BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 1
ITEM # Description Qty Unit Rate $ Amount $
1 General Items
A Power House Structure Summary
2 Substructure SUM
3 Frame SUM
4 Floors SUM
5 Staircase and Landings SUM
6 Roof SUM
7 Walls SUM
8 Ceiling SUM
9 Plumbing and Sanitary Fittings SUM
10 Joinery Fittings and Fixtures SUM
11 Cable Trenches SUM
B Workshop Structure Summary
13 Substructure SUM
14 Frame SUM
15 Roof SUM
16 Walls SUM
17 Plumbing SUM
18 Tank Farm and Bund Wall SUM
19 Water Tank Foundation SUM
20 Culvert SUM
Carried forward
POWER PLANT SUMMARY
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 2
ITEM # Description Qty Unit Rate $ Amount $
Brought forward -$
C Electricals
12 Internal and External Lighting and Fixtures SUM
21 Station Grid and Fence Grounding SUM
22 Lighting Protection SUM
23 Power Cables SUM
20 General Attendance SUM
24 Access Road SUM
25 Retaining Wall SUM
D Mechanical
26 Firefighting SUM
27 Air Conditioning SUM
28 Internal Roads SUM
29 Site Works and Drains SUM
30 Oily Water Separator SUM
E RIVER APPROACH
31 Section 1 SUM
32 Section 2 SUM
33 Section 3 SUM
34 Section 4 SUM
35 Earthworks SUM
36 Reinforced Concrete SUM
Provisional Sum SUM
Total Plant Cost
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 3
ITEM # Description Qty Unit Rate $ Amount $
1 General Items
1.1 CONTRACTUAL REQUIREMENTS
1.1.1 Performance bond SUM
1.1.2 Insurance of Works SUM
1.1.3 Insurance against damage to persons and property SUM
1.1.4 Advanced Payment Bond SUM
1.2 SPECIFIED REQUIREMENTS
1.2.1 Material Testing
1.2.1.1 Concrete and Other Tests as specified SUM
1.3 TEMPORARY WORKS
1.3.1 Access Scaffolding SUM
1.3.2 Support Scaffolding and Propping SUM
1.3.3 Temporary Fence SUM
1.4 METHOD RELATED CHARGES
1.4.1 Accomodation and Buildings
1.4.1.1 Contractor Office Facility SUM
1.4.1.2 Stores SUM
1.4.1.3 Canteen SUM
1.4.1.4 Toilets SUM
1.4.1.5 GPL Office Facility SUM
Carried Forward
Brought Forward
GENERAL ITEMS
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 4
ITEM # Description Qty Unit Rate $ Amount $
1.5 SERVICES
1.5.1 Electricity SUM
1.5.2 Water SUM
1.5.3 Security SUM
1.5.4 Site Transport SUM
1.5.5 Personnel Transport SUM
1.5.6 NIS SUM
1.5.7 PAYE SUM
1.6 PLANT MOBILIZATION AND DEMOBILIZATION
Allow for mobilization and demobilization of equipment necessary
for the safe and as per schedule execution of the works.
1.6.1 Excavators SUM
1.6.2 Cranes SUM
1.6.4 Concrete Mixers SUM
1.6.5 Concrete Transport SUM
1.6.6 Front end loaders SUM
1.6.7 Jack hammer & Compressors SUM
1.6.8 Dump Trucks SUM
1.6.9 Pile Hammer SUM
1.6.9 Road Rollers SUM
Carried Forward
Brought Forward
1.7.1 Supervision SUM
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 5
ITEM # Description Qty Unit Rate $ Amount $
1.7.2 Administration SUM
1.7.3 Site Surveying and Setting Out SUM
1.8 SAFETY EQUIPMENT AND MATERIALS
1.8.1 Allowance to be made for the supply of job-related
safety equipment as specified in the Guyoil Safety Manual
and Specifications or any equipment the Engineeer
deems necessary to ensure the safe completion of
project. Inlcude for Barricades and Site Demarcation
This sum shall not include equipment already owned by
the contractor SUM
1.10 ADJUSTMENT ITEM
The contractor shall set out below and fully describe in the
space provided overleaf (inserting the relevant clause Number
and reference) and price any work or obligation or anything in
the Contract or Specifications not included for in the tender rates
or elsewhere for which he considers a separate charge is required.
The Sums in this item shall be considered fixed lump sums, and
as such will not be subject to adjustment. If the contractor does not
make allowance in the space provided below than the rates
inserted elsewhere shall be deemed to cover all of the obligations
under the contract.
1.10.1
SUM
1.10.2
SUM
1.10.3
SUM
Carried Forward -$
Brought Forward -$
1.10.4
SUM
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 6
ITEM # Description Qty Unit Rate $ Amount $
1.10.5
SUM
1.10.6 SUM
1.10.7 SUM
1.10.8 Provisional Sum SUM
General Items to Main Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 7
ITEM # Description Qty Unit Rate $ Amount $
Engine House
2.0 SUBSTRUCTURE
2.1 Excavation and Earthwork
2.1.1 Remove existing topsoil average 150mm thick 657 m2
2.1.2 Clay and silty clay 1m -1.5m depth 199 m3
2.1.3 Backfill with white sand and compact 66 m3
2.2. Disposal
2.2.1. Dispose of excavated material off site 299 m3
2.3 Surface treatment
2.3.1 Level and ram bottom of excavation to receive sandfill 163 m2
2.3.2 Sandfill to make up levels average 150mm thick 163 m2
2.4 Disposal of water
2.4.1 Keep excavation free from general water Sum
2.5 Sandfill
2.5.1 Clean white sand ,well watered and compacted in 150mm layers 222 m3
2.6 Termite treatment
2.6.1 Treat bottom and sides of excavation against subterranean
termites and obtain a five year guarantee for this protection 626 m2
2.6.2 Ditto to top of sandfill ditto 485 m2
2.7 Damp proof membrane
2.7.1 Damp proof membrane 500 gauge polythene
sheets with 305mm side and end laps ; laps
doubled ( measured net : no allowance for laps ) 485 m2
Carried forward
Brought forward
ENGINE HOUSE
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 8
ITEM # Description Qty Unit Rate $ Amount $
2.8 Lean concrete : Blinding
2.8.1 50 mm thick cement and sand ( 1: 6 ) 163 m2
2.9 Insitu Concrete
2.9.1 Provision of concrete, designed mix
2.9.1.1 C30/37 (4375 PSI), Cement to BS12, 20 mm- coarse aggregate 189 m3
2.9.2 Placing of concrete,
2.9.2.1 reinforced footings thickness 150mm- 450mm 51 m3
2.9.2.2 reinforced walls thickness 150mm- 450mm 53 m3
2.9.2.4 reinforced concrete pedestals cross sectional area 0.2 -0.5 m2
11 m3
2.9.2.5 reinforced slabs, thickness not exceeding 150mm 74 m3
2.10 Concrete Ancillaries
2.10.1 Formwork: rough finish, beams ,pile caps , walls ,pedestals
2.10.1.1 Vertical: width 225mm 379 m
2.10.1.2 Vertical: width 300mm –1200mm 563 m2
2.10.1.3 Horizontal : width 300mm –1200mm 23 m2
2.11 Reinforcement (measured provisionally )
2.11 1. Deformed bars to BS 4449.Yield strength 460 N/mm2 (66,000 psi )
2.11.1.1 20 mm 2,660 kg
2.11.1.2 16 mm 3,111 kg
2.11.1.3 10 mm 2,936 kg
2.11.1.4 BRC No. 65 Fabric with 305mm side laps ( measured net : no 485 m2
allowance made for laps)
Substructure to Power House Summary
3.0 Frame
3.1 Insitu Concrete
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 9
ITEM # Description Qty Unit Rate $ Amount $
3.1.1 Provision of concrete, designed mix
3.1.1.1 C30/37 (4375 PSI), Cement to BS12, 20 mm- coarse aggregate 17 m3
3.1.2 Placing of concrete,
3.1.2.1 reinforced beam crossectional area 0.2 -0.5 m2
11 m3
3.1.2.3 reinforced sills, ledges and the like 5 m3
3.1.3 Concrete Ancillaries
3.1.3.1 Formwork: wrought finish, beams , walls ,slabs
3.1.3.1.1 Vertical: width 300mm –1200mm 37 m2
3.1.3.1.2 Vertical: width 150 mm 48 m
3.1.3.1.3 Horizontal: width 300mm –1200mm 18 m2
3.1.3.2 Reinforcement (measured provisionally )
3.1.3.2.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
3.1.3.2.1.1 20 mm 1,657 kg
3.1.3.2.1.3 10 mm 955 kg
Carried forward
Brought forward
3.2 Structural Steelwork to ASTM A992 complete with all
necessary connector plates , haunches, bolts, one coat
red oxide primer and two coats enamel paint , colour to be
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 10
ITEM # Description Qty Unit Rate $ Amount $
approved by employer and inclusive of all installation
3.2.1 Anchor bolt set consisting of 4 separate 25 mm diameter
anchor bolts to ASTM A449 Type 3 , 685 mm long 12 m
3.2.2 Wide Flange Beam W 16 x 31 as main girders 22 m
3.2.3 Wide Flange Beam W 16 x 36 as crane rail beams 41 m
3.2.4 Wide Flange Beam W 16 x 31 as crane rail brackets 13 m
3.2.5 Wide Flange Beam W 10 x 26 as main girders 27 m
3.2.6 Wide Flange Beam W 10 x 22 as rafters 197 m
3.2.7 Wide Flange Beam W10 x 22 as floor joists 138 m
3.2.8 Wide Flange Beam W10 x 17 as floor joists 51 m
3.2.9 Wide Flange Beam W10 x 15 as tie beams 139 m
3.2.10 Wide Flange Beam W8 x 18 as columns 53 m
3.2.11 Wide Flange Beam W8 x 31 as columns 188 m
3.2.12 Wide Flange Beam W8 x 15 as vent rafters 65 m
3.2.13 Wide Flange Beam W8 x 15 as columns 19 m
3.2.14 203 mm Galvanized Zed Purlins 660 m
3.2.1.4 25mm diameter steel rods as diagonal wind bracing 355 m
Frame to Power House Summary
4.0 Floors
4.1 Insitu Concrete
4.1.1 Provision of concrete, designed mix
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 11
ITEM # Description Qty Unit Rate $ Amount $
4.1.1.1 C30/37 (4375 PSI), Cement to BS12, 20mm- coarse aggregate 26 m3
4.1.2 Placing of concrete,
4.1.2.1 reinforced slab average thickness 100 mm 26 m3
4.2 Concrete Ancillaries
4.2.1 Formwork: 22 ga galvanised profiled metal deck left in place
4.2.1.1 Horizontal: width 300 mm –1200 mm 258 m2
4.3 Reinforcement (measured provisionally )
4.3.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
4.3.1.1 10 mm 545 kg
4.3.1.2 BRC No. 65 Fabric with 305 mm side laps ( measured net : no
allowance made for laps ) 258 m2
4.4 Floor tiles
4.4.1 25mm thick cement /sand mortar screed to concrete floor 258 m2
4.4.2 610 mm x 610 mm non slip porcelain tiles 20 mm thick in
approved colours in thinset and pointing in white or
coloured cement grout 163 m2
4.5 Epoxy paint finish to concrete floor
4.5.1 Self priming,self sealing trowel applied,aggregate-rich
polyurethane and aggregate- cement based matrix coat 6
mm thick - Florocrete HD or equivalent 485 m2
Floor to Power House Summary
5.0 Staircases and Landings
5.1 Structural Steelwork to ASTM A992 complete with all
necessary connector plates , haunches, bolts, one coat
red oxide primer and two coats enamel paint , colour to be
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 12
ITEM # Description Qty Unit Rate $ Amount $
approved by employer and inclusive of all installation
5.1.1 Channel Section C 8 x 13.7 as stringer 68 m
5.1.2 Angle Section 51 x 51 x 6mm as treader bracket 37 m
5.1.3 Wide Flange Beam W 8 x 15 as landing bracket bolted to
reinforced concrete wall complete with 12mm steel face plate
and 20 No. 20mm diameter anchor bolts 152mm long for fixing 5 m
5.1.4 10mm thick steel chequered plate cut and bent and welded to
treader bracket as treaders 21 m2
5.1.5 10mm thick steel chequered plate cut and bent and welded to
treader bracket as landings 10 m2
5.2 Miscellaneous Metal Work
5.2.1 Galvanized iron pipe handrail 1 m high from 50mm Ø galv. pipe
with top and middle rail and intermediate supports at 1.5m c/c
complete with 150mm x 150mm x10m base plate.and 10 mm
Ø bolts 100mm long including one coat etching primer , one
coat zinc cromate primer and two coats metal paint 69 m
Staircases and Landings to Power Plant Summary
6.0 Roof
6.1 Roof Covering
6.1.1 26 gauge pre-painted galvalum roof sheets with 2
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 13
ITEM # Description Qty Unit Rate $ Amount $
corrugation side laps and 305 mm end laps fixed to purlins
with drive screws and neoprene washers ( measured net
: no allowance for laps ) and with adhesive sealing strip 737 m2
6.1.2 26 gauge pre-painted plain ridge flashing 610 mm girth
once bent and dressed over roof sheets including
fixing with drive screws and neoprene washers 38 m
6.2 Rainwater Goods
6.2.1 150mm x150mm pvc box gutter fixed to steel fascia with PVC 71 m
brackets
6.2.2 100 mm diameter non pressure pvc down pipe fixed to concrete
columns with metal brackets including 12 no. 90 deg bends 30 m
6.3 Roof Insulation
6.3.1 1 layer Prodex AD 10 Thermal Insulation or equivalent
below roof sheets 737 m2
Roof to Power Plant Summary
7.0 Walls
7.1 External
7.1.1 Blockwork
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 14
ITEM # Description Qty Unit Rate $ Amount $
7.1.1.1 150 mm thick hollow concrete block in cement/sand mortar ( 1:4) 720 m2
7.1.1.2 Plaster 50mm thick cement /sand ( 1:4) 1440 m2
7.1.1.3 Expanded metal ex 250 mm wide set in concrete columns
every 5th blockwork course as wall tie 206 m
7.1.2 Doors
7.1.2.1 Single hung hardwood panel door 915 mm x 2134 mm x 63 mm
complete with 50mm x 150mm GH frame , 3 no. metal hinges ,
and mortice lock , Yale or equivalent 4 nr
7.1.2.2 Galvanised steel roller shutter doors 3658 mm wide x 2438 mm
high complete with metal frame, electrical mechanism for
opening and closing and locking device 2 nr
7.1.3 Windows
7.1.3.1 Sliding window 1067 mm wide x 1524 mm high , clear glass
6mm thick in anodised aluminum frame all set in block wall 7 nr
7.1.3.1 Sliding window 915 wide x 610 high , clear glass 6 mm thick
in anodised aluminum frame all set in block wall 6 nr
7.1.3.2 Steel louver window 915 mm wide by 457 mm high fixed to
hollow concrete block wall comprising 6 No 125 mm x 1.5 mm
flat section set at 45 deg louver blades fixed in a 100 x 100 x 3
mm RHS frame , and complete with all necessary brackets ,bolts,
welds , anchors and seals and including one coat etching
primer ,one coat zinc cromate and three coats metal paint 61 nr
Carried Forward
Brought Forward
7.1.4 Painting
7.1.4.1 1 coat primer to timber doors including door frames 8 m2
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 15
ITEM # Description Qty Unit Rate $ Amount $
7.1.4.2 2 coats oil based paint to timber doors including door frames 8 m2
7.1.4.3 3 coats emulsion paint to block walls 720 m2
7.1.4.4 1 coat textured paint, Spread Tex or equivalent 720 m2
7.2 Internal
7.2.1 Blockwork
7.2.1.1 102 mm thick hollow concrete block in cement / sand mortar 392 m2
7.2.1.2 Plaster 51mm thick cement /sand ( 1:4) 784 m2
7.2.3 Doors
7.2.3.1 Single hung hardwood flush door 915 mm x 2134 mm x 63 mm
with 25 mm x 100 mm hardwood lock rail clad with 6 mm
plywood both faces and finished both faces with furniture quality
sheet laminate by WILSONART or equivalent and bound on all
edges w hardwood strip complete with 50mm x 150mm GH
frame , 3 no. metal hinges , and mortice lock , Yale or equivalent 12 nr
7.2.3.2 Single hung hardwood flush door 762 mm x 2134 mm x 63 mm
with 25 mm x 100 mm hardwood lock rail clad with 6 mm
plywood both faces and finished both faces with furniture quality
sheet laminate by WILSONART or equivalent and bound on all
edges w hardwood strip complete with 50mm x 150mm GH
frame , 3 no. metal hinges , and mortice lock , Yale or equivalent 6 nr
7.2.4 Windows
7.1.4.1 Sliding window 1067 mm wide x 1524 mm high , clear glass
6mm thick in anodised aluminum frame all set in block wall 8 nr
Carried Forward
Brought Forward
7.2.5 Concrete work
7.2.5.1 Precast C30/37 reinforced concrete lintels 102 mm x 203 mm
x 1372 mm long with 2 no. 12 mm dia bars top and bottom and
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 16
ITEM # Description Qty Unit Rate $ Amount $
6 mm dia stirrups at 100 mm centers including all necessary
formwork and bedding lintel on blockwork 101 nr
7.2.5.2 Precast C30/37 reinforced concrete lintels 102 mm x 203 mm
x 2438 mm long with 2 no. 12 mm dia bars top and bottom and
6 mm dia stirrups at 100 mm centers including all necessary
formwork and bedding lintel on blockwork 2 nr
7.2.6 Painting
7.2.6.1 3 coats emulsion paint to block walls 784 m2
7.2.7 Wall tiles
7.2.7.1 305 mm x 305 mm ceramic tiles in thinset and pointing in white
or coloured cement 79 m2
7.2.7.3 610 x 100 mm skirting cut from 610 mm x 610 mm x 20 mm
porcelain tiles in thinset and pointing in white or coloured cement 105 m
7.2.8 Fire Extinguishers
7.2.8.1 Supply and install 5 kg dry chemical fire extingisher complete
with wall mount 4 Nr
Walls to Power House Summary
8.0 Ceilings
8.1 Acoustic ceiling tile in lightweight C-section galvanised
metal frame on a 610mm x 610 mm grid suspended from
floor and roof above with8 mm diameter steel hanger rods .
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 17
ITEM # Description Qty Unit Rate $ Amount $
8.1.1 10 mm thick acoustic ceiling tile 610 mm x 610 mm
complete with metal framing and hanger rods 200 m2
8.2 Gypsum wall board single panelled as ceiling bulkhead on
50 mm x 100 mm light weight metal framing including
taping and slicking of joints
8.2.1 16 mm thick gypsum board complete with metal framing
and hanger rods 5 m2
8.3 Hardwood moulding screwed to block wall
wall
8.3.1 76 mm wide 214 m
8.4 Painting
8.4.1 1 coat primer to timber moulding 33 m2
8.4.2 2 coats oil based paint to timber moulding 17 m2
8.4.3 3 coats emulsion paint to ceiling bulkhead 5 m2
Ceilings to Power House Summary
9.0 Plumbing and Sanitary Fittings
9.1 Water Closets
9.1.1 White Vitreous china WC suite Type BTW by Twyfords or
similar comprising P trap ,wash down action rimless bowl ,siphon
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 18
ITEM # Description Qty Unit Rate $ Amount $
jets , WC bowl back inlet , 9 litre capacity cistern and cover
with flush valve , side inlet ball valve , 20 mm diameter side
overflow , solid plastic seat and cover with stainless steel hinges
and plastic outlet connector for 100 mm soil pipe including fixing 4 nr
9.1.2 White vitreous chinal urinal by Twyfords or similar
comprising p trap, wash down action and siphon jets
inclusive of all necessary pipes, valves, bends and connections 2 nr
9.2 Lavatory Basins
9.2.1 Sandringham 50 cm by Armitage Shanks or similar ,
white vitreous china , with one tap hole , wall mounted
complete with chrome plated pillar mixer lever type tap for
hot/ cold water supply , 37 mm waste outlet fittings ,trap ,
chain stay and plug including fixing and inclusive of all
necessary pipes , valves ,bends and connections 4 nr
9.3.2 Single bowl , double drainboard stainless steel sink
complete with chrome plated pillar tap for cold water
supply 37 mm waste outlet fittings ,trap ,chain stay and
plug including fixing to counter and inclusive of all
necessary pipes , valves ,bends and connections 1 nr
9.3 Toilet Roll Holders
9.3.1 Toilet roll holder, screw fix to all, chrome plated 6 nr
9.4 Sanitary Installation
9.4.1 PVC non pressure Pipe and fittings with cement solvent
joints
9.4.1.1 Soil Pipe 100 mm diameter 55 m
9.4.1.2 Vent pipe 100 mm diameter 12 m
9.4.1.3 Waste Pipe 51 mm diameter 45 m
Carried Forward
Brought Forward
9.4.2 Extra over for 100mm diameter pvc soil pipe :
9.4.2.1 Single branch 8 nr
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 19
ITEM # Description Qty Unit Rate $ Amount $
9.4.2.2 Single branch with rodding eye 8 nr
9.4.2.3 WC pan connector 8 nr
9.4.2.4 Bend 18 nr
9.4.2.5 Vent cowl 4 nr
9.4.3 Extra over for 51 mm diameter pvc waste pipe :
9.4.3.1 S trap 51 mm diameter with screwed cleaning eye 8 nr
9.4.3.2 P trap 51 mm diameter 8 nr
9.4.3.3 Bend 51 mm diameter 24 nr
9.5 Cold Water Installation
9.5.1 PVC pressure Pipe and fittings with cement solvent joints
9.5.1.1 Pipe 20 mm diameter 37 m
9.5.1.2 Pipe 12 mm diameter 12 m
9.5.2 Extra over for 20 mm diameter pvc pressure pipe :
9.5.2.1 Bends 18 nr
9.5.2.2 Tees 18 nr
9.5.2.3 20 mm diameter high pressure screw down brass stop cock 8 nr
9.5.2.4 20 mm diameter bib cock 8 nr
9.5.2.5 Straight reducer 20 mm to 12 mm 8 nr
Carried Forward
Brought Forward
9.5.2.5 Straight tap connector with screwed joint to tubing 8 nr
9.5.3 Extra over for 12 mm diameter pvc pressure pipe:
9.5.3.1 Bends 8 nr
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 20
ITEM # Description Qty Unit Rate $ Amount $
9.5.3.2 Tees 8 nr
9.5.3.3 12 mm diameter high pressure screw down brass stop cock 8 nr
9.5.3.4 Straight tap connector with screwed joint to tubing 8 nr
9.5.3.5 Connection of 12 mm diameter pvc pipe to WC cistern including
all necessary fittings 4 nr
9.6 Miscellaneous Fittings and Fixtures
9.6.1 2700 litre plastic water tank 4 Nr
9.7 Sewage Treatment
9.7.1 Excavation and Earthworks
9.7.1.1 Excavation for foundations
9.7.1.2 Clay and silty clay 1m -1.5m depth 17 m3
9.7.1.3 Planking and strutting of sides of excavation not
exceeding 1.5 m deep 33 m2
9.7.2 Disposal
9.7.2.1 Dispose of excavated material off site 17 m3
9.7.3 Surface Treatment
9.7.3.1 Level and ram botton of excavation to receive sandfill 10 m2
9.7.3.2 Sandfill to make levels average 150 mm thick 10 m2
Carried Forward
Brought Forward
9.7.4 Disposal of Water
9.7.4.1 Keep excavation free from general water SUM
9.7.5 Backfill
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 21
ITEM # Description Qty Unit Rate $ Amount $
9.7.5.1 Clean white sand, well watered and compacted in 150 mm layers 3 m3
9.7.6 Lean concrete : Blinding
9.7.6.1 51 mm thick cement and sand ( 1: 6 ) 20 m2
9.7.7 Insitu Concrete*
9.7.7.1 Provision of concrete, designed mix
9.7.7.1.1 C30/37 (4375 PSI), Cement to BS12, 3/4- coarse aggregate 3 m3
9.7.7.2 Placing of concrete
9.7.7.2.1 reinforced slabs, thickness not exceeding 150 mm 3 m3
9.7.8 Concrete Ancillaries
9.7.8.1 Formwork: rough finish, beams ,pile caps , walls ,pedestals
9.7.8.1.1 Vertical: width 200 mm 17 m
9.7.8.2 Reinforcement (measured provisionally )
9.7.8.2.1 BRC No. 65 Fabric with 305 mm side laps (measured net: no 20 m2
allownace made for laps)
9.7.9 Septic Tank
9.7.9.1 Supply and install septic tank Roboplastic as
manufactured by Roto Plastic Trinidad Ltd.
Inclusive of sealed cover holding
9.7.9.1.1 2275 litres 1 nr
Carried Forward
Brought Forward
9.7.10 Soakaway
9.7.10.1 Excavation for pits
9.7.10.2 Clay and silty clay 1m -1.5m depth 5 m3
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 22
ITEM # Description Qty Unit Rate $ Amount $
9.7.11 Geotextile Fabric
9.7.11.1 Non woven geotextile fabric Type 801 from Synthetic
Industries or equivalent with 150 mm side laps ( measured net
: no allowance made for laps) 19 m2
9.7.12 Backfill
9.7.12.1 Selected clay compacted in 6 layers 2 m3
9.7.12.2 20 mm single size aggregate 4 m3
9.7.13 PVC non pressure Pipe and fittings with cement solvent
joints
9.7.13.1 Soil Pipe 100 mm diameter with 36 No. 6 mm dia drilled holes 4 m
Plumbing & Sanitary Fittings to Power Plant Summary
10.0 Joinery Fitting and Fixtures
10.1 Floor level kitchen cabinets 915 mm high x 3350 mm wide x
610 mm deep with 4 No doors 686 mm wide by 762 mm high
and intermediate shelf and drawers all from MDF board and
37 mm thick CORIAN or equivalent counter top
complete with all door hinges , door knobs and ball catches
draw slides and handles including painting and installation 1 No
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 23
ITEM # Description Qty Unit Rate $ Amount $
10.2 Floor level kitchen cabinets 915 mm high x 1220 mm wide x
610 mm deep with 4 No doors 686 mm wide by 762 mm high
and intermediate shelf and drawers all from MDF board and
37 mm thick CORIAN or equivalent counter top
complete with all door hinges , door knobs and ball catches
draw slides and handles including painting and installation 1 No
10.3 High level kitchen cabinets 915 mm high x 1830 mm wide x
610 mm deep with 4 No doors 686 mm wide by 762 mm high
complete with all door hinges , door knobs and ball catches
draw slides and handles including painting and installation 1 No
Joinery Fitting and Fixtures to Power Plant Summary
11.0 Cable Trenchs
11.1 Reinforced Concrete Cable Trench 1525 mm wide 610 mm deep
with 150 mm thick base and sides and with 76 mm x76 mm
rebate to top of drain on both sides reinforced with 51 mm x
51 mm x 6 mm angle set in concrete and including all necessary
excavation ,return fill and compaction ,formwork and No 65
BRC fabric to base and sides. 24 m
Cable Trenches to Power Plant Summary
Power Plant Summary
2.0 Substructure
3.0 Frame
4.0 Floors
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 24
ITEM # Description Qty Unit Rate $ Amount $
5.0 Staircases and Landings
6.0 Roof
7.0 Walls
8.0 Ceiling
9.0 Plumbing and Sanitary Fittings
10.0 Joinery Fittings and Fixtures
11.0 Cable Trenches
Engine House to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 25
ITEM # Description Qty Unit Rate $ Amount $
Workshop
13.1 Excavation and Earthwork
13.1.1 Excavate topsoil average 150 mm thick 1,170 m2
13.1.2 Excavate foundation - Clay and silty clay 1m -1.5 m depth 58 m3
13.1.3 Backfill with white sand and compact 175 m3
13.2. Disposal
13.2.1. Dispose of excavated material off site 236 m3
13.3 Surface treatment
13.3.1 Level and ram bottom of excavation to receive sandfill 48 m2
13.3.2 Sandfill to make up levels average 150 mm thick 48 m2
13.4 Disposal of water
13.4.1 Keep excavation free from general water Sum
13.5 Sandfill
13.5.1 Clean white sand ,well watered and compacted in 150 mm layers 62 m3
13.6 Termite treatment
13.6.1 Treat bottom and sides of excavation against subterranean
termites and obtain a five year guarantee for this protection 201 m2
13.6.2 Ditto to top of sandfill ditto 136 m2
13.7 Damp proof membrane
13.7.1 Damp proof membrane 500 gauge polythene
sheets with 305 mm side and end laps ; laps
doubled ( measured net : no allowance for laps ) 136 m2
Carried forward
Carried forward
Brought forward
WORKSHOP
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 26
ITEM # Description Qty Unit Rate $ Amount $
13.8 Lean concrete : Blinding
13.8.1 51 mm thick cement and sand ( 1: 6 ) 48 m2
13.9 Insitu Concrete
13.9.1 Provision of concrete, designed mix
13.9.1.1 C30/37 (4375 PSI), Cement to BS12, 20 mm- coarse aggregate 56 m3
13.9.2 Placing of concrete,
13.9.2.1 reinforced footings thickness 150mm- 450mm 11 m3
13.9.2.2 reinforced walls thickness 150mm- 450mm 17 m3
13.9.2.4 reinforced concrete pedestals cross sectional area 0.2 -0.5 m2
2 m3
13.9.2.5 reinforced slabs, thickness not exceeding 150mm 27 m3
13.10 Concrete Ancillaries
13.10.1 Formwork: rough finish, beams ,pile caps , walls ,pedestals
13.10.1.1 Vertical: width 225mm 126 m
13.10.1.2 Vertical: width 300mm –1200mm 161 m2
13.11 Reinforcement (measured provisionally )
13.11 1. Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
13.11.1.1 20 mm 535 kg
13.11.1.2 16 mm 785 kg
13.11.1.3 10 mm 733 kg
13.11.1.4 BRC No. 65 Fabric with 305mm side laps ( measured net : no
allowance made for laps) 136 m2
Substructure to Workshop Summary
14.0 FRAME
14.1 Insitu Concrete
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 27
ITEM # Description Qty Unit Rate $ Amount $
14.1.1 Provision of concrete, designed mix
14.1.1.1 C30/37 (4375 PSI), Cement to BS12, 20 mm- coarse aggregate 8 m3
14.1.2 Placing of concrete,
14.1.2.1 reinforced beam crossectional area 0.2 -0.5 m2
5 m3
14.1.2.3 reinforced columns crossectional area 0.2 -0.5 m2
2 m3
14.1.3 Concrete Ancillaries
14.1.3.1 Formwork: wrought finish, beams , walls ,slabs
14.1.3.1.1 Vertical: width 300 mm –1200 mm 126 m2
14.1.3.1.2 Horizontal: width 300 mm –1200 mm 16 m2
14.1.3.2 Reinforcement (measured provisionally )
14.1.3.2.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
14.1.3.2.1.1 20 mm 773 kg
14.1.3.2.1.3 10 mm 429 kg
14.2 Structural Steelwork to ASTM A992 complete with all
necessary connector plates , haunches, bolts, one coat
red oxide primer and two coats enamel paint , colour to be
approved by employer and inclusive of all installation
14.2.1 Anchor bolt set consisting of 4 separate 20 mm diameter
anchor bolts to ASTM A449 Type 3 , 305 mm long 55 Nr
14.2.1.1 Wide Flange Beam W 8 x 15 as rafters 43 m
14.2.1.2 203 mm Galvanized Zed Purlins 164 m
Frame to Workshop Summary
15.0 ROOF
15.1 Roof Covering
15.1.1 26 gauge pre-painted galvalum roof sheets with 2
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 28
ITEM # Description Qty Unit Rate $ Amount $
corrugation side laps and 305 mm end laps fixed to purlins
with drive screws and neoprene washers ( measured net
: no allowance for laps ) and with adhesive sealing strip 156 m2
15.1.2 26 gauge pre-painted plain ridge flashing 610 mm girth
once bent and dressed over roof sheets including
fixing with drive screws and neoprene washers 16 m
15.2 Rainwater Goods
15.2.1 150mm x150mm pvc box gutter fixed to steel fascia with PVC 33 m
brackets
15.2.2 100 mm diameter non pressure pvc down pipe fixed to concrete 37 m
columns with metal brackets including 12 no. 90 deg bends
15.3 Roof Insulation
15.3.1 1 layer Prodex AD 10 Thermal Insulation or equivalent
below roof sheets 156 m2
Roof to Workshop Summary
16.0 WALLS
16.1 External
16.1.1 Blockwork
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 29
ITEM # Description Qty Unit Rate $ Amount $
16.1.1.1 152 mm thick hollow concrete block in cement/sand mortar ( 1:4) 186 m2
16.1.1.2 Plaster 51mm thick cement /sand ( 1:4) 371 m2
16.1.1.3 Expanded metal ex 254 mm wide set in concrete columns
every 5th blockwork course as wall tie 206 m
16.1.2 Doors
16.1.2.1 Single hung hardwood panel door 915 mm x 2134 mm x 63 mm
complete with 50mm x 150mm GH frame , 3 no. metal hinges ,
and mortice lock , Yale or equivalent 2 nr
16.1.2.2 Galvanised steel roller shutter doors 3658 mm wide x 2438 mm
high complete with metal frame, electrical mechanism for
opening and closing and locking device 1 nr
16.1.3 Windows
16.1.3.1 Steel louver window 915 mm wide by 457 mm high fixed to
hollow concrete block wall comprising 6 No 125 mm x 1.5 mm
flat section set at 45 deg louver blades fixed in a 100 x 100 x 3
mm RHS frame , and complete with all necessary brackets ,bolts,
welds , anchors and seals and including one coat etching
primer ,one coat zinc cromate and three coats metal paint 40 nr
16.1.4 Concrete work
16.1.4.1 Precast C30/37 reinforced concrete lintels 102 mm x 203 mm
x 1372 mm long with 2 no. 12 mm dia bars top and bottom and
6 mm dia stirrups at 100 mm centers including all necessary
formwork and bedding lintel on blockwork 2 nr
16.1.4.2 Precast C30/37 reinforced concrete lintels 102 mm x 203 mm
x 2438 mm long with 2 no. 12 mm dia bars top and bottom and
6 mm dia stirrups at 100 mm centers including all necessary
formwork and bedding lintel on blockwork 1 nr
Carried Forward
Brought Forward
16.1.5 Painting
16.1.5.1 1 coat primer to timber doors including door frames 8 m2
16.1.5.2 2 coats oil based paint to timber doors including door frames 8 m2
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 30
ITEM # Description Qty Unit Rate $ Amount $
16.1.5.3 3 coats emulsion paint to block walls 186 m2
16.1.5.4 1 coat textured paint, Spread Tex or equivalent 186 m2
16.2 Internal
16.2.1 Blockwork
16.2.1.1 102 mm thick hollow concrete block in cement / sand mortar 34 m2
16.2.1.2 Plaster 51mm thick cement /sand ( 1:4) 69 m2
16.2.2 Doors
16.2.2.1 Single hung hardwood panel door 915 mm x 2134 mm x 63 mm
complete with 50mm x 150mm GH frame , 3 no. metal hinges ,
and mortice lock , Yale or equivalent 4 nr
16.2.2.2 Single hung hardwood panel door 762 mm x 2134 mm x 63 mm
complete with 50 mm x 150 mm GH frame , 3 no. metal hinges ,
and mortice lock , Yale or equivalent 1 nr
16.2.3 Painting
16.2.3.1 1 coat primer to timber doors including door frames 20 m2
16.2.3.2 2 coats oil based paint to timber doors including door frames 20 m2
16.2.3.3 3 coats emulsion paint to block walls 69 m2
16.2.4 Concrete work
16.2.4.1 Precast C30/37 reinforced concrete lintels 102 mm x 203 mm
x 1372 mm long with 2 no. 12 mm dia bars top and bottom and
6 mm dia stirrups at 100 mm centers including all necessary
formwork and bedding lintel on blockwork 5 nr
Carried Forward
Brought Forward
16.2.5 Wall tiles
16.2.5.1 305 mm x 305 mm ceramic tiles in thinset and pointing in white
or coloured cement 13 m2
Walls to Workshop Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 31
ITEM # Description Qty Unit Rate $ Amount $
17.0 PLUMBING AND SANITARY FITTINGS
17.1 Water Closets
17.1.1 White Vitreous chinaWC suite Type BTW by Twyfords or
similar comprising P trap ,wash down action rimless bowl
, siphon jets , WC bowl back inlet , 9 litre
capacity cistern and cover with flush valve , side inlet
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 32
ITEM # Description Qty Unit Rate $ Amount $
ball valve , 20 mm diameter side overflow , solid plastic
seat and cover with stainless steel hinges and plastic
outlet connector for 100 mm soil pipe including fixing 1 nr
17.2 Lavatory Basins
17.2.1 Sandringham 50 cm by Armitage Shanks or similar ,
white vitreous china , with one tap hole , wall mounted
complete with chrome plated pillar mixer lever type tap for
hot/ cold water supply , 37 mm waste outlet fittings ,trap ,
chain stay and plug including fixing and inclusive of all
necessary pipes , valves ,bends and connections 1 nr
17.2.2 Single bowl , double drainboard stainless steel sink
complete with chrome plated pillar tap for cold water
supply 37 mm waste outlet fittings ,trap ,chain stay and
plug including fixing to counter and inclusive of all
necessary pipes , valves ,bends and connections 1 nr
17.3 Toilet Roll Holders
17.3.1 Toilet roll holder, screw fix to all, chrome plated 1 nr
17.4 Sanitary Installation
17.4.1 PVC non pressure Pipe and fittings with cement solvent
joints
17.4.1.1 Soil Pipe 100 mm diameter 12 m
17.4.1.2 Vent pipe 100 mm diameter 3 m
17.4.1.3 Waste Pipe 51 mm diameter 12 m
Carried Forward
Brought Forward
17.4.2 Extra over for 100mm diameter pvc soil pipe :
17.4.2.1 Single branch 2 nr
17.4.2.2 Single branch with rodding eye 1 nr
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 33
ITEM # Description Qty Unit Rate $ Amount $
17.4.2.3 WC pan connector 1 nr
17.4.2.4 Bend 4 nr
17.4.2.5 Vent cowl 1 nr
17.4.3 Extra over for 51 mm diameter pvc waste pipe :
17.4.3.1 S trap 51 mm diameter with screwed cleaning eye 1 nr
17.4.3.2 P trap 51 mm diameter 2 nr
17.4.3.3 Bend 51 mm diameter 6 nr
17.5 Cold Water Installation
17.5.1 PVC pressure Pipe and fittings with cement solvent joints
17.5.1.1 Pipe 20 mm diameter 37 m
17.5.1.2 Pipe 12 mm diameter 12 m
17.5.2 Extra over for 20 mm diameter pvc pressure pipe :
17.5.2.1 Bends 4 nr
17.5.2.2 Tees 4 nr
17.5.2.3 20 mm diameter high pressure screw down brass stop cock 2 nr
17.5.2.4 20 mm diameter bib cock 1 nr
17.5.2.5 Straight reducer 20 mm to 12 mm 2 nr
Carried Forward
Brought Forward
17.5.2.6 Straight tap connector with screwed joint to tubing 2 nr
17.5.3 Extra over for 12 mm diameter pvc pressure pipe:
17.5.3.1 Bends 4 nr
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 34
ITEM # Description Qty Unit Rate $ Amount $
17.5.3.2 Tees 4 nr
17.5.3.3 12 mm diameter high pressure screw down brass stop cock 2 nr
17.5.3.4 Straight tap connector with screwed joint to tubing 1 nr
17.5.3.5 Connection of 12 mm diameter pvc pipe to WC cistern including
all necessary fittings 1 nr
17.6 Miscellaneous Fittings and Fixtures
16.2.5 Fire Extinguishers
17.6.1 Supply and install 5 kg dry chemical fire extingisher complete
with wall mount 2 Nr
17.6.2 2700 litre plastic water tank 1 nr
17.7 Sewage Treatment
17.7.1 Excavation and Earthworks
17.7.1.1 Excavation for foundations
17.7.1.2 Clay and silty clay 1m -1.5m depth 17 m3
17.7.1.3 Planking and strutting of sides of excavation not
exceeding 1.5 m deep 33 m2
17.7.2 Disposal
17.7.2.1 Dispose of excavated material off site 17 m3
Carried Forward
Brought Forward
17.7.3 Surface Treatment
17.7.3.1 Level and ram botton of excavation to receive sandfill 10 m2
17.7.3.2 Sandfill to make levels average 150 mm thick 10 m2
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 35
ITEM # Description Qty Unit Rate $ Amount $
17.7.4 Disposal of Water
17.7.4.1 Keep excavation free from general water SUM
17.7.5 Backfill
17.7.5.1 Clean white sand, well watered and compacted in 150 mm layers 3 m3
17.7.6 Lean concrete : Blinding
17.7.6.1 51 mm thick cement and sand ( 1: 6 ) 20 m2
17.7.7 Insitu Concrete*
17.7.7.1 Provision of concrete, designed mix
17.7.7.1.1 C30/37 (4375 PSI), Cement to BS12, 20 mm - coarse aggregate 3 m3
17.7.7.2 Placing of concrete
17.7.7.2.1 reinforced slabs, thickness not exceeding 150 mm 3 m3
17.7.8 Concrete Ancillaries
17.7.8.1 Formwork: rough finish, beams ,pile caps , walls ,pedestals
17.7.8.1.1 Vertical: width 200 mm 17 m
17.7.8.2 Reinforcement (measured provisionally )
17.7.8.2.1 BRC No. 65 Fabric with 305 mm side laps (measured net: no 20 m2
allownace made for laps)
Carried Forward
Brought Forward
17.7.9 Septic Tank
17.7.9.1 Supply and install septic tank Roboplastic as
manufactured by Roto Plastic Trinidad Ltd.
Inclusive of sealed cover holding
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 36
ITEM # Description Qty Unit Rate $ Amount $
17.7.9.1.1 2275 litres 1 nr
17.7.10 Soakaway
17.7.10.1 Excavation for pits
17.7.10.1.1 Clay and silty clay 1m -1.5m depth 5 m3
17.7.10.2 Geotextile Fabric
17.7.10.2.1 Non woven geotextile fabric Type 801 from Synthetic
Industries or equivalent with 150 mm side laps ( measured net
: no allowance made for laps) 19 m2
17.7.10.3 Backfill
17.7.10.3.1 Selected clay compacted in 6 layers 2 m3
17.7.10.3.2 20 mm single size aggregate 4 m3
17.7.10.4 PVC non pressure Pipe and fittings with cement solvent
joints
17.7.10.4.1 Soil Pipe 100 mm diameter with 36 No. 6 mm dia drilled holes 4 m
Plumbing & Sanitary Fittings to Power Plant Summary
Workshop Summary
13.0 Substructure
14.0 Frame
15.0 Roof
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 37
ITEM # Description Qty Unit Rate $ Amount $
16.0 Walls
17.0 Plumbing & Sanitary Fittings
Workshop to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 38
ITEM # Description Qty Unit Rate $ Amount $
12.0 INTERNAL & EXTERNAL LIGHTING & FIXTURES
12.1 Internal and External Lighting Fixtures
12.1.1 LED Troffer Complete Lighting Fixture
48" x 24", 4000K, 3000 lumens LED Troffer complete
Lighting Fixture, inclusive of all screws and other additional
accessories for firm and safe installation. Operating voltage
120 to 277 Vac, 60Hz and shall be 50,000 hr of rated life 50 Nr
12.1.2 LED Wraparound Lighting Fixture (2380 lumens)
47-2/5" x 5-1/2", 4000K, 2380 Lumens LED Wraparound
Fixture, inclusive of all screws and other additional
accessories for its firm and safe installation. Operational
voltage 120Vac, 60Hz and shall be 50,000 hr of rated life 11 Nr
12.1.3 LED Wraparound Lighting Fixture (1200 lumens)
47-2/5" x 5-1/2", 4000K, 1200 Lumens LED Wraparound
Fixture, inclusive of all screws and other additional
accessories for its firm and safe installation. Operational
voltage 120Vac, 60Hz and shall be 50,000 hr of rated life 13 Nr
12.1.4 LED High Bay Complete Lighting Fixture
4x60W, 4745K to 5310K LED High Bay complete
lighting fixture, inclusive of all screws and other additional
accessories for firm and safe installation. Operating voltage
100 to 277 Vac, efficacy shall be not less than 109 lm/W 24 Nr
12.1.5 LED Wallpack Outdoor Area Flood Light
40W, 5000K LED Wallpack outdoor area flood light
lighting fixture, inclusive of all screws and other additional
accessories for firm and safe installation. Operating voltage
100 to 277 Vac, efficacy 80 lm/W, NEMA 7x7 14 Nr
12.1.5 Pole Mounted Area Lighting
4x60W, 4000K Hi-Power LED Shoebo, Variable-Mount
Luminarie with photocell, inclusive of all screws and other
accessories for firm and safe installation. Operating voltage
100 to 277 Vac, efficacy shall be not less than 93 lm/W
Housing shall be die-cast aluminum textured architectural
bronze powder coat finished over a chromate conversion
coating and fitted with tempered flat clear glass lens.
Include mouting arm fixtures for 3" dia. Galv. Pole (Included) 22 Nr
Carried Forward
Brought Forward
ELECTRICALS
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 39
ITEM # Description Qty Unit Rate $ Amount $
12.2 Cables
12.2.1 Low Smoke Zero Halogen BSEN60702 Part 1, 750V
(Heavy Duty) Magnesium Oxide Insulation, cores laid up,
Plain Copper Sheath, LSZH sheathSolid Plain Copper
Conductor, including adequately sized gland, seal and gland
shroud for both ends of each conductor
12.2.1.1 3 x 50mm2
1 roll
12.2.1.2 3 x 10mm2
10 roll
12.2.1.3 3 x 4mm2
5 roll
12.2.1.4 3 x 2.5mm2
12 roll
12.2.1.5 3 x 1.5mm2
4 roll
12.3 Switches
12.3.1 Supply and Installation of double pole single gang 32 Amp
flush mount UL Listed switch with metallic base and all other
necessary accessories and fittings for its firm and safe
installation. 7 Nr
12.3.2 Supply and Installation of double pole single gang 6 Amp flush
mount UL Listed switch with metallic base and all other
necessary accessories and fittings for its firm and safe
installation. 37 Nr
12.4 Receptacles
Supply and Installation of 15 Amp Switched Socket 120V
Duplex UL listed flush mounted Outlet with metallic base. 29 Nr
Carried Forward
Brought Forward
12.5 Moulded Case Circuit Breakers
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 40
ITEM # Description Qty Unit Rate $ Amount $
Supply and Install of the following IEC 60947-2 rated TP,
Icu ≥ 35kA, Ue ≥ 480 MCCB (UL 489 CSA C22.2) including
adequate sized enclosure (NEMA 2/IP30), bolts and nuts and
all other fittings and accessories for its firm and safe
installation:
12.5.1 125 Amp 2 Nr
12.5.2 100 Amp 2 Nr
12.5.3 50 Amp 1 Nr
12.5.4 15 Amp 5 Nr
12.6 Bus Bar Chamber
Supply and Installation of 200 Amp BSEN60439-1, Icu=63kA
550V, 1φ 3W Bus Bar 1 Nr
12.7 Load Centres
12.7.1 Supply and Installation of 125Amps, 24 Pole, 1φ-3W UL
listed Circuit Breaker Panel 4 Nr
12.7.2 Supply and Installation of 125Amps, 12 Pole, 3φ-4W UL
listed Circuit Breaker Panel 2 Nr
12.8 Miniature Circuit Breakers
12.8.1 Supply and Installation of the following IEC 60947-2 rated,
Icu ≥ 10kA, Ue ≥ 240 MCB:
12.8.1.1 15 Amp Single Pole 18 Nr
12.8.1.2 30 Amp Single Pole 6 Nr
Carried Forward
Brought Forward
12.9 Rigid Metallic Conduits and Fittings
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 41
ITEM # Description Qty Unit Rate $ Amount $
Supply and Install of the following 10ft length Galvanized Steel
Rigid Metallic and all other necessary fittings and ascessories
for its safe and firm installation.
12.9.1 3/4" 200 Nr
12.9.2 2 1/2" 10 Nr
12.9.3 Supply and Install the following Fittings for the 3/4",
Galvanized Steel Rigid Metallic Conduit:
12.9.3.1 "T" 30 Nr
12.9.3.2 Coupling 20 Nr
12.9.3.3 Clamps 400 Nr
12.9.3.4 Standard Entries (Male) 20 Nr
12.9.3.5 Elbows 40 Nr
12.10 PVC Conduits and Fittings
12.10.1 Supply and Install of the following 20ft length PVC Schedule
80 pipes and all other necessary fittings and ascessories for its
safe and firm installation.
12.10.1.1 2" 130 Nr
12.10.2 Supply and Install the following Fittings for the 2",
Galvanized Steel Rigid Metallic Conduit:
12.10.2.1 "T" 25 Nr
12.10.2.2 Coupling 20 Nr
12.10.2.3 Clamps 20 Nr
12.10.2.4 Elbows 25 Nr
Internal and External Lighting to Electricals Summary
21.0 Station Grid & Fence Grounding
21.1 Supply and Installation of 1x70mm2, Copper,
annealed bare soft-drawn conductor. 2,550 m
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 42
ITEM # Description Qty Unit Rate $ Amount $
21.2 Supply and Installation of 10ft x 5/8" grounding rod and clamp. 249 Nr
21.3 Supply and Installation of 24" Tin-plated and ferrules high
conductivity and corrosion resistance Flexible copper
braids. Item must be Certified C22.22 No. 41 and listed
UL 467 and UL 486A Grounding and Bonding Equipment 8 Nr
21.4 Supply and Installation of GAR Claps. Material must be
high-conductivity wrought copper and must confirm
to IEEE 837 and UL 467 Standard 30 Nr
21.5 Supply of the following types of Molds made from
synthetic graphite capable of withstanding high temperature
and providing an everage life of not less than fifty (50)
separate exothermic welds for 1x70mm2 conductor:
21.5.1 pole -115g 2 Nr
21.5.2 3-way -150g 2 Nr
21.5.3 4-way -200g 2 Nr
21.6 Supply of the following ANSI/IEEE Std 80 and Std 837
approved and ISO 9001:2000 certified complete package
Cadweld materials of the following sizes:
21.6.1 115g for Pole connection 249 Nr
21.6.2 150g for 3-way connection 40 Nr
21.6.3 200g for 4-way connection 35 Nr
21.6.4 90g for connection of conductor splicing 30 Nr
Carried Forward
Brought Forward
21.7 Supply of Stainless Steel:1-1/2" x 1/2" bolt with 2 flat washers,
1 lock washer and nut 100 Nr
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 43
ITEM # Description Qty Unit Rate $ Amount $
21.8 Supply of 600/1000V LV Compression, uninsulated copper Lug
for 70mm2 standard conductor size with stud size of 12 mm 100 Nr
Station Grid and Fence Grounding to Electricals Summary
22.0 Lighting Protection
22.1 Supply and Install complete Lighting Protection for the
Steel Frame Building. Unit shall include; Early Streamer
Emission Terminal (40µS, height of 684.6mm, ø 28mm),
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 44
ITEM # Description Qty Unit Rate $ Amount $
Stainless Steel 304 Mast adaptor, mast, air base terminal and
air terminal support. The assembled height shall not exceed
or be less than 1980 mm (6'-6") 1 Nr
22.2 Supply and Install complete Lighting Protection for the
Steel Frame Building. Unit shall include; Early Streamer
Emission Terminal (25µS, height of 684.6mm, ø 28mm),
Stainless Steel 304 Mast adaptor, mast, air base terminal and
air terminal support. The assembled height shall not exceed or
be less than 1980 mm (6'-6") 2 Nr
22.3 Supply and Install 50mm2 (fusing capacity equivalancy) Tinned
Composite Copper-Bonded Steel Cables. Stranding shall be
133-tinned copper, 21 tinned copper-bonded steel. 300 m
22.4 Supply and Install Brass UL Class 1 (4/0 max) Cable
Connectors:
22.4.1 Cross-run Cable Connector 90 Nr
22.4.2 T-connector 20 Nr
Lighting Protection to Electricals Summary
23.0 Power Cables
23.1 Supply of 1x185mm2, Type 2XHSY, IEC 60502-2, 18kV Class
XLPE/EPR Unarmoured Insulated Stranded Copper Conductor
Cable 969 m
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 45
ITEM # Description Qty Unit Rate $ Amount $
23.2 Supply of 1x50mm2, Type 2XHSY, IEC 60502-2, 18kV Class
XLPE/EPR Unarmoured Insulated Stranded Copper Conductor
Cable 492 m
Power Cables to Electricals Summary
23 A Electrical and Air Conditioning Installation
23 A1 Allow for general attendance Sum
23 A2 Allow for special attendance Sum
General Attendance to Electricals Summary
D Electricals
12 Internal and External Lighting and Fixtures SUM #REF!
21 Station Grid and Fence Grounding SUM #REF!
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 46
ITEM # Description Qty Unit Rate $ Amount $
22 Lighting Protection SUM #REF!
23 Power Cables SUM #REF!
20 General Attendance SUM #REF!
Electricals Total to Power Plant Summary SUM #REF!
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 47
ITEM # Description Qty Unit Rate $ Amount $
18.0 TANK FARM AND BUND WALL
18.1 Excavation for foundations
18.1.1 Remove existing topsoil average 150 mm thick 186 m2
18.1.2 Clay and silty clay 1m -1.5 m depth 163 m3
18.2 Disposal
18.2.1 Dispose of excavated material off site 191 m3
18.3 Surface treatment
18.3.1 Grade and compact bottom of excavation to receive sandfill. 134 m2
18.3.2 Sandfill to make up levels average 150 mm thick 134 m2
18.4 Dewatering
18.4.1 Keep excavation free from water SUM
18.5 Lean concrete : Blinding
18.5.1 Place and compact 51 mm thick cement and sand blinding (1: 6) 134 m2
18.6 Insitu Concrete*
18.6.1 Provision of concrete, designed mix
18.6.1.1 C30 (4375 Psi), Cement to BS12, 20 mm - coarse aggregate 60 m3
18.6.2 Placing of concrete,
18.6.2.1 reinforced footings thickness 150 mm- 450 mm 12 m3
18.6.2.2 reinforced footings thickness 150 mm- 450 mm 24 m3
18.6.2.3 reinforced walls thickness 150mm- 450 mm 20 m3
18.6.2.3 reinforced slabs, thickness not exceeding 150 mm 28 m3
Carried forward
Brought forward
TANK FARM AND BUND WALL
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 48
ITEM # Description Qty Unit Rate $ Amount $
18.7 Concrete Ancillaries
18.7.1 Formwork: wrought finish , walls ,slabs
18.7.1.1 Vertical: width 225 mm 129 m
18.7.1.1 Vertical: width 300 mm –1200 mm 190 m2
18.7.2 Reinforcement (measured provisionally )
18.7.2.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
18.7.2.1.1 20 mm dia 331 kg
18.7.2.1.2 16 mm dia 4049 kg
18.7.2.1.3 10 mm dia 775 kg
18.7.2.1.4 BRC No. 65 Fabric with 305 mm side laps ( measured net : no 173 m2
allowance made for laps)
18.7.3 Water Bar
18.7.3.1 Flexible water bar Tricosal F300 Elastormer or equivalent 53 m
18.8 Pipework
18.8.1 203 mm dia. Gate Valve for PVC Pipe 1 nr
18.8.2 203 mm dia. Check Valve for PVC Pipe 1 nr
18.8.3 203 mm dia. PVC Pipe 13 m
18.8.4 203 mm dia. PVC 90 deg bend 4 nr
18.9 Miscellaenous Metal Work
18.9.1 Fabricate and install 51 mm metal grate from 51 mm x 6 mm
flats at 51 mm c/c according to dimensions indicated on the
1 m2
18.1 Protect all work in this section Item
Tank Farm and Bund Wall to Main Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 49
ITEM # Description Qty Unit Rate $ Amount $
19.0 WATER TANK FOUNDATION
19.1 Excavation for foundations
19.1.1 Excavate & remove existing topsoil average 150 mm thick 23 m2
19.1.2 Excavate Clay and silty clay 1m -1.5 m depth 27 m3
19.2 Disposal
19.2.1 Dispose of excavated material off site 30 m3
19.3 Surface treatment
19.3.1 Grade and compact bottom of excavation to receive sandfill. 27 m2
19.3.2 Sandfill to make up levels average 150 mm thick 27 m2
19.4 Dewatering
19.4.1 Keep excavation free from water SUM
19.5 Lean concrete : Blinding
19.5.1 Place and compact 51 mm thick cement and sand blinding (1: 6) 27 m2
19.6 Insitu Concrete*
19.6.1 Provision of concrete, designed mix
19.6.1.1 C30 (4375 Psi), Cement to BS12, 20 mm coarse aggregate 19 m3
19.6.2 Placing of concrete,
19.6.2.1 reinforced footings thickness 150 mm- 450 mm 3 m3
19.6.2.2 reinforced footings thickness 150 mm- 450 mm 5 m3
19.6.2.3 reinforced walls thickness 150mm- 450 mm 4 m3
19.6.2.3 reinforced slabs, thickness not exceeding 150 mm 7 m3
Carried forward
Brought forward
WATER TANK FOUNDATION
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 50
ITEM # Description Qty Unit Rate $ Amount $
19.7 Concrete Ancillaries
19.7.1 Formwork: wrought finish , walls ,slabs
19.7.1.1 Vertical: width 225 mm 47 m
19.7.1.1 Vertical: width 300 mm –1200 mm 45 m2
19.7.2 Reinforcement (measured provisionally )
19.7.2.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
19.7.2.1.1 20 mm dia 331 kg
19.7.2.1.2 16 mm dia 1049 kg
19.7.2.1.3 10 mm dia 354 kg
19.7.2.1.4 BRC No. 65 Fabric with 305 mm side laps ( measured net : no 27 m2
allowance made for laps)
19.1 Protect all work in this section Item
Water Tank Foundation to Main Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 51
ITEM # Description Qty Unit Rate $ Amount $
20.0 RC CULVERT
20.1 Earthworks
Excavation for foundations 11 m x 6 m
Allow for working Room
20.1.1 Excavate top soil n.e 150 mm thick 5 m2
20.1.2 Excavate Clay/silty clay for foundation & wingwall n.e 1.7 m depth 61 m3
20.1.3 Backfill with white sand and compact 24 m3
20.2 Disposal
20.2.1 Dispose of excavated material off site 70 m3
20.3 Surface treatment
20.3.1 Grade and compact bottom of excavation to receive sandfill. 33 m2
20.3.2 Sandfill to make up levels average 150 mm thick 38 m2
20.3.3 Supply and install Geotextile 2175 Kn/m2, non-woven heat bonded
over area prior to sand fill course 1,385 m2
20.3.4 Supply, Place, grade, shape and compact to 98% modified
protor density, 100mm thick base course design mix (60:40)
first grade crusher run (75mm). Rate to include for soaking and
compacting with a roller compactor weighing 4 m3
20.4 Dewatering
20.4.1 Keep excavation free from water SUM
20.5 Lean concrete : Blinding
20.5.1 Place and compact 51 mm thick cement and sand blinding (1: 6) 5 m2
20.6 Insitu Concrete*
Carried forward
Brought forward
RC CULVERT
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 52
ITEM # Description Qty Unit Rate $ Amount $
20.6.1 Provision of concrete, designed mix
20.6.1.1 C30 (4375 Psi), Cement to BS12, 20 mm - coarse aggregate 40 m3
20.6.2 Placing of concrete,
20.6.2.1 reinforced slabs, thickness not exceeding 150 mm 40 m3
20.7 Concrete Ancillaries
20.7.1 Formwork: wrought finish , walls ,slabs
20.7.1.1 Vertical: width 300 mm –1200 mm 250 m2
20.7.2 Reinforcement (measured provisionally )
20.7.2.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
20.7.2.1.1 20 mm dia 4680 kg
20.7.2.1.2 16 mm dia 5415 kg
20.8 Protect all work in this section Item
Culvert to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 53
ITEM # Description Qty Unit Rate $ Amount $
24.0 ACCESS ROAD
Construct concrete road 5m wide x 200 mm thick, 277m lgth
24.1 Earth Works
24.1.1 Allow for De-watering of site by means of mechanical pump.
24.1.2 Supply and compact to 98% modified proctor density white
sand fill in layers n.e 150 mm in fill areas to sub-base level 9100 m3
24.1.3 Supply and compact selected soil to form 1 m wide shoulder
on both sides of the road 150 mm thick 96 m3
24.1.3 Supply and compact selected soil to form embankment
on both sides of the road 85 m3
24.1.4 Supply and compact selected soil to drain base both sides 85 m3
24.2 Geogrid and Geotextile
24.1.2 Supply and lay Tensar BX 1200 HDPE Bi-Axial Geogrid or
Approved Equivalent below the road as per specifications,
including all leads and lifts 1385 m2
24.1.2 Supply and install Geotextile 200g/m2, non-woven heat bonded 1,385 m
2
over area prior to placing filter course
24.3 Sub-Base Course
24.1.2 Scarify the roadbed and remove all rocks larger than 100 mm 1385 m2
24.1.3 Supply, Place, grade, shape and compact to 98% modified
protor density, 200mm thick white sand/sand clay mix
(40:60) to sand sub-grade. Rate to include for soaking
and compacting with a roller compactor weighing
not less than 10 tons 319 m3
24.4 Base Course
24.4.1 Supply, Place, grade, shape and compact to 98% modified
protor density, 200mm thick base course design mix (60:40)
first grade crusher run (75mm). Rate to include for soaking and
compacting with a roller compactor weighing
not less than 5 tons 319 m3
Carried forward
Brought forward
ACCESS ROAD
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 54
ITEM # Description Qty Unit Rate $ Amount $
24.5 Reinforcement (measured provisionally )
24.5.1 Deformed bars to BS 4449.Yield strength 460 N/mm2
(66,000 psi )
Supply, cut, bend and fix HYT bars to roadway. Rate to include 12327
for expansion and contraction joints, longitudinal joints.
24.5.1.1 12 mm @ 200mm cc each way 14080 kg
24.5.1.2 12 mm - Drains 7938 kg
24.6 Formwork: wrought finish , walls ,slabs
24.6.1 Vertical: width 300 mm –1200 mm 498 m2
24.7 Insitu Concrete
24.7.1 Provision of concrete, designed mix
C30/37 (4375 PSI), Cement to BS12, 20 mm- coarse aggregate
24.7.1.1 Road 229 m3
24.7.1.2 Drains 139 m3
24.7.1.3 Placing of concrete,
24.7.1.4 reinforced footings thickness 150mm- 450mm 444 m3
Access Road to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 55
ITEM # Description Qty Unit Rate $ Amount $
25.0 RETAINING WALL
25.1 Earthworks
Allow for working space
25.1.1 Excavate for foundation trench 260.3 m x 3 m x 1300 mm 1015.2 m3
25.1.2 Excavate for key 260.3 m x 300 mm x 600 mm 47 m3
25.1.3 Backfill with white sand and compact 1,051 m3
25.2 Disposal
25.2.1 Dispose of excavated material off site 1,167 m3
25.3 Surface treatment
25.3.1 Level and compact bottom of excavation to receive sandfill. 781 m2
25.3.2 White Sandfill 300mm thick in layers n.e 150 mm compact
to 95% modified Proctor 270 m3
25.4 Dewatering
25.4.1 Keep excavation free from water with 24 hr.monitoring SUM
25.5 Lean concrete : Blinding
25.5.1 Place and compact 75 mm thick cement and sand blinding (1: 3) 781 m2
25.6 Insitu Concrete*
25.6.1 Provision of concrete, designed mix
25.6.1.1 C30 (4375 Psi), Cement to BS12, 20 mm coarse aggregate
to foundation 375 m3
25.6.1.2 C30 (4375 Psi), Cement to BS12, 20 mm coarse aggregate
to 300mm thick wall 141 m3
25.6.2 Placing of concrete,
25.6.2.1 reinforced footings thickness 150 mm- 450 mm 375 m3
Carried forward
Brought forward
RETAINING WALL
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 56
ITEM # Description Qty Unit Rate $ Amount $
19.6.2.2 reinforced walls thickness 150mm- 450 mm 141 m3
25.7 Concrete Ancillaries
25.7.1 Formwork:
25.7.1.1 Supply, place and install timber formwork to foundation
sides, including ties and straps 521 m
25.7.1.2 Vertical: width 300 mm –1200 mm 1098.5 m2
25.8 Reinforcement (measured provisionally )
25.8.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi ) to Foundation
25.8.1.1 16 mm dia main bars to slab and key 4425.1 kg
25.8.1.2 12 mm dia. Distribution bars 6950 kg
25.8.1.3 Protect all work in this section Item
25.8.2 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi ) to Walls
25.8.2.1 16 mm dia main bars 9728.7 kg
25.8.2.2 12 mm dia 2085 kg
25.8.2.3 10 mm dia 1549.3 kg
25.8.2.4 Protect all work in this section Item
25.9 Auxiliaries
25.9.1 75 mm dia PVC Pipe Weep Holes @ 900mm cc 87 m
25.9.2 25mm No fines granular backfill layer to weep hole 71 m3
Retaining Wall to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 57
ITEM # Description Qty Unit Rate $ Amount $
26.0 FIRE FIGHTING AND PREVENTION
26.1 Supply and install 4.5 kg (10 lbs) dry chemical fire extingisher
complete with wall mount, hose and horn applicator
tested to 250 bar 4 Nr
26.2 Mobile Foam Equipment (Angus Hi-Combat AF 120)
120 litre foam concentrate tank, Hi-Combat UNI- 225
inductor and F225/HU low expansion foam branch pipe,
two 15m lengths of dutch coiled 45mm dia. Duraline fire hose
fitted with light alloy 67 mm instantaneous couplings to BS336
including a shut off ball valve fitted to the inductor and 5 pales
of Angus Tridol "C" AFFF Concentrate at induction of 3% 2 Nr
26.3 Light Duty Portable Extinguishers (dry powder)
9 kg (20 lbs) ABC multi-purpose powder for all round fire
protection on Class A, B and C fire,15 bar working pressure
Manufacturer: Amerex or Badger 4 Nr
26.4 Light Duty Portable Extinguishers (dry powder)
68 kg (150 lbs) ABC multi-purpose powder for all round fire
protection on Class A, B and C fire,15 bar working pressure
Manufacturer: Amerex or Badger 2 Nr
26.5 Mobile Fire Pump (Angus LDA600)
Diesel engine driven pump with delivery range of 600* l/min
at 7 bar delivery to over 1,400* l/min at 2 bar 2 Nr
26.6 Fire Hose
23000 mm x 67mm (75 feet x 2.5") 4 lgths
26.7 Alarms
Flashing Strobe/Horn 5 Nr
26.8 Fire Hydrant
Dry barrel design 1 Nr
Fire Fighting and Prevention to Power Plant Summary
27.0 AIR CONDITIONING AND VENTILATION
MECHANICAL
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 58
ITEM # Description Qty Unit Rate $ Amount $
27.1 Supply and install 18000 BTU split AC unit, wall mounted
220 V, 60 Hz 1 Nr
27.2 Supply and install 24000 BTU split AC unit, wall mounted
220 V, 60 Hz 3 Nr
27.3 Supply and install 36000 BTU split AC unit, wall mounted
220 V, 60 Hz 2 Nr
AC to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 59
ITEM # Description Qty Unit Rate $ Amount $
28.0 INTERNAL ROAD
Construct concrete road 5m wide x 200 mm thick, 277m lgth
28.1 Earth Works
28.1.1 Allow for De-watering of site by means of mechanical pump.
28.1.2 Supply and compact to 98% modified proctor density white
sand fill in layers n.e 150 mm in fill areas to sub-base level 288 m3
28.1.3 Supply and compact selected soil to form embankment
on both sides of the road 19 m3
28.1.4 Supply and compact selected soil to drain base both sides 19 m3
28.2 Geogrid and Geotextile
28.2.1 Supply and lay Tensar BX 1200 HDPE Bi-Axial Geogrid or
Approved Equivalent below the road as per specifications, 480 m2
including all leads and lifts
28.2.2 Supply and install Geotextile 200g/m2, non-woven heat bonded
over area prior to placing filter course 480 m2
28.3 Sub-Base Course
28.3.1 Supply, Place, grade, shape and compact to 98% modified
protor density, 300mm thick white sand/sand clay mix
(40:60) to sand sub-grade. Rate to include for soaking
and compacting with a roller compactor weighing
not less than 10 tons 250 m3
28.4 Base Course
28.4.1 Supply, Place, grade, shape and compact to 98% modified
protor density, 100mm thick base course design mix (60:40)
first grade crusher run (75mm). Rate to include for soaking and
compacting with a roller compactor weighing
not less than 5 tons 80 m3
Carried forward
Brought forward
INTERNAL ROAD
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 60
ITEM # Description Qty Unit Rate $ Amount $
28.5 Reinforcement (measured provisionally )
28.5.1 Deformed bars to BS 4449.Yield strength 460 N/mm2
(66,000 psi )
Supply, cut, bend and fix HYT bars to roadway. Rate to include 12327
for expansion and contraction joints, longitudinal joints.
28.5.1.1 12 mm @ 200mm cc each way 14080 kg
28.5.1.2 12 mm - Drains 7938 kg
28.6 Formwork: wrought finish , walls ,slabs
28.6.1 Vertical: width 225mm 320 m
28.7 Insitu Concrete
28.7.1 Provision of concrete, designed mix
C30/37 (4375 PSI), Cement to BS12, 20 mm- coarse aggregate
28.7.1.1 Road 105 m3
28.7.1.2 Drains 225mm x 200 mm 7 m3
28.7.2 Placing of concrete,
28.7.2.1 reinforced footings thickness 150mm- 450mm 112 m3
Internal Road to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 61
ITEM # Description Qty Unit Rate $ Amount $
29.0 SITE WORK AND DRAINS
29.1 Earthworks
Excavation for foundations 11 m x 6 m
Allow for working Room
29.1.1 Excavate top soil n.e 150 mm thick 2100 m2
29.1.2 Supply and install Geotextile 2175 Kn/m2, non-woven heat
bonded over area prior to sand fill course 1,385 m2
29.1.4 Supply, Place, grade, shape and compact to 98% modified
protor density, 1m-2m thick white sand/sand clay mix
(50:50) for base over site. Rate to include for soaking
and compacting with a roller compactor weighing
not less than 10 tons 5731 m3
29.1.5 Supply, Place, grade, shape and compact 100 mm thick
26 mm minus gravel to site in identified areas 210 m3
29.1.6 Dispose of excavated material off site 242 m3
29.1.7 Keep excavation free from water SUM
29.2 Drains
29.2.1 Internal Drains
29.2.1.1 Reinforced Concrete Drain 300 mm wide graded from
300 mm to 450 mm over length of 34 m with 150 mm
thick base and sides and with 900mm x 900mm rebate to
top of drain on both sides reinforced with, 50mm x 50mm x
6mm angle set in concrete and including all necessary
excavation , return fill and compaction , formwork and
No 65 BRC fabric to base and sides. 195 m
29.2.1.2 Supply and install 200mm Ø corrugated HDPE pipe as
underground drain 35 m
Carried forward
Brought forward
SITE WORK AND DRAINS
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 62
ITEM # Description Qty Unit Rate $ Amount $
29.3 Perimeter Drains
29.3.1 Formwork: wrought finish , walls ,slabs
29.3.1.1 Vertical: width 300 mm –1200 mm 395 m2
29.4 Reinforcement (measured provisionally )
Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
29.4.1 12 mm dia 5618 kg
29.5 Provision of concrete, designed mix
29.5.1 C30 (4375 Psi), Cement to BS12, 20 mm - coarse aggregate 116 m3
29.5.1.1 Placing of concrete,
29.5.1.2 reinforced slabs, thickness not exceeding 150 mm 116 m3
Site Works and Drains to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 63
ITEM # Description Qty Unit Rate $ Amount $
30.0 OILY WATER SEPARATOR
30.1 Earthworks
Excavation for foundations 11 m x 6 m
Allow for working Room
30.1.1 Excavate Clay and silty clay n.e 3 m depth 150 m3
30.1.2 Level and ram bottom of excavation to receive sandfill 22 m2
30.1.3 Sandfill to make up levels average 150 mm thick 22 m2
30.1.4 Supply, Place, grade, shape and compact to 98% modified
protor density, 300mm thick white sand 30 m3
30.1.5 Dispose of excavated material off site 150 m3
30.1.6 Keep excavation free from water SUM
30.2 Formwork: wrought finish , walls ,slabs
30.2.1 Vertical: width 300 mm –1200 mm 22 m2
30.3 Reinforcement (measured provisionally )
Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi )
30.3.1 16 mm dia 50 kg
30.3.2 12 mm dia 1100 kg
30.3.3 10 mm dia 1500 kg
30.3.4 BRC No. 65 Fabric with 305mm side laps ( measured net : no
allowance made for laps) 2 m2
30.4 Provision of concrete, designed mix
30.4.1 Place and compact 50 mm thick cement and sand blinding (1: 3) 5 m2
30.4.2 C30 (4375 Psi), Cement to BS12, 20 mm - coarse aggregate 25 m3
Carried forward
Brought forward
OILY WATER SEPARATOR
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 64
ITEM # Description Qty Unit Rate $ Amount $
30.5 Placing of concrete,
30.5.1 reinforced slabs, thickness not exceeding 150 mm 25 m3
30.6 Pipe Work
30.6.1 Supply and install Pipe works as indicated.
30.6.1.1 8" dia. Cast Iron Pipe 8 m
30.6.1.2 6" dia. Cast Iron Slotted Skimmer Pipe 2 m
30.6.1.3 Petroleum resistant rubber boot set in concrete 4 No.
30.6.1.4 Cast iron handle 18" long and 3" wide 1 No.
30.6.1.5 4" diameter cast iron overflow pipe 20' long 1 No.
30.6.1.6 8" Cast Iron Tee 2 No.
30.6.1.7 Extra over 4" diameter cast iron pipe for 90 deg bend 1 No.
30.6.1.8 8" dia. Gate Valve for Cast Iron Pipe 2 No.
30.6.1.9 8" dia. Check Valve for Cast Iron Pipe 2 No.
30.6.1.10 8" dia. PVC Pipe 8 m
30.6.1.11 8" dia. PVC 90 deg bend 4 No.
30.7 Water Bar
30.7.1 Flexible water bar Tricosal F300 Elastormer or equivalent 20 m
30.8 Miscellaenous Metal Work
Fabricate and Install 50 mm Metal Grate Deck from 50mm x 6mm flats at 50mm c/c according to dimensions
indicated on the drawings. 10 m
Oily Water Separator to Power Plant Summary
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 65
ITEM # Description Qty Unit Rate $ Amount $
31.0 RIVER APPROACH SECTION 1
Double Wall
31.1 AZ 20-800, S 430 GP SHEET PILE
31.1.1 Double pile form I, w idth b=1.6 m, Wall 1, Tr1 L=6.1m
8 @ 17 m lengths 12.043 tons
31.1.2 Double pile form I, w idth b=1.6 m, Wall 2, Tr1 L=6.1m
8 @ 10.5 m lengths 7.438 tons
31.2 UPN 300 S 355 JO WAILING BEAM
31.2.3 Waling beam, Tr1 L=6.1m
8 @ 6.4 m lengths 1.183 tons
31.3 dia. 60mm / M80 TIE ROD
31.3.1 Tie rod system 60mm dia. With upset threaded ends M80
6 @ 6m lengths 6 Nr
31.4 C 14 S 355 GP CORNER SECTION
31.4.1 C14 corner section 4 @ 10.5m length 0.605 tons
31.4.2 C14 corner section 2 @ 17m length 0.490 tons
32.0 RIVER APPROACH SECTION 2
Main Wall and Anchor Wall
32.1 AZ 22-800, S 430 GP SHEET PILE
32.1.1 Double pile form I, w idth b=1.6 m, Wall 1, Tr1 L=6.0m
8 @ 17 m lengths 13.110 tons
32.1.2 Double pile form I, w idth b=1.6 m, Wall 1, Tr3 L=6.5m
4 @ 17 m lengths 13.110 tons
32.2 AZ 12-770, S 355 GP SHEET PILE
32.2.1 Double pile form I, w idth b=1.54 m, Anc. Wall 2, Tr1 L=6.0m
4 @ 9 m lengths 5.227 tons
Carried forward
Brought forward
RIVER APPROACH
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 66
ITEM # Description Qty Unit Rate $ Amount $
32.2.2 Double pile form I, w idth b=1.54 m, Anc. Wall 2, Tr2 L=6.0m
4 @ 9 m lengths 5.227 tons
32.2.3 Double pile form I, w idth b=1.54 m, Anc. Wall 2, Tr3 L=6.5m
4 @ 9 m lengths 5.227 tons
32.3 UPN 350 S 355 JO WAILING BEAM
32.3.1 Waling beam, Tr1 L=6.0m, 4 @ 6.28m lengths 1.522 tons
32.3.2 Waling beam, Tr2 L=6.0m, 4 @ 6.28m lengths 1.522 tons
32.3.3 Waling beam, Tr3 L=6.5m, 4 @ 6.28m lengths 1.522 tons
32.4 dia. 64mm / M85 TIE ROD
32.4.1 Tie rod system 60mm dia. With upset threaded ends M80
9 @ 18m lengths 9 Nr
33.0 RIVER APPROACH SECTION 3
Double Wall
33.1 AZ 12-770, S 355 GP SHEET PILE
33.1.1 Double pile form I, w idth b=1.54 m, Anc. Wall 2, Tr1 L=6.0m
34 @ 11m lengths 27.152 tons
33.2 UPN 220 S 355 JO WAILING BEAM
33.2.1 Waling beam, Tr1 L=25.4m, 4 @ 26.18m lengths 3.079 tons
33.3 dia. 48mm / M64 TIE ROD
33.3.1 Tie rod system 48mm dia. With upset threaded ends M64
9 @ 6.5m lengths 9 Nr
34.0 RIVER APPROACH SECTION 4
Main Wall and Anchor Wall
34.1 AZ 12-770, S 355 GP SHEET PILE
Carried forward
Brought forward
34.1.1 Double pile form I, w idth b=1.54 m, Main Wall , Tr1 L=19.5m
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 67
ITEM # Description Qty Unit Rate $ Amount $
13 @ 6 m lengths 11.326 tons
34.1.2 Double pile form I, w idth b=1.54 m, Anc. Wall, Tr1 L=19.50m
13 @ 4 m lengths 7.550 tons
34.1.3 Double pile form I, w idth b=1.54 m, Main Wall , Tr2L=24.6m
16 @ 6 m lengths 13.929 tons
34.1.4 Double pile form I, w idth b=1.54 m, Anc. Wall, Tr2 L=24.6m
16 @ 4 m lengths 9.293 tons
34.1.5 Double pile form I, w idth b=1.54 m, Main Wall , Tr3 L=21.6m
14 @ 6 m lengths 12.197 tons
34.1.6 Double pile form I, w idth b=1.54 m, Anc. Wall, Tr3 L=21.6m
14 @ 4 m lengths 8.131 tons
34.1.7 Double pile form I, w idth b=1.54 m, Main Wall , Tr4 L=27.6m
18 @ 6 m lengths 15.682 tons
34.1.8 Double pile form I, w idth b=1.54 m, Anc. Wall, Tr4 L=27.6m
18 @ 4 m lengths 10.454 tons
34.2 UPN 160 S 355 JO WAILING BEAM
34.2.1 Waling beam, Tr1 L=19.5m, 4 @ 20m lengths 1.504 tons
34.2.2 Waling beam, Tr2 L=24.6m, 4 @ 24.64m lengths 1.853 tons
34.2.3 Waling beam, Tr3 L=21.6m, 4 @ 21.56m lengths 1.621 tons
34.2.4 Waling beam, Tr4 L=27.6m, 4 @ 27.72 m lengths 2.085 tons
34.3 dia. 39mm / M39 TIE ROD
34.3.1 Tie rod system 39mm dia. With upset threaded ends M39
34 @ 6.0m lengths 9 Nr
Carried forward
Brought forward
35.0 RIVER APPROACH EARTHWORKS
35.1 Supply, Place, and compact rock infill 1m thick 630 m3
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 68
ITEM # Description Qty Unit Rate $ Amount $
35.2 Supply, Place and compact to 98% modified
protor density, river sand 6 m thick. Rate to include
compacting with a roller compactor weighing
not less than 10 tons 3790 m3
35.3 Supply, Place, grade, shape and compact to 98% modified
protor density, 300mm thick white sand/sand clay mix
(40:60) to sand sub-grade. Rate to include for soaking
and compacting with a roller compactor weighing
not less than 10 tons 210 m3
35.4 Supply, Place, grade, shape and compact to 98% modified
protor density, 200mm thick base course design mix (60:40)
first grade crusher run (75mm). Rate to include for soaking and
compacting with a roller compactor weighing
not less than 5 tons 252 m3
36.0 RIVER APPROACH CONCRETE
36.1 Beams and Slab
36.1.1 Lean concrete : Blinding
36.1.1 Place and compact 75 mm thick cement and sand blinding (1: 3) 663 m2
36.2 Insitu Concrete*
36.2.1 Provision of concrete, designed mix
36.2.1.1 C30 (4375 Psi), Cement to BS12, 20 mm coarse aggregate
SSP beams 20 m3
36.2.1.2 C30 (4375 Psi), Cement to BS12, 20 mm coarse aggregate
200 mm thick slab 146 m3
36.2.2 Placing of concrete,
36.2.2.1 reinforced beam thickness 150 mm- 450 mm 20 m3
Carried forward
Brought forward
36.2.2.2 reinforced slab thickness 150mm- 450 mm 146 m3
36.3 Concrete Ancillaries
36.3.1 Formwork:
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx
BARTICA 3.3 MW POWER PLANT BILL OF QUANTITIES 69
ITEM # Description Qty Unit Rate $ Amount $
36.3.1.1 Supply, place and install timber formwork to beam
sides, including ties and straps 250 m
36.3.1.2 Vertical: width 300 mm –1200 mm 325 m2
36.4 Reinforcement (measured provisionally )
36.4.1 Deformed high yield steel bars to BS 4449.
Yield strength 460 N/mm2 (66,000 psi ) to SSP Bean ans Pavement
36.4.1.1 16 mm dia main bars to SSP beam 2083 kg
36.4.1.2 12 mm dia. Bars to slab 4688 kg
36.4.1.3 Supply, Place, grade, shape and compact 100 mm thick
26 mm minus gravel to site in identified areas 20 m3
36.4.1.4 Protect all work in this section Item
BOQ GPL-PI-021-2017- Civil Works-R1.xlsx