Chiltern RailwaysLeamington Spa Station: Phase 1 – Power Upgrade & Associated Works
Thursday 15th January 2015
• Company Brief
• Accreditation
• Company Structure
• Our Services
• Our Solutions
• Experience
CONTENTS
• Date Of Incorporation: 13th December 2000.• Managing Director: Simon Winson. • Offices: St Bartholomew’s Church.• Company Registration No: 4123907• VAT Registration No: 927367006
COMPANY BRIEF
RES have an integrated management system which ensures full compliance with the rail industries stringent safety, health, environmental and quality (SHEQ) requirements and are accredited with the following;
• RISQS Certificate No: 094280
• NIC EIC Enrolment No: 029036
• UKAS accredited for: Quality ISO 9001:2008 Certificate No:12417-QMS-001Occupational Health and Safety - OHSAS 18001 Certificate No: 12417-HAS-001Environmental - ISO 14001 Certificate No: 12417-EMS-001
ACCREDITATION
COMPANY STRUCTURE
Simon WinsonManaging Director
Projects DirectorArron Simpson
Project ManagerAdam Farnsworth
Project EngineerPaul Claridge
Project ManagerScott Kendrick
Project EngineerJosh Parker
Project EngineerDan Clarke
Design ManagerPaul Pinches
Design EngineerNick White
Design EngineerMichael Morris
Design EngineerDavid Hudson
CommercialJonathan Watson
Quantity Surveyor
SHEQ AdvisorsFPA Consulting
DirectorTBA
Office ManagerLyndsey Lee
Admin AsstSamantha Rigley
Financial ControllerVerity Lamb
Finance AsstJade Price
Business Development Manager
Bryan Blareau
EstimatorTony Owens
Marketing AsstAlannah Dunnachie
OUR SERVICES
Design Mechanical Engineering
Civil Engineering Electrical Engineer
Electrical Testing Maintenance & Support
Consultancy, Surveying & Project Management
OUR SOLUTIONS
Point Heating Stations & Platforms
Lighting Installations Civil Works
DNO Signalling Supplies
Earthing & Bonding Level Crossings
Cable Installation UPS Installation
EXPERIENCE
Finsbury Park & Alexander Palace Stations Capacity EnhancementClient: Balfour Beatty RailValue: £470KDesign & Build
• Intrusive survey, Form B specification, drawings, calculations, assessments.• New mains, sub mains switchgear & lighting control.• Reconfiguration of existing sub mains & cabling.• Installation of mains, sub mains cabling & CMS.• Platform, canopy, subway & station buildings lighting.• Lift power supplies.• Lift motor rooms fit out small power, lighting ventilation & heating.• New fire alarm & security system.• OLE traction bonding.• New water supply & mechanical fit out to station buildings.• Reconfiguration of existing & new DOO equipment.• Contract Responsible Engineer Duties
EXPERIENCE
Peterborough Station M&E / E&P WorksClient: Carillion Value: £1.1M Refurbishment
• Reconfiguration of sub mains equipment & cabling.• Cable management systems.• Lighting control equipment.• R&L column, bulkhead & bollard lighting.• Fire alarm system modifications & extensions.• Point heating.• Water supply across bridge & sub-metered to retail units.• Retail telecoms re-configuration.
TECHNICAL
Top Related