Effort Estimation for BASIS Activities for NGL Migration

2
Effort Estimation for BASIS activities: NGL Migration. System UPS (Sand Box) DEV QAS PRD Activity PRD System Copy - - - BASIS PD (ABAP Installation) 5 - - - Activity NGL Migration NGL Migration NGL Migration NGL Migration BASIS PD 5 5 5 5 In Scope: 1. Technical installation (ABAP) & post installation activities 2. Installation of Add-on and patches 3. Applying notes 4. Transport 5. System performance monitoring Out of Scope: 1. OS& DB Installation 2. Download of Add-on & patches 3. Maintaining STMS, OSS connection 4. Hardware sizing 5. Generating Developer key

description

BASIS

Transcript of Effort Estimation for BASIS Activities for NGL Migration

Page 1: Effort Estimation for BASIS Activities for NGL Migration

Effort Estimation for BASIS activities: NGL Migration.

System UPS (Sand Box) DEV QAS PRD

Activity PRD System Copy - - -BASIS PD (ABAP Installation) 5 - - -

Activity NGL Migration NGL Migration NGL Migration NGL MigrationBASIS PD 5 5 5 5

In Scope:

1. Technical installation (ABAP) & post installation activities2. Installation of Add-on and patches3. Applying notes4. Transport5. System performance monitoring

Out of Scope:

1. OS& DB Installation2. Download of Add-on & patches3. Maintaining STMS, OSS connection4. Hardware sizing5. Generating Developer key