Legal Requirements on Lifting Operation
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
2/36
2010 Government of Singapore
A Great Workforce A Great Workplace
2
Presentation Overview
1. Tower Cranes Accidents
2. Reminders on Legislation Compliance
3. Key WSH Act Subsidiary Legislation on LiftingOperation at Worksites
4. Some Proposed Changes to Legislation
OSHD Building Safer Workplaces
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
3/36
2010 Government of Singapore
A Great Workforce A Great Workplace
3
Recent Events
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
4/36
2010 Government of Singapore
A Great Workforce A Great Workplace
4
Recent Events
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
5/36
2010 Government of Singapore
A Great Workforce A Great Workplace
5
Chairman
Mr Tan Wee Seng
(CEO, Bovis Lend Lease Pte Ltd)
Member
Mr Chan Yew Kwong
(MOM)
Member
Mr Albert Chan
(Liebherr-Spore pte ltd)
Member
Mr Wilfred Tan
(Tiong Woon Crane & Transport)
Member
Mr Frankie Tan
(SCA)
Member
Mr Chiang Soon Hock
(ASMI)
Member
Mr Neo Choon Keong
(BCA)
Member
Mr John Stewart
(Manitowoc Cranes)
5
NCSTF Secretariat
(IS&D)
Member
Mr Mohd Ismadi
(MOM)
Member
Mr Yeo Kim Hock
(SCAL)
Ma
inTaskforce
National Crane Safety Taskforce
Enhance
Capability & Competency
Enhance Awareness
Enhance Legislation
& Standards
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
6/36
2010 Government of Singapore
A Great Workforce A Great Workplace
6
5 workers were in the
process of dismantling a
tower crane from a
height of 16 stories
During preparatory
works for jacking down,
the crane jib section with
its slewing unit toppled
to the ground
One erector fell together
with the crane jib section
& died at the scene. 3
others were injured.
CRANE TOPPLES, KILLED WORKER
ON 17 MAR 2010
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
7/36 2010 Government of Singapore
A Great Workforce A Great Workplace
7
SCENE OF THE ACCIDENT
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
8/36 2010 Government of Singapore
A Great Workforce A Great Workplace
8
SCENE OF THE ACCIDENT
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
9/36 2010 Government of Singapore
A Great Workforce A Great Workplace
9
SCENE OF THE ACCIDENT
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
10/36 2010 Government of Singapore
A Great Workforce A Great Workplace
10
5 workers were installing a trolley
platform to the jacking cage of tower
crane to prepare for jacking up of
crane.
Trolley platform was being hoisted intoposition when it hit the adjacent work
platform with a worker on it.
Work platform became dislodged and
fell 55m to the ground with the worker.
The worker fortunately landed on a
waste plastic bin which cushioned his
fall. He survived the accident and is
undergoing treatment for his injuries.
COLLAPSE OF JACKNG CAGES WORK PLATFORM
ON 13 APR 2010
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
11/36 2010 Government of Singapore
A Great Workforce A Great Workplace
11
Dislodged work platform was not interconnected to
the other two remaining platforms in accordance
with manufacturers instructions.
Investigation Findings
Trolley platform at anotherworksite for illustration
SCENE OF THE ACCIDENT
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
12/36 2010 Government of Singapore
A Great Workforce A Great Workplace
12
Only Approved Crane Contractors are allowed to perform any
erection, jumping/jacking & dismantling of Cranes
Adequate Risk Assessment must be carried out prior to the
commencement of work
Risks & SWP must be communicated to all involved Must be carried out in accordance with manufacturers instructions
as provided in the manufacturers manuals
Must be carried out only by competent erectors under the direct
supervision of a competent supervisor. Other works and vicinity at affected areas must be no-entry zone
Components used for erection of tower crane must be
original/approved by manufacturers
Reduce risk by having designated jacking cage for tower crane
Legislation Compliance on Cranes Erection,
Alteration & Dismantling Work
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
13/36 2010 Government of Singapore
A Great Workforce A Great Workplace
13
In accordance to the Notification for Use of Tower Cranes, all
bolts/pins or connecting fasteners used must be in
accordance to manufacturers design and readily identifiable.
Connections for Mast Sections
Recent IncidentsSalient Results & Findings
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
14/36
2010 Government of Singapore
A Great Workforce A Great Workplace
14
Expendable Foundation Anchors of Tower
Crane must not be re-cycled as in accordance
tomanufacturers
instruction.
Foundation Anchors
Recap of Past DirectivesFrom Past Incidents
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
15/36
2010 Government of Singapore
A Great Workforce A Great Workplace
15
Other Key WSH Subsidiary
Legislation on Lifting Operation
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
16/36
2010 Government of Singapore
A Great Workforce A Great Workplace
16
Regulation 10
3D
Type of Work that requires PTWS (High-risk
Construction Work - HRCW)
Demolition work;
Excavation and trenching work in a tunnel or hole exceeding 1.5m in depth;
Lifting operations involving tower, mobile or crawler crane;
Piling work;
Tunneling work;
Work on a Scaffold where a person could fall > 2m; and
Work involving entry into a confined space.
Any person who carries out any of the said work without a PTW issued shall
be guilty of an offence
Fine $20,000 (max)
WSH (Construction) Regulations 2007 - PTW
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
17/36
2010 Government of Singapore
A Great Workforce A Great Workplace
17
Identifying work risks Ensuring work is allowed to commence only
after the hazardous work environment andcondition have been adequately assesses
and certified safe.
In line with the RA framework as it validatesthe implementation of control measures
Part III
3D Implementing Permit-to-work System for select high-risk construction work (HRCW)
A proven and systematic method of
WSH (Construction) Regulations 2007
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
18/36
2010 Government of Singapore
A Great Workforce A Great Workplace
18
HRCW must be carried out
with due regard to safety and
health of persons performingthe work
Persons are informed of the
hazards associated with the
HRCW and precautions to be
taken
Necessary safety precautions
taken and enforced when the
Implementing PTWSThe PTW shall provide that:
Step 1 - Application
Step 2 - Evaluation
Step 3 - Issue
Step 4 - Posting
Monitoring
Imp
lementingPTWS
Regulation 11
WSH (Construction) Regulations 2007 - PTW
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
19/36
2010 Government of Singapore
A Great Workforce A Great Workplace
19
Appoint a Project manager
Appoint a Safety Assessor (who shall be either aWSHO for the worksite or a competent person);
Take so far as is reasonably practicable measuresto ensure PTWS is implemented in accordancewith regulations
Regulation 11
Duty of Occupier to:
Implementing PTWS
WSH (Construction) Regulations 2007 - PTW
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
20/36
2010 Government of Singapore
A Great Workforce A Great Workplace
20
Made by Supervisor of person carrying out HRCW
Made in such form and manner as required byProject Manager
State measures to be taken to ensure safety andhealth or persons carrying out HRCW
Addressed to Project Manager and submitted toSafety Assessor for Evaluation and Endorsement
Step 1 Application of PTW
Regulation 13
WSH (Construction) Regulations 2007 - PTW
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
21/36
2010 Government of Singapore
A Great Workforce A Great Workplace
21
Assess or evaluate whether all reasonably practicablemeasures have been taken to ensure safety and health ofpersons who will be carrying out HRCW
Inspect site where HRCW is to be carried out with Supervisor
If Safety Assessor is satisfied that HRCW can be carried out
safely, he shall endorse PTW and forward to Project Managerfor approval
Duty ofSafety Assessor to exercise due diligence whenperforming his functions in relation to evaluation and
endorsement of PTW
Step 2 Evaluation of PTW
Regulation 14
On receipt of PTW, the Safety Assessor shall:
WSH (Construction) Regulations 2007 - PTW
f
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
22/36
2010 Government of Singapore
A Great Workforce A Great Workplace
22
Proper evaluation of the risks and hazards involved based on
available information No incompatible work carried out at the same time and in
same vicinity
All reasonably practicable measures will or have been taken
All persons involved are informed of the associated hazards Duty ofProject Manager to exercise due diligence when
performing his function in relation to issuance of PTW
Step 3 Issuance of PTW
Regulation 15
On receipt of endorsed PTW, the Project Manager may issuePTW if he is satisfied that:
WSH (Construction) Regulations 2007 - PTW
A G W kf A G W k l
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
23/36
2010 Government of Singapore
A Great Workforce A Great Workplace
23
Clearly post a copy of PTW issued including,where practicable, a sketch of the areawhere the HRCW is permitted
Ensure that copy of PTW not removed until
date of expiry / revocation of PTW or on
completion of HRCW
Step 4 Posting of PTW
Regulation 16
After issuance of PTW, Duty of Supervisor to:
WSH (Construction) Regulations 2007 - PTW
A G t W kf A G t W k l
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
24/36
2010 Government of Singapore
A Great Workforce A Great Workplace
24
AE test and examination
LM to be tested and examined by AE at least once a year (or
as determined by Commissioner)
Certificate of test and examination by AE to kept available forinspection
[GP]
Brake
Crane provided with readily accessible and efficient brake (or
other safety device for that purpose)
[GP]
WSH (GP) Regulations: Requirement on LM
A G t W kf A G t W k l
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
25/36
2010 Government of Singapore
A Great Workforce A Great Workplace
25 All Rights Reserved
LIFTING SUPERVISOR
has successfully completed a training course approved by
the Commissioner; and
has, in the opinion of the occupier, such relevantexperience in lifting operations for at least one year.
RIGGER & SIGNALMAN
No person shall be appointed as a RIGGER/SIGNALMAN
unless he has successfully completed a training course
approved by the Commissioner
Factories (OOC) Regulations: Appointment of Personnel by Occupier
A G t W kf A G t W k lR i i f C O
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
26/36
2010 Government of Singapore
A Great Workforce A Great Workplace
26
Registration of Crane Operator
No person shall operate a mobile crane or tower crane in a
factory unless he is registered as a crane operator under these
Regulations and is the holder of a valid certificate.
No person shall employ or cause or permit any person who isnot registered as a crane operator under these Regulations to
operate a mobile crane or tower crane in a factoryNote:
a) To drive a mobile crane - must have the relevant driving license
b) To operate a mobile crane must be registered crane operatorc) Lorry loader operator not required to be registered if purpose is
mainly to transport materials or goods. However, operator must
still be trained and competent to operate lorry crane safety.
(Proposed mandatory training for such operators)
Factories (OOC) Regulations: Registration of Crane Operator
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
27/36
2010 Government of Singapore
A Great Workforce A Great Workplace
27
(a) co-ordinate all lifting activities;
(b) ensure that only registered crane operators, appointed riggers and appointed
signalmen participate in any lifting operation involving the use of a mobile crane or a
tower crane;
(c) ensure that the ground conditions are safe for any lifting operation to be performed by
any mobile crane;
(d) unless he is present to supervise a lifting operation, ensure that there is a set
ofsafe lifting procedures for any lifting operation by a mobile crane or a
tower crane;
(e) briefall crane operators, riggers and signalmen on the safe lifting procedures referred toin sub-paragraph (d); and
(f) if any unsatisfactory or unsafe conditions are reported to him by any crane operator or
rigger, take such measures to rectify the unsatisfactory or unsafe condition or
otherwise ensure that any lifting operation is carried out safely.
(Proposed Change - Lifting Supervisor to supervise in accordance to Lifting Plan)
Factories (OOC) Regulations: Duty of Lifting Supervisor
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
28/36
2010 Government of Singapore
A Great Workforce A Great Workplace
28 All Rights Reserved
Duty of Crane Operator
LS is present or has approved the carrying out of such
operation
weight of the object is known (indicated in the LiftingPlan/PTW);
he has received a clear signal from a signalman (whenrequired)
No lifting unless
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
29/36
2010 Government of Singapore
A Great Workforce A Great Workplace
29 All Rights Reserved
List of Relevant Approved Codes by WSH Council
for Lifting Operation
SS536 : CP for the safe use of mobile cranes
CP 62 : CP for the safe use of tower cranes
CP 63 : CP for the lifting of persons in work
platforms suspended from cranes
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
30/36
2010 Government of Singapore
A Great Workforce A Great Workplace
30
News ReportsA lorry crane was involved in a tree
pruning operation.A 33-year-old foreign worker from
the landscape management
company, which owns the tree-
pruning vehicle, was arrested for
causing death by negligence.
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
31/36
2010 Government of Singapore
A Great Workforce A Great Workplace
31
Intervention 1 Launch of Joint Ops
Woodpecker on 28 July A Joint Ops codenamed Operation
Woodpecker conducted on 28 July
10 by MOM, LTA, NParks and HDB
Ops covered 15 worksites on publicroads island-wide
Ops aimed to reinforce safety
guidelines for works on public roads
and to allow the participatingagencies to garner sense of the level
of safety awareness and compliance
to safety standards
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
32/36
2010 Government of Singapore
A Great Workforce A Great Workplace
32
Findings of Joint Ops Woodpecker
on 28 July 2010 Workers carrying out tree-pruning activities in man-bucket
were provided with necessary safety equipment (eg safety
harness, safety gloves, glasses etc).
All the lorry crane operators checked had undergone either a
structured training course or OJT.
Operators had also extended the outriggers of the lorry cranes
to ensure stability.
Contractors were generally aware of the need to demarcate the
work zone through the placement of appropriate cones,
barriers and warning signages, as stipulated in LTA's Code of
Practices for Traffic Control at Work Zone. However there
were sites inspected where the cones, barriers were found to
have been placed too close to the work area.
Some sites inspected did not conduct RA implement a PTW for
lifting operations involving lorry cranes.
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
33/36
2010 Government of Singapore
A Great Workforce A Great Workplace
33
Issuance of Technical Circular on SWP for Operating
Lorry Cranes on Public Roads
Circular intended to remind
employers on common hazards
involved in such works and
preventive measures which included
the following:
Risks due to Traffic Movement
Risks involved in Operation of
Lorry Cranes Risks due to Working at Heights
Risks due to Contact with
Overhead Cables and Structures
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
34/36
2010 Government of Singapore
A Great Workforce A Great Workplace
34
Compliance Assistance
Code of Practice Traffic Controland Road Safety by LTA
WSH Guidelines for Landscape
and horticulture Works byWSHC and CUGE
Technical Advisories for Safe
Operation of Lifting Equipment
A Great Workforce A Great Workplace
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
35/36
2010 Government of Singapore
A Great Workforce A Great Workplace
35
Some Proposed Changes to Legislation
Proposed mandatory training &competency certification for Lorry Crane
Operators
Lifting Supervisor to supervise lifting
operation in accordance to Lifting Plan Effected through review of Factories
OOC Regulations by Sep 2011
Development of Training Curriculum for
Lorry Crane Operators is on way
Development of ACOP for Lifting
Operation under way
A Great Workforce A Great Workplace
Final thought
7/31/2019 Legal Requirement on Lifting Operation SCAL 23 Sep 2010
36/36
A Great Workforce A Great Workplace
ThankYou
For more info:
Ministry of Manpower Singapore
www.mom.gov.sg
Workplace Safety and Health Council
www wshc gov sg