    APE Diesel pile hammers are tough.

    Based on extensive experience and construc-tion know-how, constant improvements withregard to design and manufacturing, APEDiesel pile hammers are the most productiveand reliable availabe.APE Diesel pile hammers are both ram andpower plant. They do not require an additionalpower source. APE Diesel pile hammers areunbeatable with regard to minimum wear and lownumber of parts to wear. They have no pistonrods, no crankshaft, no cams or bearings.APE Diesel pile hammers are reliable andalways ready to operate in variable climates andproducing the highest energy transfer.For demanding pile driving projects the APEis the diesel pile hammer of choice.

    D46-32

    Technical DataMaximum batter.....................................................1:3 | 1:1Piston weight........................................................10,143 lbsEnergy per blow: max / min (Adjustable)...107,177/52,260 ft.lbsBlows per minute: min / max..........................................37/53Consumption: Diesel fuel........................................4.23 gal/hrConsumption: Lubrication oil.................................0.61 gal/hrCapacity: Diesel fuel.............................................23.51 galCapacity: Lubrication oil......................................4.49 galOperating wt.: Hammer.....................18,720 | 19,580 lbs

    Operating wt.: Tripping device..............882 lbsOperating wt.: Tool box........220 lbs

    Dimensions (in)a Length overall......................................208.1a1 Length over cylinder extension..............247.4b Impact block diameter..................................27.2

    c Width over bolts..............................................34.6

    d Hammer width overall.....................................28.3

    e Width for guiding-face to face.........................25.2f Hammer center to pump guard.......................17.9g Hammer center to bolt center.......................10.8h Hammer depth overall..............................31.6

    H Minimum clearance for leads................19.7