
Order ReceiptReport to Customer &
ar ca on , orp o er nspec ora e
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
37/53
y p
Supporting Depts
For
NDE TUBE FAILURE ANALYSIS WATER CHEMISTRY &OXIDE SCALE THICKNESS
INSITU METALLOGRAPHY
Specialised Work
NDTL,SAS CENTRAL LAB Corp. R&D
ACCELERATED
CREEP RUPTURE TEST
CENTRAL LAB,
WRI
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
38/53
Expert PanelFor RLA
Engineering& R&D Metallurgical
Analysis
NDE
Doctorates : 5Post Graduates : 50
Doctorates : 6Post Graduates : 10
Level I : 43Level II : 136
Graduates : 250 Graduates : 10 Level III : 6
eve , as per -
Techniques UT, RT, MT, PT, Eddy Current(ET), & Leak Test (LT)
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
39/53
National NDT Award from ISNT 4 times
Two Registered Assessors Qualified from
ns u e o eg s ere er e
Assessors (IRCA, UK)
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
40/53
spec a con r u on n e area o
Personnel, Boiler Inspectorate Personnel and
Customers Personnel HRD Training Program on RLA Being
Conducted for Education of BHEL En ineers
Customer Engineers & Boiler Inspectors WRI & BHEL Indo-German Pro ram
Encompasses RLA also
Boilers Including Piping & Industrial Boilers &
other Com onents
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
41/53
(cont.)
Training of BHEL executives in the field of RLA at
,
Field Training at Chandrapura TPS by EPRI, USA
o er ea er o ca on w
Material Based on Assessment by RLA Techniques
Being Met When Called for
SAIL, Bokaro in Full Agreement Technically
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
42/53
Special NDT techniques developed by BHEL
Detection of hydrogen damage by UT Measurement of oxide scale thickness by
.
Microstructural evaluation by replication
A new technique called VAPINE'.
by UT.
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
43/53
Post Ex osture Uni-Axial Accelerated cree testin
In-Situ Hardness Tester
-
Digital Strain Measurement Gauge
Portable Microscope for Insitu MetallurgicalExamination
Portable Alloy Analyser
with microprocessor
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
44/53
Unique Test Facilities at BHEL (Cont)
Impact test facility up to minus 196 deg C
Scanning Electron Micro Scope
Atomic Absorption Spectrometer Portable Stress Anal ser
Video Fibrescope
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
45/53
Scannin Electron Micro Sco e
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
46/53
-
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
47/53
Li ament Crack Detection b UT
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
48/53
ecommen at ons ormat yp ca
Residual life ins ection intervals of components
ar s nee ng rep acemen s
Parts needin re airs
Chemical cleaning advice & procedure
o cat ons requ re or e extens on
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
49/53
Advice on water regimes Improvements in operational methods
Retrofits / improvements in control &
instrumentation
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
50/53
stu es arr e out y
Total Number of studies carried out : 208Power Boilers : 138
Process/Industrial Boilers : 70
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
51/53
Run Repair Replace
RLA
Evaluates For All Phases
Committed to making a better world
Bharat Heavy Electricals Limited, Tiruchirapalli
Currentworking ofBHELin the RLA Field
8/13/2019 Life Assesment of Boilers
52/53
Current working of BHEL in the RLA Field
Working on a comprehensive Advanced RLA software to evaluate pressure part creep and Fatique life
assessment called ALIAS.
and accurate. Planning to use in site with data
.
Strain measurement to Evaluate the safety factor of
Drum as per ASME code Section 8UG L101.
Drum with the ASME design safety margin for the
Committed to making a better world
.
Bharat Heavy Electricals Limited, Tiruchirapalli
8/13/2019 Life Assesment of Boilers
53/53