www.gspholding.com2
Contents
Company Overview
© GSP 2016 Information contained in this document is GSP property and shall be used exclusively for its purpose.
The information cannot be either partially or entirely submitted to third parties without prior written approval from the GSP Management Team
GSP HSEQ Management System
Business & Clients
GSP Engineering
Facilities
Fleet
Investment Policy
www.gspholding.com3
Wherever Your Projects May Take You,
We Will Be There For You
We are an international company with headquarters in
Constanta, Romania and subsidiary offices in Moscow, Rotterdam,
Dubai, Campeche (Gulf of Mexico), Tunis, Valetta, Limassol, Lagos,
Singapore, Istanbul, employing over 2,500 personnel
We are a full-service oil and gas service provider that works with
the largest organizations in the world and that has a long history
and track record in a variety of segments of the oil & gas
industry
We offer global coverage, to serve our clients’ international needs
We are members of the International Association of Drilling
Contractors (IADC), International Maritime Contractors
Association (IMCA), International Pipe Line and Offshore
Contractors Association (IPLOCA), International Well Control
Forum (IWCF);
www.gspholding.com4
Founded in 2003, GSP quickly became a reliable partner
for top international oil and gas groups
2003 2005 2008 2009 2010 2011 2012 2015
Following the privatization
of National Oil Company,
Petrom, GSP is established
employing 90% of Petrom’s
offshore personnel
GSP takes over firsts
assets:
six offshore drilling rigs, five
offshore support vessels
and a crane barge
GSP enters the offshore
construction market with a
contract awarded by TPAO
GSP establishes its first
engineering capacities
in Rotterdam
GSP is awarded
subsea pipelay contract
(165 km) with Gazprom in
the Black Sea.
GSP registers a turnover of
over USD 600m.
Acquires additional assets –
incl. GSP Bigfoot 1, GSP
Bigfoot 2 and the ROV fleet
GSP extends its fleet with 2
jack-up rigs, and a
construction vessel for
North Sea operations, GSP
Falcon
GSP enters the North Sea Market;
awarded two contracts, for drilling and
pipelay, by Wintershall, the largest crude
oil and natural gas producer in Germany,
a company member of the BASF Group
GSP enters Gulf of Mexico
with two Jack-ups,
the third one starting
operations in 2014
GSP enters the
West African
market
GSP relocates the
engineering head office in
Bucharest
GSP consolidates the
engineering capacity,
entering in joint
cooperation with RIE
2016
www.gspholding.com5
Geographical Footprint
Mexico MozambiqueNigeria Tunisia RussiaThe NetherlandsUnited kingdom Luxembourg Italy Greece Turkey CyprusRomania UAE Singapore
Drilling Projects
Pipelaying Projects
Survey Projects
Company / Office
Legend:
www.gspholding.com6
Top Rated: GSP has a strong customer base
with a dominant market position in the Black Sea
Dzhubga
Tuapse
Lazarevskoye
Sochi
Illustration
www.gspholding.com7
… and continues growing in the North Sea, Azov Sea, Marmara Sea
and South East Mediterranean markets
Azov Sea
Projects:
• Clients: GAZPROM, LUKOIL,
Rosneft, Cernomorneftegas,
Socar
• Drilling
• Pipelay work
• Subsea works
incl.
Hyperbaric
subsea
welding
• Survey
• Supply vessel/
Anchor
Handling
• Saturation
Diving/ ROV
operations
Caspian Sea
Projects:
• Clients: Bahar Energy, Socar
• Logistic offshore support
services – Baku Azerbaijan /
Aktau - Kazakhstan
• Platform Drilling – Azerbaijan /
Baku
Mediterranean & Marmara Sea
Projects:
• Clients: TPAO, Energean, Total,
Cooper Energy, ETAP
Sonatrach, Albpetrol, Japan Oil
• Drilling
• Pipe lay/ umbilical
• Pipe lay job
• Survey/ Diving
• Supply vessel/ Anchor
handling
Sakhalin/ Russian Far East
Projects:
• Clients: Gazprom, MRTS
• Subsea/ Diving
• Pipe lay barge management,
Welding, NDT, FJC and pipe
launching
Barents, Pechora & Kara Sea
Projects:
• Clients: Gazpromneft Sakhalin,
Rosneft Artic Shelf, Novatek
• Drilling with Jack-up in Russia
• Supply vessel, Anchor Handling
Gulf of Mexico
Projects:
• Clients: PEMEX
• Drilling with jack up
North Sea
Projects:
• Clients: Wintershall Nordzee,
Perenco, EON, Technip
• Drilling with jack up rig
• Pipe lay, umbilical, trenching,
survey, ROV, Diving
• Supply vessel
• Heavy lift transport
Middle East
Projects:
• Clients: NIOC Iran, Repsol
• Drilling with Jack up
• Joint Venture : MEAOS – Middle
East and Africa Offshore Service
LLC – Abu Dhabi – partner Abu
Dhabi Mar – Fabrication Facility
• Pipe lay job
www.gspholding.com9
Introduction to GSP HSEQ Management System
ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 ISO 30000:2009 ISO TS 29001:2010 ISPS Code ISM Code
GSP has a fully Integrated HSEQ Management System that incorporates international regulatory requirements, recognized oil
and gas standards and industry best practices.
In our search for excellence in Health, Safety, Environment and Quality, GSP established relationship with Det Norske Veritas
and Bureau Veritas. Since than our Integrated HSEQ Management System has been certified in the following ISO Standards:
GSP vessels and assets comply with all the applicable international regulatory conventions and classification requirements which
have also been incorporated into our HSEQ Management System.
• ISO 9001 – Quality Management;
• ISO 14001 – Environmental Management;
• BS OHSAS 18001 – Occupational Health and Safety;
• ISO/TS 29001 – Quality Management for Oil and Gas.
www.gspholding.com10
Safety Culture
GSP employees – make the work place safer:
• Stop Work Authority (SWA)
• Permit to Work System (PTW)
• Task Risk Assessment (TRA)
• Safety Observation System
GSP’s personnel is facing often work in very demanding roles and extreme conditions. Continuous different hazards may arise and
have to be managed, whether in offshore locations, fabrication areas, or the transport of people, equipment and products. Through
our procedures we ensure that whatever our personnel is doing, they always pay attention on possible risks and on the safety of
operations before they start work and during their work.
Our management team assures that everyone who works for GSP, or with GSP, take personal responsibility in the following areas:
• comply with the safety rules and regulations relevant to their work;
• intervene to prevent unsafe conditions; and
• respect fellow workers and the communities in which we work.
Managers and Supervisors – promote safety culture:
• Communicate High Safety Standards.
• Lower Tolerance for Risk – ALARP.
• Promote and Participate – Safety Observations.
• HSE Performance – KPI Establish & Monitor.
• Promote High Safety Standards - HSE coaching.
www.gspholding.com11
Monitoring HSE: Fact & Figures
KEY PERFORMANCE
INDICATORS2013 2014 2015 2016
Fatality (FTL) 0 0 0 0
Lost Time Injuries (LTI) 3 2 1 0
Work Restricted Case (WRC) 2 2 0 0
Medical Treatment Case (MTC) 5 7 5 2
First Aid Case (FAC) 8 10 9 3
Total Man Hours 4,800,839 4,378,438 3,193,316 1,469,936
Lost Time Injury Frequency Rate
(LTIFR)0.62 0.46 0.31 0
Total Recordable Frequency Rate
(TRFR) 2.08 2.51 1.88 1.36
www.gspholding.com12
Project Communication as a Key Success Factor
• By various Project
Documentation (Forms),
targeted information can be
controlled and risks can be
reduced and communicated
in time
• Our company policy
foresees:
o Steering Committees
o Monthly Jour Fixes
o Weekly Update Meetings
o Daily Meetings (for safety,
project status etc.)
Results & Benefits
Risk Management Communication
Measures
Status Report MoMAction Item List
Project
Planning
Actions
Core responsibilities
Project Documentation (Forms)
Risks
ScheduleTarget Organization ResultsBudget
Planning
Project Planning: Monitoring and Control
Risk Matrix
Progress
www.gspholding.com13
Project Audit Approach
RiskMgmt.
Project Communication
Demand Mgmt.& Project
DocumentationCost-validation
Project setup & planning
ProjectAudit
HR Mgmt.& Budget Controlling
Benefits for our costumers
• The project audit approach of GSP considers
the key dimensions of project management
(time, cost, quality) from the perspective of 6
thematic fields
• Our Project Audit approach provides to our
costumers the following benefits:
Cost transparency
Planning security
Audit compliance
Recommendations
Overall project implementation
www.gspholding.com15
Our Business (1/3)
• Conductor Hammering and pipe
handling
• Wells Production Testing
• Formation logging service
• Completion
• Logistics and transportation
• Emergency response
Integrated Drilling Services Management
• Self-elevating drilling unit
• Semi-submersible drilling unit
• Platform modular Rigs
• Maintenance and Operations
management of 3rd party Rigs
• Well design
• Directional Drilling
• Cementing engineering and services
• Fishing tools and services
• Drilling Fluids engineering and
services
• Solid control and disposal, mud
logging
Offshore Drilling Rigs (MODU) Operations
• EPCI (Engineering, Procurement,
Construction and Installation)
• Onshore Fabrication and Assembly
Yards (Berth 34 Constanta, Midia North
Constanta, Agigea South Constanta)
• Midia Pipeyard and Machine Shop
• Large Capacity Heavy Lift Equipment
• Subsea Installation
• Saturation diving ROV
operation/Trenching
• Commissioning and Operation
• Manpower
Offshore Construction
• AHTS
• PSV
• MPSV
• IRM
• Stand by vessels
• Construction Vessels:
• DP2 Flex-Lay / J-Lay Pipelay
• Ocean transport Submersible
Barge
• DP2 Derrick Pipe Lay Barge
• Barge Shearleg Crane 1800 t
Vessel Services
• Large Capacity Heavy Lift
Equipment
• Subsea Installation
• Saturation diving ROV
operation/Trenching
• Commissioning and Operation
• Manpower
www.gspholding.com16
Our Business (2/3)
• fabrication and installation off subsea well head, Christmas three, flow line and pipe equipment
• storage and assembly of PLETs( pipeline and termination), manifolds, umbilical’s and risers and anchor piles.
• fabrication of topside, buoys, FPSO modules, buoyancy tanks, jackets and platforms.
• building, repair, conversion, maintenance of Jack up and deep water drilling rigs, construction vessels and supply vessels
GSP South Production Facility & Shipyard, Agigea
• Integrated warehousing, open and bulk
storage, handling, heavy lifting and heavy
transportation
• Contract logistics (tubular material and
other oilfield equipment pick & pack, cross
docking)
• Project/contract based global forwarding
• Freight management
• End to end solutions for the offshore
oil and gas industry
• Project cargo, general cargo & steel
cargo, assembly of industrial cargoes,
offshore vessels and rigs port
assistance and services
• Import export services
GSP North Production Facility & Pipeyard, Midia
Multidisciplinary engineering services for:
• Oil & Gas drilling/production offshore and
onshore plants;
• Hydrocarbons and chemicals processing
plants;
• Power generation plants.
• Structural engineering. (FEM/FEA,
scantling calc, class dwgs, workshop
design)
• Outfitting engineering (pipe sys,
mechanical, HVAC, electric sys)
• Naval architecture (hydrostatic,
hydrodynamic)
• Conceptual design
• Tender process support
• Basis of design
• Concept, analysis and calculations
• Class drawings
• Workshop drawings and prod info
• Purchasing support
• Pipe yard/tubular and oilfield
equipment workshop
• 3rd party services on permanent
basis (customs clearance, according
with the European Union
regulations, dangerous goods
transportation measures,
procurement services and support.)
GSP Engineering
www.gspholding.com17
Our Business (3/3)
• Helicopter Crew Transportation
• ERCC Capabilities: Medical Evacuation (MEDEVAC);
Search And Rescue (SAR) / Helicopter Incident, Flight
Following
• Experienced personnel as requested by Oil & Gas industry
• Audited and certified by Italian and Romanian Civil Aviation
Authorities
Vega Offshore Aviation
• Drilling Courses: IWCF Well Control
(Level2/Level3&4), Operating Driller Cyber
Chair X-COM, DR1 Offshore Drilling
Induction
• HSE Courses: IADC Rig Pass
• ROV Courses: ROV Operator
• Courses for Marine Personnel: Basic
Safety Induction, Advanced Safety
Training, Safe Rigging & Slinging,
Seagoing DP Familiarization
• English Language Courses
• 120 seats in four training rooms, 20
seats in conference room, 14 design
offices, 50 seats in restaurant
GSP Training
• DrillSIM 6000 & DrillSIM 20 drilling
simulators
• ROV simulator room equipped with
ROV Triton XLX Simulator,
designed by Perry Slingsby
• DNV GL ISO 9001 Quality System
Certification
• Total facility area: 2196.5 sqm
• 3 x AW139 helicopters (2 with Full Ice Protection System);
configurations: 12 seat offshore passenger, MedEvac, SAR
• Fixed Wing - Air Ambulance Evacuation Charters
• Mihail Kogalniceanu Airport – operational base
• Midia – maintenance base
• Food and Beverages Services
• Housekeeping Services
• Custom Catering Services for Oil & Gas,
Shipping and Air transport companies
• Procurement and Logistics capabilities
• Executive chef with extensive experience and Serve Café
Certification, nutrition specialists
• Bio Food options/ selection of sustainable local products
• Continuous Training Programs
• Integrated HSEQ Management System
GSP Catering
www.gspholding.com18
Our Clients
Selected References:
Offshore Drilling, Constructions and Support Services
Offshore Support ServicesOffshore ConstructionOffshore Drilling
www.gspholding.com19
Engineering
GSP Engineering, member of GSP Holding, enjoy a long lasting regional leading position in the Offshore Engineering & Construction
businesses, with a strong focus on oil & gas-related activities in remote areas shallow and deep-waters
GSP Engineering
www.gspholding.com20
GSP Engineering
GSP Engineering is an engineering
companies working in the Oil & Gas
Industry on:
• Sea-lines
• Subsea Template
• Subsea Manifolds
• Deck & Jackets
• Hyperbaric Welding
We support our clients since the early phases of projects and throughout the entire
development of the field with a wide set of products and services including
platforms, pipelines, subsea field developments and with distinctive capabilities in
the execution of large-scale offshore projects.
We leverage on our strong engineering, procurement, project management,
construction, installation and technological competence, our outstanding asset
base and consolidated local presence (people, yards, logistic bases) especially in
strategic countries like Russia.
In these areas GSP Engineering
covers:
• Engineering Management
• Conceptual & Basic Design
• Procurement And EPCI Projects
Management
• Fabrication, Marine Operation &
Installation Engineering
www.gspholding.com21
Facilities
GSP Training Center
Berth 34
GSP North Production Facility
Midia
GSP South Production Facility& Shipyard
Agigea
The location provides fast river / canal connection with Western Europe
and directly with Rotterdam port, through the Rhine-Main canal.
www.gspholding.com22
Construction & Workshop Facilities
The location ensures fast river/canal connection with Western Europe and directly with Rotterdam port, through the Rhine-Main canal. The location is ideal to serve the needs of the Black Sea region, and beyond, offshore and onshore oil, gas and petrochemical construction market. It also allows GSP to benefit from a direct source of skilled local craftsmen, dedicated to meeting the needs of any offshore or onshore development project.
www.gspholding.com23
GSP South Production Facility & Shipyard, AgigeaProfile
GSP Shipyard is a regional facility specialized in procurement, engineering, fabrication, and project management for offshore
constructions.
GSP Shipyard offers the necessary infrastructure to support offshore construction with a complex steelwork facility endowed with
an extensive fleet of heavy lift cranes.
GSP Shipyard tackles each challenge with safe, reliable and innovative solutions, committed to provide sustainable development
both for the company and for the community where it operates.
GSP Shipyard fabricates the steel structures in accordance with all relevant standards requested by offshore oil and gas industry.
• ISO & ISPS certified port facilities • Skilled & certified manpower • Heavy lift & high speed onshore and floating cranes, up to
4400 tons • Multipurpose workshops and heavy-duty platforms • Complex steelwork facility
www.gspholding.com24
GSP South Production Facility & Shipyard, AgigeaFacts & Figures
Access to open sea
Distance to open water: 6 km
Minimum channel water depth 7 m
Minimum channel width 160 m
Height restrictions None
Tidal range Negligible
Steel fabrication area
Surface Maximum load
Crushed stone pavement area 66,000 m2 30 t/m2
Pile reinforced area 3,600 m2 200 t/m2
Concrete pavement 13,500 m2 30 t/m2
Personnel and Manpower
• At peak work load the Agigea Fabrication Yard employs over 350
personnel and has an annual direct man-hour capacity of more one
million man-hours.
• The yard operates five and a half days a week with two shifts per
day.
Construction & assembly hall
New built yard quarter 950 m2
Production area: 5,750 m2
Gantries 2 x (20 + 5) ton
GSP SHIPYARD CONSTRUCTION AND FABRICATION YARD:
EXISTING BASE PLAN – MOL 1A CONSTANTA SOUTH PORT
Black Sea
existing operational base – 72,640 sq m
development area – 59,370 sq m
GSP existing facilities
Legend:
www.gspholding.com25
GSP Shipyard provides end-to-end solutions in steel
fabrication services having the full capacity to deliver:
• Jackets
• Decks / Topsides
• Bridges
• Tripods
• Piles
• Floating Structures
• Offshore constructions and modules
• Piping and facility installation.
GSP Shipyard provides highly specialized services for the
shipbuilding projects and repairs including:
• New-builds
• Upgrades
• Reactivation / Conversion
• Green scrapping
Works performed on Akcakoca Project
Works performed on Akcakoca Project
Annual Tonnage Capacity: 5,000 metric tons – after upgrading:
up to 12,500 metric tons
Annual Direct Man-Hour Capacity: 1 million man-hours
Largest Jacket: 1,450 metric tons
Largest Single Piece Deck: 700 metric tons
Maximum Wharf Side Lift: 1,450 metric tons (GSP Neptun)
GSP South Production Facility & Shipyard, Agigea: Fabrication Capabilities
www.gspholding.com26
GSP North Production Facility & Pipeyard, MidiaProfile
GSP Logistics is providing support services to oil and gas producing companies, oil and gas operators, shipping lines, vessel
operators and drilling contractors. These services include, but are not limited to machine shop services, drilling fluid services, pipe
coating services and many other. All services are provided with the support of the following facilities:
• Quay Apron with trenches for bulking and water/
drilling mud supplies
• Area behind quay for silos
• Storage racks for pipes and drilling gear
• General storage and lay down area
• Workshops/ Warehouses and testing facilities
• Other facilities for casing, tubulars, machine shops
and pipe coating
• Pipe storage and double joint welding line facility
• Welding shop facility for pipeline projects
• Cranes, lifting equipment and heavy trucks
• Office for base operators and users
• Maintenance, fire and safety storage areas and workshops
• Helicopters operation facility and maintenance
• Waste management facilities
GSP Logistics is an industrial harbor logistic facility for offshore oil and gas activities, located in the
north part of Harbor Constanta, Romania
www.gspholding.com27
GSP North Production Facility & Pipeyard, Midia: Facts & FiguresGSP Logistic base incorporates all types of transport infrastructure from aviation to ship transport and land transport (on railway and on road)
Area details Surface Maximum
load
Crushed stone pavement: 310,000 m2 15 t/m2
Concrete pavement: 45,000 m2 30 t/m2
Constructions (incl. helicopter base): 20,000 m2
Operational & Inside Storage area Surface
Outside operational area: 7,500 m2
Total warehouses surface: 7,000 m2
Offices: 900 m2
3 workshops
Offshore welding school
Automatic line for tubular drilling equipment check & repairs
Drilling school (similar offshore rig equipment)
Access to GSPL Base:
1.By water:
• connection to Black Sea
• connection to Danube Channel
2. By railway – direct connection with national rail network
3. By road
4. By air – through helicopter base
www.gspholding.com28
GSP Training Center - Berth 34, Constanta Harbour The DrillSIM-6000 is capable to offer full Well Control training and training in Cyber Base operating controls.
• Drilling Courses
• HSE Courses
• ROV Operations
Simulator room I:
GSP Training Center also offers training using Drill SIM 20 mobile compact drilling simulator. The two
simulators are high level technological products, offering comprehensive training solutions for the oil and
gas industry.
• 2,196.50 sqm total area
• 120 seats in four training halls
• 20 seats in conference room
• 14 design offices
• 50 seats in cafeteria
Simulator room II:
Equipped with a remote operated vehicle (ROV) simulator. The ROV Triton XLX Simulator is designed
and manufactured in 2010 by Perry Slingsby, UK, in cooperation with VMAX Simulation Technologies
US.
The ROV simulator comprises:
• ROV Pilot and Assistant controls;
• Input / Output devices identical with the real ROV devices, including Media Wall monitors;
• Instructor’s desk for monitoring, logging, scenario creation and troubleshooting problems input,
parameters and variables for the virtual environment.
www.gspholding.com29
Fleet
Jack up Rigs
Vessels
Construction Vessels
Offshore Heavy Lift Cranes
ROVs & SAT Diving System & Trenchers
Helicopters
www.gspholding.com30
Our FleetRigs - self elevating units, cantilever
GSP ATLAS
Four legs
Built 1985
Rebuilt 2007
Class GL
Flag Malta
Accom. 90+2
Helideck 80 x 80 ft
Max Drill Depth
25,000 ft
Max Water Depth
300 ft
GSP ATLAS
GSP ORIZONT
Four legs
Built 1982
Rebuilt 2006
Class GL
Flag Malta
Accom. 90+2
Helideck 80 x 80ft
Max Drill Depth
25,000 ft
Max Water Depth
300 ft
Three legs
Built 1984
Upgraded 2011
Class ABS
Flag Vanuatu
Accom. 88
Helideck 70 ft
Max Drill Depth
25,000ft
Max Water Depth
300ftGSP FORTUNA
Four legs,
Built 1984,
Upgraded 2003
Class ABS
Flag Malta
Accom. 90 + 2
Helideck 80x80 ft,
Max Drill depth
20,000 ft
Max Water Depth
300 ftGSP PROMETEU
Four legs
Built 1987
Rebuilt 2007
Class ABS
Flag Malta
Accom. 95 + 2
Helideck 80 x 80 ft
Max Drill Depth
30,000 ft
Max Water Depth
300 ftGSP JUPITER
Four legs,
Built 1988,
Rebuilt 2009
Class ABS
Flag Panama
Accom. 100
Helideck 80x80 ft
Max Drill depth
30,000 ft
Max Water Depth
300 ftGSP SATURN
Three legs
Built 1992
Class ABS
Flag Vanuatu
Accom. 116
Helideck 83 x 83 ft
Max Drill Depth
30,000 ft
Max Water Depth
350 ftGSP MAGELAN
Three legs,
Built 1980,
Rebuilt 2014
Class ABS
Flag Vanuatu
Accom. 100
Helideck 70 ft
Max Drill depth
25,000 ft
Max Water Depth
333 ftGSP URANUS
www.gspholding.com31
Our FleetAHTS Vessels
GSP ANTARES
AHTS Offshore Support Vessel, class
ABS, class notation A1E, Fire Fighting
Class 1 + AMS + DPS-1, offshore
support, towing, fire fighting and
antipollution vessel. Main engines 2 x
2,575 BHP. Built in 2009 at Fujian,
China.
Duties: Offshore drilling rig towing and
positioning, anchor handling, rescue
missions, supply transport for offshore
activities.
GSP ALCOR
AHTS Offshore Support Vessel, class
ABS, towing, fire fighting and
antipollution vessel Class 1, DPS-2, Main
engines 2 X 4,000 kW,
Wartsila 8L32
Built in 2005 by Jaya Shipbuilding &
Engineering, Singapore.
Duties: Offshore drilling rig towing and
positioning, rescue, supply transport for
offshore activities.
AHTS Offshore Support Vessel,
class ABS, towing, fire fighting and
antipollution vessel
Class 1, ICE-C, 8,000 HP, DPS-1,
Main engines 2 X 2,925 kW
Built in 2006 by Jaya Shipbuilding
& Engineering Singapore.
Duties: Offshore drilling rig towing
and positioning, rescue, supply
transport for offshore activities.
GSP QUEEN GSP KING
AHTS Offshore Tug/Supply Vessel, class BV, DP-1 firefighting, antipollution, rescue vessel with 150 persons
capacity
Class I +Hull + MACH; Tug Supply Vessel, Unrestricted Navigation, ICE, DYNAPOS-AM/AT, designed and built in
1982 by Bolsoenes Verft, Norway. Main engines 4 x MAK Diesel 3,200 BHP, total 12,800 HP
Duties: Offshore drilling rig towing and positioning, rescue, supply transport for offshore activities.
Safety/Emergency Response/AHTS/OSR
Vessel, Class DnV, class notation + 1A1
Tug/Supply Vessel –
SF FiFi I+II – Oil Rec Dyn. Pos. autr. –
LFL, EO. Designed and built in 1985 in
Ulstein Yard/Norway.
Propulsion: 4 x Winchmann Diesel type
AXAG, each 4,500 BHP. 170 tons
continuous Bollard Pull.
Duties: offshore drilling rig towing and
positioning, multifunction Safety Service
Vessel – full rescue class, certified for
300 persons, supply transport for
offshore activities.
GSP VEGA
www.gspholding.com32
Our FleetPlatform Supply Vessels, Crew Vessels
PSV, OSR
Class BV
Built 1983
Major upgrade 2009
Main propulsion
5,160HP
LOA 67.4 m,
Beam 16.8 m
Accom. 21.GSP CENTARUS
PSV
Class ABS
DPS2, FiFi I
Built 2014
Main propulsion
4 x 1,825kW
LOA 87.02 m,
Beam 18.08 m
Accom. 52.
Tug - supply
Class BV
Built 1994
Main propulsion
2 x 1,814 kW
LOA 60.92 m
Beam 13.59 m
Accom. 22.
Crew & supply
Class BV
Built 1995
Main propulsion
2,800 kW
LOA 73.33 m
Beam 13.63 m
Accom. 99.
GSP ORION
Tug - supply
Class BV
Built 1995
Main propulsion
2 x 1,814 kW
LOA 60.79 m
Beam 13.59 m
Accom. 22.
GSP LICORN
GSP PERSEU
GSP PHOENIX
www.gspholding.com33
Our FleetConstruction Vessels
GSP BIGFOOT 2
Semi-submersible, Heavy lift, Transportation Barge
Class Lloyd’s Register, class notation +100A1
submersible pontoon, maximum operating depth
12.26 meters to bottom of keel, deck strengthened up
to 15,000 kg / sqm
LOA 122.45 m
Beam 30.50 m
Built in 1977 in Japan
Rebuilt in GSP’s North Production Facility – Midia
Base.
Duties: Dry heavy marine transportation – offshore
drilling rigs, offshore production structures and
modules such as jackets, topsides, other heavy
floating and non-floating cargoes, using the float on /
float off method, other offshore installation works.
GSP BIGFOOT 1
DP2 Pipelay Barge
Heavy-lift 400 MT offshore crane
Classified under ABS register, class notation A1,
Barge, DPS-2, UWILD, CRC. 60 MT pipe handling
crane LOA (excluding stinger) 135.00 m, 6 x 2,200kW
Rolls Royce Azimuth Thrusters, 8 point Mooring
Winches, KONGSBERG DPS Class 2, KONGSBERG
HIPAP 500 system, 200 MT pipelaying capacity, 6 x 50
MT Pipe Repair Davits, A&R Winch capacity of 200
MT, three sections-90m Stinger, helideck-Sikorsky S-
61N & S-92 with refueling system, 125 HP ROV XLR,
accommodation 240 POB. Built in 2010 in GSP
Shipyard, upgraded in 2015.
Duties: Pipelay, heavy lift works. The pipelay system is
based on the single joint S-lay principle. The barge is
capable of installing 6” to 60” diameter pipelines.
www.gspholding.com34
Our FleetOffshore Heavy Lift Cranes
100 tons SWL crane barge
Built in 1973
LOA 40,66 m
Beam 20.02 m
Power 2 x 331 kW
Accommodation: Crew only – 16
Duties: offshore construction
GSP GRANIT
1,800 tons SWL crane barge
Built in 1998, upgraded in 2010
Lifting speed / load 1.8 m / min., lifting speed
/ unload 3.6 m / min.
Main hooks lifting height 72.00 m
LOA 83 m, Breadth 44 m
Gross tonnage 7.502 t
Accommodation: 16
Duties: Offshore construction – platform
installation, rebuilding and removal.
GSP NEPTUN
www.gspholding.com35
Our FleetROV, Sat Diving & Trenchers
Capacity up to 15 divers
Designed and built by LexMar Eng.
IMCA and ABS compliant.
Water depth: up to 300 m
The ROVs (Remotely operated vehicle) GSP owns and operates incorporate latest generation robotic technologies being able to operate in the safest
manner in the toughest weather conditions and challenging environment.
Mohican Inspection Class ROV
system, 2,000 msw
GSP MOHICAN
GSP SAT DIVING SYSTEM
Navajo compact size and weight
portable ROV system
300 msw
GSP MOHAVEGSP ROV TRITON XLR
Perry Slingsby Triton XLR,
Medium Duty Work Class ROV
3,000 msw, 125 HP
Perry Slingsby Triton XLX,
Heavy Duty Work Class ROV
3,000 msw, 150 HP
GSP ROV TRITON XLX
GSP JETTING JACKGSP OCEAN TRENCHER &
GSP OCEAN RANGER
Max. Operating Depth: 50 m
Burial Depth: 0.6 to 1 m to top of product
Cutting Capacity: Sand / Clay
Minimum Ground Pressure: 10 Kpa
Max. Operating Depth: 30m or modified to 100m
Burial Depth: 0 to 3.3 m to top of product
Cutting Capacity: Sand to moderate/ strong rock
Minimum Ground Pressure: 10 Kpa
www.gspholding.com36
Our FleetHelicopters
AGUSTA WESTLAND 139
• 3 x Agusta Westland AW139
• Passenger offshore transportation, search and rescue operations over water/mountains, MedEvac
operations
• Largest cabin size in its class, two sliding doors and flat cabin, unprecedented all weather capabilities
• 2 of the aircrafts are equipped with the Full Ice Protection System (FIPS)
• All the specifications required by the Oil & Gas Industry (OGP), two Search and Rescue transponders
- SART, single rescue hoist-Goodrich, being able to perform a search and rescue mission flying 100
NM from the take off base, stay in the area for nearly 100 minutes and fly back to the base retaining
45 minutes of reserve (with standard fuel tanks).
• Aerolite Stretcher Kit included (a 3 part stretcher installed in the center of the cabin using the seat
tracks) which allows medics full access to the patient in flight.
www.gspholding.com37
Investment PolicyPlanned / Future
Arctic Project
GSP Titan
Offshore Logistic Hub
www.gspholding.com38
Investment PolicyArctic Project
Hull size: 90 x 90 m (Ice strengthened) Ice Class PC4 , Hull depth: 12 m, Draft floating: 8 mCantilever reach: 70ft aft of stern (90ft aft of skidbox) x 70ft transverseDrilling package: 1,500 kips, 35,000 ft drilling depthMaximum variable load: 7,500t (6,500t floating)Accommodation: 150 persons, Leg diameter: 7mJacking system lifting capacity: 10,000t per leg (15,000t holding)Drilling sleeve: 7m diameter, extending at least 5m below waterlineAutonomy: minimum 60 daysExtensive H2S preparations – temporary refuge / IBEECZero discharge for Caspian requirements
Performance characteristics in ice and open water:Trial speed 16 knotsContinuous bollard pull 140tMin. economical speed 12 knots in Hs=3mIcebreaking 1.8m (+20 cm snow) at 2 knotsManeuvering turning in 1.7m ice at 200m dia in 3minsEnvironmental conditions:Ambient temperature -400C to +350CSea water temperature -200C to +250C Endurance / Autonomy: Endurance 2 months
New rig design to operate in ice condition
GSP
TBN
Multi Role Icebreaker / Offshore Construction Vessel
GSP
TBN
GSP
TBN
Supply of offshore platforms, drilling rigs and vessels with stores, materials and equipment according to buyer's specificationsIce breaking / Ice managementEarly stage fire fighting and rescue operations close to structure on fireRescue and standby services to offshore installationsOpen water speed:16 kn at 90% of propulsion powerClass Notation: DnV or similar, 1A1, Supply Vessel SF, Icebreaker ICE-10, E0, Standby Vessel, DYNPOS-AUTRO, E0, Winterized, DAT(-35°C), DK(+), Fire Fighting II, Deice, COMF-V(3), Clean Design, NAUTOSV
Icebreaking Platform Supply Vessel
www.gspholding.com39
Investment PolicyArctic Project & GSP Titan
The tasks of the vessel as an icebreaker are:• operate as an escort icebreaker• contract towing for small and medium sized assisted vessels• oil-combating vessel• fire-fighting vesselThe vessel shall also be equipped to operate for the oil industry as AHTS with the following tasks: Anchor Handling Tug Supply Vessels (AHTS)standby vessel for 200 person
Icebreaking Anchor Handling Tug Supply Vessel
GSP Titan
GSP Titan
5000T Derrick Pipe-lay Vessel
3000m Pipe-lay / 5000T Heavy Lift CCS / ABS
• PRINCIPAL DIMENSIONS• Length Overall 199 m• Operating Draft(min/max) 7.5 m/10.6 m • Accommodation Comfort class living quarters- 398 people• ABS Class Notation +A1 Offshore Support Vessel (Heavy Lift, Pipe Lay, DSV
Capable, ROV Capable, SPS), E, +AMS, +ACCU, +DPS-3, BWT, CPS, CRC, ENVIRO, HAB (WB), HELIDK, NIBS, Ice Class DO, MLC-ACCOM, POT, UWILD
• Dynamic Positioning DP3, Kongsberg• Main Generators: 6 xWartsila 12V32,750 rpm .diesel engines• Output Power 6,680 kW each• Emergency Generator (1) 640kW• Harbour Generator (1) 1,500kWPedestal Crane: main hoist 5000t fixed, 3500t revolving; auxiliary hoist 1200t
wave compensated Pipelay System 600t tension S-lay up to 60-inch pipe diameterROVs 2 workclass 3000m rated
GSP TBN
www.gspholding.com40
Investment PolicyOffshore Logistic HUB
General description
Constructing Shipyard Harland and Wolff Belfast,
Northern Ireland
Year entered service 2000
Dimensions
LOA
Lpp
Breadth
Depth
Draft
231.51 m
210.00 m
36.00 m
17.80 m
10.00 m
Accommodation200 persons in base configuration
Option to increase to 300
HelideckRated for Sikorsky S61
helicopters; 83 ft. diameter
Transit speed Up to 12 knots
Power and Machinery
Main Power
8 x MAN B&W 9L3240 diesel
engines rated at 4,320 kW each
driving 1 x ABB 4,184 kW
generator
Emergency Power1 x Caterpillar 35416 diesel
engine rated at 1,100 kW driving
480 VAC
Power DistributionABB generator protection
Station keeping / Propulsion system
Thrusters6 x Kamewa / Aquamaster 7001 Azimuth
Thrusters 4.1 m diameter fixed pitch fully
ratractable
DP SystemNautronix C3 ASK NMS 6000 L3 control
system
Cranes
2 x Seatrax 6032
cranes140 ft. boom @ 56.6 mt @ 19.8 m radius
2 x Seatrax 7228
cranes120 ft. boom @ 56.6 mt @ 19.8 m radius
Autonomous Rescue and Recovery Craft
(ARRC) - Optional
2 x ARRC 6 persons
www.gspholding.com41
Investment PolicyOffshore Logistic HUB
Sack StoreWorkshops Brine Drill Pipes & Casing
Mud Pump Room Base Oil Liquid Cargo
FIFI – II Class System Offshore Logistic Containers Capping StacksDrill Pipes
Gangways
www.gspholding.com42
Romania
Mexico
Russia
The Netherlands
Address: Constanta Port, Berth 34, 900900, Constanta
Tel: 0040 241 555 255; 0040 241 555 256
Fax: 0040 241 555 257
E-mail: [email protected]
Address: Marconistraat 16, 3029 AK, Rotterdam
Tel/ Fax: 0031 (0) 10 741 0100; E-mail: [email protected]
Carretera, Carmen Puerto Real, km 1,5, Colonia Pedro Saenz de
Baranda, Ciudad del Carmen, 24195, Campeche
Tel.: (+52) 938 386 0413; E-mail:[email protected]
Address: 79 Vavilova Street, Build.1, Office 1, 117335, Moscow
Tel: +7 (499) 550 17 02; E-mail: [email protected]
UAE
Unit no Almas-BC-32, Almas
Business Centre DMCC Level No 2, Almas Tower, Plot No. LT-2
Jumeirah Lakes Towers, Silver Tower, 18 Floor, 18C Office, Dubai
Tel.00971 506 334 868
Top Related