METHOD STATEMENT SUBMITTAL
Record Reference: Date : Feb 2012
Project Details:
Project Name: Shamkha South Infrastructure Works Lot 3
Client : Musanada Consultant : Mott MacDonald Contractor : CSCEC-JV-ARC Project Manager: PARSONS
IR NO : Rev No : 3
INSTALLATION OF NEW 48V DC SYSTEM
Contents :
1. Purpose 2. Scope 3. Legislation and Code of Practice 4. References 5. Definitions 6. Resources 6.1 Material 6.2 Sub Contractors 6.3 Shop Drawing 6.4 Tools and Equipments 6.5 Human Resources 7. Safety 8. Construction Method 8.1 Prior Activities 8.2 Procedures 9. Construction Program 10. Inspection and Testing 11. Related Forms
12. Attachments
Contractor Signature : Discipline QA/QC HSE MEP Construction Manager:
Engineer:
The Engineer:
A- Approved B- Approved with Comments C-Revise and Resubmit D- Rejected
Comments:
Distribution:
Discipline: Roads Electrical Water Drainage Irrigation Telecommunication Others