Electrical Works BoQ - intra.sd.undp.orgintra.sd.undp.org/bids/doc/83.pdf · ELECTRICAL WORKS BILLS...

23
United Nations Development Programme - Sudan Kadugli Training Centre 1/23 KADUGLI TRAINING CENTRE KADUGLI – SOUTH KORDOFAN STATE Section (4) ELECTRICAL WORKS BILLS OF QUANTITIES

Transcript of Electrical Works BoQ - intra.sd.undp.orgintra.sd.undp.org/bids/doc/83.pdf · ELECTRICAL WORKS BILLS...

United Nations Development Programme - Sudan Kadugli Training Centre

1/23

KADUGLI TRAINING CENTRE KADUGLI – SOUTH KORDOFAN STATE

Section (4)

ELECTRICAL WORKS

BILLS OF QUANTITIES

United Nations Development Programme - Sudan Kadugli Training Centre

2/23

BILL NO (1) – COMMON ROOM

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

1.1 Sub Distribution boards as specified here under and shown on the drawings :-

1.1.1 DB-C, 63A main isolator, TPN+E,12-ways 1 NO

1.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

1.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 125 ML

1.3

Lighting & Small Power

1.3.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

1.3.1.1 Light points ( wiring up to the switch ) 31 NO

1.3.1.2 General purpose socket–outlet point 15 NO

1.3.1.3 Ceiling fan point 12 NO

1.3.1.4 Air cooler switch point 2 NO

1.3.1.5 TV socket outlet point 1 NO

1.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

1.3.2.1 13 A , 3-pin switched socket out let 8 NO

1.3.2.2 16 A , 2-pin socket outlet 7 NO

1.3.2.3 1-gang, 1- way lighting switch 1 NO

1.3.2.4 2-gang, 1- way lighting switch 4 NO

1.3.2.5 1-gang, 2-way lighting switch 2 NO

1.3.2.6 TV socket outlet 1 NO

ITEM DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

United Nations Development Programme - Sudan Kadugli Training Centre

3/23

1.3.2.7 Ceiling fan 56 ins. 12 NO 1.3.2.8 4000 cfm air cooler 2 NO

1.3.3

Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

1.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture

7 NO

1.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 12 NO

1.3.3.3 1 x 36w, 4ft, batten fluorescent fixture. 12 NO

1.4

Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

1.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 125 ML

1.5

Lightning Protection System Supply, install & test the following lightning protection system

1.5.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

1.5.1.1 Earthing pit 1 NO

1.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

1.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

1.5.2 Air terminals 4 NO

1.5.3 20×3 mm cu. tape down conductor 90 ML

1.5.4 Fixing & clamping accessories L Sum

L Sum

1.6 Fire Fighting

6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (1) CARRIED TO SUMMARY

United Nations Development Programme - Sudan Kadugli Training Centre

4/23

BILL NO (2) - HALL – (2 Nos.)

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

2.1 Sub Distribution boards as specified here under and shown on the drawings :-

2.1.1 DB-H, 63A main isolator, TPN+E,12-ways 2 NO

2.2

Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

2.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 220 ML

2.3

Lighting & Small Power

2.3.1

Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

2.3.1.1 Light points ( wiring up to the switch ) 44 NO

2.3.1.2 General purpose socket–outlet point 18 NO

2.3.1.3 Ceiling fan point 16 NO

2.3.1.4 Air cooler switch point 4 NO

4.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

2.3.2.1 13 A , 3-pin switched socket out let 9 NO

2.3.2.2 16 A , 2-pin socket outlet 9 NO 2.3.2.3 1-gang, 1- way lighting switch 2 NO

2.3.2.4 2-gang, 1- way lighting switch 4 NO

2.3.2.5 1-gang, 2-way lighting switch 4 NO 2.3.2.6 Ceiling fan 56 ins. 16 NO

2.3.2.7 4000 cfm air cooler 4 NO

ITEM DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

United Nations Development Programme - Sudan Kadugli Training Centre

5/23

2.3.3

Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

2.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture

14 NO

2.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 30 NO

2.4

Main Electrical Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

2.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 220 ML

2.5

Lightning Protection System Supply, install & test the following lightning protection system

2.5.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

2.5.1.1 Earthing pit 1 NO

2.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

2.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

2.5.2 Air terminals 4 NO

2.5.3 20×3 mm cu. tape down conductor 180 ML

2.5.4 Fixing & clamping accessories L Sum

L Sum

2.6 Fire Fighting Supply, install & test the following fire fighting fixtures.

2.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (2) CARRIED TO SUMMARY

United Nations Development Programme - Sudan Kadugli Training Centre

6/23

BILL NO (3) – LECTURE HALL

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

3.1 Sub Distribution boards as specified here under and shown on the drawings :-

3.1.1 DB-L, 63A main isolator, TPN+E,12-ways 1 NO

3.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

3.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 100 ML

3.3 Lighting & Small Power

3.3.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

3.3.1.1 Light points ( wiring up to the switch ) 30 NO

3.3.1.2 General purpose socket–outlet point 12 NO

3.3.1.3 Ceiling fan point 8 NO

3.3.1.4 Air cooler switch point 4 NO

6.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

3.3.2.1 13 A , 3-pin switched socket out let 6 NO 3.5.2.2 16 A , 2-pin socket outlet 6 NO

3.5.2.3 1-gang, 1- way lighting switch 4 NO

3.5.2.4 1-gang, 2-way lighting switch 4 NO

3.5.2.5 Ceiling fan 56 ins. 8 NO

3.5.2.6 4000 cfm air cooler 4 NO

3.3.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

3.3.3.1 1 x 18w IP55 weather proof outdoor type wall 10 NO

United Nations Development Programme - Sudan Kadugli Training Centre

7/23

bracket lighting fixture 3.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 20 NO

3.4 Public Address System work to include supply & fixing of devices, conduits , wires , wire termination & testing complete with all necessary accessories , preparation of drawings, specifications and schedule subject to the approval of the Engineer:-

3.4.1 5 watt amplifier 1 NO 3.4.2 Goose neck desk type microphone 2 NO

3.4.3 5 watt wall mounted speakers 2 NO

3.4

Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

3.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 100 ML

3.5

Lightning Protection System Supply, install & test the following lightning protection system

3.5.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

3.5.1.1 Earthing pit 1 NO

3.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

3.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

3.5.2 Air terminals 4 NO

3.5.3 20×3 mm cu. tape down conductor 90 ML

3.5.4 Fixing & clamping accessories L Sum

L Sum

3.6 Fire Fighting Supply, install & test the following fire fighting fixtures.

3.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

3.6.2 Fire fighting hose reel 30m x 25mm hose 1 NO

TOTAL BILL (3) CARRIED TO SUMMARY

United Nations Development Programme - Sudan Kadugli Training Centre

8/23

BILL NO (4) – EASTERN OFFICE

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

4.1 Sub Distribution boards as specified here under and shown on the drawings :-

4.1.1 DB-O, 63A main isolator, TPN+E,12-ways 1 NO

4.2

Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

4.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 160 ML

4.3

Lighting & Small Power

4.3.1

Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

4.3.1.1 Light points ( wiring up to the switch ) 25 NO

4.3.1.2 General purpose socket–outlet point 22 NO

4.3.1.3 Ceiling fan point 5 NO

4.3.2

Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

4.3.2.1 13 A , 3-pin switched socket out let 11 NO

4.5.2.2 16 A , 2-pin socket outlet 11 NO

4.5.2.3 1-gang, 1- way lighting switch 3 NO

4.5.2.4 2-gang, 1- way lighting switch 4 NO

4.5.2.5 1-gang, 2-way lighting switch 2 NO

4.5.2.6 Ceiling fan 56 ins. 5 NO

4.3.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings,

United Nations Development Programme - Sudan Kadugli Training Centre

9/23

specifications and schedule & subject to the approval of the Engineer:-

4.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture

5 NO

4.3.3.2 1 x 18w, 2ft, batten fluorescent fixture. 4 NO

4.3.3.3 2 x 36w, 4ft, batten fluorescent fixture. 16 NO

4.4

Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

4.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 160 ML

4.5

Lightning Protection System Supply, install & test the following lightning protection system

4.5.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

4.5.1.1 Earthing pit 1 NO

4.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

4.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

4.5.2 Air terminals 4 NO

4.5.3 20×3 mm cu. tape down conductor 90 ML

4.5.4 Fixing & clamping accessories L Sum

L Sum

5.6 Fire Fighting Supply, install & test the following fire fighting fixtures.

5.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (4) CARRIED TO SUMMARY

United Nations Development Programme - Sudan Kadugli Training Centre

10/23

BILL NO (5) – WESTERN OFFICE)

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

5.1 Sub Distribution boards as specified here under and shown on the drawings :-

5.1.1 DB-O1, 63A main isolator, TPN+E,12-ways 1 NO

5.2

Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

5.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 150 ML

5.3

Lighting & Small Power

5.3.1

Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

5.3.1.1 Light points ( wiring up to the switch ) 22 NO

5.3.1.2 General purpose socket–outlet point 22 NO

5.3.1.3 Ceiling fan point 6 NO

5.3.2

Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

5.3.2.1 13 A , 3-pin switched socket out let 11 NO

5.5.2.2 16 A , 2-pin socket outlet 11 NO

5.5.2.3 1-gang, 1- way lighting switch 6 NO

5.5.2.4 2-gang, 1- way lighting switch 1 NO

5.5.2.5 1-gang, 2-way lighting switch 2 NO

5.5.2.6 Ceiling fan 56 ins. 6 NO

5.3.3

Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all

United Nations Development Programme - Sudan Kadugli Training Centre

11/23

necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

5.3.3.1 1 x 23w IP55 weather proof outdoor type wall bracket lighting fixture

7 NO

5.3.3.2 2 x 36w, 4ft, batten fluorescent fixture. 15 NO

5.4

Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

5.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 150 ML

5.5

Lightning Protection System Supply, install & test the following lightning protection system

5.5.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

5.5.1.1 Earthing pit 1 NO

5.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

5.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO 5.5.2 Air terminals 4 NO

5.5.3 20×3 mm cu. tape down conductor 90 ML

5.5.4 Fixing & clamping accessories L Sum

L Sum

5.6 Fire Fighting Supply, install & test the following fire fighting fixtures.

5.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (5) CARRIED TO SUMMARY

United Nations Development Programme - Sudan Kadugli Training Centre

12/23

BILL NO (6) - RESTAURANT

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

6.1 Sub Distribution boards as specified here under and shown on the drawings :-

6.1.1 DB-R, 63A main isolator, TPN+E,24-ways 1 NO

6.2.

16 A, TPN+E weather proof isolating switches for cold room freezer

1

NO

6.3

4 HP, TP, weather proof ON/OFF DOL starter for cold room freezer

1 NO

6.4

Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

6.4.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 50 ML

6.5

Lighting & Small Power

6.5.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

6.5.1.1 Light points ( wiring up to the switch ) 44 NO 6.5.1.2 General purpose socket–outlet point 23 NO

6.5.1.3 Water heater socket–outlet point 1 NO 6.5.1.4 Ceiling fan point 11 NO

6.5.1.5 Exhaust fan socket outlet point 1 NO

6.5.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

6.5.2.1 13 A , 3-pin switched socket out let 13 NO 6.5.2.2 16 A , 2-pin socket outlet 12 NO

6.5.2.3 1-gang, 1- way lighting switch 9 NO QTY UNIT UNIT AMOUNT

United Nations Development Programme - Sudan Kadugli Training Centre

13/23

ITEM DESCRIPTION

RATE

6.5.2.4 2-gang, 1- way lighting witch 5 NO

6.5.2.5 1-gang, 2-way lighting switch 6 NO

6.5.2.6 Ceiling fan 56 ins. 11 NO

6.5.2.7 300 mm Ø, industrial type exhaust fan 1 NO

6.5.2.8 Cold room freezer 4.05x3.3x3m(H) completed with external cooling unit model SHG22 / 190 - 4sl 4 horse power and condenser unit model CTE158M 6ED insulated with sandwich panel 10cm thick density 40 kg/m3 and hinged insulated 7cm thick door.

1 SET

6.5.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

6.5.3.1 1 x 18 w IP55 weather proof outdoor type wall bracket lighting fixture

14 NO

6.5.3.2 2 x 36w, 4ft, batten fluorescent fixture. 19 NO

6.5.3.3 1 x 36w, 4ft, batten fluorescent fixture. 9 NO

6.5.3.4 1 x 18w, 2ft, batten fluorescent fixture. 2 NO

2.6

Main Electrical Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

6.6.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 50 ML

6.7

Lightning Protection System Supply, install & test the following lightning protection system

6.7.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

6.7.1.1 Earthing pit 1 NO

6.7.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

6.7.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

6.7.2 Air terminals for O/H water tank & Power House

2 NO

6.7.3 20×3 mm cu. tape down conductor 270 ML

6.7.4 Fixing & clamping accessories L L

United Nations Development Programme - Sudan Kadugli Training Centre

14/23

Sum Sum 6.8 Fire Fighting

Supply, install & test the following fire fighting fixtures.

6.8.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

6.8.2 Fire fighting hose reel 30m x 25mm hose 1 NO

TOTAL BILL (6) CARRIED TO SUMMARY

BILL NO (7) – VIP GUEST HOUSE

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

7.1 Sub Distribution boards as specified here under and shown on the drawings :-

7.1.1 DB-V, 100A main isolator, TPN+E,24-ways 1 NO

7.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

7.2.1 4 c x 35 mm2 ,CU , XLPE /SWA/ PVC 180 ML

7.3

Lighting & Small Power

7.3.1

Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

7.3.1.1 Light points ( wiring up to the switch ) 39 NO

7.3.1.2 General purpose socket–outlet point 19 NO

7.3.1.3 Ceiling fan point 8 NO

7.3.1.4 Air conditioner socket–outlet point 8 NO 7.3.1.5 Water heater socket–outlet point 4 NO

7.3.1.6 TV socket outlet point 8 NO

ITEM DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

7.3.2 Electrical Devices

United Nations Development Programme - Sudan Kadugli Training Centre

15/23

work to include, fixing of devices and wire termination complete with all necessary accessories :-

7.3.2.1 13 A , 3-pin switched socket out let 13 NO

7.5.2.2 16 A , 2-pin socket outlet 10 NO

7.5.2.3 15 A , 3-pin switched socket out let for AC units 8 NO

7.5.2.4 1-gang, 1- way lighting switch 10 NO

7.5.2.5 2-gang, 1- way lighting switch 8 NO

7.5.2.6 1-gang, 2-way lighting switch 4 NO 7.5.2.7 TV socket outlet 8 NO

7.5.2.8 Ceiling fan 56 ins. 8 NO 7.5.2.9 Water heater 50 Litres 4 NO

7.5.2.10 18000 BTU/H window unit air conditioner 8 NO

7.3.3

Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

7.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture

10 NO

7.3.3.2 1 x 18w, 2ft, batten fluorescent fixture. 9 NO 7.3.3.3 1 x 36w, 4ft, batten fluorescent fixture. 20 NO

7.4

Main Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

7.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 180 ML

7.5

Lightning Protection System Supply, install & test the following lightning protection system

7.5.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

7.5.1.1 Earthing pit 1 NO

7.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

7.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

7.5.2 Air terminals 4 NO

United Nations Development Programme - Sudan Kadugli Training Centre

16/23

7.5.3 20×3 mm cu. tape down conductor 180 ML

7.5.4 Fixing & clamping accessories L Sum

L Sum

7.6 Fire Fighting Supply, install & test the following fire fighting fixtures.

7.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

TOTAL BILL (7) CARRIED TO SUMMARY

BILL NO (8) – YOUTH DORMITORY – (2 Nos.)

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

8.1 Sub Distribution boards as specified here under and shown on the drawings :-

8.1.1 DB-Y, 63A main isolator, TPN+E,18-ways 2 NO

8.2 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

8.2.1 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 250 ML

8.3

Lighting & Small Power

8.3.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

8.3.1.1 Light points ( wiring up to the switch ) 78 NO

8.3.1.2 General purpose socket–outlet point 88 NO 8.3.1.3 Ceiling fan point 22 NO

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

8.3.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary

United Nations Development Programme - Sudan Kadugli Training Centre

17/23

accessories :- 8.3.2.1 13 A , 3-pin switched socket out let 44 NO

8.3.2.2 16 A , 2-pin socket outlet 44 NO

8.3.2.3 1-gang, 1- way lighting switch 28 NO

8.3.2.4 1-gang, 2-way lighting switch 12 NO

8.3.2.5 Ceiling fan 56 ins. 22 NO

8.3.3

Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

8.3.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture

24 NO

8.3.3.2 1 x 36w, 4ft, batten fluorescent fixture. 54 NO

8.4

Main Electrical Earthing wire work to include fixing & termination of main earth wire to the sub distribution board earthing bus bar & metal enclosures & cable armour complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

8.4.1 1c×10 mm2 PVC insulated (Y/G) cu. conductor 250 ML

8.5

Lightning Protection System Supply, install & test the following lightning protection system

8.5.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

8.5.1.1 Earthing pit 1 NO

8.5.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

8.5.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

8.5.2 Air terminals for O/H water tank & Power House

2 NO

8.5.3 20×3 mm cu. tape down conductor 180 ML

8.5.4 Fixing & clamping accessories L Sum

L Sum

8.6 Fire Fighting Supply, install & test the following fire fighting fixtures.

8.6.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

United Nations Development Programme - Sudan Kadugli Training Centre

18/23

8.6.2 Fire fighting hose reel 30m x 25mm hose 1 NO

TOTAL BILL (8) CARRIED TO SUMMARY

BILL NO (9) - TOILET – (3 Nos.)

ITEM

DESCRIPTION

QTY UNIT UNIT RATE

AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as shown on drawings, specifications, IEE wiring regulations & as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

9.1

Lighting & Small Power

9.1.1

Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

9.1.1 Light points ( wiring up to the switch ) 42 NO

9.1.2 General purpose socket–outlet point 6 NO

7.2

Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

9.2.1 13 A , 3-pin switched socket out let 6 NO

9.2.2 1-gang, 1- way lighting switch 6 NO

9.2.3 2-gang, 1-way lighting switch 18 NO

9.3 Light Fittings work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

9.3.1 1 x 18w IP55 weather proof outdoor type wall bracket lighting fixture

18 NO

9.3.2 2 x 36w, 4ft, batten fluorescent fixture. 6 NO

9.3.3 1 x 18w, 2ft, batten fluorescent fixture. 24 NO

TOTAL BILL (9) CARRIED TO SUMMARY

United Nations Development Programme - Sudan Kadugli Training Centre

19/23

BILL NO (10) - MAIN POWER SUPPLY, PUMPS, SECURITY GATE,

POWER HOUSE & SITE LIGHTING

ITEM

DESCRIPTION

QTY UNIT UNIT RATE AMOUNT

Supply, install test commission and hand over in good working conditions complete the electrical system as specifications, IEE wiring regulations, as shown on the drawings,& as required by Local Electrical Authorities (NEC) for the complete project all up to the satisfaction of the Engineer.

10.1

Main Distribution Board (MDB- M) located in power house containing :-

- 400A TPN+E copper busbars - Main incoming 400A TP MCCB - Multi digital meter & indication lamps - Outgoings :- - 1 x 400/320 A TP MCCB 1 SET - 1 x 100/100 A TP MCCB

- 11 x 100/40 A TP MCCB

- 1 x 100/30 A TP MCCB

10.2

MCC-PUMPS, 63A main isolator, TPN+E Busbar, containing:-

- 20A, TP, mcb, 2-nos.

- 7.5 HP, TP, ON/OFF DOL starter – 2 nos.

- 30A, TP, mcb, 1-no.

- 10 HP, TP, ON/OFF DOL starter – 1 no.

1

SET

10.3 Sub Distribution board for security gate house as specified here under and shown on the drawings :-

10.3.1 DB-S, 30A side entry main mcb, TPN+E, 9-ways

1 NO

10.3 Power Cables Supply & install complete cables, for connection of main power circuits & central AC units, water pumps including supply of glands & lugs. NB:- Stated cable lengths are approximate, delivery shall be after exact measurement of cable length on site

ITEM

DESCRIPTION

QTY UNIT UNIT RATE AMOUNT

10.3.1 4 c x 150 mm2 ,CU , XLPE /SWA/ PVC 50 ML

10.3.2 4 c x 10 mm2 ,CU , XLPE /SWA/ PVC 30 ML

10.3.3 4 c x 6 mm2 ,CU , XLPE /SWA/ PVC 40 ML

10.3.4 5c x 4 mm2 ,CU , FLEX/ PVC 250 ML

United Nations Development Programme - Sudan Kadugli Training Centre

20/23

10.4

Cable Ducts & Trenches work to include excavations, laying of pipes, building of manholes,

10.4.1 100 mm diameter, 6-meter length pvc pipes 200 NO

10.4.2 Trench excavations as specified – Working drawings shall be submitted for approval of dimensions

300

ML

10.4.3 Cable manhole 80 × 80 × 80 cm 17 NO

10.5

Site & Fence Lighting

10.5.1 Lighting poles points - for site lighting , work to include erection of poles on concrete block foundation & cable termination ,complete with all necessary accessories :-

10.5.1.1 6 meters high galvanised steel pole fitted with single arm

8

NO

10.5.1.2 6 meters high galvanised steel pole fitted with double arm

2

NO

10.5.1.3 Wall mounted lighting point 9 NO

10.5.1.4 Pole mounted weather proof socket outlet point – at 50 cm above FFL

4

NO

10.5.2

Lighting Fixtures

10.5.2.1 1 x 250 w, sodium vapour street lighting lantern IP 54 -

13

NO

10.5.2.2 1 x 26 w, IP55 weather proof wall mounted type lighting fixture for fence.

9

NO

10.6 Security Gate & Power House

10.6.1 Electrical Points work to include laying of conduit , installation of boxes & wiring from the distribution board up to the point complete with all necessary accessories :-

10.6.1.1 Light points ( wiring up to the switch ) 16 NO

10.6.1.2 General purpose socket–outlet point 6 NO 10.6.1.3 Ceiling fan point 2 NO

10.6.2 Electrical Devices work to include, fixing of devices and wire termination complete with all necessary accessories :-

ITEM

DESCRIPTION

QTY UNIT UNIT RATE AMOUNT

10.6.2.1 13 A , 3-pin switched socket out let 3 NO 10.6.2.2 16 A , 2-pin socket outlet 3 NO

10.6.2.3 13 A , 3-pin water proof switched socket out let 4 NO

10.6.2.4 1-gang, 1- way lighting switch 2 NO

10.6.2.5 20A, TP, ON/OFF lighting switching contactor 1 NO

10.6.2.6 Ceiling fan 56 ins. 2 NO

10.6.3 Light Fittings

United Nations Development Programme - Sudan Kadugli Training Centre

21/23

work to include supply & fixing of lighting fixtures and wire termination complete with all necessary accessories , as per drawings, specifications and schedule & subject to the approval of the Engineer:-

10.6.3.1 1 x 23w IP55 weather proof outdoor type wall bracket lighting fixture

8 NO

10.6.3.2 1 x 36w, 4ft, IP65 weather proof outdoor type fluorescent fixture.

4

NO

10.6.3.3 1 x 36w, 4ft, batten fluorescent fixture. 2 NO

10.6.3.4 1 x 18w, 2ft, batten fluorescent fixture. 2 NO

10.7

Electrical Earthing System Supply, install & test the following earthing system

10.7.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

10.7.1.1 Earthing pit 1 NO

10.7.1.2 Earthing rods, including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

14 NO

10.7.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

10.7.2

Earthing Wires work to include fixing & termination of earth wires to all metal enclosures ,cable armour & then to the earthing bus bar complete as required including all necessary accessories NB: - Stated wire lengths are approximate, delivery shall be after exact measurement of length on site.

10.7.2.2 1c × 70 mm2 PVC insulated (Y/G) cu. conductor 50 ML

10.7.2.3 1c × 10 mm2 PVC insulated (Y/G) cu. conductor 30 ML

10.7.2.4 1c × 6 mm2 PVC insulated (Y/G) cu. conductor 30 ML

10.8

Lightning Protection System Supply, install & test the following lightning protection system

ITEM

DESCRIPTION

QTY UNIT UNIT RATE AMOUNT

10.8.1

Earthing Pits work to include driving of earthing rods, testing & construction of earth pits manholes

10.8.1.1 Earthing pit 1 NO

10.8.1.2 Earthing rods including earth resistance measurement NB: - Number of rods depends on the soil characteristics.

4 NO

10.8.1.3 Heavy duty manhole cover (30 x 30 cm ) 1 NO

10.8.2 Air terminals for O/H water tank & Power House 2 NO

10.8.3 20×3 mm cu. tape down conductor 30 ML

United Nations Development Programme - Sudan Kadugli Training Centre

22/23

10.8.4 Fixing & clamping accessories L Sum

L Sum

10.9 Fire Fighting Supply, install & test the following fire fighting fixtures.

10.9.1 6 kg Carbon Dioxide Fire Extinguisher 1 NO

10.10 Stand-By Diesel Generators:

Note: GENERATORS ARE NOT IN CONTRACT Supply a stand-by diesel Generators as specified having prime rating output at site conditions. Work to include construction of concrete foundation & steel cage, placing of genset , termination of cables, installation of power cable & earthing , supply & erection of bulk fuel tank & piping and any other works as required :-

10.10.1 250 KVA standby / 225 KVA prime rating, 1500 r.p.m, 415/ 240V, 50 Hz, diesel, water-cooled engine, generating set.

2 SET NIC NIC

10.10.2 Manual Change Over Switch ,4-pole,400A 1 NO

10.10.3 20000 litres. cylindrical, horizontal steel fuel tank work to include construction of concrete foundation, placing of fuel tank & piping connections

1

NO

10.10.4 Installation, Testing, Commissioning of the above as specified at site conditions with one year maintenance

JOB JOB

TOTAL BILL (10) CARRIED TO SUMMARY

United Nations Development Programme - Sudan Kadugli Training Centre

23/23

KADUGLI TRAINING CENTRE

ELECTRICAL INSTALLATION WORKS

COST ESTIMATE SUMMARY

BILL NO. COST AMOUNT

IN SDG

TOTAL BILL (1) COMMON ROOM

TOTAL BILL (2) HALLS

TOTAL BILL (3) LECTURE HALL

TOTAL BILL (4) EASTERN OFICE

TOTAL BILL (5) WESTERN OFFICE

TOTAL BILL (6) RESTAURANT

TOTAL BILL (7) VIP GUEST HOUSE

TOTAL BILL (8) YOUTH DORMITORY

TOTAL BILL (9) TOILET

TOTAL BILL (10) MAIN POWER SUPPLY, PUMPS, SECURITY

GATE, POWER HOUSE & SITE LIGHTING

OVERALL TOTAL