METHOD STATEMENT SUBMITTAL Record Reference: Project Details: Project Nam Shamkha South Infrastructure Works Lot 3 Client Musanada Consultant Contractor CSCEC-JV-ARC Project Manager: IR NO : Rev No INSTALLATION OF NEW 48V DC SYSTEM Contents : 1. Purpose 2. Scope 3. Legislation and Code of Practice 4. References 5. Definitions 6. Resources 6.1 Material 6.2 Sub Contractors 6.3 Shop Drawing 6.4 Tools and Equipments 6.5 Human Resources 7. Safety 8. Construction Method 8.1 Prior Activities 8.2 Procedures 9. Construction Program 10. Inspection and Testing 11. Related Forms 12. Attachments Contractor Signature : Discipline QA/QC HSE MEP Engineer: The Engineer: A- Approved B- Approved with Comments C-Re Comments: Distribution: Discipline: Roads Electrical Water Drain

description

dc

Transcript of First Page 48

Page 1: First Page 48

Page 1 of 8

METHOD STATEMENT SUBMITTAL

Record Reference: Date : Feb 2012

Project Details:

Project Name: Shamkha South Infrastructure Works Lot 3

Client : Musanada Consultant : Mott MacDonald Contractor : CSCEC-JV-ARC Project Manager: PARSONS

IR NO : Rev No : 3

INSTALLATION OF NEW 48V DC SYSTEM

Contents :

1. Purpose 2. Scope 3. Legislation and Code of Practice 4. References 5. Definitions 6. Resources 6.1 Material 6.2 Sub Contractors 6.3 Shop Drawing 6.4 Tools and Equipments 6.5 Human Resources 7. Safety 8. Construction Method 8.1 Prior Activities 8.2 Procedures 9. Construction Program 10. Inspection and Testing 11. Related Forms

12. Attachments

Contractor Signature : Discipline QA/QC HSE MEP Construction Manager:

Engineer:

The Engineer:

A- Approved B- Approved with Comments C-Revise and Resubmit D- Rejected

Comments:

Distribution:

Discipline: Roads Electrical Water Drainage Irrigation Telecommunication Others