Page 1: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

L.S

Site preparation:

Includesa. Removal of deans cutting and grading the natural ground of any type of soil to the dimensions and levels shown on the drawings including the complete removal and disposal (as directed by Site Engineer) of pavements and structures of any kind visible or encountered during the cutting.b. Laying out the work

1

Earth Work:

the whole of the work shall be executed according to section 2 of the specification If rock is encountered during excavation for foundation and if permitted by the Site Engineer, it may not need to be removal provided that the surface is roughened with proper steps and any other arrangements requested by the Site Engineer to his satisfaction

2 Cu.m

2.1- Excavation for the foundation of all types of walls, retaining walls, columns, and back walls for floors yards walkways, aprons and passages. . etc. and wherever needed and in all types of soil including "Rock" it includes keeping the trenches free from water the price includes also backfilling the excavated trenches with ordinary approved material in well compacted layers not exceeding 20 cm in thickness.

Cu.m

2.2- Filling inside and outside the building with approved materials in well compacted layers not exceeding 20 cm in thicknessNote:

- Compaction ratio for the filling under the reinforced concrete flooring and ramp flooring should be 95 % MDD

- Last layer should not exceed 15 cm

Concrete Work :

All of the works shall be executed according to section 3 of the specification Whenever crushed stone is specified under foundation concrete it should be very well compacted in a way that part the stones be penetrated into the soil of The foundation (With exception if the soil of the foundation is rock or conglomerate). The final surface of the crushed stone should be even and non-porous

3

Cu.m

3.1-Plain concrete (1:2:4) for the foundation of the walls,retaining walls (if any), back walls of the walkways, yards,Aprons and passages and wherever needed over a layer of 10 cm thick and compacted crushed stone.

1

Page 2: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

Cu.m3.2- Plain concrete (1:3:6) under the reinforced concrete of the foundation of the walls and the footings of the columns or wherever needed

3

Cu.m

3.3- Reinforced concrete (1:2:4) for foundation of the walls The cost includes provision and fixing of reinforcing steel bars and fixing of needed spacers according to the drawings.

Cu.m

3.4- Reinforced concrete (1:1.5:3) for columns and column footings. The cost includes provision and fixing of reinforcing steel bars and fixing of needed spacers according to the drawings.

Cu.m

3.5- Reinforced concrete (1:2:4) for slabs lintels. Beams. Tie Beams at any level, parapets, stairs, louvers and decorations. The cost includes providing and fixing of reinforcing steel bars And fixing of needed spacers according to the drawings.

Sq.m

3.6- Plain concrete (1:2:4) 10 cm thick over a layer of 10 cm thick and compacted crushed stone for floors, yards. Walkways ramps for disabled. Aprons and passages. .. Etc. the item includes execution of expansion joints at intervals not exceeding three meters (in both directions when the shorter dimension is more than 3 m) and filling properly with semi dry cement mortar 1:3. All exposed edges should be chamfered (2.5 x 2.5) cm. Cost of excavation with backfilling, plain concrete for foundation and block wall of the back wall will be paid under the other relevant items of this B.o.Q.

Sq.m3.7- Plain concrete (1:2:4) 8 cm thickness under tile floors and over 10 cm compacted crushed stone including executing join if require

M.L

3.8- Wall capping with reinforced concrete (1:2:4) of 20 mm maximum size of aggregate for parapets. Top and sides of the capping should be fair faced. The cost includes providing and fixing of reinforcing steel bars and needed spacers according to the drawings.

M.L

3.9- Window sills with reinforced concrete(1:2:4) of 20 mm Maximum size of aggregate. The exposed parts of the sill Should be fair faced. The cost includes providing and fixing of reinforcing steel bars and needed spacers according to the drawings.

2

Page 3: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

Masonry :

The works shall be executed according to section 7 of the specification. Stone walls may be constructed with local available stones if conforms to the specifications and approved by the Site Engineer. The space between the two rows of the stone should be filled with stone pieces and cement mortar 1:3. The stone piecesShould be surrounded completely by cement mortar 1:3.

4

Cu.m

4.1- Building walls with fabricated perforated brick (24x12x 8) and cement mortar (1:3). The cost includes provision insulating sheets between the wall and the slab or tie beam cast monolithically with the slab as shown on the drawings.

Metal works conforming to section 16 of the specification :

5.1- Metal Doors: Steel doors with steel plate G18 leaf frame with angle Iron of 25x25 mm. for double face and37.5x37.5 mm. for single face. The outer frame should be made with double section 3 mm thickness or as shown on the drawings The doors should be provided with 4 mm thick glass panes if required, mortise switch lock (Hungarian type or the best type available in local market if the. Hungarian type is not available), and door stoppers fixed on the floor. All iron monger and metal frames should be painted with two coats of antirust paint, the first before fixing and the second after fixing and three layers of oil paint.

5

Sq.ma- Double Face

Sq.mb- Single Face.

Sq.mc- Grilled metal door

M.L

5.2- Metal rails, for locations and as per details shown on the drawings With a layer of anti rust and three: Dryers of oil paint for all iron` monger and metal frames for stairs and balconies

5.3- Metal Works for Disabled:

Set

a- To provide materials and work to fix Grab bars as per theDetails shown on the drawings. Using G.I. pipe 1.5" dia (deformed if possible) to be mounted to the wall with screw into anchor.

M.L

b- To provide materials and work, to fix metal hand rail on both sides of the Ramp for the disabled of height 60 cm for the Children and 90 crn for the others, with G.I. pipe 1.5" dia. according to the details shown oil the drawings

M.L5.3-Metal fence complete as the details shown on the drawing including a layer of antirust and three layer of oil paint

3

Page 4: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

M.L

5.4- Provide and fix steel stair complete as shown on the drawings, with two layers of antirust and three layers of oil Paint. Cost of needed excavation, backfilling, concrete works will be paid under relevant items of this B.o.Q.

5

Aluminum works : according to the specification and asdetailed in the drawings, including all accessories,requirements for proper fixing, and all other relatedComplementary works.Notes:

1. All glass panes should be 6mm. Thick, transparent or translucent as shown on drawings.

2. Sections should be compatible with the requirements, Specifications and the drawings.

3. All the materials should be Turkish product.Samples and working drawings should be approved before Fabrication and installation.

6

Sq.m

6.1- Aluminum doors, using best aluminum sections, double face panels complete including all accessories complete including all accessories, as detailed in the drawings. The cost includes providing and fixing of door stoppers, switch locks, handles and ail accessories should be first class Turkish product. For toilet doors, type of locks should be of special Type to be selected by Site Engineer

Sq.m

6.2-Aluminum windows using best Turkish aluminum Sections with separate steel protection net (Burglar Bars) fly screen gage 30 for opened area (with aluminum frame as detailed in the drawings) and 6 mm thick transparent glass panes for all windows. Except for toilets, glass should be translucent. The cost includes a separate steel protection tic, (Burglar Bars) which should conform to the requirements of item 5 of the B.o.Q., to be painted with two coats of antirust paint the first before fixing and the :second after fixing and Three layers of oil faint.

Sq.m6.3 - Cur tine wall ( Aluminum window )

Sq.m

6.4- Aluminum Door-Windows using best aluminum sections, double: face panels complete including all accessories, as detailed in the drawings. The cost includes providing and fixing of door stoppers. Switch locks. Handles and all accessories should, be first class Turkish product. The cost includes providing and fixing fly screen gage: 30 for opened area (with aluminum frame, as detailed in the drawings) and 6rnm thick transparent glass panes. Separate steel protection net (Burglar Bars) will be paid under other item of the B.o.Q.

No.6.5- Door closers (hydraulic, best type available in the market).

4

Page 5: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

Sq.m

AlternativeWooden Doors (Single) conforming to sections 15 and 16 of the specification Providing and installing wooden doors from Malaysian teak ply wood both sides thickness 4 mm and frame size (7.5x15) cm using Finland wood. The cost includes providing and fixing of Switch lock (Italian or the best type available in the local market if the Italian type is not available), applying of at least three layers of good type of "Spirto" providing and fixing a stopper on the floor and fixing Aluminum Sheet (20 Cm. high) at the bottom. Of both sides of the door leaf.

6

Sq.m

AlternativeWooden Doors (Double Face) conforming to sections 15 and 16 of the specification: Providing and installing wooden doors from Malaysian teak ply wood both sides. thickness 4 mm and frame size (7.5x15) cmusing Finland wood and frame cap 1.0 x 7.5 cm The cost includes providing and fixing of switch lock (Italian or the best type available in the local market if the Italian type is not available), applying of at least three layers of good type of " Spirto" providing and fixing a stopper on the floor and fixing Aluminum Sheet (20 Cm. high ) at the bottom of both sides of the door leaf

Sq.m

Flooring conforming to section 12 of the specification:

7.1- Providing and laying; approved mosaic tiles, for floors (30x30) cm or (40 x40) cm with cement mortar 1:3. And filling the joints with white cement. The surface should be well smoothed and properly polished

7Sq.m

7.2- Providing and laying ceramic tiles (20x10) cm or (20x20) cm of the rough surface type with cement mortar (1:3) for floors as shown in the Finishing Table.

Sq.m

7.3- Plastic: tile for flooring and other locations. The price includes P.V.C. skirting and 1:3 cement screed 5 cm. thick according to drawings and specifications. Sizes Colors and types shall be selected by Site Engineer.

Sq.m

Finishing conforming to section 11 of the specification:

8.1- Plastering with cement mortar (1:3) min. thickness 20 mm cement slurry must be applied before. Plastering.

8

Sq.m8.2- Rendering (Nather) of approved color, with white cement and clean sand for the external faces.

Sq.m8.3- Plastering with gypsum, min. thickness (25) mm. for walls and ceiling. A base layer of cement slurry must be applied before plastering.

5

Page 6: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

8.4- Tiling with first degree ceramic tiles. for the walls of the toilets, drinking platform and elsewhere as indicated on the drawings:

8

Sq.ma- ( 10 x 20 ) cm

Sq.mb- ( 15 x 15 ) cm

Sq.mc- ( 15 x 20 ) cm

Sq.md- ( 20 x 25 ) cm

M.L8.5- Skirting with mosaic tiles cement mortar ( 1:3 ) 10 cm high

Sq.m8.6- Wainscoting by three layers of oil paint (Alhaditha or Alshimal trade mark Iraqi Prod.).

Sq.m8.7- Emulsion Paint: Painting with emulsion (AI-Shimal trade mark Iraqi Prod.) three; layers for all gypsum plastering work.

Sanitary Installation:

Includes provision of best qualityAvailable in the market of materials, fittings, valves, mixers, traps, gullies with cover supports, hangers, fasteners and clips. It also includes any needed excavation with backfilling and manpower for the installation and internal connection of the water system to hot and cold Water and to the main water supply system and connecting the internal sewerage system toThe main outer sewerage system. All water pipes should be coated with two layers of anti rust (first layer before fixing and second after fixing) and all imbedded pipes should be insulated by a layer of bitumen coat wrapped with jute (canvas). All Hot water, pipes lines and cold water pipe lines expose to atmosphere should be wrapped by fiber glass and jute (canvas) The water system should be tested according to the specification .Before using any material, the Contractor shall: submit samples for the approval of the Site Engineer.

9

9.1- Wash basin (sink) with steel frame made from angle iron 1.5"x1.5" completely painted with a layer of antirust and three layers of oil paint and complete accessories (grill German product with mixer Iran product

No.a- Single wing and single basin.

No.b- Double wing and single basin.

No.c- Double win and double basin

No.

9.2- Wash basin ceramic 50x60cm having self contained overflow, Iran product (pars trade mark first class) with mixer Iran Product (technic trade mark first class) with steel grill German product and high pressure connection steel hose, properly fastened with screw, nut and washer complete with supporting brackets

6

Page 7: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

No.

9.3- Ceramic W.C latrine with gully, Iran Prod. (Mina trade mark first degree) and high pressure connection steel hose pipe with chrome valve with painted Flash cistern complete with all necessary works.

9

No.

9.4- Ceramic western W.C with flush cistern and high pressure connection steel hose pipe with chrome valve , trap, toilet roller holder 15cm x 15cm and a steel hose pipe with Chrome valve as shown on the drawings, Iran Product (Mina trade mark first class) including all requirements and accessories.

No.9.5- Water tags (1/2"), Chrome plated first class.

No.

9.6-Steel Tanks: The item includes the following:Supply materials and fabricate pressed steel tank sizes: as below, external flange plates(1.22x1.22)m and 5mm thickness and cove plate sheet G(16) fixed to the frame made from angle iron size (2.5x2.5) inch then bracing inside the tank with ;angle iron size (2.5x.2.5)". Fixing flange plates together should be by iron bolts, nuts and welding according to the drawing .(The cost includes supply and fixing inlet, outlet. overFlow).

No.

9.7- Water tank (20 M³ ) made of pressed and (Parched) galvanized iron sheets Gauge 18 including concrete pedestal (base) as shown on the drawing, fittings (valves, 2 laps at 10 cm from the bottom of the tank, float valve, wash out valve.), hinged cover cap and all pipe connections

No.

Alternative9.8 -Water tank (6M3 ) made of pressed and (Parched)

Galvanized iron sheets Gauge 18 including concrete pedestal (base) as shown on the drawing, fittings (valves, 2 taps at 10 cm from the bottom of the tank, float valve, wash out valve) hinted cover cap and all pipe connections.

9.9-Galvanized iron water pipes: (The pipes and accessories should be first class).

M.La- (1/2") dia. (Turkish prod., 5.1 kg / 6m.l).

M.Lb- (3/4") dia. ( Turkish prod., 7 kg / 6m.l)

M.Lc- (1") dia. (Turkish prod., 9k / 6 m I).

9.10- P.V.C Pipes, including all necessary excavation, laying, jointing and connecting the pipes, providing and placing concrete 1:2:4 10 cm. thick under and all around the pipes as showing in the drawings. Backfilling with approved compacted material

M.La-(4") dia. (Iraqi prod., pressure 6 Bar and 3 mm thick).

M.Lb-(8") dia. (Iran prod., pressure 6 Bar and 5 mm thick).

7

Page 8: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

9.11- Masonry manholes. All-inclusive excavation, leanconcrete, watts with concrete blocks and cement mortar 1:3 plastered inside with cement mortar 1:3 and cover for the system according to the drawings and instructions of Site engineer

9

No.a- Size (30 x30) cm. inside dimension.

No.b- Size (40 x 40) cm inside dimension.

No.c- Size (50 x 50) cm. inside dimension.

.No.d- Size (80 x 80)cm., inside dimension

M.L

9.12- Cast iron pipes 4" dia. properly fixed to the wall and the slab complete with all fillings and accessories according to the drawings for draining rainwater from the roof.

M.L

Alternative 9.13- G.I pipes 4" dia. properly fixed to the wall and the slab, complete with all fittings and accessories according to the drawings for draining rainwater from the roof.

9.14- Construction of sewer concrete pipe line on a base of 20 cm plain concrete 1:3:6 over a 10cm well compacted crushed stone and completely surrounded with 15cm concrete 1:3:6 complete as shown on the drawings. Cost of excavation (including de-watering) and needed manholes with cover will be paid under the relevant items of this E.o.Q.

M.La- For 0.4m diameter of pipe

Elec.Work :-

All materials supplied by contractor must be new arid of the best quality. All materials will be approved by engineer before using, sample from each type to be shown and approved by engineer before execution of the whole work. The work include installation of all wiring (inside best quality, grade one, high pressure, plastic pipe, Jordan made), cables, cable trenches, main distribution board boxes .switches .lights conduits arid all necessary work all the works will be according to the standard specification, drawings and instruction of supervisor engineer .For the below items the price includes all requirements such as stainless steel pipes, single wire (1x2.5 min). Steel axes, junction etc .The whop electric power net must be testes after completion.

10

pc

10.1- Larne fluorescent (1x40) watt, supply and installcomplete florescent base with lamp (1x40,watt) best quality plastic Cover for false ceiling with all accessories

pc10.2- lamp fluorescent: (1x40) Walt, supply and installcomplete florescent base With lamp (1x40 ) watt best quality with all requirements

8

Page 9: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

pc10.3-Wall bracket : supply and install wall bracket with(100)watt best quality with all fitting

10

pc10.4-Ceiling Lamps: Supply and install Ceiling Lamp with (100watt latish) English made with all fitting.

pc10.5-Spot light supply and install spot light(ceilingType), England or Italian made with lamp (100watt) with all fittings.

pc10.6- Water proof Lamp: supply and install best quality water proof lamps(100watt),England or Italian with all necessary annexes and fittings

pc10.7-Ceiling Lamp (big Thurayia): supply arid install best quality Ceiling lamps (big Tthurayia), with all necessary annexes arid fittings

pc

10.8- Projectors (125watt): Supply and install best quality projectors (125watl) in location specified In the drawings or engineer satisfaction: with all annexes and fittings.

pc

10.9- Ceiling Fans: Supply and install best quality ceiling fans with regulator (Indian type) with all annexes and fittings According to engineer satisfaction.

pc10.10- Exhaust fans 12"x12": supply and install best quality 12"x12" exhaust fans (Japan made) with all annexes and fitting

pc10.11- Exhaust fans 6"x6": supply and install best quality 6"x6" exhaust fans (Japan made) with all annexes and fitting

pc10.12- Admin Bells: Supply and install admin bells with push boll on ( English made ) with all annexes and fittings

pc10.13- Switch Socket 13Amp Supply and install best quality switch socket 13Amp (English made), (Cribtry) with all wiring and accessories.

pc10.14- Switch Socket 15Amp Supply and install best quality switch socket 15Amp (English made), (Cribtry) with all wining and accessories.

pc

10.15- 3phase on off starter switch 40Amp Supply andInstall 40Amp. Phase On-Off starter switch original (English made) with phase filler according to ngineer's satisfaction.

10.16- Cables for connection between (M.D.B),(C.B) and all other points by the use of best and approved quality power cables Turkish or Jordan made. The work includes trench excavation zinc, backfilling according to drawings and engineer's satisfaction

9

Page 10: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

M.La- Cable (4x6) mm2

10

M.Lb- (:able (2x10) mm

M.Lc- Cable (2x16) mm2

M.Ld- Cable (4x10) mm2

M.Le- Cable (3x25+16) mm2

M.Lf- Cable (3x35+25) mm2

M.Lg- Cable (3x300+150) mm2

10.17- supply installs small control board for operating lighting etc. for criminal all according to the drawing and engineer

10.18- supply and install small control board for prating and controlling split units of criminal hall size (50x40x25)cm from plate G(16mm) includes:

pca- (One Number ) 3phase (100A) breaker (MG)type

pcb-(Four Number)3phase(32A)phase filler best qualities.

pcc- (Four Number) 3phase (32 contractor best qualities.

pcd-(five number) bas bar(3x26)mm

pce- (Three number) signal for phase.

10.19- Supply and install best and approved quality sub distribution board ( Circuit breaker ) original England made(Crib try) with all Required annexes according to the drawings and engineers satisfaction:

pca- ( 4 miniature ) circuit breaker single phase with main capacity 40 Amp

pcb- ( 9 miniature ) circuit breaker single phase with main capacity 100 Amp

pcc- ( 12 miniature ) circuit breaker single phase with main capacity 100 Amp

pcd- ( 12 miniature ) circuit breaker single phase with main capacity 100 Amp

pce- ( 6 miniature ) circuit breaker single phase with main capacity 60 Amp

10.20- Main Distribution board: supply and install main distribution board (M.D.B) of metal plat gauge ( 2mm) with ( 4.10x1.60x0.35) m dimension with lockable door and all required annexes painted with oil paint according to the drawing and engineer's instruction which is include

10

Page 11: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

pca- (One number) 3phase. 1000 Amp kilo watt hour meterKWHm

10

pcb- (One number) (0-500) volt meter (Germany type).

pcc- (three number) Amp meter with (1000/5)Amp Germany type

pcd- (One number) Selector Switch (best quality).

pce- (Three number) Signal light for phases.

pcf- (ogle number)Main Auto breaker, 3phases, 1000 AmpCapacity original (MG) France made.

pcg- (Twenty, eight number) Sub- Auto breaker 3 phases. With Capacity 100 Amp original (MG) France made.

pch- (Three numbers) Sub- Auto breaker, 3phase, with capacity 150 Amp original (MG) France made.

pci- (Four number) Sub- Auto breaker. 3phase, with capacity 200 Amp original (MG) France made.

pcj- (Five number) bus Bar made form cupper for connecting the distribution cable with diameter 10x60) mm for above 2000Amp capacity.

10.21- Earth system :- Supply and Install earth system include connection between under ground earth system with (M.D.B) (C.B)s & switch Sockets according to thedrawiongs and engineer's satisfaction the work include Provision all materials such as cables, wires,...etc which is indicated in the drawings.

pc10.22-Telephone System: All materials supplied by the contractor. must be new, best quality andget engineer's approval before using:

pca- Supply and install best quality Main Distribution Telephone Box of capacity of (20 pair) lines, according to the drawings.

pcb- Supply and install sub-distribution telephone joint box of Capacity of (5 pair) lines, according to the drawings.

pcc- Supply arid install sub-distribution telephone joint box ofCapacity (3pair) lit lines according to the drawings.

pcd- Supply and install sub-distribution joint box of capacity6pair)lines according to the drawings

pce- Supply and install sub-distribution joint box of capacity30pair) lines according to the drawing.

pcf- Supply and install sub-distribution telephone joint box ofCapacity (40pair) lines according to the drawings.

11

Page 12: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

pcg-Supply and install sub- distribution Tel joint box capacity of(120 pair)lines according to the drawings.

10

pch-Supply and install Tel outlet(MK) English made include Tel wire ( 4.0x0.6)mm2 ( English made )

M.Li-Supply and install Tel cable(20x0.6) mm2 English made.

j-Supply and install Tel cable(40x0.6) mm2 English made.

k- Supply and install Tel cable (10x0.6) mm2 English made.

I- Supply and install Tel cable (12x0.60) mm2 English made.m- Supply and install Tel cable (40x0.6) mm2 English made.

10.23- Lighting Protection System: Supply and installLightning protection system by fixing suitable tower at the root of the building and arrange lighting protection system as a loop by using suitable bus bars and connected it with system arranged under around all works must be done under supervisor satisfaction and according to slander specification. The work include provision all material which is come true the aim

Mechanical work :-

All equipment's and materials supplied by the contractor rust be new best quality and guaranteed for min. One year under actual Operation the contractor must supply detail catalogs operation and maintenance manuals and other necessary illustration guides to approval of engineer before supplying Fire work includes installation connection to the power with all other necessary accessories and annexes and testing for operation The whose work must be according to specification and satisfaction and instruction . The lift and central Heating & Cooling system must be according to the following specifications:

1111.1- package unit installation on the Roof of the building and testing and all the requirements for proper connection with the main ducts as shown in the drawing. Mark need (Zamil-Craft)

No.

a- Specific of package unit Central heating/cooling system

Nominal Capacity (18tons)(53Kkw) Refrigerant (R-22) Nominal (Evaporator Blower)(CFM)L/S

(7500-3539) Compressor type/Scroll, Quantity / 2

12

Page 13: Boq sample

Item Cost

Unit Price

Qty.UnitItem DescriptionNo.

No.b- Specific of Package unit Central heating/cooling system

Nominal Capacity(21.5Tons)(76kw)

11

M.L

11.2- Rectangular Air Ducts-installation: Including supply of material work will be done with galvanized sheet metal gauge (21-24) as described in sheets duct supported and hanged with steel bar unit and screw. The flexible joint should be considered between units and main duct. The work will be done according to the instruction Of the Supervisor Engineer Installation with fiber glass thickness (25mm)clothing and two layers of flunkout according to the specification

11.3- Air Distribution terminals supply and return Air Diffusers and Grills with Galvanized sheet metal and wooden frames fixing to the side wall with branch ducts. two direction manually movable Air Control for each one

No.a- 600x300 mm

No.b- 500x250 mm

No.

11.4- Providing installation and testing of split unit cassette type Air Conditioner Cooling / Heating Capacity (4tons).The work will be done according to the instruction of the supervisor Engineer. Mark needs (Diakin- National-General-Carrier).

No.

11.5- Shade frame for Packages: supply material and installShade frames (3x3x2.5) m size from 2."X2" angle iron cornered from top by gauge 18(G.L) sheets. Fixed to the frame properly. The frame Legs fixed to the floor through (4x150x150) mm iron Plates with screw and socket-The 4 sides should be closed with 8mm dig. B.R.C mesh with door (BRC arid tube frame).

11.6-Water Pump: Supply and install water pump of approved quality (Italian made).The works includes fixing in position and all other required fittings and annexes to engineer's satisfaction

No.a- Specific of water pump dies size 40mm,max-H 35m,max-Q(100 L/min )output 1.5kw.V-Ph-Hz 220-50Amp 6.5

No.b- Specific of water pump dies size 76.5 mm(3"),max-H(50-60)m max-Q (0.6-3.6m3) V-Ph-Hz (380-3-(60-61)),cos. 0.85 Amp 15.5

11.7-Elevator (Lift): All equipments and materials supplied by the contractor must be new, best quality and guaranteed for min. one year under actual operation. The contractor must supply detail catalogs. operation and maintenance manuals and other necessary illustration guides to approval of engineer before: supplying The work includes installation connection to the power with all other necessary accessories and annexes and testing for operation the whole work must be according to specification and engineers satisfaction and instruction , The lift and central heating & Cooling system must be according to the following specifications:

13

Page 14: Boq sample

Item CostUnit Price

Qty.UnitItem DescriptionNo.

Schindler trade mark (Austria );Pressure lift capacity andSpecification

Speed 0.6-1.0 m/s. Drive: A/C geared or rear less two speed drive with step-starting. Power rating 10kw 50meter Travel, No. of entrances (10) all, opening on the same side. Floor Destination: B.F/1 - G.F/2 - 1st F/3 - 2nd F/4 – 3rd F/5 - 4th F/6 - 5th F/7 - 6th F/8 - 7th F/9 - 8th F/10,Door For landing and car, full automatic two panel central - opening sliding door, Car design Modern all stainless steel passenger car.

1- Control Unit : Modern electronic technology

2- Hi reliability in operation due to maintenance – free

3- Logical designed control and monitoring indicators make at tendency easy and safe for the maintenance personal

4- Adaptability to change operation condition

14