Download - BALDWIN CREEK ROCKY RIVER STABILIZATION NEAR … › ... › 1556 › BD_NearAbbeyRoad.pdfABBEY ROAD North Royalton, Ohio SUMMARY This project includes over 400 linear feet of channel

Transcript
  • Abbey R

    d

    Copyright nearmap 2015

    Project AssetsRegional Stormwater System

    ¯ 0 50 100 Feet

    BALDWIN CREEK STABILIZATION NEAR ABBEY ROADNorth Royalton, Ohio

    SUMMARYThis project includes over 400 linear feet of channel realignment and floodplain reconnection west of Abbey Road to create a stable meander pattern and alleviate severe bank erosion. A private driveway crossing will be evaluated for replacement because it is in poor condition and contributes to stream instability.

    Project DetailsAsset Numbers:BD00287BD00291BD00292BD00293Contract Type:GED/Bid/BuildConstruction Cost:$440,000

    Anticipated Construction NTP:3rd QTR 2020Watershed Team Leader:Donna [email protected]

    ROCKY RIVERWATERSHED•BALDWIN CREEKSUBWATERSHED