Effort Estimation for BASIS activities: NGL Migration.
System UPS (Sand Box) DEV QAS PRD
Activity PRD System Copy - - -BASIS PD (ABAP Installation) 5 - - -
Activity NGL Migration NGL Migration NGL Migration NGL MigrationBASIS PD 5 5 5 5
In Scope:
1. Technical installation (ABAP) & post installation activities2. Installation of Add-on and patches3. Applying notes4. Transport5. System performance monitoring
Out of Scope:
1. OS& DB Installation2. Download of Add-on & patches3. Maintaining STMS, OSS connection4. Hardware sizing5. Generating Developer key