Director of Buildings' OfficeSlide no.1January 2010
Trinity College Universal Design Issues
Access 2010
Cobble Reduction
Access to Historic (Protected) Buildings
Developments from 2006-2010
Pavilion made fully accessible Front sq cobblestone and ramped entrances, residences Automated entrances to some buildings – College green, Hamilton, Luce Hall Science Gallery – entrance Toilet improvements – Arts and East end New Square residences – ground floor made accessible Access Audit of College completed Egress works – evac chairs Science office redesign – Hamilton Portable loops in all service areas
Director of Buildings' OfficeSlide no.3January 2010
Director of Buildings' OfficeSlide no.4January 2010
Trinity College Universal Design IssuesTemporary/immediate solutions
House 39 – Law School Anatomy Building
Director of Buildings' OfficeSlide no.5January 2010
Trinity College Universal Design IssuesTemporary/immediate solutions
House 39 – Law School Anatomy Building
Director of Buildings' OfficeSlide no.6January 2010
Trinity College Universal Design Issues Permanent solutions Historic Buildings
Front Square HousesNew access ramps
Director of Buildings' OfficeSlide no.7January 2010
Trinity College Universal Design IssuesPermanent solutions - Historic Buildings
House 27
Entrance ramp to Catering Building(removal of centre rail)
Director of Buildings' OfficeSlide no.8January 2010
Trinity College Universal Design Issues Permanent solutions Historic Buildings
The Old Library The GMB(Sounder/beacon retrofitted)
Director of Buildings' OfficeSlide no.9January 2010
Trinity College Universal Design Issues Permanent solutions Historic Buildings
Cobble Reduction – in progress
Director of Buildings' OfficeSlide no.10January 2010
Trinity College Universal Design IssuesPermanent solutions - New Buildings
East End 4/5 SNIAMS (automatic doors)
Director of Buildings' OfficeSlide no.11January 2010
Trinity College Universal Design IssuesPermanent solutions - New Buildings
Berkeley Podium (ramp) Ussher Podium (platform lift)Sounder/beacon retrofitted)
Director of Buildings' OfficeSlide no.12January 2010
Trinity College Universal Design IssuesPermanent solutions - Existing Buildings
Lecky Library (Arts Building)
Director of Buildings' OfficeSlide no.13January 2010
Trinity College Universal Design IssuesPermanent solutions- New Buildings
Ussher/Berkeley Library (ramp and lift)
Director of Buildings' OfficeSlide no.14January 2010
Trinity College Universal Design IssuesPermanent solutions- New Buildings
The Pavilion Bar – new lift and other UA facilities
Director of Buildings' OfficeSlide no.15January 2010
Trinity College Universal Design IssuesGeneral Facilities
UA Toilet
Designated Parking Bay
Director of Buildings' OfficeSlide no.16January 2010
Trinity College Universal Design IssuesPermanent solutions- New Buildings
Ussher/Berkeley Library (ramp and lift)
Director of Buildings' OfficeSlide no.17January 2010
Trinity College Universal Design IssuesInternal Works - retrofit
Security Desk Wheel Chair accessible
Lecture Theatre Induction Loops
(on going)
Director of Buildings' OfficeSlide no.18January 2010
Trinity College Universal Design IssuesInternal Works – Fire egress measures
Arts Building Evac Chair (Motorised)
Director of Buildings' OfficeSlide no.19January 2010
Trinity College Universal Design IssuesExternal works - Completed
Sloped pavement access
Director of Buildings' OfficeSlide no.20January 2010
Trinity College Universal Design IssuesExternal works - Completed
Entrance Door Automation
Director of Buildings' OfficeSlide no.21January 2010
Trinity College Universal Design IssuesExternal works - Completed
Entrance Door Automation
Director of Buildings' OfficeSlide no.22January 2010
Trinity College Universal Design IssuesExternal works - In progress
Front Square Cobble Reduction – sample area
Director of Buildings' OfficeSlide no.23January 2010
Trinity College Universal Design IssuesExternal works – In progress
Front Square Ramped Access Phase 2 – work in progress adjustment to entrance steps to facilitate ramps
Director of Buildings' OfficeSlide no.24January 2010
Trinity College Universal Design IssuesGeneral Facilities
Mobile Induction Loops
Director of Buildings' OfficeSlide no.25January 2010
Trinity College Universal Design IssuesExternal works - Interim solutions
Portable Ramp
Director of Buildings' OfficeSlide no.26January 2010
Trinity College Universal Design IssuesGeneral Requirements
Mobility: ease of access for all
Hearing: Induction loops, strobe alarms
Vision: Tactile clues, lighting, audible alarms
Director of Buildings' OfficeSlide no.27January 2010
Trinity College Universal Design IssuesCompleted Projects – Lecture Halls
Accessible for all new buildings
Note: Access to lecture theatres in old buildings to be considered.
Director of Buildings' OfficeSlide no.28January 2010
Trinity College Universal Design IssuesCompleted Projects – Goldsmith Hall Residences
All units accessible by lift
All units ‘visitable’ and adaptable when required.
Specifically designed bathrooms available.
Director of Buildings' OfficeSlide no.29January 2010
Trinity College Universal Design IssuesCompleted Projects – Botany Bay Residences
Refurbishment Provision of 9 no places in 3 no. units
Each unit is fully adapted to suit Universal Design requirements
Including specifically designed kitchens and bathrooms
In addition facilities can be provided for both the visually impaired and deaf persons in the remaining units.
Director of Buildings' OfficeSlide no.30January 2010
Trinity College Universal Design IssuesCurrent Programs/Projects - Trinity Hall Residences
Each of the three new buildings is fully accessibleAll apartments are 'visitable‘
45 of 938 bed spaces are enabled bed spaces with specially designed toilet/shower facilities with 'nurse call' system centrally monitored and enabled kitchen facilities.
Each apartment has an 1800 turning circle for wheelchair access.
All switches, door furniture etc are universally accessible-visibility socket switches fitted
Specifically designated parking bays
Provision of facilities for both the visually impaired and deaf occupants.
Director of Buildings' OfficeSlide no.31January 2010
Trinity College Universal Design IssuesPriority List 1 2006 – all completed
GMB: internal lift
The Pavilion Bar: platform lift.
East Theatre: automate entrance door.
Arts Building (Faculty Area): automate doors/platform lift
Chemistry Building: improve access to Large Lecture Theatre.
Physiology/Zoology Building: Access provision.
The Boathouse: provision of UA toilets
Santry Pavilion: provision of UA toilets/changing room
Director of Buildings' OfficeSlide no.32January 2010
Trinity College Universal Design IssuesPriority List - General
Induction Loop System
Deaf alerter – Fire Alarms.
Cobble reduction.
Improve external/internal circulation routes
Visual/tactile provisions.
Director of Buildings' OfficeSlide no.33January 2010
Trinity College Universal Design IssuesFor Consideration
Front Square: Access provision/automate doors
Provost’s House: Access provision.
New Square: Access provision/automate doors
East End: Improve access to existing buildings.
Islandbridge: improve access/lift installation/UD facilities.
Santry Pavilion: improve access/lift installation/UD facilities.