United Nations Development Programme - Sudan Kadugli Training Centre
1/23
KADUGLI TRAINING CENTRE KADUGLI – SOUTH KORDOFAN STATE
Section (4)
ELECTRICAL WORKS
BILLS OF QUANTITIES
United Nations Development Programme - Sudan Kadugli Training Centre
2/23
BILL NO (1) – COMMON ROOM
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
1.1 Sub Distribution boards as specified here under and shown on the drawings :-
1.1.1 DB-C, 63A main isolator, TPN+E,12-ways 1 NO
1.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
1.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 125 ML
1.3
Lighting & Small Power
1.3.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
1.3.1.1 Light points ( wiring up to the switch ) 31 NO
1.3.1.2 General purpose socket–outlet point 15 NO
1.3.1.3 Ceiling fan point 12 NO
1.3.1.4 Air cooler switch point 2 NO
1.3.1.5 TV socket outlet point 1 NO
1.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
1.3.2.1 13 A , 3-pin switched socket out let 8 NO
1.3.2.2 16 A , 2-pin socket outlet 7 NO
1.3.2.3 1-gang, 1- way lighting switch 1 NO
1.3.2.4 2-gang, 1- way lighting switch 4 NO
1.3.2.5 1-gang, 2-way lighting switch 2 NO
1.3.2.6 TV socket outlet 1 NO
ITEM DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
United Nations Development Programme - Sudan Kadugli Training Centre
3/23
1.3.2.7 Ceiling fan 56 ins. 12 NO 1.3.2.8 4000 cfm air cooler 2 NO
1.3.3
Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
1.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture
7 NO
1.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 12 NO
1.3.3.3 1 x 36w, 4ft, batten fluorescent fixture. 12 NO
1.4
Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
1.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 125 ML
1.5
Lightning Protection System Supply, install & test the following lightning protection system
1.5.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
1.5.1.1 Earthing pit 1 NO
1.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
1.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
1.5.2 Air terminals 4 NO
1.5.3 20×3 mm cu. tape down conductor 90 ML
1.5.4 Fixing & clamping accessories L Sum
L Sum
1.6 Fire Fighting
6 kg Carbon Dioxide Fire Extinguisher 1 NO
TOTAL BILL (1) CARRIED TO SUMMARY
United Nations Development Programme - Sudan Kadugli Training Centre
4/23
BILL NO (2) - HALL – (2 Nos.)
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
2.1 Sub Distribution boards as specified here under and shown on the drawings :-
2.1.1 DB-H, 63A main isolator, TPN+E,12-ways 2 NO
2.2
Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
2.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 220 ML
2.3
Lighting & Small Power
2.3.1
Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
2.3.1.1 Light points ( wiring up to the switch ) 44 NO
2.3.1.2 General purpose socket–outlet point 18 NO
2.3.1.3 Ceiling fan point 16 NO
2.3.1.4 Air cooler switch point 4 NO
4.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
2.3.2.1 13 A , 3-pin switched socket out let 9 NO
2.3.2.2 16 A , 2-pin socket outlet 9 NO 2.3.2.3 1-gang, 1- way lighting switch 2 NO
2.3.2.4 2-gang, 1- way lighting switch 4 NO
2.3.2.5 1-gang, 2-way lighting switch 4 NO 2.3.2.6 Ceiling fan 56 ins. 16 NO
2.3.2.7 4000 cfm air cooler 4 NO
ITEM DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
United Nations Development Programme - Sudan Kadugli Training Centre
5/23
2.3.3
Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
2.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture
14 NO
2.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 30 NO
2.4
Main Electrical Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
2.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 220 ML
2.5
Lightning Protection System Supply, install & test the following lightning protection system
2.5.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
2.5.1.1 Earthing pit 1 NO
2.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
2.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
2.5.2 Air terminals 4 NO
2.5.3 20×3 mm cu. tape down conductor 180 ML
2.5.4 Fixing & clamping accessories L Sum
L Sum
2.6 Fire Fighting Supply, install & test the following fire fighting fixtures.
2.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
TOTAL BILL (2) CARRIED TO SUMMARY
United Nations Development Programme - Sudan Kadugli Training Centre
6/23
BILL NO (3) – LECTURE HALL
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
3.1 Sub Distribution boards as specified here under and shown on the drawings :-
3.1.1 DB-L, 63A main isolator, TPN+E,12-ways 1 NO
3.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
3.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 100 ML
3.3 Lighting & Small Power
3.3.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
3.3.1.1 Light points ( wiring up to the switch ) 30 NO
3.3.1.2 General purpose socket–outlet point 12 NO
3.3.1.3 Ceiling fan point 8 NO
3.3.1.4 Air cooler switch point 4 NO
6.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
3.3.2.1 13 A , 3-pin switched socket out let 6 NO 3.5.2.2 16 A , 2-pin socket outlet 6 NO
3.5.2.3 1-gang, 1- way lighting switch 4 NO
3.5.2.4 1-gang, 2-way lighting switch 4 NO
3.5.2.5 Ceiling fan 56 ins. 8 NO
3.5.2.6 4000 cfm air cooler 4 NO
3.3.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
3.3.3.1 1 x 18w IP55 weather proof outdoor type wall 10 NO
United Nations Development Programme - Sudan Kadugli Training Centre
7/23
bracket lighting fixture 3.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 20 NO
3.4 Public Address System work to include supply & fixing of devices, conduits , wires , wire termination & testing complete with all necessary accessories , preparation of drawings, specifications and schedule subject to the approval of the Engineer:-
3.4.1 5 watt amplifier 1 NO 3.4.2 Goose neck desk type microphone 2 NO
3.4.3 5 watt wall mounted speakers 2 NO
3.4
Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
3.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 100 ML
3.5
Lightning Protection System Supply, install & test the following lightning protection system
3.5.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
3.5.1.1 Earthing pit 1 NO
3.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
3.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
3.5.2 Air terminals 4 NO
3.5.3 20×3 mm cu. tape down conductor 90 ML
3.5.4 Fixing & clamping accessories L Sum
L Sum
3.6 Fire Fighting Supply, install & test the following fire fighting fixtures.
3.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
3.6.2 Fire fighting hose reel 30m x 25mm hose 1 NO
TOTAL BILL (3) CARRIED TO SUMMARY
United Nations Development Programme - Sudan Kadugli Training Centre
8/23
BILL NO (4) – EASTERN OFFICE
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
4.1 Sub Distribution boards as specified here under and shown on the drawings :-
4.1.1 DB-O, 63A main isolator, TPN+E,12-ways 1 NO
4.2
Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
4.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 160 ML
4.3
Lighting & Small Power
4.3.1
Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
4.3.1.1 Light points ( wiring up to the switch ) 25 NO
4.3.1.2 General purpose socket–outlet point 22 NO
4.3.1.3 Ceiling fan point 5 NO
4.3.2
Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
4.3.2.1 13 A , 3-pin switched socket out let 11 NO
4.5.2.2 16 A , 2-pin socket outlet 11 NO
4.5.2.3 1-gang, 1- way lighting switch 3 NO
4.5.2.4 2-gang, 1- way lighting switch 4 NO
4.5.2.5 1-gang, 2-way lighting switch 2 NO
4.5.2.6 Ceiling fan 56 ins. 5 NO
4.3.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings,
United Nations Development Programme - Sudan Kadugli Training Centre
9/23
specifications and schedule & subject to the approval of the Engineer:-
4.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture
5 NO
4.3.3.2 1 x 18w, 2ft, batten fluorescent fixture. 4 NO
4.3.3.3 2 x 36w, 4ft, batten fluorescent fixture. 16 NO
4.4
Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
4.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 160 ML
4.5
Lightning Protection System Supply, install & test the following lightning protection system
4.5.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
4.5.1.1 Earthing pit 1 NO
4.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
4.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
4.5.2 Air terminals 4 NO
4.5.3 20×3 mm cu. tape down conductor 90 ML
4.5.4 Fixing & clamping accessories L Sum
L Sum
5.6 Fire Fighting Supply, install & test the following fire fighting fixtures.
5.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
TOTAL BILL (4) CARRIED TO SUMMARY
United Nations Development Programme - Sudan Kadugli Training Centre
10/23
BILL NO (5) – WESTERN OFFICE)
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
5.1 Sub Distribution boards as specified here under and shown on the drawings :-
5.1.1 DB-O1, 63A main isolator, TPN+E,12-ways 1 NO
5.2
Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
5.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 150 ML
5.3
Lighting & Small Power
5.3.1
Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
5.3.1.1 Light points ( wiring up to the switch ) 22 NO
5.3.1.2 General purpose socket–outlet point 22 NO
5.3.1.3 Ceiling fan point 6 NO
5.3.2
Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
5.3.2.1 13 A , 3-pin switched socket out let 11 NO
5.5.2.2 16 A , 2-pin socket outlet 11 NO
5.5.2.3 1-gang, 1- way lighting switch 6 NO
5.5.2.4 2-gang, 1- way lighting switch 1 NO
5.5.2.5 1-gang, 2-way lighting switch 2 NO
5.5.2.6 Ceiling fan 56 ins. 6 NO
5.3.3
Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all
United Nations Development Programme - Sudan Kadugli Training Centre
11/23
necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
5.3.3.1 1 x 23w IP55 weather proof outdoor type wall bracket lighting fixture
7 NO
5.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 15 NO
5.4
Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
5.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 150 ML
5.5
Lightning Protection System Supply, install & test the following lightning protection system
5.5.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
5.5.1.1 Earthing pit 1 NO
5.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
5.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO 5.5.2 Air terminals 4 NO
5.5.3 20×3 mm cu. tape down conductor 90 ML
5.5.4 Fixing & clamping accessories L Sum
L Sum
5.6 Fire Fighting Supply, install & test the following fire fighting fixtures.
5.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
TOTAL BILL (5) CARRIED TO SUMMARY
United Nations Development Programme - Sudan Kadugli Training Centre
12/23
BILL NO (6) - RESTAURANT
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
6.1 Sub Distribution boards as specified here under and shown on the drawings :-
6.1.1 DB-R, 63A main isolator, TPN+E,24-ways 1 NO
6.2.
16 A, TPN+E weather proof isolating switches for cold room freezer
1
NO
6.3
4 HP, TP, weather proof ON/OFF DOL starter for cold room freezer
1 NO
6.4
Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
6.4.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 50 ML
6.5
Lighting & Small Power
6.5.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
6.5.1.1 Light points ( wiring up to the switch ) 44 NO 6.5.1.2 General purpose socket–outlet point 23 NO
6.5.1.3 Water heater socket–outlet point 1 NO 6.5.1.4 Ceiling fan point 11 NO
6.5.1.5 Exhaust fan socket outlet point 1 NO
6.5.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
6.5.2.1 13 A , 3-pin switched socket out let 13 NO 6.5.2.2 16 A , 2-pin socket outlet 12 NO
6.5.2.3 1-gang, 1- way lighting switch 9 NO QTY UNIT UNIT AMOUNT
United Nations Development Programme - Sudan Kadugli Training Centre
13/23
ITEM DESCRIPTION
RATE
6.5.2.4 2-gang, 1- way lighting witch 5 NO
6.5.2.5 1-gang, 2-way lighting switch 6 NO
6.5.2.6 Ceiling fan 56 ins. 11 NO
6.5.2.7 300 mm Ø, industrial type exhaust fan 1 NO
6.5.2.8 Cold room freezer 4.05x3.3x3m(H) completed with external cooling unit model SHG22 / 190 - 4sl 4 horse power and condenser unit model CTE158M 6ED insulated with sandwich panel 10cm thick density 40 kg/m3 and hinged insulated 7cm thick door.
1 SET
6.5.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
6.5.3.1 1 x 18 w IP55 weather proof outdoor type wall bracket lighting fixture
14 NO
6.5.3.2 2 x 36w, 4ft, batten fluorescent fixture. 19 NO
6.5.3.3 1 x 36w, 4ft, batten fluorescent fixture. 9 NO
6.5.3.4 1 x 18w, 2ft, batten fluorescent fixture. 2 NO
2.6
Main Electrical Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
6.6.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 50 ML
6.7
Lightning Protection System Supply, install & test the following lightning protection system
6.7.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
6.7.1.1 Earthing pit 1 NO
6.7.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
6.7.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
6.7.2 Air terminals for O/H water tank & Power House
2 NO
6.7.3 20×3 mm cu. tape down conductor 270 ML
6.7.4 Fixing & clamping accessories L L
United Nations Development Programme - Sudan Kadugli Training Centre
14/23
Sum Sum 6.8 Fire Fighting
Supply, install & test the following fire fighting fixtures.
6.8.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
6.8.2 Fire fighting hose reel 30m x 25mm hose 1 NO
TOTAL BILL (6) CARRIED TO SUMMARY
BILL NO (7) – VIP GUEST HOUSE
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
7.1 Sub Distribution boards as specified here under and shown on the drawings :-
7.1.1 DB-V, 100A main isolator, TPN+E,24-ways 1 NO
7.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
7.2.1 4 c x 35 mm2 ,CU , XLPE /SWA/ PVC 180 ML
7.3
Lighting & Small Power
7.3.1
Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
7.3.1.1 Light points ( wiring up to the switch ) 39 NO
7.3.1.2 General purpose socket–outlet point 19 NO
7.3.1.3 Ceiling fan point 8 NO
7.3.1.4 Air conditioner socket–outlet point 8 NO 7.3.1.5 Water heater socket–outlet point 4 NO
7.3.1.6 TV socket outlet point 8 NO
ITEM DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
7.3.2 Electrical Devices
United Nations Development Programme - Sudan Kadugli Training Centre
15/23
work to include, fixing of devices and wire termination complete with all necessary accessories :-
7.3.2.1 13 A , 3-pin switched socket out let 13 NO
7.5.2.2 16 A , 2-pin socket outlet 10 NO
7.5.2.3 15 A , 3-pin switched socket out let for AC units 8 NO
7.5.2.4 1-gang, 1- way lighting switch 10 NO
7.5.2.5 2-gang, 1- way lighting switch 8 NO
7.5.2.6 1-gang, 2-way lighting switch 4 NO 7.5.2.7 TV socket outlet 8 NO
7.5.2.8 Ceiling fan 56 ins. 8 NO 7.5.2.9 Water heater 50 Litres 4 NO
7.5.2.10 18000 BTU/H window unit air conditioner 8 NO
7.3.3
Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
7.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture
10 NO
7.3.3.2 1 x 18w, 2ft, batten fluorescent fixture. 9 NO 7.3.3.3 1 x 36w, 4ft, batten fluorescent fixture. 20 NO
7.4
Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
7.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 180 ML
7.5
Lightning Protection System Supply, install & test the following lightning protection system
7.5.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
7.5.1.1 Earthing pit 1 NO
7.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
7.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
7.5.2 Air terminals 4 NO
United Nations Development Programme - Sudan Kadugli Training Centre
16/23
7.5.3 20×3 mm cu. tape down conductor 180 ML
7.5.4 Fixing & clamping accessories L Sum
L Sum
7.6 Fire Fighting Supply, install & test the following fire fighting fixtures.
7.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
TOTAL BILL (7) CARRIED TO SUMMARY
BILL NO (8) – YOUTH DORMITORY – (2 Nos.)
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
8.1 Sub Distribution boards as specified here under and shown on the drawings :-
8.1.1 DB-Y, 63A main isolator, TPN+E,18-ways 2 NO
8.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
8.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 250 ML
8.3
Lighting & Small Power
8.3.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
8.3.1.1 Light points ( wiring up to the switch ) 78 NO
8.3.1.2 General purpose socket–outlet point 88 NO 8.3.1.3 Ceiling fan point 22 NO
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
8.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary
United Nations Development Programme - Sudan Kadugli Training Centre
17/23
accessories :- 8.3.2.1 13 A , 3-pin switched socket out let 44 NO
8.3.2.2 16 A , 2-pin socket outlet 44 NO
8.3.2.3 1-gang, 1- way lighting switch 28 NO
8.3.2.4 1-gang, 2-way lighting switch 12 NO
8.3.2.5 Ceiling fan 56 ins. 22 NO
8.3.3
Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
8.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture
24 NO
8.3.3.2 1 x 36w, 4ft, batten fluorescent fixture. 54 NO
8.4
Main Electrical Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
8.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 250 ML
8.5
Lightning Protection System Supply, install & test the following lightning protection system
8.5.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
8.5.1.1 Earthing pit 1 NO
8.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
8.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
8.5.2 Air terminals for O/H water tank & Power House
2 NO
8.5.3 20×3 mm cu. tape down conductor 180 ML
8.5.4 Fixing & clamping accessories L Sum
L Sum
8.6 Fire Fighting Supply, install & test the following fire fighting fixtures.
8.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
United Nations Development Programme - Sudan Kadugli Training Centre
18/23
8.6.2 Fire fighting hose reel 30m x 25mm hose 1 NO
TOTAL BILL (8) CARRIED TO SUMMARY
BILL NO (9) - TOILET – (3 Nos.)
ITEM
DESCRIPTION
QTY UNIT UNIT RATE
AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
9.1
Lighting & Small Power
9.1.1
Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
9.1.1 Light points ( wiring up to the switch ) 42 NO
9.1.2 General purpose socket–outlet point 6 NO
7.2
Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
9.2.1 13 A , 3-pin switched socket out let 6 NO
9.2.2 1-gang, 1- way lighting switch 6 NO
9.2.3 2-gang, 1-way lighting switch 18 NO
9.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
9.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture
18 NO
9.3.2 2 x 36w, 4ft, batten fluorescent fixture. 6 NO
9.3.3 1 x 18w, 2ft, batten fluorescent fixture. 24 NO
TOTAL BILL (9) CARRIED TO SUMMARY
United Nations Development Programme - Sudan Kadugli Training Centre
19/23
BILL NO (10) - MAIN POWER SUPPLY, PUMPS, SECURITY GATE,
POWER HOUSE & SITE LIGHTING
ITEM
DESCRIPTION
QTY UNIT UNIT RATE AMOUNT
Supply, install test commission and hand over in good working conditions complete the electrical system as specifications, IEE wiring regulations, as shown on the drawings,& as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.
10.1
Main Distribution Board (MDB- M) located in power house containing :-
- 400A TPN+E copper busbars - Main incoming 400A TP MCCB - Multi digital meter & indication lamps - Outgoings :- - 1 x 400/320 A TP MCCB 1 SET - 1 x 100/100 A TP MCCB
- 11 x 100/40 A TP MCCB
- 1 x 100/30 A TP MCCB
10.2
MCC-PUMPS, 63A main isolator, TPN+E Busbar, containing:-
- 20A, TP, mcb, 2-nos.
- 7.5 HP, TP, ON/OFF DOL starter – 2 nos.
- 30A, TP, mcb, 1-no.
- 10 HP, TP, ON/OFF DOL starter – 1 no.
1
SET
10.3 Sub Distribution board for security gate house as specified here under and shown on the drawings :-
10.3.1 DB-S, 30A side entry main mcb, TPN+E, 9-ways
1 NO
10.3 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site
ITEM
DESCRIPTION
QTY UNIT UNIT RATE AMOUNT
10.3.1 4 c x 150 mm2 ,CU , XLPE /SWA/ PVC 50 ML
10.3.2 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 30 ML
10.3.3 4 c x 6 mm2 ,CU , XLPE /SWA/ PVC 40 ML
10.3.4 5c x 4 mm2 ,CU , FLEX/ PVC 250 ML
United Nations Development Programme - Sudan Kadugli Training Centre
20/23
10.4
Cable Ducts & Trenches work to include excavations, laying of pipes, building of manholes,
10.4.1 100 mm diameter, 6-meter length pvc pipes 200 NO
10.4.2 Trench excavations as specified – Working drawings shall be submitted for approval of dimensions
300
ML
10.4.3 Cable manhole 80 × 80 × 80 cm 17 NO
10.5
Site & Fence Lighting
10.5.1 Lighting poles points - for site lighting , work to include erection of poles on concrete block foundation & cable termination ,complete with all necessary accessories :-
10.5.1.1 6 meters high galvanised steel pole fitted with single arm
8
NO
10.5.1.2 6 meters high galvanised steel pole fitted with double arm
2
NO
10.5.1.3 Wall mounted lighting point 9 NO
10.5.1.4 Pole mounted weather proof socket outlet point – at 50 cm above FFL
4
NO
10.5.2
Lighting Fixtures
10.5.2.1 1 x 250 w, sodium vapour street lighting lantern IP 54 -
13
NO
10.5.2.2 1 x 26 w, IP55 weather proof wall mounted type lighting fixture for fence.
9
NO
10.6 Security Gate & Power House
10.6.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-
10.6.1.1 Light points ( wiring up to the switch ) 16 NO
10.6.1.2 General purpose socket–outlet point 6 NO 10.6.1.3 Ceiling fan point 2 NO
10.6.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-
ITEM
DESCRIPTION
QTY UNIT UNIT RATE AMOUNT
10.6.2.1 13 A , 3-pin switched socket out let 3 NO 10.6.2.2 16 A , 2-pin socket outlet 3 NO
10.6.2.3 13 A , 3-pin water proof switched socket out let 4 NO
10.6.2.4 1-gang, 1- way lighting switch 2 NO
10.6.2.5 20A, TP, ON/OFF lighting switching contactor 1 NO
10.6.2.6 Ceiling fan 56 ins. 2 NO
10.6.3 Light Fittings
United Nations Development Programme - Sudan Kadugli Training Centre
21/23
work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-
10.6.3.1 1 x 23w IP55 weather proof outdoor type wall bracket lighting fixture
8 NO
10.6.3.2 1 x 36w, 4ft, IP65 weather proof outdoor type fluorescent fixture.
4
NO
10.6.3.3 1 x 36w, 4ft, batten fluorescent fixture. 2 NO
10.6.3.4 1 x 18w, 2ft, batten fluorescent fixture. 2 NO
10.7
Electrical Earthing System Supply, install & test the following earthing system
10.7.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
10.7.1.1 Earthing pit 1 NO
10.7.1.2 Earthing rods, including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
14 NO
10.7.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
10.7.2
Earthing Wires work to include fixing & termination of earth wires to all metal enclosures ,cable armour & then to the earthing bus bar complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.
10.7.2.2 1c × 70 mm2 PVC insulated (Y/G) cu. conductor 50 ML
10.7.2.3 1c × 10 mm2 PVC insulated (Y/G) cu. conductor 30 ML
10.7.2.4 1c × 6 mm2 PVC insulated (Y/G) cu. conductor 30 ML
10.8
Lightning Protection System Supply, install & test the following lightning protection system
ITEM
DESCRIPTION
QTY UNIT UNIT RATE AMOUNT
10.8.1
Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes
10.8.1.1 Earthing pit 1 NO
10.8.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.
4 NO
10.8.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO
10.8.2 Air terminals for O/H water tank & Power House 2 NO
10.8.3 20×3 mm cu. tape down conductor 30 ML
United Nations Development Programme - Sudan Kadugli Training Centre
22/23
10.8.4 Fixing & clamping accessories L Sum
L Sum
10.9 Fire Fighting Supply, install & test the following fire fighting fixtures.
10.9.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO
10.10 Stand-By Diesel Generators:
Note: GENERATORS ARE NOT IN CONTRACT Supply a stand-by diesel Generators as specified having prime rating output at site conditions. Work to include construction of concrete foundation & steel cage, placing of genset , termination of cables, installation of power cable & earthing , supply & erection of bulk fuel tank & piping and any other works as required :-
10.10.1 250 KVA standby / 225 KVA prime rating, 1500 r.p.m, 415/ 240V, 50 Hz, diesel, water-cooled engine, generating set.
2 SET NIC NIC
10.10.2 Manual Change Over Switch ,4-pole,400A 1 NO
10.10.3 20000 litres. cylindrical, horizontal steel fuel tank work to include construction of concrete foundation, placing of fuel tank & piping connections
1
NO
10.10.4 Installation, Testing, Commissioning of the above as specified at site conditions with one year maintenance
JOB JOB
TOTAL BILL (10) CARRIED TO SUMMARY
United Nations Development Programme - Sudan Kadugli Training Centre
23/23
KADUGLI TRAINING CENTRE
ELECTRICAL INSTALLATION WORKS
COST ESTIMATE SUMMARY
BILL NO. COST AMOUNT
IN SDG
TOTAL BILL (1) COMMON ROOM
TOTAL BILL (2) HALLS
TOTAL BILL (3) LECTURE HALL
TOTAL BILL (4) EASTERN OFICE
TOTAL BILL (5) WESTERN OFFICE
TOTAL BILL (6) RESTAURANT
TOTAL BILL (7) VIP GUEST HOUSE
TOTAL BILL (8) YOUTH DORMITORY
TOTAL BILL (9) TOILET
TOTAL BILL (10) MAIN POWER SUPPLY, PUMPS, SECURITY
GATE, POWER HOUSE & SITE LIGHTING
OVERALL TOTAL