Grid(Lab) Resource Management System
…and general Grid Resource Management
Jarek Nabrzyski et al.
Poznan Supercomputing And Networking Center
CGW 2003
GridLab
EU funded project, involving 11 European and 3 American partners (Globus and Condor teams),
January 2002 – December 2004
Main goal: to develop a Grid Application Toolkit (GAT) and set of grid services and tools...
resource management (GRMS), data management,monitoring, adaptive components, mobile user support, security services,portals,
... and test them on a real testbed with real applications
CGW 2003
GridLab Members
PSNC (Poznan) - coordination AEI (Potsdam) ZIB (Berlin) Univ. of Lecce Cardiff University Vrije Univ. (Amsterdam) SZTAKI (Budapest) Masaryk Univ. (Brno) NTUA (Athens)
Sun MicrosystemsCompaq (HP)
ANL (Chicago, I. Foster) ISI (LA, C.Kesselman) UoWisconsin (M. Livny)
collaborating with:Users!
EU Astrophysics Network,
DFN TiKSL/GriKSL
NSF ASC Project
other Grid projectsGlobus, Condor,
GrADS,
PROGRESS,
GriPhyn/iVDGL,
CrossGrid and all the other European Grid Projects (GRIDSTART)
other...
CGW 2003
It’s Easy to ForgetHow Different 2003 is From 1993
Ubiquitous Internet: 100+ million hostsCollaboration & resource sharing the norm
Ultra-high-speed networks: 10+ Gb/sGlobal optical networks
Enormous quantities of data: PetabytesFor an increasing number of communities, gating step is not collection but analysis
Huge quantities of computing: 100+ Top/sUbiquitous computing via clusters
Moore’s law everywhere: 1000x/decadeInstruments, detectors, sensors, scanners
Courtesy of Ian Foster
CGW 2003
And Thus,The Grid “Problem” (or Opportunity)
Dynamically link resources/servicesFrom collaborators, customers, eUtilities, … (members of evolving “virtual organization”)
Into a “virtual computing system”Dynamic, multi-faceted system spanning institutions and industries
Configured to meet instantaneous needs, for:
Multi-faceted QoX for demanding workloadsSecurity, performance, reliability, …
Courtesy of Ian Foster
CGW 2003
Integration as a Fundamental Challenge
R
Discovery
Many sourcesof data, services,computation
R
Registries organizeservices of interestto a community
Access
Data integration activitiesmay require access to, &exploration of, data at many locations
Exploration & analysismay involve complex,multi-step workflows
RM
RM
RMRM
RM
Resource managementis needed to ensureprogress & arbitrate competing demands
Securityservice
Securityservice
PolicyservicePolicyservice
Security & policymust underlie access& managementdecisions
Courtesy of Ian Foster
CGW 2003
Grid Scheduling
Current approach:Extension of job scheduling for parallel computersResource discovery and load-distribution to a remote resourceUsually batch job scheduling model on remote machine
But actually required for Grid scheduling is:Co-allocation and coordination of different resource allocations for a Grid job Instantaneous ad-hoc allocation not always suitable
This complex task involves:“Cooperation” between different resource providersInteraction with local resource management systems (interfaces and functions of many LRM differ from each other)Support for reservations and service level agreementsOrchestration of coordinated resource allocations
CGW 2003
Allocation for Grid Job Example
time
Data Transfer
Loading Data Parallel Computation Providing Data
Data Transfer Network 1
Computer 1
Parallel ComputationComputer 2
Communication for Computation
Network 3
VR-Cave Visualization
Data Data Access Storing Data
Communication for Visualization
Network 2
Software UsageSoftware License
Data StorageStorage
Task of the Grid Resource Management!
Task of the Grid Resource Management!
CGW 2003
Local Scheduling Systems
Observation:
Local resource management (LRM) systems existrequire extension for Grids by additional software or
will directly support Grids in the future
DRMAA is available today for some LRM systems
Different LRM systems will be part of the Grid and will perform a lower-level scheduling
In addition the Grid will require some higher-level scheduling for coordinating the user’s jobs.
Multi-level scheduling model
CGW 2003
Multi-level Grid Scheduling Architecture
Scheduler
Schedule
time
localJob-Queues
Resource 1
Scheduler
Schedule
time
localJob-Queues
Resource 2
Scheduler
Schedule
time
localJob-Queues
Resource n
Grid-Scheduler
Grid-User
Higher-levelGrid Scheduling
Lower-levelScheduling
Grid SchedulingArchitecture
Courtesy of Ramin Yahyapour
CGW 2003
User Objective
Local computing typically has:
A given scheduling objective as minimization of response time
Use of batch queuing strategies
Simple scheduling algorithms: FCFS, Backfilling
Grid Computing requires:
Individual scheduling objectivebetter resources
faster execution
cheaper execution
More complex objective functions apply for individual Grid jobs!
CGW 2003
Provider/Owner Objective
Local computing typically has:
Single scheduling objective for the whole system: e.g. minimization of average weighted response time or high utilization/job throughput
In Grid Computing:
Individual policies must be considered:access policy,priority policy,accounting policy, and other
More complex objective functions apply for individual resource allocations!User and owner policies/objectives may be subject to privacy considerations!
CGW 2003
Grid Economics – Different Business Models
Cost modelUse of a resource
Reservation of a resource
Individual scheduling objective functionsUser and owner objective functions
Formulation of an objective function
Integration of the function in a scheduling algorithmMarket-economic approaches
Application of computational intelligence
Resource selectionThe scheduling instances act as broker
Collection and evaluation of resource offers
CGW 2003
Scheduling Model
Using a Brokerage/Trading strategy:
Submit Grid Job Description
Analyze Query
Query for Allocation Offers
Higher-levelscheduling
Lower-levelscheduling
Discover ResourcesSelect Offers
Collect Offers
Coordinate Allocations
Generate Allocation Offer
Consider individual owner policies
Consider individual userpolicies
Consider communitypolicies
CGW 2003
Properties of Multi-Level Scheduling Model
Multi-level scheduling must support different RM systems and strategies.
Provider can enforce individual policies in generating resource offers
User receives resource allocation optimized to the individual objective
Different higher-level scheduling strategies can be applied
Multiple levels of scheduling instances are possible
Support for fault-tolerant and load-balanced services
CGW 2003
Negotiation in Grids
Multilevel Grid scheduling architectureLower level local scheduling instance
Implementation of owner policies
Higher level Grid scheduling instanceResource selection and coordination
(Static) Interface definition between both instancesDifferent types of resources
Different local scheduling systems with different properties
Different owner policies
(Dynamic) Communication between both instancesResource discovery
Job monitoring
CGW 2003
GGF WG Scheduling Attributes
Define the attributes of a lower-level scheduling instance that can be exploited by a higher-level scheduling instance.
Attributes of allocation properties Guaranteed completion time of allocation,
Allocations run-to-completion, …
Attributes of available informationAccess to tentative schedule,
Exclusive control,…
Attributes for manipulating allocation executionPreemption,
Migration,…
Attributes for requesting resourcesAllocation Offers,
Advance Reservation,…
CGW 2003
Towards Grid Scheduling
Grid Scheduling Methods:Support for individual scheduling objectives and policies
Economic scheduling methods to Grids
Multi-criteria scheduling models (most general)
Architectural requirements:Generic job description
Negotiation interface between higher- and lower-level scheduler
Economic management services
Workflow management
Integration of data and network management
Interoperability is a key!
CGW 2003
Data and Network Scheduling
Most new resource types can be included via individual lower-level resource management systems.
Additional considerations for
Data managementSelect resources according to data availability
But data can be moved if necessary!
Network managementConsider advance reservation of bandwidth or SLA
Network resources usually depend on the selection of other resources!
Coordinate data transfers and storage allocation
User empowered/owned lambdas!
CGW 2003
Example of a Scheduling Process
Scheduling Service:1. receives job description2. queries Information Service for static resource
information3. prioritizes and pre-selects resources4. queries for dynamic information about resource
availability5. queries Data and Network Management Services6. generates schedule for job7. reserves allocation if possible
otherwise selects another allocation8. delegates job monitoring to Job Manager
Job Manager/Network and Data Management: service, monitor and initiate allocation
Example:
40 resources of requested type are found.
12 resources are selected.
8 resources are available.
Network and data dependencies are detected.
Utility function is evaluated.
6th tried allocation is confirmed.
Data/network provided and
job is started
CGW 2003
Conclusions for Grid Scheduling
Grids ultimately require coordinated scheduling services.
Support for different scheduling instancesdifferent local management systems
different scheduling algorithms/strategies
For arbitrary resourcesnot only computing resources, also
data, storage, network, software etc.
Support for co-allocation and reservationnecessary for coordinated grid usage (see data, network, software, storage)
Different scheduling objectivescost, quality, other
Grid resource management services are a key to success of the Grid vision!…so are the applications that could show the Grid benefit!
CGW 2003
Integration of a Grid Scheduling System
Globus as de-facto standardbut no higher-level scheduling services available
Many projects include scheduling requirementsFocus on a running implementation for a specific problem
No attempt to generate a general solution
Grid scheduling cannot be developed by single groupsRequirements for several other services
Community effort is key!
Requires open Grid standards that enables Grid schedulingSupport for different implementations while being interoperable
CGW 2003
Activities
Core service infrastructureOGSA/OGSI
GGF hosts several groups in the area of Grid scheduling and resource management.
Examples:
WG Scheduling Attributes (finished)
WG Grid Resource Allocation Agreement Protocol (active)
WG Grid Economic Services Architecture (active)
WG Scheduling Ontology (proposed)
RG Grid Scheduling Architecture (proposed)
Network of Excellence “CoreGRID” (proposed)define the software infrastructure for Next Generation Grids
CGW 2003
What are Basic Blocks for a Grid Scheduling Architecture?
Scheduling Service
Data Management Service
Network Management Service
Information Service
Resources
Data
Network
Network-Resources
Management SystemNetwork
Network Manager
ManagementSystem
Compute/ Storage /Visualization etc
Compute Manager Data Manager
Data-Resources
Query for resources
Maintain information
Maintain information
static & scheduled/forecasted
Reservation
Accounting and Billing
Service
Job Supervisor
Service
Basic Blocks and Requirements are still
to be defined!
Courtesy of Ramin Yahyapour
CGW 2003
Conclusion
Resource management and scheduling is a key service in an Next Generation Grid
In a large Grid the user cannot handle this taskNor is the orchestration of resources a provider task
System integration is complex but vitalIndividual results may be of limited benefit without being embedded in a larger project
Basic research is required in this area.No ready-to-implement solution is available (although EDG, CrossGrid, GridLab etc. work on it)New concepts are necessary
A significant joint effort is needed to support Grid Scheduling!Also research is still necessary!
CGW 2003
RM in GridLab: What our users want...
Two primary applications: Cactus (simulations) and Triana (data mining/analysis)
other application communities are also being engaged,
Application oriented environment Resources (grid) on demandAdaptive applications/adaptive scenarios – adaptive grid environment
job checkpoint, migration, spawn off a new job when needed,
Open, pervasive, not even restricted to a single Virtual OrganizationThe ability to work in a disconnected environment
start my job on a disconnected laptop; migrate it to grid when it becomes availablefrom laptops to fully deployed Virtual Organizations
Mobile workingSecurity on all levels
CGW 2003
What our users want... (cont.)
The infrastructure must provide capabilities to customise choice of service implementation (e.g. using efficiency, reliability, first succeeding, all)Advance reservation of resources,To be able to express their preferences regarding their jobs on one hand and to understand the resource and VO policies on the other hand,Policy information and negotiation mechanisms
what is a policy of usage of the remote resources?
Prediction-based information How long will my job run on a particular resource?What resources do I need to complete the job before deadline?
CGW 2003
Coalescing Binary Scenario
GridLabTest-bed
GW Data
Distributed Storage
Logical File Name
CB Search
Controller
GAT (GRMS, Adaptive)
GW Data
GAT (Data Management)
• Submit Job• Optimised Mapping
Email, SMS notification
CGW 2003
GridLab RMS approach
Grid resources are not only the machines, but also databases, files, users, administrators, instruments, mobile devices, jobs/applications ...Many metrics for scheduling: throughput, cost, latency, deadline, other time and cost metrics...Grid resource management consists of job/resource scheduling, security (authorization services,...), local policies, negotiations, accounting, ...GRM is both, user and resource owner driven negotiation process and thus, multicriteria decision making processWS-Agreement is badly neededTwo ongoing implementations: production keep-up and future full-feature
CGW 2003
GRMS - the VO RMS
GRMS is a VO (community) resource management systemComponent and pluggable architecture allows to use it as a framework for many different VOsComponents include:
Resource discovery (now MDS-based, other solutions easy to be added: now adding the GridLab testbed information system: see Ludek’s talk tomorrow)Scheduling (Multicriteria, economy, workflow, co-scheduling, SLA-based scheduling) - work in progressJob ManagementWorkflow ManagementResource Reservation
CGW 2003
GRMS - the plan
Job Receiver
Jobs Queue
BROKER ExecutionUnit
ResourceDiscovery
Scheduler
ResourceReservation
PredictionUnit
File TransferUnit
InformationServices
DataManagement
AuthorizationSystem
Adaptive
WorkflowManager
SLANegotiation
GRMS
Monitoring
GLOBUS, other
Local Resources (Managers)
CGW 2003
Current implementation
submitJob - submits new job,
migrateJob - migrates existing job,
getMyJobsList - returns list of jobs belonging to the user,
registerApplicationAccess - registers application access,
getJobStatus - returns GRMS status of the job,
getHostName - returns host name, on which the job is/was running
getJobInfo - returns a structure describing the job,
findResources - returns resources matching user's requirements,
cancelJob - cancels the job,
getServiceDescription - returns description of a service.
CGW 2003
GRMS - overview
ResourceDiscovery
Broker
JobManager
Resource Management System
Globus Infrastructure
•Data Management•Adaptive Components•GridLab Authorization Service
•MDS•GRAM•GridFTP•GASS
Grid Environment
GridLab Services
User Access Layer
(GAT) Application
GridLabPortal
CGW 2003
GRMS –detailed view
ResourceDiscovery
Broker
JobManager
WebService
Interface
JobQueue
User AccessLayer System
LayerServices
GridLabServices
WorkflowMgmt.
TaskRegistry
DB
CGW 2003
GRMS –detailed view
ResourceDiscovery
Broker
JobManager
JobQueue
User AccessLayer System
LayerServices
GridLabServices
WorkflowMgmt.
TaskRegistry
DB
WebService
Interface
WebService
Interface
WebService
Interface
WebService
Interface
WebService
Interface
WebService
Interface
WebService
Interface
WebService
Interface
CGW 2003
GRMS functionality
Ability to choose the best resources for the job execution, according to Job Description and chosen mapping algorithm;Ability to submit the GRMS Task according to provided Job Description;Ability to migrate the GRMS Task to better resource, according to provided Job Description;Ability to cancel the Task;Provides information about the Task status;Provides other information about Tasks (name of host where the Task is/was running, start time, finish time);
CGW 2003
GRMS functionality (cont.)
Provides list of candidate resources for the Task execution (according to provided Job Description);Provides a list of Tasks submitted by given user;Ability to transfer input and output files (GridFTP, GASS, WP8 Data Management System);Ability to contact Adaptive Components Services to get additional information about resourcesAbility to register a GAT Application callback informationAbility to submit a set of tasks with precedence constraints (work-flow of tasks and input/output files)
CGW 2003
GRMS modules
Broker ModuleSteers process of job submittion
Chooses the best resources for job execution (scheduling algorithm)
Transfers input and output files for job's executable
Resource Discovery ModuleFinds resources that fullfills requirements described in Job Description
Provides information about resources, required for job scheduling
CGW 2003
GRMS modules (cont.)
Job Manager ModuleAbility to check current status of job
Ability to cancel running job
Monitors for status changes of runing job
Workflow Management ModuleCreates workflow graph of tasks from Job Description
Put tasks to Job Queue
Controls the tasks execution according to precedence constraints
CGW 2003
GRMS modules (cont.)
Web Service InterfaceProvides GSI enabled web service interface for Clients (GAT Application, GridLab Portal)
Job QueueAllows to put the tasks into the queue
Provides way for getting tasks from queue accorging to configured algorithm (FIFO)
Task RegistryStores information about the task execution (start time, finish time, machine where executed, current status, Job Description)
CGW 2003
Job Description
Task executable file location
arguments
file argument (files which have to be present in working directory of running executable)
environment variables
standard input
standard output
standard error
checkpoint files
CGW 2003
Job Description (cont.)
Resource requirements of executable name of host for job execution (if provided no scheduling algorithm is used)
operating system
required local resource management system
minimum memory required
minimum number of cpus required
minimum speed of cpu
other parameter passed directly to Globus GRAM
CGW 2003
Job Description – new elements
Job Description consists of one or more Task descriptions
Each Task can have a section which denotes parent tasks
CGW 2003
Job Description - example
< grmsjob appid = MyApplication><task id=1>
<resource><osname> Linux </osname><memory> 128 </memory><cpucount> 2 </cpucount>
</resource> <executable type="single" count="1">
<file name="String" type="in"> <url> gsiftp://rage.man.poznan.pl/~/Apps/MyApp </url>
</file><arguments>
<value> 12 </value> <value> abc </value>
</arguments><stdin>
<url> gsiftp://rage.man.poznan.pl/~/Apps/appstdin.txt </url></stdin><stdout>
<url> gsiftp://rage.man.poznan.pl/~/Apps/appstdout.txt </url></stdout>
</ executable ></task></grmsjob >
CGW 2003
Job Description – example 2
< grmsjob appid = MyApplication><task id=task1>
<resource> ...
</resource> <executable type="single" count="1">
...</ executable >
</task><task id=task2>
<resource> ...
</resource> <executable type="single" count="1">
...</ executable ><workflow>
<parent>task1</parent></workflow>
</task></grmsjob >
CGW 2003
Research focus of GRMS
Focus on the infrastructure is not enough for the efficient GRMFocus on policiesFocus on multicriteria aspects of the GRM
users, their preferences and applicationsresource owners’ preferencespreference models, multicriteria decision making, knowledge will be crucial for efficient resource management
Focus on AI techniques for GRMFocus on business models, economy grids
Cost negotiation mechanisms could be part of the SLA negotiation process (WS-Agreement)
contradictory in nature
CGW 2003
GRMS and SLA
CGW 2003
GRMS and SLA (cont.)
CGW 2003
End-users (consumers)having requirements concerning their applications (e.g. expect a good performance of their applications, expect a good response time) have requirements concerning resources (e.g. prefer machines with a big storage, machines with certain configurations)
Resource Administrators and Owners (providers)share resources to achieve some benefits
VO Administrator (criteria and preferences must be secure)
requires robust and reliable provisioning of resourcesmanages and controls VO by making global policies (community policies)
STAKEHOLDERS OF THE GRID RESOURCE MANAGEMENT PROCESS
CGW 2003
Multicriteria RM in GridLab
Gathering of informationapps requirements (resource requirements, environment, etc.)
user preferences (which criteria and how important)user support, preference modeling tools,
Selection phasechoose the best resources (schedule) based on the information provided and on the resource availability (estimates, predictions)
from simple matchmaking to multiple optimisation techniques
Execution phasefile staging, execution control, job monitoring, migration, usually re-selection of resources, application adaptation (application managers, adaptive services from GridLab)
CGW 2003
Many different research fields, e.g. Multicriteria Optimization, Project Scheduling, Artificial Intelligence, Decision Support SystemsWe consider a resource management problem as a multicriteria decision making process with various stakeholdersVarious stakeholders have different point of views and criteria (along with preferences)We need to aggregate somehow (negotiation and agreement processes are required) various criteria and stakeholders’ preferencesWe focus on a compromise solution rather then the optimal one (does it exist?)We want to satisfy many stakeholders rather than the particular one
Multicriteria approach in GRMS
CGW 2003
Memory
Storage
MULTICRITERIA (1)
Memory
Storage
End user 1 End user 2
Application 1(e.g. Data analysis )
Application 2(e.g. Data mining)
R1
R2
R3R4
R1
R2R3
R4
Hard constraints (e.g. RSL)<Mem = 100MB>, <Storage = 1G>
??? ???
CGW 2003
Memory
Storage
MULTICRITERIA (2)
MAX Z = 1*Mem + 2*Storage(where z is the objective function)
Memory
Storage
MAX Z = 2*Mem + 1*Storage(where z is the objective function)
R1
R2
R3R4
R1
End user 1 End user 2
Application 1(e.g. Data analysis )
Application 2(e.g. Data mining)
R2R3
R4
CGW 2003
We have added only two parameters to hard constraints: priority and min/max (optimization direction)
NEW : <Mem = 100MB><Priority = 2><Opt = Max> <Storage = 1G><Priority = 1> <Opt = Max>
End users are able to express their preferences in a very simple way
End users’ preferences are taken into account (compromise solutions are chosen)
PROPOSALS
CGW 2003
Concerning particular resources (e.g. memory, flops) or schedules (e.g. estimated processing time, maximum lateness)Specific for end-users (e.g. mean response time, mean tardiness, cost of computations), resource owners (e.g. machine idleness) and administrators (e.g. throughput, makespan)Time criteria (e.g. mean response time, makespan, mean tardiness), cost criteria (e.g. weighted resource consumption, cost of computations) and resource utilization criteria (e.g. load balancing, machine idleness)But... (in practice :-(,
- Lack or limited set of low level mechanisms which support e.g. advanced reservation,
- Negotiation protocols and agreements- Prediction tools which provide advanced analysis and estimations (e.g.
execution time, queue wait time),- Reliable information sources which describe behaviors of applications and
resources, etc.
MULTIPLE CRITERIA
CGW 2003
As a function: by means of parameters used in an utility function in order to model the importance of criteria expressed using the resource specification language (e.g. JSDL) or gathered from stakeholders during an interactive process (e.g. WS-Agreement)
As a relation:input parameters such as weights and thresholds are provided by stakeholders
As logic statements (decision rules):- if conditions on criteria then decision, - future directions we need to follow (machine learning methods, learning from examples and previous actions)...
More details in the Kluwer’s book...
PREFERENCE GATHERING
CGW 2003
Our approach extends and is based on many scheduling strategies...
Gathering of informationapplications requirements (resource requirements, environment, etc.)users’ preferences (which criteria and how important)
user support, preference modeling toolsSelection
choice of the best resources or schedules based on the information provided and on the resource availability (estimates, predictions)
from simple matchmaking to multiple optimization techniquesExecution
file staging, execution control, job monitoring, migration, usually re-selection of resources, application adaptation
STEPS OF MULTICRITERIA RESOURCE MANAGEMENT
CGW 2003
One central scheduler exists for multiple applications (e.g. LSF, PBS, Sun Grid Engine)
The goal is to match a set of application requirements to all available resources on the basis of various criteria
Usually multicriteria techniques are used for the evaluation of resource co-allocations (external mechanisms )
MC in JOB SCHEDULING
CGW 2003
• Each application is scheduled by an internal scheduler and forms a self-contained system
• The goal is to match particular application requirements with one (or some) good resource(s) based on various criteria
• Multicriteria techniques are used for the evaluation resources as well as resource co-allocations (internal mechanisms)
MC in APPLICATION LEVEL SCHEDULING
CGW 2003
Mathematical models:Assumptions:
R = 7 resourcesNEU = 3 end-users (eu1, eu2,eu3)
tasks t11, t21, t22, t31
resources are maintained by NRO = 3 resource owners (ro1, ro2, ro3),each task has to be assigned to one resourcestakeholders’ preferences are expressed in the form of utility functions
SIMPLE EXAMPLE (THEORY)
More details in the Kluwer’s book...
CGW 2003
The average execution time (T) - an average execution time of all tasks submitted by a given end-userThe cost of resource usage (C) - the sum of costs of the resources’ usage by end-user's tasksThe income (I) - the total income for a given resource owner
SELECTED CRITERIA
More details in the Kluwer’s book...
CGW 2003
Due to many hard constraints appearing in practice (specified by means of resource description language, policy rules in a scheduler, etc.), the number of feasible solutions can be decreased significantly.
In our case, due to specific requirements of tasks (t11, t21, t22, and t31) the set of available resources is limited to r1, r2, r3 and r4. In addition, the manager's task t11 is assigned automatically to the dedicated resource r3 (because invoking appropriate administration rules) so only r1, r2, and r4 are considered.
Once all hard constraints are met, we can examine the soft constraints and multicriteria analysis.
HARD CONSTRAINTS
More details in the Kluwer’s book...
CGW 2003
Gathering preferences from all stakeholders
• Evaluation of solutions (schedules) for each stakeholder using local utility functions
• Aggregation of local evaluations (in the example using global utility function)
• The best compromise solution is chosen (in the example with the best value of utility function)
SOFT CONSTRAINTS AND MULTICRITERIA ANALYSIS
More details in the Kluwer’s book...
CGW 2003
GRID SERVICES AND OGSI-AGREEMENT
OGSA defines Grid as a service-oriented environment
OGSA model represents all entities of Grid as a Grid service (resources, brokers, applications)
Interoperability between high-level community schedulers and local resource managers is supported,
There must be agreement on how these entities will interact with each other (e.g. many different resource managers could provide different functionalities)
CGW 2003
The goal is to negotiate the best contracts for a set of applications based on various additional criteria e.g.
level of service capability, quality, deployment and dynamic reconfiguration
level of commitment, service agreement and satisfaction
Multicriteria techniques are used for the evaluation of resources/services and brokering negotiations
MULTICRITERIA AND WS-AGREEMENT
End Users
VO Administrator
ResourceOwners
CGW 2003
In order to implement multicriteria scenarios (simple) we have to add some new tags (describing various criteria and preferences) to the existing job specifications: JSDL example:
<jsdl:nameOfTerm wsp:Usage="wsp:Required"> <jsdl:criterion jsdl:type=type>
<jsdl:preference=value/> {or jsdl:preferences = a>b, b<d, c>d, a=c}</jsdl:criterion>
</jsdl:nameOfTerm>
where:jsdl:type is one of two types: jsdl:minimization or jsdl:maximizationjsdl:priority expresses an end user’s preference More complicated and advanced MC scenario could be implemented, new tags and
mechanisms are required)
SIMPLE EXAMPLE (MC in JSDL)
CGW 2003
Use of prediction techniques to support ‘high level criteria’:
Prediction of:a state of resourcesapplication requirements (e.g. memory, storage space)application performance (e.g. execution time)
Dealing with prediction errors (e.g. AI methods)
Active participation in GRAAP and JSDL Working Groups under GGFImplement our new ideas in existing resource management systems (e.g. GridLab – GRMS, Progress, SGI Grid, Clusterix)
FUTURE RESEARCH WORK
CGW 2003
Summary
GridLab’s RM is focused on the multicriteria aspects of resource management (local vs. global policies, user vs. resource owner etc.)
GRMS is currently deployed on the GridLab testbed
It supports the migration because of the bad performance scenario
new emerging scenarios we have in mind
Other deployments include: SGI Grid, Progress, HPC Europa, Clusterix (future), GriPhyN (workflow execution on Globus)
more info: www.gridlab.org -> WP9
CGW 2003
The GRM book
Published in October 2003 by Kluwer
www.kap.nl
CGW 2003
Thank you!