www.gspholding.com 1 GSP Holding Company Presentation www.gspholding.com

Transcript of GSP · PDF filesubsea pipelay contract (165 km) ... • comply with the safety rules and...

www.gspholding.com1

GSP HoldingCompany Presentationwww.gspholding.com

www.gspholding.com2

Contents

Company Overview

© GSP 2016 Information contained in this document is GSP property and shall be used exclusively for its purpose.

The information cannot be either partially or entirely submitted to third parties without prior written approval from the GSP Management Team

GSP HSEQ Management System

Business & Clients

GSP Engineering

Facilities

Fleet

Investment Policy

www.gspholding.com3

Wherever Your Projects May Take You,

We Will Be There For You

We are an international company with headquarters in

Constanta, Romania and subsidiary offices in Moscow, Rotterdam,

Dubai, Campeche (Gulf of Mexico), Tunis, Valetta, Limassol, Lagos,

Singapore, Istanbul, employing over 2,500 personnel

We are a full-service oil and gas service provider that works with

the largest organizations in the world and that has a long history

and track record in a variety of segments of the oil & gas

industry

We offer global coverage, to serve our clients’ international needs

We are members of the International Association of Drilling

Contractors (IADC), International Maritime Contractors

Association (IMCA), International Pipe Line and Offshore

Contractors Association (IPLOCA), International Well Control

Forum (IWCF);

www.gspholding.com4

Founded in 2003, GSP quickly became a reliable partner

for top international oil and gas groups

2003 2005 2008 2009 2010 2011 2012 2015

Following the privatization

of National Oil Company,

Petrom, GSP is established

employing 90% of Petrom’s

offshore personnel

GSP takes over firsts

assets:

six offshore drilling rigs, five

offshore support vessels

and a crane barge

GSP enters the offshore

construction market with a

contract awarded by TPAO

GSP establishes its first

engineering capacities

in Rotterdam

GSP is awarded

subsea pipelay contract

(165 km) with Gazprom in

the Black Sea.

GSP registers a turnover of

over USD 600m.

Acquires additional assets –

incl. GSP Bigfoot 1, GSP

Bigfoot 2 and the ROV fleet

GSP extends its fleet with 2

jack-up rigs, and a

construction vessel for

North Sea operations, GSP

Falcon

GSP enters the North Sea Market;

awarded two contracts, for drilling and

pipelay, by Wintershall, the largest crude

oil and natural gas producer in Germany,

a company member of the BASF Group

GSP enters Gulf of Mexico

with two Jack-ups,

the third one starting

operations in 2014

GSP enters the

West African

market

GSP relocates the

engineering head office in

Bucharest

GSP consolidates the

engineering capacity,

entering in joint

cooperation with RIE

2016

www.gspholding.com5

Geographical Footprint

Mexico MozambiqueNigeria Tunisia RussiaThe NetherlandsUnited kingdom Luxembourg Italy Greece Turkey CyprusRomania UAE Singapore

Drilling Projects

Pipelaying Projects

Survey Projects

Company / Office

Legend:

www.gspholding.com6

Top Rated: GSP has a strong customer base

with a dominant market position in the Black Sea

Dzhubga

Tuapse

Lazarevskoye

Sochi

Illustration

www.gspholding.com7

… and continues growing in the North Sea, Azov Sea, Marmara Sea

and South East Mediterranean markets

Azov Sea

Projects:

• Clients: GAZPROM, LUKOIL,

Rosneft, Cernomorneftegas,

Socar

• Drilling

• Pipelay work

• Subsea works

incl.

Hyperbaric

subsea

welding

• Survey

• Supply vessel/

Anchor

Handling

• Saturation

Diving/ ROV

operations

Caspian Sea

Projects:

• Clients: Bahar Energy, Socar

• Logistic offshore support

services – Baku Azerbaijan /

Aktau - Kazakhstan

• Platform Drilling – Azerbaijan /

Baku

Mediterranean & Marmara Sea

Projects:

• Clients: TPAO, Energean, Total,

Cooper Energy, ETAP

Sonatrach, Albpetrol, Japan Oil

• Drilling

• Pipe lay/ umbilical

• Pipe lay job

• Survey/ Diving

• Supply vessel/ Anchor

handling

Sakhalin/ Russian Far East

Projects:

• Clients: Gazprom, MRTS

• Subsea/ Diving

• Pipe lay barge management,

Welding, NDT, FJC and pipe

launching

Barents, Pechora & Kara Sea

Projects:

• Clients: Gazpromneft Sakhalin,

Rosneft Artic Shelf, Novatek

• Drilling with Jack-up in Russia

• Supply vessel, Anchor Handling

Gulf of Mexico

Projects:

• Clients: PEMEX

• Drilling with jack up

North Sea

Projects:

• Clients: Wintershall Nordzee,

Perenco, EON, Technip

• Drilling with jack up rig

• Pipe lay, umbilical, trenching,

survey, ROV, Diving

• Supply vessel

• Heavy lift transport

Middle East

Projects:

• Clients: NIOC Iran, Repsol

• Drilling with Jack up

• Joint Venture : MEAOS – Middle

East and Africa Offshore Service

LLC – Abu Dhabi – partner Abu

Dhabi Mar – Fabrication Facility

• Pipe lay job

www.gspholding.com8

GSP HSEQ Management System

www.gspholding.com9

Introduction to GSP HSEQ Management System

ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007 ISO 30000:2009 ISO TS 29001:2010 ISPS Code ISM Code

GSP has a fully Integrated HSEQ Management System that incorporates international regulatory requirements, recognized oil

and gas standards and industry best practices.

In our search for excellence in Health, Safety, Environment and Quality, GSP established relationship with Det Norske Veritas

and Bureau Veritas. Since than our Integrated HSEQ Management System has been certified in the following ISO Standards:

GSP vessels and assets comply with all the applicable international regulatory conventions and classification requirements which

have also been incorporated into our HSEQ Management System.

• ISO 9001 – Quality Management;

• ISO 14001 – Environmental Management;

• BS OHSAS 18001 – Occupational Health and Safety;

• ISO/TS 29001 – Quality Management for Oil and Gas.

www.gspholding.com10

Safety Culture

GSP employees – make the work place safer:

• Stop Work Authority (SWA)

• Permit to Work System (PTW)

• Task Risk Assessment (TRA)

• Safety Observation System

GSP’s personnel is facing often work in very demanding roles and extreme conditions. Continuous different hazards may arise and

have to be managed, whether in offshore locations, fabrication areas, or the transport of people, equipment and products. Through

our procedures we ensure that whatever our personnel is doing, they always pay attention on possible risks and on the safety of

operations before they start work and during their work.

Our management team assures that everyone who works for GSP, or with GSP, take personal responsibility in the following areas:

• comply with the safety rules and regulations relevant to their work;

• intervene to prevent unsafe conditions; and

• respect fellow workers and the communities in which we work.

Managers and Supervisors – promote safety culture:

• Communicate High Safety Standards.

• Lower Tolerance for Risk – ALARP.

• Promote and Participate – Safety Observations.

• HSE Performance – KPI Establish & Monitor.

• Promote High Safety Standards - HSE coaching.

www.gspholding.com11

Monitoring HSE: Fact & Figures

KEY PERFORMANCE

INDICATORS2013 2014 2015 2016

Fatality (FTL) 0 0 0 0

Lost Time Injuries (LTI) 3 2 1 0

Work Restricted Case (WRC) 2 2 0 0

Medical Treatment Case (MTC) 5 7 5 2

First Aid Case (FAC) 8 10 9 3

Total Man Hours 4,800,839 4,378,438 3,193,316 1,469,936

Lost Time Injury Frequency Rate

(LTIFR)0.62 0.46 0.31 0

Total Recordable Frequency Rate

(TRFR) 2.08 2.51 1.88 1.36

www.gspholding.com12

Project Communication as a Key Success Factor

• By various Project

Documentation (Forms),

targeted information can be

controlled and risks can be

reduced and communicated

in time

• Our company policy

foresees:

o Steering Committees

o Monthly Jour Fixes

o Weekly Update Meetings

o Daily Meetings (for safety,

project status etc.)

Results & Benefits

Risk Management Communication

Measures

Status Report MoMAction Item List

Project

Planning

Actions

Core responsibilities

Project Documentation (Forms)

Risks

ScheduleTarget Organization ResultsBudget

Planning

Project Planning: Monitoring and Control

Risk Matrix

Progress

www.gspholding.com13

Project Audit Approach

RiskMgmt.

Project Communication

Demand Mgmt.& Project

DocumentationCost-validation

Project setup & planning

ProjectAudit

HR Mgmt.& Budget Controlling

Benefits for our costumers

• The project audit approach of GSP considers

the key dimensions of project management

(time, cost, quality) from the perspective of 6

thematic fields

• Our Project Audit approach provides to our

costumers the following benefits:

Cost transparency

Planning security

Audit compliance

Recommendations

Overall project implementation

www.gspholding.com14

Business & Clients

www.gspholding.com15

Our Business (1/3)

• Conductor Hammering and pipe

handling

• Wells Production Testing

• Formation logging service

• Completion

• Logistics and transportation

• Emergency response

Integrated Drilling Services Management

• Self-elevating drilling unit

• Semi-submersible drilling unit

• Platform modular Rigs

• Maintenance and Operations

management of 3rd party Rigs

• Well design

• Directional Drilling

• Cementing engineering and services

• Fishing tools and services

• Drilling Fluids engineering and

services

• Solid control and disposal, mud

logging

Offshore Drilling Rigs (MODU) Operations

• EPCI (Engineering, Procurement,

Construction and Installation)

• Onshore Fabrication and Assembly

Yards (Berth 34 Constanta, Midia North

Constanta, Agigea South Constanta)

• Midia Pipeyard and Machine Shop

• Large Capacity Heavy Lift Equipment

• Subsea Installation

• Saturation diving ROV

operation/Trenching

• Commissioning and Operation

• Manpower

Offshore Construction

• AHTS

• PSV

• MPSV

• IRM

• Stand by vessels

• Construction Vessels:

• DP2 Flex-Lay / J-Lay Pipelay

• Ocean transport Submersible

Barge

• DP2 Derrick Pipe Lay Barge

• Barge Shearleg Crane 1800 t

Vessel Services

• Large Capacity Heavy Lift

Equipment

• Subsea Installation

• Saturation diving ROV

operation/Trenching

• Commissioning and Operation

• Manpower

www.gspholding.com16

Our Business (2/3)

• fabrication and installation off subsea well head, Christmas three, flow line and pipe equipment

• storage and assembly of PLETs( pipeline and termination), manifolds, umbilical’s and risers and anchor piles.

• fabrication of topside, buoys, FPSO modules, buoyancy tanks, jackets and platforms.

• building, repair, conversion, maintenance of Jack up and deep water drilling rigs, construction vessels and supply vessels

GSP South Production Facility & Shipyard, Agigea

• Integrated warehousing, open and bulk

storage, handling, heavy lifting and heavy

transportation

• Contract logistics (tubular material and

other oilfield equipment pick & pack, cross

docking)

• Project/contract based global forwarding

• Freight management

• End to end solutions for the offshore

oil and gas industry

• Project cargo, general cargo & steel

cargo, assembly of industrial cargoes,

offshore vessels and rigs port

assistance and services

• Import export services

GSP North Production Facility & Pipeyard, Midia

Multidisciplinary engineering services for:

• Oil & Gas drilling/production offshore and

onshore plants;

• Hydrocarbons and chemicals processing

plants;

• Power generation plants.

• Structural engineering. (FEM/FEA,

scantling calc, class dwgs, workshop

design)

• Outfitting engineering (pipe sys,

mechanical, HVAC, electric sys)

• Naval architecture (hydrostatic,

hydrodynamic)

• Conceptual design

• Tender process support

• Basis of design

• Concept, analysis and calculations

• Class drawings

• Workshop drawings and prod info

• Purchasing support

• Pipe yard/tubular and oilfield

equipment workshop

• 3rd party services on permanent

basis (customs clearance, according

with the European Union

regulations, dangerous goods

transportation measures,

procurement services and support.)

GSP Engineering

www.gspholding.com17

Our Business (3/3)

• Helicopter Crew Transportation

• ERCC Capabilities: Medical Evacuation (MEDEVAC);

Search And Rescue (SAR) / Helicopter Incident, Flight

Following

• Experienced personnel as requested by Oil & Gas industry

• Audited and certified by Italian and Romanian Civil Aviation

Authorities

Vega Offshore Aviation

• Drilling Courses: IWCF Well Control

(Level2/Level3&4), Operating Driller Cyber

Chair X-COM, DR1 Offshore Drilling

Induction

• HSE Courses: IADC Rig Pass

• ROV Courses: ROV Operator

• Courses for Marine Personnel: Basic

Safety Induction, Advanced Safety

Training, Safe Rigging & Slinging,

Seagoing DP Familiarization

• English Language Courses

• 120 seats in four training rooms, 20

seats in conference room, 14 design

offices, 50 seats in restaurant

GSP Training

• DrillSIM 6000 & DrillSIM 20 drilling

simulators

• ROV simulator room equipped with

ROV Triton XLX Simulator,

designed by Perry Slingsby

• DNV GL ISO 9001 Quality System

Certification

• Total facility area: 2196.5 sqm

• 3 x AW139 helicopters (2 with Full Ice Protection System);

configurations: 12 seat offshore passenger, MedEvac, SAR

• Fixed Wing - Air Ambulance Evacuation Charters

• Mihail Kogalniceanu Airport – operational base

• Midia – maintenance base

• Food and Beverages Services

• Housekeeping Services

• Custom Catering Services for Oil & Gas,

Shipping and Air transport companies

• Procurement and Logistics capabilities

• Executive chef with extensive experience and Serve Café

Certification, nutrition specialists

• Bio Food options/ selection of sustainable local products

• Continuous Training Programs

• Integrated HSEQ Management System

GSP Catering

www.gspholding.com18

Our Clients

Selected References:

Offshore Drilling, Constructions and Support Services

Offshore Support ServicesOffshore ConstructionOffshore Drilling

www.gspholding.com19

Engineering

GSP Engineering, member of GSP Holding, enjoy a long lasting regional leading position in the Offshore Engineering & Construction

businesses, with a strong focus on oil & gas-related activities in remote areas shallow and deep-waters

GSP Engineering

www.gspholding.com20

GSP Engineering

GSP Engineering is an engineering

companies working in the Oil & Gas

Industry on:

• Sea-lines

• Subsea Template

• Subsea Manifolds

• Deck & Jackets

• Hyperbaric Welding

We support our clients since the early phases of projects and throughout the entire

development of the field with a wide set of products and services including

platforms, pipelines, subsea field developments and with distinctive capabilities in

the execution of large-scale offshore projects.

We leverage on our strong engineering, procurement, project management,

construction, installation and technological competence, our outstanding asset

base and consolidated local presence (people, yards, logistic bases) especially in

strategic countries like Russia.

In these areas GSP Engineering

covers:

• Engineering Management

• Conceptual & Basic Design

• Procurement And EPCI Projects

Management

• Fabrication, Marine Operation &

Installation Engineering

www.gspholding.com21

Facilities

GSP Training Center

Berth 34

GSP North Production Facility

Midia

GSP South Production Facility& Shipyard

Agigea

The location provides fast river / canal connection with Western Europe

and directly with Rotterdam port, through the Rhine-Main canal.

www.gspholding.com22

Construction & Workshop Facilities

The location ensures fast river/canal connection with Western Europe and directly with Rotterdam port, through the Rhine-Main canal. The location is ideal to serve the needs of the Black Sea region, and beyond, offshore and onshore oil, gas and petrochemical construction market. It also allows GSP to benefit from a direct source of skilled local craftsmen, dedicated to meeting the needs of any offshore or onshore development project.

www.gspholding.com23

GSP South Production Facility & Shipyard, AgigeaProfile

GSP Shipyard is a regional facility specialized in procurement, engineering, fabrication, and project management for offshore

constructions.

GSP Shipyard offers the necessary infrastructure to support offshore construction with a complex steelwork facility endowed with

an extensive fleet of heavy lift cranes.

GSP Shipyard tackles each challenge with safe, reliable and innovative solutions, committed to provide sustainable development

both for the company and for the community where it operates.

GSP Shipyard fabricates the steel structures in accordance with all relevant standards requested by offshore oil and gas industry.

• ISO & ISPS certified port facilities • Skilled & certified manpower • Heavy lift & high speed onshore and floating cranes, up to

4400 tons • Multipurpose workshops and heavy-duty platforms • Complex steelwork facility

www.gspholding.com24

GSP South Production Facility & Shipyard, AgigeaFacts & Figures

Access to open sea

Distance to open water: 6 km

Minimum channel water depth 7 m

Minimum channel width 160 m

Height restrictions None

Tidal range Negligible

Steel fabrication area

Surface Maximum load

Crushed stone pavement area 66,000 m2 30 t/m2

Pile reinforced area 3,600 m2 200 t/m2

Concrete pavement 13,500 m2 30 t/m2

Personnel and Manpower

• At peak work load the Agigea Fabrication Yard employs over 350

personnel and has an annual direct man-hour capacity of more one

million man-hours.

• The yard operates five and a half days a week with two shifts per

day.

Construction & assembly hall

New built yard quarter 950 m2

Production area: 5,750 m2

Gantries 2 x (20 + 5) ton

GSP SHIPYARD CONSTRUCTION AND FABRICATION YARD:

EXISTING BASE PLAN – MOL 1A CONSTANTA SOUTH PORT

Black Sea

existing operational base – 72,640 sq m

development area – 59,370 sq m

GSP existing facilities

Legend:

www.gspholding.com25

GSP Shipyard provides end-to-end solutions in steel

fabrication services having the full capacity to deliver:

• Jackets

• Decks / Topsides

• Bridges

• Tripods

• Piles

• Floating Structures

• Offshore constructions and modules

• Piping and facility installation.

GSP Shipyard provides highly specialized services for the

shipbuilding projects and repairs including:

• New-builds

• Upgrades

• Reactivation / Conversion

• Green scrapping

Works performed on Akcakoca Project

Works performed on Akcakoca Project

Annual Tonnage Capacity: 5,000 metric tons – after upgrading:

up to 12,500 metric tons

Annual Direct Man-Hour Capacity: 1 million man-hours

Largest Jacket: 1,450 metric tons

Largest Single Piece Deck: 700 metric tons

Maximum Wharf Side Lift: 1,450 metric tons (GSP Neptun)

GSP South Production Facility & Shipyard, Agigea: Fabrication Capabilities

www.gspholding.com26

GSP North Production Facility & Pipeyard, MidiaProfile

GSP Logistics is providing support services to oil and gas producing companies, oil and gas operators, shipping lines, vessel

operators and drilling contractors. These services include, but are not limited to machine shop services, drilling fluid services, pipe

coating services and many other. All services are provided with the support of the following facilities:

• Quay Apron with trenches for bulking and water/

drilling mud supplies

• Area behind quay for silos

• Storage racks for pipes and drilling gear

• General storage and lay down area

• Workshops/ Warehouses and testing facilities

• Other facilities for casing, tubulars, machine shops

and pipe coating

• Pipe storage and double joint welding line facility

• Welding shop facility for pipeline projects

• Cranes, lifting equipment and heavy trucks

• Office for base operators and users

• Maintenance, fire and safety storage areas and workshops

• Helicopters operation facility and maintenance

• Waste management facilities

GSP Logistics is an industrial harbor logistic facility for offshore oil and gas activities, located in the

north part of Harbor Constanta, Romania

www.gspholding.com27

GSP North Production Facility & Pipeyard, Midia: Facts & FiguresGSP Logistic base incorporates all types of transport infrastructure from aviation to ship transport and land transport (on railway and on road)

Area details Surface Maximum

load

Crushed stone pavement: 310,000 m2 15 t/m2

Concrete pavement: 45,000 m2 30 t/m2

Constructions (incl. helicopter base): 20,000 m2

Operational & Inside Storage area Surface

Outside operational area: 7,500 m2

Total warehouses surface: 7,000 m2

Offices: 900 m2

3 workshops

Offshore welding school

Automatic line for tubular drilling equipment check & repairs

Drilling school (similar offshore rig equipment)

Access to GSPL Base:

1.By water:

• connection to Black Sea

• connection to Danube Channel

2. By railway – direct connection with national rail network

3. By road

4. By air – through helicopter base

www.gspholding.com28

GSP Training Center - Berth 34, Constanta Harbour The DrillSIM-6000 is capable to offer full Well Control training and training in Cyber Base operating controls.

• Drilling Courses

• HSE Courses

• ROV Operations

Simulator room I:

GSP Training Center also offers training using Drill SIM 20 mobile compact drilling simulator. The two

simulators are high level technological products, offering comprehensive training solutions for the oil and

gas industry.

• 2,196.50 sqm total area

• 120 seats in four training halls

• 20 seats in conference room

• 14 design offices

• 50 seats in cafeteria

Simulator room II:

Equipped with a remote operated vehicle (ROV) simulator. The ROV Triton XLX Simulator is designed

and manufactured in 2010 by Perry Slingsby, UK, in cooperation with VMAX Simulation Technologies

US.

The ROV simulator comprises:

• ROV Pilot and Assistant controls;

• Input / Output devices identical with the real ROV devices, including Media Wall monitors;

• Instructor’s desk for monitoring, logging, scenario creation and troubleshooting problems input,

parameters and variables for the virtual environment.

www.gspholding.com29

Fleet

Jack up Rigs

Vessels

Construction Vessels

Offshore Heavy Lift Cranes

ROVs & SAT Diving System & Trenchers

Helicopters

www.gspholding.com30

Our FleetRigs - self elevating units, cantilever

GSP ATLAS

Four legs

Built 1985

Rebuilt 2007

Class GL

Flag Malta

Accom. 90+2

Helideck 80 x 80 ft

Max Drill Depth

25,000 ft

Max Water Depth

300 ft

GSP ATLAS

GSP ORIZONT

Four legs

Built 1982

Rebuilt 2006

Class GL

Flag Malta

Accom. 90+2

Helideck 80 x 80ft

Max Drill Depth

25,000 ft

Max Water Depth

300 ft

Three legs

Built 1984

Upgraded 2011

Class ABS

Flag Vanuatu

Accom. 88

Helideck 70 ft

Max Drill Depth

25,000ft

Max Water Depth

300ftGSP FORTUNA

Four legs,

Built 1984,

Upgraded 2003

Class ABS

Flag Malta

Accom. 90 + 2

Helideck 80x80 ft,

Max Drill depth

20,000 ft

Max Water Depth

300 ftGSP PROMETEU

Four legs

Built 1987

Rebuilt 2007

Class ABS

Flag Malta

Accom. 95 + 2

Helideck 80 x 80 ft

Max Drill Depth

30,000 ft

Max Water Depth

300 ftGSP JUPITER

Four legs,

Built 1988,

Rebuilt 2009

Class ABS

Flag Panama

Accom. 100

Helideck 80x80 ft

Max Drill depth

30,000 ft

Max Water Depth

300 ftGSP SATURN

Three legs

Built 1992

Class ABS

Flag Vanuatu

Accom. 116

Helideck 83 x 83 ft

Max Drill Depth

30,000 ft

Max Water Depth

350 ftGSP MAGELAN

Three legs,

Built 1980,

Rebuilt 2014

Class ABS

Flag Vanuatu

Accom. 100

Helideck 70 ft

Max Drill depth

25,000 ft

Max Water Depth

333 ftGSP URANUS

www.gspholding.com31

Our FleetAHTS Vessels

GSP ANTARES

AHTS Offshore Support Vessel, class

ABS, class notation A1E, Fire Fighting

Class 1 + AMS + DPS-1, offshore

support, towing, fire fighting and

antipollution vessel. Main engines 2 x

2,575 BHP. Built in 2009 at Fujian,

China.

Duties: Offshore drilling rig towing and

positioning, anchor handling, rescue

missions, supply transport for offshore

activities.

GSP ALCOR

AHTS Offshore Support Vessel, class

ABS, towing, fire fighting and

antipollution vessel Class 1, DPS-2, Main

engines 2 X 4,000 kW,

Wartsila 8L32

Built in 2005 by Jaya Shipbuilding &

Engineering, Singapore.

Duties: Offshore drilling rig towing and

positioning, rescue, supply transport for

offshore activities.

AHTS Offshore Support Vessel,

class ABS, towing, fire fighting and

antipollution vessel

Class 1, ICE-C, 8,000 HP, DPS-1,

Main engines 2 X 2,925 kW

Built in 2006 by Jaya Shipbuilding

& Engineering Singapore.

Duties: Offshore drilling rig towing

and positioning, rescue, supply

transport for offshore activities.

GSP QUEEN GSP KING

AHTS Offshore Tug/Supply Vessel, class BV, DP-1 firefighting, antipollution, rescue vessel with 150 persons

capacity

Class I +Hull + MACH; Tug Supply Vessel, Unrestricted Navigation, ICE, DYNAPOS-AM/AT, designed and built in

1982 by Bolsoenes Verft, Norway. Main engines 4 x MAK Diesel 3,200 BHP, total 12,800 HP

Duties: Offshore drilling rig towing and positioning, rescue, supply transport for offshore activities.

Safety/Emergency Response/AHTS/OSR

Vessel, Class DnV, class notation + 1A1

Tug/Supply Vessel –

SF FiFi I+II – Oil Rec Dyn. Pos. autr. –

LFL, EO. Designed and built in 1985 in

Ulstein Yard/Norway.

Propulsion: 4 x Winchmann Diesel type

AXAG, each 4,500 BHP. 170 tons

continuous Bollard Pull.

Duties: offshore drilling rig towing and

positioning, multifunction Safety Service

Vessel – full rescue class, certified for

300 persons, supply transport for

offshore activities.

GSP VEGA

www.gspholding.com32

Our FleetPlatform Supply Vessels, Crew Vessels

PSV, OSR

Class BV

Built 1983

Major upgrade 2009

Main propulsion

5,160HP

LOA 67.4 m,

Beam 16.8 m

Accom. 21.GSP CENTARUS

PSV

Class ABS

DPS2, FiFi I

Built 2014

Main propulsion

4 x 1,825kW

LOA 87.02 m,

Beam 18.08 m

Accom. 52.

Tug - supply

Class BV

Built 1994

Main propulsion

2 x 1,814 kW

LOA 60.92 m

Beam 13.59 m

Accom. 22.

Crew & supply

Class BV

Built 1995

Main propulsion

2,800 kW

LOA 73.33 m

Beam 13.63 m

Accom. 99.

GSP ORION

Tug - supply

Class BV

Built 1995

Main propulsion

2 x 1,814 kW

LOA 60.79 m

Beam 13.59 m

Accom. 22.

GSP LICORN

GSP PERSEU

GSP PHOENIX

www.gspholding.com33

Our FleetConstruction Vessels

GSP BIGFOOT 2

Semi-submersible, Heavy lift, Transportation Barge

Class Lloyd’s Register, class notation +100A1

submersible pontoon, maximum operating depth

12.26 meters to bottom of keel, deck strengthened up

to 15,000 kg / sqm

LOA 122.45 m

Beam 30.50 m

Built in 1977 in Japan

Rebuilt in GSP’s North Production Facility – Midia

Base.

Duties: Dry heavy marine transportation – offshore

drilling rigs, offshore production structures and

modules such as jackets, topsides, other heavy

floating and non-floating cargoes, using the float on /

float off method, other offshore installation works.

GSP BIGFOOT 1

DP2 Pipelay Barge

Heavy-lift 400 MT offshore crane

Classified under ABS register, class notation A1,

Barge, DPS-2, UWILD, CRC. 60 MT pipe handling

crane LOA (excluding stinger) 135.00 m, 6 x 2,200kW

Rolls Royce Azimuth Thrusters, 8 point Mooring

Winches, KONGSBERG DPS Class 2, KONGSBERG

HIPAP 500 system, 200 MT pipelaying capacity, 6 x 50

MT Pipe Repair Davits, A&R Winch capacity of 200

MT, three sections-90m Stinger, helideck-Sikorsky S-

61N & S-92 with refueling system, 125 HP ROV XLR,

accommodation 240 POB. Built in 2010 in GSP

Shipyard, upgraded in 2015.

Duties: Pipelay, heavy lift works. The pipelay system is

based on the single joint S-lay principle. The barge is

capable of installing 6” to 60” diameter pipelines.

www.gspholding.com34

Our FleetOffshore Heavy Lift Cranes

100 tons SWL crane barge

Built in 1973

LOA 40,66 m

Beam 20.02 m

Power 2 x 331 kW

Accommodation: Crew only – 16

Duties: offshore construction

GSP GRANIT

1,800 tons SWL crane barge

Built in 1998, upgraded in 2010

Lifting speed / load 1.8 m / min., lifting speed

/ unload 3.6 m / min.

Main hooks lifting height 72.00 m

LOA 83 m, Breadth 44 m

Gross tonnage 7.502 t

Accommodation: 16

Duties: Offshore construction – platform

installation, rebuilding and removal.

GSP NEPTUN

www.gspholding.com35

Our FleetROV, Sat Diving & Trenchers

Capacity up to 15 divers

Designed and built by LexMar Eng.

IMCA and ABS compliant.

Water depth: up to 300 m

The ROVs (Remotely operated vehicle) GSP owns and operates incorporate latest generation robotic technologies being able to operate in the safest

manner in the toughest weather conditions and challenging environment.

Mohican Inspection Class ROV

system, 2,000 msw

GSP MOHICAN

GSP SAT DIVING SYSTEM

Navajo compact size and weight

portable ROV system

300 msw

GSP MOHAVEGSP ROV TRITON XLR

Perry Slingsby Triton XLR,

Medium Duty Work Class ROV

3,000 msw, 125 HP

Perry Slingsby Triton XLX,

Heavy Duty Work Class ROV

3,000 msw, 150 HP

GSP ROV TRITON XLX

GSP JETTING JACKGSP OCEAN TRENCHER &

GSP OCEAN RANGER

Max. Operating Depth: 50 m

Burial Depth: 0.6 to 1 m to top of product

Cutting Capacity: Sand / Clay

Minimum Ground Pressure: 10 Kpa

Max. Operating Depth: 30m or modified to 100m

Burial Depth: 0 to 3.3 m to top of product

Cutting Capacity: Sand to moderate/ strong rock

Minimum Ground Pressure: 10 Kpa

www.gspholding.com36

Our FleetHelicopters

AGUSTA WESTLAND 139

• 3 x Agusta Westland AW139

• Passenger offshore transportation, search and rescue operations over water/mountains, MedEvac

operations

• Largest cabin size in its class, two sliding doors and flat cabin, unprecedented all weather capabilities

• 2 of the aircrafts are equipped with the Full Ice Protection System (FIPS)

• All the specifications required by the Oil & Gas Industry (OGP), two Search and Rescue transponders

- SART, single rescue hoist-Goodrich, being able to perform a search and rescue mission flying 100

NM from the take off base, stay in the area for nearly 100 minutes and fly back to the base retaining

45 minutes of reserve (with standard fuel tanks).

• Aerolite Stretcher Kit included (a 3 part stretcher installed in the center of the cabin using the seat

tracks) which allows medics full access to the patient in flight.

www.gspholding.com37

Investment PolicyPlanned / Future

Arctic Project

GSP Titan

Offshore Logistic Hub

www.gspholding.com38

Investment PolicyArctic Project

Hull size: 90 x 90 m (Ice strengthened) Ice Class PC4 , Hull depth: 12 m, Draft floating: 8 mCantilever reach: 70ft aft of stern (90ft aft of skidbox) x 70ft transverseDrilling package: 1,500 kips, 35,000 ft drilling depthMaximum variable load: 7,500t (6,500t floating)Accommodation: 150 persons, Leg diameter: 7mJacking system lifting capacity: 10,000t per leg (15,000t holding)Drilling sleeve: 7m diameter, extending at least 5m below waterlineAutonomy: minimum 60 daysExtensive H2S preparations – temporary refuge / IBEECZero discharge for Caspian requirements

Performance characteristics in ice and open water:Trial speed 16 knotsContinuous bollard pull 140tMin. economical speed 12 knots in Hs=3mIcebreaking 1.8m (+20 cm snow) at 2 knotsManeuvering turning in 1.7m ice at 200m dia in 3minsEnvironmental conditions:Ambient temperature -400C to +350CSea water temperature -200C to +250C Endurance / Autonomy: Endurance 2 months

New rig design to operate in ice condition

GSP

TBN

Multi Role Icebreaker / Offshore Construction Vessel

GSP

TBN

GSP

TBN

Supply of offshore platforms, drilling rigs and vessels with stores, materials and equipment according to buyer's specificationsIce breaking / Ice managementEarly stage fire fighting and rescue operations close to structure on fireRescue and standby services to offshore installationsOpen water speed:16 kn at 90% of propulsion powerClass Notation: DnV or similar, 1A1, Supply Vessel SF, Icebreaker ICE-10, E0, Standby Vessel, DYNPOS-AUTRO, E0, Winterized, DAT(-35°C), DK(+), Fire Fighting II, Deice, COMF-V(3), Clean Design, NAUTOSV

Icebreaking Platform Supply Vessel

www.gspholding.com39

Investment PolicyArctic Project & GSP Titan

The tasks of the vessel as an icebreaker are:• operate as an escort icebreaker• contract towing for small and medium sized assisted vessels• oil-combating vessel• fire-fighting vesselThe vessel shall also be equipped to operate for the oil industry as AHTS with the following tasks: Anchor Handling Tug Supply Vessels (AHTS)standby vessel for 200 person

Icebreaking Anchor Handling Tug Supply Vessel

GSP Titan

GSP Titan

5000T Derrick Pipe-lay Vessel

3000m Pipe-lay / 5000T Heavy Lift CCS / ABS

• PRINCIPAL DIMENSIONS• Length Overall 199 m• Operating Draft(min/max) 7.5 m/10.6 m • Accommodation Comfort class living quarters- 398 people• ABS Class Notation +A1 Offshore Support Vessel (Heavy Lift, Pipe Lay, DSV

Capable, ROV Capable, SPS), E, +AMS, +ACCU, +DPS-3, BWT, CPS, CRC, ENVIRO, HAB (WB), HELIDK, NIBS, Ice Class DO, MLC-ACCOM, POT, UWILD

• Dynamic Positioning DP3, Kongsberg• Main Generators: 6 xWartsila 12V32,750 rpm .diesel engines• Output Power 6,680 kW each• Emergency Generator (1) 640kW• Harbour Generator (1) 1,500kWPedestal Crane: main hoist 5000t fixed, 3500t revolving; auxiliary hoist 1200t

wave compensated Pipelay System 600t tension S-lay up to 60-inch pipe diameterROVs 2 workclass 3000m rated

GSP TBN

www.gspholding.com40

Investment PolicyOffshore Logistic HUB

General description

Constructing Shipyard Harland and Wolff Belfast,

Northern Ireland

Year entered service 2000

Dimensions

LOA

Lpp

Breadth

Depth

Draft

231.51 m

210.00 m

36.00 m

17.80 m

10.00 m

Accommodation200 persons in base configuration

Option to increase to 300

HelideckRated for Sikorsky S61

helicopters; 83 ft. diameter

Transit speed Up to 12 knots

Power and Machinery

Main Power

8 x MAN B&W 9L3240 diesel

engines rated at 4,320 kW each

driving 1 x ABB 4,184 kW

generator

Emergency Power1 x Caterpillar 35416 diesel

engine rated at 1,100 kW driving

480 VAC

Power DistributionABB generator protection

Station keeping / Propulsion system

Thrusters6 x Kamewa / Aquamaster 7001 Azimuth

Thrusters 4.1 m diameter fixed pitch fully

ratractable

DP SystemNautronix C3 ASK NMS 6000 L3 control

system

Cranes

2 x Seatrax 6032

cranes140 ft. boom @ 56.6 mt @ 19.8 m radius

2 x Seatrax 7228

cranes120 ft. boom @ 56.6 mt @ 19.8 m radius

Autonomous Rescue and Recovery Craft

(ARRC) - Optional

2 x ARRC 6 persons

www.gspholding.com41

Investment PolicyOffshore Logistic HUB

Sack StoreWorkshops Brine Drill Pipes & Casing

Mud Pump Room Base Oil Liquid Cargo

FIFI – II Class System Offshore Logistic Containers Capping StacksDrill Pipes

Gangways

www.gspholding.com42

Romania

Mexico

Russia

The Netherlands

Address: Constanta Port, Berth 34, 900900, Constanta

Tel: 0040 241 555 255; 0040 241 555 256

Fax: 0040 241 555 257

E-mail: [email protected]

Address: Marconistraat 16, 3029 AK, Rotterdam

Tel/ Fax: 0031 (0) 10 741 0100; E-mail: [email protected]

Carretera, Carmen Puerto Real, km 1,5, Colonia Pedro Saenz de

Baranda, Ciudad del Carmen, 24195, Campeche

Tel.: (+52) 938 386 0413; E-mail:[email protected]

Address: 79 Vavilova Street, Build.1, Office 1, 117335, Moscow

Tel: +7 (499) 550 17 02; E-mail: [email protected]

UAE

Unit no Almas-BC-32, Almas

Business Centre DMCC Level No 2, Almas Tower, Plot No. LT-2

Jumeirah Lakes Towers, Silver Tower, 18 Floor, 18C Office, Dubai

Tel.00971 506 334 868