PUBLIC INVOLVEMENT MEETING
RACINE COUNTY ROAD IMPROVEMENTS
DECEMBER 14, 2017
T hank you for attending to-day’s meeting and for your
interest in the Racine County road improvements.
The purpose of the meeting is to introduce the project and to share early design concepts. We also invite you to talk with project staff, share your thoughts and ask questions.
Today’s meeting is an open house. The Wisconsin Department of Transportation (WisDOT), will schedule several more meetings like this as project design and construction progresses. Please watch your mail for additional meetings, or contact us to be on our out-reach list (see comment form).
Project DescriptionIn November 2017, WisDOT took temporary jurisdiction over the following roadways:
y County KR between I-94 and 90th Street
y County H between County KR and Venice Avenue (north of WIS 11)
y Braun Road between I-94 and 90th Street
y International Drive from its southerly limit to WIS 11
Temporary jurisdiction was granted because WisDOT has the expertise needed to man-age large and complex projects
projects.511wi.gov PAGE 1
with multiple roadways and tight utility coordination time-frames. WisDOT has significant construction planned in the I-94 corridor, and one entity coordinating all road construc-tion in the area will be most efficient and cost effective.
The proposed improvements include reconstructing County KR, County H and Braun Road as multilane, divided, urban roadways with storm sewer and a multi-use
trail. Reconstruction will also include traffic signals at key intersections.
The project will extend Inter-national Drive as a multilane, divided, urban roadway with storm sewer, street lights, and a multi-use trail from its exist-ing southerly limit to WIS 11.
WIS 11, from 56th Road to 1,500 feet east of County H, will also be reconstructed to an urban, multilane roadway with storm sewer and street lights.
At today’s meeting ...
y Please review aerial views of development roadways, as well as exhibits showing traffic, utilities, environmental process and schedule information.
y Project staff are available to answer your questions.
y Real estate representatives from the Village of Mount Pleasant are also available to discuss right of way acquisition.
Area 1
Area 2
Area 3
Wis
conn
Val
ley
Way
Wis
conn
Val
ley
Way
General MitchellInternationalAirport
KenoshaRegionalAirport
CITY OF MILWAUKEE
CITY OF RACINE
CITY OF KENOSHA
MOUNTPLEASANT
STURTEVANT
KNEELAND
OAK CREEK
PLEASANT PRAIRIE
CALEDONIA
BRISTOL
UNION GROVE
HALES CORNERS
SOUTHMILWAUKEE
EAGLE LAKE
BRIGHTON
PADDOCK LAKE
KANSASVILLE
PARIS
YORKVILLE
RAYMOND
UNION CHURCH
FRANKLIN
MUSKEGO
MOUNTPLEASANT
YORKVILLE
MILWAUKEE CO.
RACINE CO.
RACINE CO.
KENOSHA CO.
WA
UK
ES
HA
CO
.
MIL
WA
UK
EE
CO
.
894 43
94
94 43
94
41
94
94
V
V
36
241
119
32
K
100
100
32
32
3138
38
38
20
11
32
A
E
31
31
20
50
50
32
142
158
31
158
G
KR
142
24
36
45
45
45
20
45
45
45
C
A
D
U
U
D
H
EA
EA
MB
UE
H
100
45
45
43
41
24
100
J
G
MB
MB
142
D
C
11
C
C
K
H
43
75
142
5083
11
75
36
G
KR
NN
EW
K
S
K
38
794
24
11
Elm RdElm Rd
Edgerton AveEdgerton Ave
Grange AveGrange Ave
Drexel AveDrexel Ave
Puetz RdPuetz Rd
Rawson AveRawson Ave
Ramsey AveRamsey Ave
College AveCollege Ave
13th
St
13th
St
51st
St
51st
St
76th
St
76th
St
92nd
St
92nd
St
Layton AveLayton Ave
How
ell A
veH
owel
l Ave
Ryan RdRyan Rd
Oakwood RdOakwood Rd
7 Mile Rd7 Mile Rd
8 Mile Rd8 Mile Rd
5th
St
5th
St
4 Mile Rd4 Mile Rd
2 Mile Rd2 Mile Rd
50th Rd50th Rd
27th
St
27th
St
51st
St
51st
St
Braun RdBraun Rd60th Rd60th Rd
100t
h A
ve10
0th
Ave
38th St38th St
60th St60th St
93rd St93rd St
22nd
Ave
22nd
Ave
Mea
chem
Rd
Mea
chem
Rd
22nd
Ave
22nd
Ave
Wilmot RdWilmot Rd
88th
Ave
88th
Ave
58th Rd58th Rd
How
ell R
dH
owel
l Rd
Nic
hols
on R
dN
icho
lson
Rd
Nic
hols
on R
dN
icho
lson
Rd
56th Rd56th Rd
LakeMichigan
Golf RdGolf Rd
60th
St
60th
St
7½ Mile Rd7½ Mile Rd
88th
Ave
88th
Ave
104t
h A
ve10
4th
Ave
76th
St
76th
St
92nd
St
92nd
St
Cap
e R
dC
ape
Rd
Oakwood RdOakwood Rd
108t
hSt
108t
hSt
39th
Ave
39th
Ave
68th
St
68th
St
Bell RdBell Rd
152n
d A
ve15
2nd
Ave
128t
h A
ve12
8th
Ave
136t
h A
ve13
6th
Ave
Layton AveLayton Ave
35th
St
35th
St
1st St1st St
5 Mile Rd5 Mile Rd
6½ Mile Rd6½ Mile Rd
51st
St
51st
St
43rd
St
43rd
St
7th St7th St
Somers RdSomers Rd
W F
ront
age
Rd
W F
ront
age
Rd
E F
ront
age
Rd
E F
ront
age
Rd
Wes
t Rd
Wes
t Rd
Spring StSpring St
Em
mer
tsen
Rd
Em
mer
tsen
Rd
Fanc
her R
dFa
nche
r Rd
108t
hSt
108t
hSt
Church RdChurch Rd
60th
St
60th
St
Cal
houn
Rd
Cal
houn
Rd
Grange AveGrange Ave
Howard AveHoward Ave Howard AveHoward Ave
Cold Spring RdCold Spring Rd
Cleveland AveCleveland AveCleveland AveCleveland AveCleveland AveCleveland Ave
124t
h S
t12
4th
St
Beloit Rd
Beloit Rd
National
Ave
National
Ave
35th
St
35th
St
20th
St
20th
St
Oklahoma AveOklahoma Ave
Morgan AveMorgan Ave
Oklahoma AveOklahoma AveOklahoma AveOklahoma Ave
Pen
nsly
vani
a A
veP
enns
lyva
nia
Ave
Pac
kard
Ave
Pac
kard
Ave
Lake Dr
Lake Dr
90th
St
90th
St
Inte
rnat
iona
l Dr
Inte
rnat
iona
l Dr
Wisconn Valley Way will be constructed on new alignment connecting County KR, Braun Road, and WIS 11.
RACINE COUNTY ROAD IMPROVEMENTS Public Involvement Meeting | December 14, 2017
For more project information or to be added to the Road Improvements project contact list:
CONTACTINFORMATION
Mike Pyritz, Communications Manager WisDOT Southeast Region (262) 521-5373 [email protected]
projects.511wi.gov PAGE 2
2017 2018 2019 2020
Design
Environmental Tasks
Public Outreach
Construction
= Public Involvement Meeting
WisDOT anticipates reconstructing Inter-national Drive and Braun Road, sched-uled to begin in summer 2018.
International Drive reconstruction is sched-uled to be completed by December 2018, and Braun Road reconstruction is sched-
uled to be completed by the end of 2019.
WisDOT will coordinate work on road improvements with anticipated work on
I-94 and area developments to accommo-
date freeway diversion and local traffic,
construction-worker access, construc-
tion-material delivery, and utility work.
Project Schedule
Before and in conjunction with the road improvements, significant public and private utility construction will occur.
Wisconn Valley Way is a new north-south roadway between County KR and WIS 11. This multi-lane controlled access road-way will accommodate development traf-fic and control access to manage safety and mobility. The location and design of Wisconn Valley Way is also consistent with the WisDOT/Mount Pleasant MOU regarding long-term frontage road devel-opment and access management.
Wisconn Valley Way
Right of way acquisition will be necessary to build the necessary road improvements. Except for WIS 11 west of I-94, the Village of Mount Pleasant is acquiring and paying for all necessary right of way including relocations. Representatives from both the village and department’s real estate teams are available tonight to explain the process and answer questions.
Because of the zoning, development and the projected traffic volumes, access control is necessary to maintain safety and mobility. The Village of Mount Pleasant is paying for and purchasing access rights on County KR, County H, Braun Road, and International Drive. On behalf of the department, the Village of Mount Pleasant will be paying for and acquiring access rights on Wisconn Valley Way, WIS 11, and the East Frontage Road.
Right of Way Acquisition
Protecting the EnvironmentAll work on the roadway improvements will be done per the WisDOT/DNR cooperative agreement. The agencies will jointly address environmental issues including wetlands, water resources and water quality, floodplains, and threatened and endangered species. Through the cooperative agreement, DNR reviews and recommends design and construction practices to comply with applicable environmental and regulatory requirements.