Ferdinandstrasse 15
Hamburg, Germany
Contract Value (net):
1.86 million EURO
Construction Period:
11/2009 - 06/2010
Client:
Grundstücksgesellschaft
Ferdinandstr. 15 GmbH
Hamburg
Client:
Barceló Hotels & Resorts
Palma de Mallorca, Spanien
Services:
Turnkey building pit
Diaphragm wall
Anchor works
Jet grouted underpinning
Bracing
Explosive ordnance clearance
Soil works
Dewatering
Execution:Implenia Spezialtiefbau GmbHInfrastructure - Northern BranchHeidenkampsweg 8120097 HamburgGERMANY
T +49 40 229257-201F +49 40 [email protected]
www.spezialtiefbau.implenia.com
A building pit of around 8.20 m deep was required for the newdevelopment of a hotel with a two-storey underground garagein Hamburg city centre following demolition of the olddevelopment.
In the course of the trail clearance for the diaphragm wallproduction a contiguous bored pile wall d=40 cm consisting ofsteel pipes filled with reinforced concrete needed to beoverdrilled. The noise-intensive demolition works could only beperformed at night because of the adjacent development.
The building pit securing used in the areas of"Ferdinandstraße" and "Brandsende" a rear-anchoreddiaphragm wall with inserted beam support with timber infillpanels.The diaphragm wall directly in front of the building adjacent tothe east was braced into the building pit using a steelconstruction.
For structural reasons, in the ramp area of the newunderground garage the adjacent buildings needed to beunderpinned with a "watertight", rear-anchored jet groutedbody. A sealing curtain of jet grouted columns extended thisinto the marl, so that a watertight trough was created togetherwith the naturally tight floor.
Quantities:
2,100 m² diaphragm wall d=60 cm, diaphragm depth 20 m
200 m² wall with inserted beam support
750 m³ jet grouted underpinning (watertight)
96 pieces anchors, l=15-18 m (partly under water strain)
70 tonnes steel bracing
11,000 m³ demolition and soil excavation
Dewatering