FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-156 NIPPON KOEI LAC CO.,LTD
2.5.9 Diagnosis of the Existing Sewerage System Infrastructure
(1) Objectives The objective of the present Study is to optimize the existing secondary sewers in the Study Area by rehabilitation or replacement; the Study Area is defined in Section 2.5.1. This Section analyzes the current condition of the secondary sewers in order to diagnose the problems and requirements.
The rehabilitation of primary sewers will take place through a study called “Rehabilitation for Primary Sewers Related with the Water and Sewerage Network Rehabilitation Projects – Lima Norte I and Lima Norte II.” It is known that SEDAPAL has finished carrying out the Terms of Reference for the study of this project at Pre F/S level (Perfil). This Perfil shall be included in the 2011 annual budget, under the consideration that the Perfil should conclude in 20121.
(2) Background The Study Area is part of two large drainage areas called Puente Piedra and Comas, and a small drainage area called Márquez-Oquendo, which can be seen in Figure 2.5.9-1. Some remaining parts of the Study Area have no sewerage system, thus it is not part of any drainage area. In this figure, there are sewerage systems in the area below Marquez drainage area, but not under SEDAPAL administration yet, thus it is beyond the scope of this Study.
1 Memorandum N° -368-2010-GDI directed to Polo Agüero, Leader of North Management Team; Project for Rehabilitation for Primary Sewers Related with the Water and Sewerage Network Rehabilitation Projects – Lima Norte I and Lima Norte II
RIO
CH
ILL
ON
RIO CHILLON
OC
EA
NO
P
AC
IF
IC
O
AREA DE DRENAJEMARQUEZ
AREA DE DRENAJECOMAS
AREA DE DRENAJEPUENTE PIEDRA
CALLAO
CB-41CAMARA DE BOMBEO
DE DESAGUE(VOL= 6.80 MĮ)
RIO
CH
ILL
ON
RIO
CH
ILL
ON
REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA
N
GRAFICO 2.5.9.1 : AREAS DE DRENAJE EXISTENTE
FIGURE 2.5.9.1: EXISTING DRAINAGE AREAS
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-158 NIPPON KOEI LAC CO.,LTD
The extension of the drainage areas and their portions in the Study Area is shown in Table 2.5.9-1.
Table 2.5.9-1: Drainage Area and Wastewater Treatment
Drainage Area (AD)
Area Wastewater Treatment Area included in the Study Area (ha)
Total Area (ha) Present Future
Comas 2,206.40 11,908.4 - Taboada WWTP*
Puente Piedra 297.80 5,271.8Puente Piedra
WWTP Puente Piedra
WWTP Márquez 36.80 36.80 - Taboada WWTP* Grand Total 2,541.00 1,721.7 - -
*: scheduled to begin operation in 2013 Source: SEDAPAL Cadastre and JICA Study Team
As shown in the table above, wastewater generated in Puente Piedra AD is treated in the Puente Piedra Wastewater Treatment Plant (WWTP) by primary treatment. On the other hand, however, Comas AD and Márquez AD do not have treatment plant and the wastewater generated in those AD are currently discharged to the sea without treatment.
SEDAPAL has agreed with a Spanish private company on a 25-year BOT contract on construction and operation of a new wastewater treatment plant with a capacity of 14m3/s, named Taboada WWTP. The treatment method is primary treatment process with sedimentation tanks, which is designed based on the National Sanitation Standard, and the treated water will be diffused to the sea at a point distanced 3.8 km from the seashore through a discharge pipe. The WWTP is currently under the design stage and is scheduled to begin operation in 2013. All wastewater generated in Comas AD and Márquez AD is planned to be treated by the Taboada WWTP after completion of the project (2015).
Figure 2.5.9-2 shows the future discharge point; the areas not shown in yellow are not going to be included in the Study area because the sewer pipes in the areas have been rehabilitated by other projects as mentioned in detail in section 2.5.9 (3).
CARABAYLLO
PUENTE PIEDRA
VENTANILLA
COMAS
LOS OLIVOS
SAN MARTIN DEPORRESCALLAO
INDEPENDENCIA
OC
EA
NO
P
AC
IF
IC
O
RIO
CH
ILL
ON
RIO CHILLON
CB-02CAMARA DE BOMBEO
DE DESAGUE(VOL=47.60MĮ)
CB-41CAMARA DE BOMBEO
DE DESAGUE(VOL= 6.80 MĮ)
REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA
N
Preparation of the Perfil Study of the Project : “Installation of theWater and Sewerage System for Oquendo, Santa Rosa andNaranjal Scheme (sectors 251, 252, 256 and 257)”. This projectinvolves Comas and Marquez drainage area
Project of Sanitation Enlargement of the Socially Excluded Area ofLima Loan Agreement PE-P30.Lot 10: District of Puente Piedra, Works of Water and SewerageSecondary Networks, Valle Chillon Gardens - La Ensenada -Chillon Housing Association Schemes
Execution of General Works of Water and Seweragethat are executed by L.P.N.N 0029-2003 “GeneralWorks of Water and Sewerage for Oquendo, Santa Rosaand Naranjal Scheme” (sectors 251, 252, 256 and 257)executed by “Santa Rosa” Joint Venture.
Contract of Work 023-2007-CW-31960/IBRD-SEDAPALEnlargement of Water and Sewerage Networks byCondominium Systems in Several Districts of NorthArea Package 2
LEGEND
GRAFICO 2.5.9.2: SISTEMA DE ALCANTARILLADO FUTURO
FIGURE 2.5.9.2: FUTURE SEWERAGE SYSTEM
Preparation of Perfil Study of the Project of Enlargement andImprovement of the Water and Sewerage System, Las Animas hilland attachments scheme
Project of Sanitation Improvement of Socially Excluded Areas ofLima, Loan Agreement PE-P30 Lot 7
Works Pro-Networks Alfredo Villa Calderon Shanty Town
PROMESAL Works Lot 6-9B Valle Chillon, Primavera, AnoNuevo: Independencia-Comas-Carabayllo Sector Scheme
Works in Las Magnolias Shanty Town
PAC Works - Package 4 Comas, Carabayllo, Independencia,Puente Piedra
Lima North II Study Area
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-160 NIPPON KOEI LAC CO.,LTD
Table 2.5.9-2 shows the three drainage areas that are functioning in the Study area. The table also gives the areas of drainage sub areas as defined in the Perfil Study based on flow direction, and level of manholes.
Table 2.5.9-2: Drainage Sub-areas
Drainage Areas (AD) Sewers Drainage Sub-Areas
Name Hectares
Comas
Prolg. Lima Sewer AD-PL1 108.8 AD-PL2 108.2
Chillón Sewer
AD-CH1 105.2 AD-CH2 45.9 AD-CH3 96.9 AD-CH4 137.5
Ramal 13 and 17 SewerAD-R1 103.3 AD-R2 78.3
Naranjal Sewer AD-N1 118.6 AD-N2 84.1
Los Alisos Sewer AD-A1 132.3 AD-A2 96.6
Comas Sewer AD-CO1 80.2 AD-CO2 107.6
Collique Sewer
ADC-1 40.1 ADC-2 64.6 ADC-3 48.9 ADC-4 24.3 ADC-5 46.9 ADC-6 58.2
San Agustín Sewer
AD-AG1 17.7 AD-AG2 113.8 AD-AG3 49.2 AD-AG4 110.9
Tungasuca Sewer AD-T1 67.8 AD-T2 29.2 AD-T3 87.4
Carabayllo Sewer AD-CA1 44.0 Total 2206.4
Puente Piedra Puente Piedra Sewer
AD-P1 116.1 AD-P2 62.6 AD-P3 49.1 AD-P4 69.9
Total 297.8
Márquez Márquez Sewer AD-M1 36.8
Total 36.8 Grand Total 2541.0
Source: JICA Study Team
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-161 NIPPON KOEI LAC CO.,LTD
It must be pointed out that the Master Plan contemplates the future construction of 2 wastewater treatment plants in the study area, the San Felipe WWTP and the Sinchi Roca WWTP.
According to the SEDAPAL’s Investigation and Development Management’s Research, Standardization, and Physical Planning Team, the San Felipe WWTP cannot be built as the planned location for its construction has no available land area. Instead, a possibility to extend the Puente Piedra WWTP is being analyzed.
As the Sinchi Roca WWTP is located on the Sinchi Roca Park Zone, no decisions have been made to build a plant yet.
(3) Sewerage System SEDAPAL differentiates the primary sewers and the secondary sewers in the following way:
• The primary sewers are pipes with a diameter between 350 mm (14”) and 1,800 mm (72”).
• The secondary sewers are pipes with a diameter between 160 mm (6”) and 350 mm (14”).
Figure 2.5.9-3 shows the existing drainage sub-areas, as well as the primary sewers that go through this drainage area.
RIO
CH
ILL
ON
RIO CHILLON
OC
EA
NO
P
AC
IF
IC
O
AD-R1
AD-CH3
AD-R2
AD-N1
AD-CO1
AD-CO2
AD-A2
AD-A1
AD-N2
AD-CH4
AD-CH2
AD-PL1
AD-PL2
AD-T1
AD-T2AD-CA1 AD-AG3
AD-AG2
AD-AG4
AD-T3ADC-6
ADC-5
ADC-3
ADC-2
ADC-4 ADC-1
AD-AG1
AD-M1
AD-P1
AD-P2
AD-P3
AD-P4
CARABAYLLO
COMAS
LOS OLIVOS
SAN MARTIN DEPORRES
INDEPENDENCIA
CALLAO
VENTANILLA
N
Drainage Area(AD) Sewers
Sub Drainage AreaNomenc. Has
Comas
Prolg. Lima SewersAD - PL1 108.8AD - PL2 108.2
SewersChillon
AD - CH1 105.2AD - CH2 45.9AD - CH3 96.9AD - CH4 137.5
Ramal 13 y 17 SewersAD - R1 103.3AD - R2 78.3
Naranjal SewersAD - N1 118.6AD - N2 84.1
Los Alisos SewersAD - A1 132.3AD - A2 96.6
Comas SewersAD - CO1 80.2AD - CO2 107.6
Collique Sewers
ADC -1 40.1ADC -2 64.6ADC -3 48.9ADC -4 24.3ADC -5 46.9ADC -6 58.2
San Agustin Sewers
AD - AG1 17.7AD - AG2 113.8AD - AG3 49.2AD - AG4 110.9
Tungasuca SewersAD - T1 67.8AD - T2 29.2AD - T3 87.4
Carabayllo Sewers AD - CA1 44.0Total 2206.4
Puente PiedraPuente Piedra Sewers
AD - P1 116.1AD - P2 62.6AD - P3 49.1AD - P4 69.9
Total 297.8
M§rquezMarquez Sewers AD - M1 36.8
Total 36.8Total 2541.0
REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA
GRAFICO 2.5.9-3: COLECTORES PRIMARIOS Y SUB AREAS DE DRENAJE EXISTENTE
FIGURE 2.5.9-3: EXISTING PRIMARY SEWERS AND SUB DRAINAGE AREA
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-163 NIPPON KOEI LAC CO.,LTD
1) Primary Sewerage System
The drainage areas in the Study area and their respective sewerage systems are detailed in the following items.
(a) Comas Drainage Area
This drainage area involves the districts of Comas, Independencia, Los Olivos, and a part of the districts of Carabayllo, San Martín de Porres and Callao; it has a total drainage area of 11,908.4 hectares.
The Study Area included in this Comas drainage area includes parts of the Comas, Los Olivos and San Martín de Porres districts, with a total drainage area of 2,206.4 hectares.
The Comas-Chillón main collector is the main sewer in this drainage area, and the sewage from the area flows to the main collector by gravity. This sewer collects wastewater from the districts of Carabayllo, Comas, and Los Olivos, as well as partially from Independencia; San Martín de Porres and Callao, and discharges to the sea without treatment.
The technical information about this main collector is given here:
• Diameter of pipe: 1,350 mm (54”)
• Drainage Area: 11,908.4 hectares
Main contributors: Comas, Chillón, Garagay, Palao, Ingeniería, Carabayllo.
This main collector discharges directly to the sea at Oquendo Beach – Callao. Opposite Av. El Emisor, but part of its waters are used raw for agricultural purposes.
The total length of the main collector is 82.537km.
Primary Sewers:
In the Study Area, the Comas drainage area contains the following primary sewers:
- Comas Sewer - Naranjal Sewer - Túpac Amaru Sewer - Ingeniería Sewer - Infantas Sewer - Carabayllo Sewer - San Agustín Sewer - San Diego Sewer - Trapiche Sewer - 13 and 17 Sewers - Chillón Sewer - Naranjal Spillway
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-164 NIPPON KOEI LAC CO.,LTD
In terms of pipe material, pipes are predominantly made of Simple Standard Concrete (64.8%). See Table 2.5.9-3.
Table 2.5.9-3: Length of Primary Sewers by Material
Drainage Area
Diameter Type of Material / Length (m) Sub Total (m)
% Mm AC RC SC PSC PVC
Comas
350 12,225.5 2.10 12,227.6 24.96
355 1,574.50 1,574.5 3.21
400 291.4 4,491.9 4,783.3 9.76
450 6,249.2 6,249.2 12.76
525 1,290.1 1,290.1 2.63
600 14.5 3,992.6 4,007.0 8.18
750 514.5 514.5 1.05
800 1,244.9 1,244.9 2.54
900 1,479.0 1,221.7 2,700.7 5.51
1000 26.0 232.6 1,558.9 1,817.6 3.71
1100 672.7 814.1 1,486.8 3.04
1200 2,014.3 2,014.3 4.11
1300 4,307.3 4,307.3 8.79
1400 2,813.1 2,813.1 5.74
1500 842.8 842.8 1.72
1800 1,113.1 1,113.1 2.27
Total 291.4 11,803.8 31,720.3 3,594.7 1,576.6 48,986.9 100.00
% 0.6 24.1 64.8 7.3 3.2 Note: AC = Asbestos Cement, RC = Reinforced Concrete, SC = Simple Concrete, PSC = Pre Stressed Concrete, PVC = Poly Vinyl Chloride Source: ECRF
The pipes with an age of between 10 and 25 years represent 25.5 % of the total. See Table 2.5.9-4.
Within this drainage area, the drainage sub-areas have also been defined:
Sinchi Roca: Located in the Comas district; according to SEDAPAL’s Master Plan, the Sinchi Roca WWTP is proposed to treat the wastewater generated in the Collique zone. However, as mentioned above, SEDAPAL has not decided the construction of this WWTP yet.
Oquendo: Located in the San Martín and Comas districts, it is proposed that wastewater will be treated in the Taboada WWTP.
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-165 NIPPON KOEI LAC CO.,LTD
Table 2.5.9-4: Length of Primary Sewers by Age
Drainage Area
Diameter Age / Length (m) Sub Total (m)
% Mm
No Data
< 10 > 35 10 to 25 25 to 35
Comas
350 5,054.2 1,827.2 486.2 4,060.9 799.1 12,227.6 25.0
355 24.6 1,549.9 1,574.5 3.2
400 1,961.4 828.2 145.4 1,848.3 4,783.3 9.8
450 2,862.3 558.2 2,461.9 366.8 6,249.2 12.80
525 707.0 399.6 183.5 1,290.1 2.60
600 2,782.7 948.8 275.5 4,007.0 8.20
750 514.5 514.5 1.10
800 150.1 1,094.7 1,244.9 2.50
900 1,237.3 282.9 614.9 565.7 2,700.7 5.50
1000 1,610.8 206.8 1,817.6 3.70
1100 1,486.8 1,486.8 3.00
1200 938.7 400.2 675.4 2,014.3 4.10
1300 2,937.7 135.1 898.8 335.8 4,307.3 8.80
1400 2,266.9 396.0 150.2 2,813.1 5.70
1500 842.8 842.8 1.70
1800 1,113.1 1,113.1 2.30
Total 25,976.2 5,294.7 2,009.2 12,505.1 3,201.7 48,986.9 100.00
% 53.0 10.8 4.1 25.5 6.5 Source: ECRF
(b) Puente Piedra Drainage Area
This drainage area involves the Puente Piedra district and part of the Carabayllo district and it has a Drainage Area of 5,271.8 hectares.
The Study area included in this Puente Piedra drainage area includes part of the Puente Piedra district and has a Drainage area of 297.8 hectares.
The Puente Piedra main collector is the main sewer, and the sewage from the Study Area flows to the main collector by gravity. The main collector discharges in the Puente Piedra Wastewater Treatment Plant (WWTP). This treatment plant uses an activated sludge process with a capacity of 450 l/s.
Main Collector: The Puente Piedra main collector is the main sewer, and various interceptors called primary sewers join it by gravity. It partially covers the districts of Los Olivos, San Martín de Porres and Puente Piedra.
The most relevant information about this main collector is as follows:
• Discharge diameter : 914 mm
• Drainage Area: : 5,271.8 hectares
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-166 NIPPON KOEI LAC CO.,LTD
This main collector delivers sewage to the Puente Piedra WWTP, which is then discharged into the Chillón River.
Primary Sewers: The primary sewers of this drainage system included in the Study area are comprised of approximately 9.8 km of pipes, whose diameters range from 350mm to 1219mm.
The piping material is predominantly made up of PE, which accounts for 77.2% of the total. See Table 2.5.9-5.
Table 2.5.9-5: Length of Primary Sewers by Type of Material
Drainage Area
Diameter Material / Length (m) Sub Total (m)
% Mm AC PE PVC
Puente Piedra
350 968.7 968.7 9.80
355 251.8 251.8 2.60
400 748.1 274.3 1,022.4 10.40
610 792.2 792.2 8.10
762 5,529.3 5,529.3 56.20
914 1,022.9 1,022.9 10.40
1219 252.8 252.8 2.60
Total 748.1 7,597.2 1,494.8 9,840.1 100.00
% 7.6 77.2 15.2 Source: ECRF
The pipes with less than 10 years of age represent 24.9% of the total. See Table 2.5.9-6.
Table 2.5.9-6: Length of Primary Sewers by Age
Drainage Area
Diameter Age / Length (m) Sub Total (m)
% Mm No Data < 10 10 to 25
Puente Piedra
350 147.9 589.5 231.3 968.7 9.80
355 251.8 251.8 2.60
400 800.3 222.1 1,022.4 10.40
610 792.2 792.2 8.10
762 3,992.3 1,537.0 5,529.3 56.20
914 1,022.9 1,022.9 10.40
1219 153.5 99.3 252.8 2.60
Total 7,161.1 2,447.8 231.3 9,840.1 100.00
% 72.8 24.9 2.4 Source: ECRF
(c) Márquez-Oquendo Drainage Area
This area is limited by the coastline of the sea and the Comas drainage area. It has a drainage area of 36.8 hectares, and it includes part of the Callao district. Area south of this drainage area has a sewerage system which is not administrated by SEDAPAL yet.
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-167 NIPPON KOEI LAC CO.,LTD
The Study Area included in this drainage area includes part of the Callao district. The entire drainage area is included in the Study area.
Because of the drainage area’s topography, it requires a pumping system, which discharges wastewater to the Chillón River without any treatment.
Main Collector: The technical information regarding the main collector is as follows:
• The discharge diameter is 350 mm
• Area of Drainage: 839.7 hectares
• This main collector discharges to the Chillón River without any treatment.
Primary Sewers: The primary sewer in the Study Area is made up of approximately 0.2 km of piping with a diameter of 350 mm.
The single material used in the sewer is Simple Standard Concrete. See Table 2.5.9-7.
Table 2.5.9-7: Length of Primary Sewers by Type of Material
Drainage Area Diameter
Material / Length (m)
Sub Total (m)
% Mm CSN
Márquez 350 165.70 165.70 100.00
Total 165.70 165.70 100.00
% 100.00 Source: ECRF
Pipes with between 10 and 25 years of age represent 100% of the total. See Table 2.5.9-8.
Table 2.5.9-8: Length of Primary Sewers by Type of Material
Drainage Area Diameter Age / Length (m)
Sub Total (m) % Mm 10 to 25
Márquez 350 165.70 165.70 100.00
Total 165.70 165.70 % 100.00
Source: ECRF
2) Secondary Sewers
The secondary networks in the Study Area are made up of approximately 652 km of pipes, whose diameters range from 100 mm to 315 mm.
The piping materials are mostly CSN and PVC. Table 2.5.9-9 shows the distribution of piping according to type of material.
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-168 NIPPON KOEI LAC CO.,LTD
Table 2.5.9-9: Piping in the Study Area
Material Quantity (Km)
Percentage
Asbestos Cement 0.175 0.027%
PVC 210.000 32.202%
Simple Standard Concrete 441.960 67.700%
Cast Iron 0.008 0.001% Source: ECRF
Figure 2.5.9-4 is a map showing the distribution of pipes in the Study area, considering the different types of material.
It is to be noted that there are some other studies and projects which are either ongoing or completed related to water supply and/or secondary sewerage upgrading. The names are given below and their respective influence areas are shown in Figure 2.5.9-5. Thus, these areas will not be investigated further in this Study.
1. Elaboration of the study of the proposed expansion and improvement of drinking water system and sewerage scheme in Cerro Las Animas and adjacent areas.
2. Health Improvement Project of the marginal areas of Lima. Loan Agreement Pe -930. Lot 10 Puente Piedra district, water networks and secondary sewage. Schemes Chillon Valley Gardens, La Ensenada, Chillon Housing Association.
3. Health Improvement Project for Marginal Areas in Lima, Loan Agreement - PE-P30, Lot 7.
4. Perfil of the “Installation of the Water Supply and Sewerage Scheme for the Oquendo Santa Rosa and El Naranjal (Sectors 251, 252, 256, and 257) Scheme” Project. This Project involves the Comas Drainage areas and the Valle Chillón, Primavera, Año Nuevo, Independencia, Comas, and Carabayllo sectors. General Water Supply Works have been executed for this scheme, by means of LP 0029-2003 Contract.
5. Promesal works, Lot 6B, Valle Chillón Chillon, Primavera, Ano Nuevo, Independencia, Comas, and Carabayllo Sector Scheme. Improvement Works in the Water Supply General Works. No improvement Works have been carried out for the sewerage network.
6. Works contract L.P. 021-2007-CW -31960 IBRD- SEDAPAL Water supply and sewerage network extensions through condominium systems in various districts. These condominium systems have carried out works on sewerage networks with diameters of less than 200 mm, and have not been included in this Study.
7. PAC 4 Comas Carabayllo Independencia, and Puente Piedra works. Reservoir rehabilitation Works.
VENTANILLA
CALLAO
COMAS
SAN JUAN DE LURIGANCHO
CARABAYLLO
LOS OLIVOS
PUENTE PIEDRA
SAN MARTIN DE PORRES
INDEPENDENCIA
SAN MARTIN DE PORRES RIMAC
LURIGANCHO
AD-0 PT1
PT6
A16
A18
AD-A1
AD-P0
AD-CH1
AD-N1
ADC-1
ADC-2
AD-CH4
PT4
AD-R1
AD-A2
AD-CA1
AD-CA2
ADC-5
AD-AG4
AD-PL1
AD-PL2
AD-AG2
AD-N2
AD-CO2
PT3
AD-CA3
AD-R2
AD-P2
AD-T2
AD-CH3
PT2
PT5
AD-T1
AD-T4
AD-CO1
ADC-6
AD-AG1
PT7
AD-T3
AD-T5
SA-42
SA-30
SA-8
AD-1Ab
SA-55
SA-57
ADC-3
SA-25SA-40B
SA-56A
SA-24
SA-56B
SA-6
AD-AG3
ADC-4
A19
AD-CH2SA-37
AD-M1
SA-12
SA-33
AD-T6
SA-52
SA-41
AD-01BAD-AG5
SA-50
AD-1Aa
SA-15
SA-4
AD-02B
SA-26
SA-54
SA-51
SA-10
SA-39A
SA-5
SA-27
SA-14
AD-3
SA-13
SA-35
SA-53
SA-34
SA-48
SA-28
SA-21
SA-16ASA-47SA-9
SA-20
AD-01A
SA-3
AD-02A
SA-31
A15
SA-7
SA-58
SA-32
SA-11
AD-04
SA-49
SA-29
SA-39B
SA-23
OCEANO PACIFICO
AV CE NTRA L
AV CHILL
ON
AV IN
DOAM
ERIC
A
AV P UNO
AV C
AV S
ANTA
ANA
AV CANTA CALLAO
AV P
ERIM
ETRAL
AV C
ARAB
AYLL
O
AV C
HACR
A CER
RO
AV 1
AV O LIV OS , LOS
AV T ANTAMAYO
AV UNGER, G
ERARDO
AV H
EROE
S DEL
ALTO
CEN
EPA
AV S
INCH
I ROC
A
A V S A N T A EL V IR A
AV R
ETAB
LO, E
L
AV RIO M A RA ÑON
AV SAN JOSE
AV MENDIOLA , A LF REDO
AV C
UZC O
AV P ARA MONGA
AV R EV OLUCIO N
A V 20 0 MI LL
A S
AV SO L DE NA R AN JA L
AV D
AV UNIVERS ITARIA
AV B
AV JUPIT ER
AV ALIS OS , LOS
AV LIM A
AV TA
Z A, LA
AV PANAMERICANA NORTE
AV 17
A V SAN DI EGO DE A LCA LA
AV SA N FE L IP E
AV PA RIA HUA NCA
AV METROPOLITANA
AV ACA P ULCO
AV E
AV C
OND OR
CANQ
UI, M
ARIA
NO
AV CONTISUYO
AV INDEPENDENCIA
AV PA
RADO DE BELL
IDO, MAR
IA
AV 4
AV RIO TAM
BO
AV INDUSTRIAL
AV INCA S, LO S
AV CH INCHA YS U YO
AV ACA C I AS , L AS
AV H
UAYL
AS
AV FA M ES A
AV D OM INIC OS , LOS
AV A
A V SA N RE MO
AV T
UPAC
AM
ARU
AV ROS ARIO , E L
A V SA N JUA N
AV S
AN M
ATE O
AV J AM A ICA
AV M E XICO
A V M
ALECO N
CHIL
LON
AV H
UAND
OY
A V ANG ELES , LO S
AV A
RTES
ANOS
, LO S
AV CED RO S, LOS
AV S ANG A RARA
A V U GA RTE , A LFONS O
AV SOL DE ORO
AV JA ZMIN E S , LOS
AV P AR R AL , E L
AV E COLO GICO
AV ZINC, E L
AV RO SAL, EL
AV M IRAFLORES
AV DE SA N M ART IN, J OS E
AV C
HASQ
UIS ,
LOS
AV M IRA MA R
AV ROS A LU Z
AV PACASMAYO
AV NO VIE M BRE , 17 DE
AV CA NA DA
A V LIBE RT A D
A V S ETIEM BR
E , 25 DE
AV EU CAL IP TO S, LO S
AV NIÑO S M A RT IRES , LOS
AV R
EGLA
, LA
AV CARR IO N, DANIEL AL CIDES
AV SAN C ARLO S
AV JA
CARA
NDA
AV HURIN CUZCO
AV M
UJIC
A GA
LLO
, MAN
UEL
AV 2
AV BOLOGNESI, FRANCISCO
AV HUA NA CAURE
AV MAN CO CAPA C
AV ANT UNE Z DE M AY OL O, S ANTIA GO
AV CO RICANCHA
AV O CTUB RE, 2 DE
AV TO RRES , LAS
A V N A RA NJAL , E L
AV P ORTA LE S , LO S
AV REPU BL IC A DE L PER U
A V DICIEM BR E, 20 D E
AV CO LE CTO RA
AV A GOSTO, 1 1 DE
AV F A UCE TT , EL ME R
AV PO MAB
A MBA
AV S
AN R
O Q UE
AV S ANTA MA R IA A LT A
AV CO ND ORCA NQ UI, J OSE G AB RIEL
AV V IRGEN DEL ROSARIO
AV ALAMO S, L OS
AV JUNIO, 15 DE
AV VALL EJO , CE SAR
AV GL O BO
T E R RA Q U E O
AV M ILAG RO D E JESUS
A V M AE STRO P E RU ANO
A V S AN E NRIQUE
AV NE PT UNO
AV VENUS
AV AL
BORA
DA, L
A
AV VI RG EN DE L CA R M EN
AV GONZALE S P RADA, MA NUE L
AV 7
AV C
ENTE
NARI
O
AV P
INO S,
LOS
AV ROSA DE AM
ERICA
AV TR
APICHE
CHIL LON
AV NARANJAL
A V IN TE GR A C IO N
AV U N IO N, L A
AV HUAMACHUCO
AV E NER O, 25 DE
AV O RQUIDEAS , LAS
A V PALME RAS , LAS
AV AM A NCA ES , LOS
AV PERIF ERICA
AV BERT ELLO, A LE JANDRO
AV BERT ELLO B O
LL AT I, AL E JA N DRO
AV AG OS TO, 22 DE
AV M
AYO,
11 D
E
AV O LIVAR, E L
AV S AN B E RNARDO
A V BET AN COU RT, R OMU LO
A V DE LA FUENT E, GUIL LE R MO
AV VE NCED ORE S, L OS
AV P RA DO , M A NUE L
A V B AS TID A S, MICAELA
AV SAN A NTO NIO
A V G AMBETT A , CRNE L NES TOR
AV MONITO
R HUASCAR
AV ANT ISUYO
AV IZA GUIR RE, CA RLOS A LBE RTO
AV DE SAN MARTIN, DO N JO
SE
AV HO NDURAS
A V PE RU AN IDAD DE LA
AV TUL IP AN ES, LO S
AV S ANTA RO SA
A V ES T
A DO
S UN
IDOS
AV D
EL B
IERZ
O
AV B END EZU, W ILBE R
AV MERINO RE YN A
AV SAN JUAN MAS IAS
AV SANTA CRUZ
AV BELAUN DE O ESTE, VICTO R A
AV CHO CAN O, JOS E SANTOS
AV JULI
O, 1
DE
AV PUNCHAUCA
AV P
LATI
NOS ,
LOS
AV SAN PEDRO DE CARABAYLLO
AV S
AN A LBIN O
AV G UARDIA CIV IL
AV AG OSTO, 25 DE
AV SO L, EL
AV PROCERES, DE LOSA V OC TUBRE , 12 DE
AV CO RDIALIDAD, LA
A V SE ÑOR DE CAUD IV ILL A
AV P ROCE RE S, LOS
A V GU AR DIA R EP UBLICAN A
AV PA RA ISO
AV MARTIN, JUAN MANUEL
AV HA YA DE LA TORR E,
VICT OR R
AV CO LE CTO R COM AS
AV SANT A AD ELA
A V CH IMP U O C L LO , ISA BE L
AV S
AUC
ES, L
OS
AV TREBOL, EL
AV V IOL E T AS , L A S
AV IZA GUIRRE , CA RLO S A
AV S AN
F RANC
ISCO
AV S AN P E DR O
AV E NER O, 22 DE
AV GRANADAS, L
AS
AV BO LO G NESI, C RNL FRAN CI SCO
AV RESIDENCIAL
AV DE LA TORRE UGA RTE , JOS E
AV CAC ERES, MRC AL AND RES A
AV VEN EZU ELA
AV M
AGNO
LIAS ,
LAS
AV AM E RICAS , LAS
AV LIBERTAD, LA
A V JE R U SALEN
AV CO NFR ATE R NID AD , LA
AV ALAMEDA DEL PINAR
AV PALMA, RICARDO
AV SAN NICO LAS
A V HE ROES
DE
P UCU
TA
AV OLA
YA, MARTIR JO
SE
AV DE L
A MU JE R PER UAN A
AV SANTI SIMA C R U Z D E SAN D IEGO
AV JUL IO, 2 8 DE
A V G RAU, A LM T E MIG UEL
AV VILLAR RE AL, FE DER ICO
AV M AL VI NAS , LAS
AV RE PU BLICA DE ISRA E L
AV S A N M AR TIN
AV PRINCIPAL
AV B ELA UNDE ES TE , VICTO R A
AV R
EPU B
LICA D
E ARG
ENTIN
A
AV M ER CURIO
AV BELEN
AV RO BLE S, LO S
AV A
LHEL
IE S, LO
S
AV VAL LE, T OMAS
AV C
AV UNG ER, G ERARDO
AV AL ISO S, LOS AV CO RICANCHA
AV CA NTA C AL LAO
AV COLEC TOR A
AV A
AV SA NT A ROS A
AV O LIVAR, E L
AV PRINCIPAL
A V S AN CA RLOS
AV ALISO S, L OS
AV U
NIVER
S ITARIA
AV F AU C ETT, E LM ER
AV CA NTA C ALLAO
AV C
ENTR
AL
AV MA NC O C A P AC
AV U
N IV
ERSI
TAR I
A
A V PRO CE RE S, LOS
AV S ANTA ANA
AV S ANTA RO SA
AV SANTA RO SA
AV R
ETAB
LO, E
L
AV INDO AMERICA
AV SAN DIEGO DE ALCALA
A V IZA G UIRRE , CA RLOS A
AV P
INOS , L
OS
AV A
AV UNGER, G
ERARDO
AV S ANTA RO SA
AV P
ACAS
MAYO
AV PANAMERICANA NORTE
AV M E RINO RE YNA
AV 200 MILLAS
AV S
ANTA
RO SA
AV S
ANTA
RO SA
AV O LIV OS , LOS
AV ME ND IO
L A, A LF RE DO
AV DO MINICOS , L OS
AV INCA S, LO S
AV NARA NJA L, E L
AV A
A V M ALE CON CH IL LON
AV SAN NICO LAS
AV ROSA DE AM
ERICA
AV S ANG A RARA
AV T UPAC AMARU
AV OCTUBRE, 12 DE
AV CANTA C
ALLA
O
AV SANTA ADELA
AV SA N C ARLOS
AV SANTA RO SA
AV B ERTEL LO BOL LATI, ALE JAN DRO
AV E
AV CO NFRATE RNIDA D, LA
AV G
AMBE
TTA,
CR N
EL N
EST O
R
AV SAN PEDRO D E CA RAB AY LLO
AV ALIS OS , LOS
AV PRINCIPA L
AV C EDR OS, L OS
AV TAN TA MAY O
AV TU
PAC
AMAR
U
AV ANT ISUYO
AV PACASMAYO
AV IZA GUIRRE , CA RLOS ALB ERTO
A V JA ZM INE S, LOS
AV CENTRAL
AV ALIS OS , LOS
AV P LATINOS , LOS
A V UNI
VERS
I TA R
I A
AV U
N IVER
S ITA
RIA
A V PALMER AS , LAS
AV U
N IV E
R SI T
ARIA
AV A
AV C U ZCO
AV CHO CANO , JOSE SANTO S
AV J AZ MINE S , LO S
AV UNIVERS ITARIA
AV CHACRA C ERRO
AV MENDIOLA , A LF REDO
AV OLIVOS , LO S
AV SA U C ES, LOS
A V TOR RES, L
A S
AV ALIS OS , LOS
AV CAN TA C A LLA O
AV S
AN
TA R OS A
AV P IN OS , LOS
AV TO RRES , LAS
AV SAN NICO LAS
AV A LIS OS , LOSAV S
AN J
OSE
AV U
NIVE
RSIT
A RI A
AV PANAMERICANA NORTE
A V CH
ACRA
CER
RO
AV U
NIVE
RSITA
RIA
A V UN G ER , GE R ARDO
AV PACASMAYO
AV TORRES , LAS
A V AGOSTO, 22 D E
AV M AG
N OLIA
S, LA
S
AV B OLO GNE SI, CRNL FRA NCIS CO
AV PA
NAMERICANA N
ORTE
AV 1
AV C
ARAB
AYLL
O
AV CENTRAL
AV TRAP ICHE CHILLON
A V NARA NJA L, E L
AV CEDRO S, LOS
AV A
AV DOMINICO S, LOS
AV P
A CA S
MAY
O
AV B
AV T U
P AC
A MAR
U
AV M EN D IO L A, A L FR EDO
AV RO SA DE AME RICA
AV SAN F ELIPE
AV INDUSTRIAL
AV VA LLEJ O, CE SA R
AV CA N T A C AL L AO
A V 200 M ILL AS
AV LIM A
AV T
UPAC
AM AR
U
A V RIO MAR AÑON
AV H
UAND
OY
AV SAUCES , LOS
AV SAN M
ATEO
AV B
AV S EÑ OR DE CA UDIV ILLA
AV UNIVERS ITARIA
AV MENDIOLA , A LF REDO
AV S
ANTA
RO SA
AV C
A V ROS ARIO, EL
AV B
AV PI
NO S , LOS
AV A
AV M E N DI OL A , A L FR E D OAV PERIM
ETRAL
AV B
AV M
UJIC
A G
A LL O
, MAN
UEL
AV PACASMAYO
AV PALMA, RICARDO
AV B
AV METROPOLITANA
AV MENDIOLA , A LF REDO
AV M ETROPOL ITANA
AV C
ANTA
CAL
LAO
A V A NG ELE S, L OS
AV U
N IVE
RSIT A RI
A
AV R
ETAB
LO, E
L
AV C
A V ME
NDIO
L A, A
L FRE
DO
AV BAV
R EPUBL
ICA D
EL P
ERU
AV B
AV A
A V UN G ER , G ERAR DO
AV TU
PAC
AMAR
U
AV CE NTRA L
AV M E ND IO L A , A L FR E DO
AV SAUC ES , LOS
A V S AN FE LIP E
AV CAN TA
C ALLAO
AV SAN ENRIQUE
AV S ANG A RARA
AV C
AV CA CE RES , MRCA L A NDRE S A
AV FA UCET T, E LM E R
AV A
A V SA N J UA N MA SIA S
AV PR AD O, M ANUE L
AV CHIMPU OCLLO, I SABEL
AV A
AV CANTA CALLAO
AV C
ENTE
NARI
O
A V S A NTA RO SA
AV CE NTRA L
AV PANAMERICANA NORTE
AV B
AV NAR AN JAL
AV P INOS , LOS
AV A
AV C
A V CE N TRA L
AV C
A V SANT A RO SA
AV S
AN F
RANCIS
CO
AV 2
AV P
RINC
IPAL
AV EUCALIPTOS , LOS
AV R
ETAB
LO, E
L
AV C
A RA B
A YLL
O
AV IN DEP ENDE N CI A
AV A
AV 17
AV IN
TEGR
ACIO
N
AV A
AV DO MINICOS, LO S
AV INDO AMERICA
AV CHILLON
AV SANTA RO SA
AV TRAP ICHE CHILLON
AV 2
AV CENTRAL
A V INT EG
R ACIO
N
AV PACASMAYO
AV N ARA NJA L
AV VENUS
AV B
A V RE VOLUCIO N
AV O LIV OS , LOS
AV T
UPAC
AMA R
U
A V H UA ND OY
AV C
AV B
AV H
UAYL
AS
AV SAN CARLOS
A V UNIV ERS IT ARIA
A V ALISOS , LO S
AV FA UCET T, E LM E R
AV SAN G ARAR A
AV ME N D IO
L A, A LF R ED O
AV IZA GUIRRE , CA RLO S A LBE RTO
SA-22
SA-16B
AD-05A
SA-40A
AD-5C
AD-05D
AD-5B
270000
270000
275000
275000
280000
280000
285000
285000
8675
000
8675
000
8680
000
8680
000
8685
000
8685
000·
LEGEND
SEWERAGE SECONDARY NETWORKMaterial
AC (Asbest Cement)CSN (Structural Plain Concrete)FOFO (Cast Iron)PVC (Vinyl Polychloride)
STUDY AREADISTRICT BOUNDARYDRAINAGE AREAROADSGREEN AREABLOCKSRIVERSCOAST1:50,000Proyección: UTM
Datum: WGS-84Zona: 18 sur
0 1 20.5km
PROYECTO :
GRAFICO 2.5.9.4: DISTRIBUCION DE TUBERIAS DEALCANTARILLADO EN AREA DE ESTUDIO SEGUN TIPO DE MATERIAL
SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMAREPUBLICA DEL PERU
FIGURE 2.5.9.4: DISTRIBUTION OF SEWERAGE PIPES IN THE STUDY AREA, BY TYPE OF MATERIAL
AC CSN FOFO PVC T otal Gener al
A16 7.522 7.522A18 0.827 10.703 11.529A19 5.732 5.732AD-0 0.969 0.735 1.704AD-01B 0.000 0.947 0.947AD-A1 18.945 11.370 30.315AD-A2 19.610 4.553 24.163AD-AG1 1.921 2.755 4.676AD-AG2 26.523 3.387 29.910AD-AG3 11.998 0.131 12.129AD-AG4 24.097 2.338 26.435ADC-1 10.078 10.078ADC-2 13.495 0.019 13.514ADC-3 4.974 4.974ADC-4 6.906 6.906ADC-5 13.657 0.036 13.693ADC-6 11.368 0.008 11.376AD-CA1 8.802 8.802AD-CA3 0.824 0.824AD-CH1 24.166 7.949 32.115AD-CH2 12.016 0.558 12.574AD-CH3 21.762 0.123 21.884AD-CH4 11.149 19.723 30.872AD-CO1 19.992 0.852 20.844AD-CO2 21.699 5.133 26.833AD-M 1 0.175 11.754 1.490 13.419AD-N1 19.231 5.554 24.785AD-N2 22.503 1.028 23.531AD-P2 0.455 0.455AD-PL1 22.179 22.179AD-PL2 20.149 2.436 22.585AD-R1 13.886 0.928 14.814AD-R2 16.435 0.925 17.360AD-T 1 11.078 3.455 14.533AD-T 2 2.515 4.305 6.819AD-T 3 0.035 0.035AD-T 4 12.392 0.147 12.539AD-T 5 10.062 10.062AD-T 6 2.606 2.606PT 1 22.992 22.992PT 2 6.592 6.592PT 3 12.996 12.996PT 4 0.018 11.667 11.685PT 5 0.929 7.850 8.779PT 6 25.445 25.445PT 7 7.544 7.544SA-57 0.032 0.032T otal 0.175 441.958 0.008 210.000 652.141Per centaj e 0.027% 67.770% 0.001% 32.202% 100.000%
Length (km) per M ater i al Dr ai nage A r ea
LENGT H (Km) OF SECONDARY NET WORKS OF SEWERAGE IN T HE ST UDY AREA
CARABAYLLO
PUENTE PIEDRA
VENTANILLA
COMAS
LOS OLIVOS
SAN MARTIN DEPORRESCALLAO
INDEPENDENCIA
OC
EA
NO
P
AC
IF
IC
O
RIO
CH
ILL
ON
RIO CHILLON
CB-02CAMARA DE BOMBEO
DE DESAGUE(VOL=47.60MĮ)
REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA
N
LEGEND
Preparation of the Perfil Study of the Project : “Installation of theWater and Sewerage System for Oquendo, Santa Rosa andNaranjal Scheme (sectors 251, 252, 256 and 257)”. This projectinvolves Comas and Marquez drainage area
Project of Sanitation Enlargement of the Socially Excluded Area ofLima Loan Agreement PE-P30.Lot 10: District of Puente Piedra, Works of Water and SewerageSecondary Networks, Valle Chillon Gardens - La Ensenada -Chillon Housing Association Schemes
Execution of General Works of Water and Seweragethat are executed by L.P.N.N 0029-2003 “GeneralWorks of Water and Sewerage for Oquendo, Santa Rosaand Naranjal Scheme” (sectors 251, 252, 256 and 257)executed by “Santa Rosa” Joint Venture.
Contract of Work 023-2007-CW-31960/IBRD-SEDAPALEnlargement of Water and Sewerage Networks byCondominium Systems in Several Districts of NorthArea Package 2
Preparation of Perfil Study of the Project of Enlargement andImprovement of the Water and Sewerage System, Las Animas hilland attachments scheme
Project of Sanitation Improvement of Socially Excluded Areas ofLima, Loan Agreement PE-P30 Lot 7
Works Pro-Networks Alfredo Villa Calderon Shanty Town
PROMESAL Works Lot 6-9B Valle Chillon, Primavera, AnoNuevo: Independencia-Comas-Carabayllo Sector Scheme
Works in Las Magnolias Shanty Town
PAC Works - Package 4 Comas, Carabayllo, Independencia,Puente Piedra
GRAFICO 2.5.9-5: OBRAS Y ESTUDIOS DE ALCANTARILLADO EN EJECUCION EN LA ZONA DE ESTUDIO
FIGURE 2.5.9.5: ON-GOING SEWERAGE WORKS AND STUDIESIN THE STUDY AREA
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-171 NIPPON KOEI LAC CO.,LTD
Table 2.5.9-10 shows the distribution of pipes by material according to the drainage areas.
Table 2.5.9-10: Drainage Area Distribution of Pipes by Type of Material in the Study Area
Drainage Area
Length by Material (Km) Demand of Pipe Km AC CSN FOFO PVC
A16 7.52 7.52 A18 0.83 10.70 11.53 A19 5.73 5.73 AD-0 0.97 0.73 1.70 AD-01B 0.00 0.95 0.95 AD-A1 18.94 11.37 30.31 AD-A2 19.61 4.55 24.16 AD-AG1 1.92 2.76 4.68 AD-AG2 26.52 3.39 29.91 AD-AG3 12.00 0.13 12.13 AD-AG4 24.10 2.34 26.44 ADC-1 10.08 10.08 ADC-2 13.50 0.02 13.52 ADC-3 4.97 4.97 ADC-4 6.91 6.91 ADC-5 13.66 0.04 13.70 ADC-6 11.37 0.01 11.38 AD-CA1 8.80 8.80 AD-CA3 0.82 0.82 AD-CH1 24.17 7.86 32.03 AD-CH2 12.02 0.56 12.58 AD-CH3 21.76 0.12 21.88 AD-CH4 11.15 19.72 30.87 AD-CO1 19.99 0.85 20.84 AD-CO2 21.70 5.13 26.83 AD-M1 0.08 11.75 1.49 13.32 AD-N1 19.04 5.53 24.57 AD-N2 22.50 1.03 23.53 AD-P2 0.46 0.46 AD-PL1 22.18 22.18 AD-PL2 20.15 2.44 22.59 AD-R1 13.88 0.93 14.81 AD-R2 16.43 0.93 17.36 AD-T1 11.08 3.46 14.54 AD-T2 2.33 4.28 6.61 AD-T3 0.04 0.04 AD-T4 12.39 0.15 12.54 AD-T5 10.06 10.06 AD-T6 2.61 2.61 PT1 22.99 22.99 PT2 6.59 6.59 PT3 13.00 13.00 PT4 0.02 11.68 11.70 PT5 0.93 7.85 8.78 PT6 25.44 25.44 PT7 7.54 7.54 SA-57 0.03 0.03
Total 0.08 441.59 0.01 209.88 651.56 Percentage 0.01% 67.77% 0.00% 32.21% 100.00%
Source: JICA Study Team
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)
FINAL REPORT
NIPPON KOEI CO.,LTD. 2-172 NIPPON KOEI LAC CO.,LTD
Figure 2.5.9.6 shows a map with the distribution of the pipes in the Study Area, according to pipe material.
Table N° 2.5.9.11 shows pipe distribution, according to pipe material, in the Study area.
Table 2.5.9-11: Drainage Area Distribution of Pipes by Type of Material in the Influence Area
Length of pipes (Km) in Secondary Sewerage Networks by Type of Material
Drainage Area Length by Material (Km)
Total AC CSN FOFO PVC
AD-A1 18.94 11.37 30.31
AD-A2 19.61 4.55 24.16
AD-AG1 1.92 2.76 4.68
AD-AG2 26.52 3.39 29.91
AD-AG3 12.00 0.13 12.13
AD-AG4 24.10 2.34 26.44
ADC-1 10.08 10.08
ADC-2 13.50 0.02 13.52
ADC-3 4.97 4.97
ADC-4 6.91 6.91
ADC-5 13.66 0.04 13.70
ADC-6 11.37 0.01 11.38
AD-CH1 24.17 7.86 32.03
AD-CH2 12.02 0.56 12.58
AD-CH3 21.76 0.12 21.88
AD-CO1 19.99 0.85 20.84
AD-CO2 21.70 5.13 26.83
AD-M1 0.08 11.75 1.49 13.32
AD-N1 19.04 5.53 24.57
AD-N2 22.50 1.03 23.53
AD-PL1 22.18 22.18
AD-PL2 20.15 2.44 22.59
AD-R1 13.88 0.93 14.81
AD-R2 16.43 0.93 17.36
AD-T1 11.08 3.46 14.54
AD-T2 2.33 4.28 6.61
AD-T3 0.04 0.04
AD-T4 12.39 0.15 12.54
AD-T5 10.06 10.06
AD-T6 2.61 2.61
Total 0.08 427.66 0.01 59.36 487.11
Source: JICA Study Team
VENTANILLA
CALLAO
COMAS
SAN JUAN DE LURIGANCHO
CARABAYLLO
LOS OLIVOS
PUENTE PIEDRA
SAN MARTIN DE PORRES
INDEPENDENCIA
SAN MARTIN DE PORRES RIMAC
LURIGANCHO
AD-0 PT1
PT6
A16
A18
AD-A1
AD-P0
AD-CH1
AD-N1
ADC-1
ADC-2
AD-CH4
PT4
AD-R1
AD-A2
AD-CA1
AD-CA2
ADC-5
AD-AG4
AD-PL1
AD-PL2
AD-AG2
AD-N2
AD-CO2
PT3
AD-CA3
AD-R2
AD-P2
AD-T2
AD-CH3
PT2
PT5
AD-T1
AD-T4
AD-CO1
ADC-6
AD-AG1
PT7
AD-T3
AD-T5
SA-42
SA-30
SA-8
AD-1Ab
SA-55
SA-57
ADC-3
SA-25SA-40B
SA-56A
SA-24
SA-56B
SA-6
AD-AG3
ADC-4
A19
AD-CH2
SA-37
AD-M1
SA-12
SA-33
AD-T6
SA-52
SA-41
AD-01BAD-AG5
SA-50
AD-1Aa
SA-15
SA-4
AD-02B
SA-26
SA-54
SA-51
SA-10
SA-39A
SA-5
SA-27
SA-14
AD-3
SA-13
SA-35
SA-53
SA-34
SA-48
SA-28
SA-21
SA-16ASA-47SA-9
SA-20
AD-01A
SA-3
AD-02A
SA-31
A15
SA-7
SA-58
SA-32
SA-11
AD-04
SA-49
SA-29
SA-39B
SA-23
OCEANO PACIFICO
AV CENTRAL
AV CHILL
ON
AV IN
DOAM
ERIC
A
AV PUNO
AV C
AV SAN
TA ANA
AV CANTA CAL LAO
AV PER
IMET
RAL
AV CA
RABA
YLLO
AV CH
ACRA
CER
R O
AV 1
AV OLIVOS, LOS
AV T ANT AMAYO
AV UNGER, GERARDO
AV HE
ROES
DEL A
LTO C
ENEP
A
AV S
INCH
I RO
CA
AV S A NT A EL VIR A
A V R
ETAB
LO, E
L
AV RIO M ARA ÑON
AV SAN JOSE
AV MENDIOLA, ALFREDO
AV C UZC
O
AV P A RAMO
N GA
AV REVOLUCION
A V 2 00 M
ILLAS
AV S OL DE NA RANJAL
AV D
AV UNIVERSITARIA
AV B
AV JUPITER
AV AL ISOS, LOS
AV LIMA
AV TA
ZA, LA
AV PANAMERICANA NORTE
AV 17
A V SAN
DIEGO DE AL CAL A
AV SAN FE LI PE
AV P A RIA HUA NCA
AV METROPOLITANA
AV ACAPULCO
AV E
AV C
ONDO
RCA N
QUI , M
ARIA
NO
AV CONT ISUYO
AV INDEPENDENC IA
AV PA
R ADO D
E BEL
LIDO , M
A RIA
AV 4
AV RIO TAMBO
AV INDUSTRIAL
AV INCAS, LO S
AV CHINCHA YS UYO
A V AC ACI AS , LAS
AV HU
AYLA
S
AV F AMESA
AV DOMINIC OS, LOS
AV A
AV SAN REM O
AV T
UPA C
AM
ARU
AV RO SA RIO , EL
A V SAN JUAN
AV S
AN M
ATEO
AV JAMAICA
AV M EXICO
AV M ALEC
ON C
HILL
ON
AV HU
ANDO
Y
AV AN GELES, LOS
AV AR
TESA
NOS,
LOS
A V CEDR OS , L OS
AV SANG ARARA
AV UGART E, ALF ONS O
AV SOL DE ORO
AV J A ZMINE S, LOS
A V PA RRA L, EL
AV ECOLO GICO
AV ZINC, EL
AV ROSAL, EL
AV M IRAFLO RES
AV DE SAN M ARTIN, JO SE
AV CH
ASQ UIS
, LO S
AV M IRAM AR
AV RO SA LUZ
AV PACASMAYO
AV NOVIEM BRE, 1 7 DE
AV CANAD A
AV LIBERTA D
A V SETIEM
BRE,
25 D E
AV E UC ALIPT O S , LOS
AV NIÑOS M ART IRES, LOS
AV R E
G LA,
LA
AV C AR RI ON , D AN IEL ALC IDE S
AV SAN CARLOS
AV JA
CARA
NDA
AV HURIN CUZCO
AV M
UJIC
A GA
LLO
, MAN
UEL
AV 2
AV BOLOGNESI , FRANCISCO
AV HUANACAURE
AV MAN CO CAP AC
A V A NTUNE Z DE M A YOLO, S ANT IA GO
AV CORICANCHA
AV OCT UBRE, 2 DE
AV TO RRES, LAS
AV NARAN JAL, E L
AV PORTALES, LO S
AV RE PUBL ICA DEL PERU
AV D ICI
EM
BRE , 20 DE
AV COLECTO RA
A V AGOST O, 11 DE
A V F AUCETT , ELM E R
A V PO
MABA
MBA
AV S
A N R
O QUE
AV SANTA MARIA ALTA
AV CONDORCANQUI , JOSE GA B R IEL
AV V IRG EN
DEL ROSARIO
AV ALAMOS, LOS
AV J UNIO , 1 5 DE
AV VALLEJO, C ESAR
A V G LO BO T ER R AQ U EO
AV MILAGRO D E JESU S
AV MA ES TRO PE R UAN O
A V SA N ENRIQ UE
AV NEPT UNO
AV VENUS
AV AL
BORA
DA, L
A
AV VIRGE N DEL CAR M EN
A V GONZ ALES PRADA, M ANUEL
AV 7
AV C
ENTE
NARI
O
A V P
INOS
, LO S
AV ROSA DE AMERICA
AV T R
APICH
E CH ILL
ON
AV NARAN JAL
A V IN T EG RA CI ON
A V UN IO N, L A
AV HUAMACHUCO
AV ENERO , 25 DE
AV O RQUIDE A S, L AS
AV P ALM ERAS, LA
S
AV AM ANCAES, LOS
AV PERIFERICA
AV BERTEL LO, AL EJANDRO
AV BE RTELLO BOLL AT I, A LE JA
NDRO
AV AGOS TO , 22 DE
AV M
AYO,
11 D
E
AV OLIVAR, EL
AV SAN BERNARDO
AV B ETAN COURT , R OM
U LO
A V DE LA F UENT E, G UI LLERM O
AV VE NCEDORE S , LO S
AV P RADO, M ANUEL
AV BASTIDAS, MICA ELA
AV S AN
ANT ON IO
AV GAM
BE TTA , C RN EL NE ST OR
AV MONITOR HUASCAR
AV ANT ISUYO
AV IZ AG UIRR E, CA RLOS A LB E RTO
AV D E SAN MARTIN , DO N JOSE
AV HONDURAS
AV PER UAN IDAD D E LA
AV TULIP
ANES,
LOS
AV SANTA RO SA
AV E
STAD
O S U
N IDO
S
AV DE
L BIER
ZO
AV BENDEZ U, WIL BER
A V MER INO REYN A
AV SAN
JUAN MAS
IAS
AV SANTA CRUZ
AV BE LA UNDE OE STE , VICTOR A
A V C HOCANO, JOS E S AN TO S
A V JU L
I O, 1
DE
AV PUNCHAUCA
AV P
LAT I
NOS,
LOS
AV SAN PEDRO DE CARABAYLLO
AV S AN
ALBINO
AV GUARDIA CIV IL
AV AG OSTO, 25 DE
AV S OL, E L
AV PROCERES, DE LOSA V OCT UBR E, 12 D E
AV CORDIALIDAD, LA
AV SEÑO R DE CAU DIVI LL A
AV PROCERES, LO S
AV GUA RDIA R EPUB LICA NA
AV PARAISO
AV MART IN, JUAN MANUEL
AV H AY
A DE
LA TO
RRE,
V ICTO R R
AV COLECTO R CO MAS
AV S A NTA ADE LA
AV CHIMP U OCLLO , ISA B EL
AV S
AUCE
S, L
OS
AV TREBOL, EL
AV VI OL E TA S , L A S
AV IZAGUIRRE, CARLO S A
AV SA
N FRA
NCI S
CO
AV S AN P EDR O
AV ENERO , 22 DE
AV GRANADAS, L
AS
A V B OLO G NESI , CR NL FRANCIS CO
AV RESIDENCIAL
AV DE LA T ORRE UGART E, JOSE
AV CA CERES
, MR CA L A NDRES A
AV V EN EZUELA
AV M
AGNO
LIAS,
LAS
AV AM ERICAS, LAS
AV LIBERTAD, LA
A V JE RUS ALE N
A V CONFRA TERNIDA D, LA
AV AL AMEDA DEL PINAR
AV PALMA, RICARDO
AV SAN NICOLAS
AV HE
ROES
DE P
UCU
T A
AV OLA
YA, M
ART IR JOSE
A V DE
L A M
UJE R PER UA NA
AV SA NT ISIMA CR U Z D E SA N DIE GO
A V JULIO , 28 D E
A V GRA U, A LMT E M IGUEL
AV V ILL ARREAL , F ED ER ICO
AV M A LVIN AS, LA
S
AV REPUBLICA DE ISRAEL
AV SA N M AR TIN
AV PRINCIPAL
AV BEL AUNDE ESTE, V ICT OR A
AV RE
PUBL
ICA D
E ARG
ENTIN
A
AV M ERCURIO
AV BEL EN
AV ROBLES, LOS
A V A
LHEL
IES, L
OS
AV VA LL E, TOMAS
AV SANTA ADELA
AV CORICANCHA
AV INDOAMERICA
AV TR
APICHE CHILLO N
AV UNGER, G ERARDO
AV SAN NICOLAS
AV INCAS, LO S
AV PANAMERICANA NORTE
AV CACER ES, M RCAL ANDRES A
AV IZAGUIRRE, CARLO S A
A V FA UCE TT, E LME R
AV SA NTA ROS A
AV OLIVAR, EL
AV OCTUBRE, 12 DE
AV METROPOLITANA
AV P
RINC
IPAL
A V RI O MA RA ÑON
AV S AN PED RO DE C ARABAYLLO
AV SAN DIEG O DE ALCALA
AV CENTRAL
AV J AZ MINE S, LO S
AV MA N CO C A PA C
AV A
AV PROCE RE S, L OS
AV SANTA RO SA
AV SA N JUAN MA SI AS
AV P RADO, M ANUEL
AV P INO S,
L OS
A V IZ AG UIRRE , CARLO S A
AV SAN
TA RO SA
A V TU
PAC
AMAR
U
AV 1
AV M ERINO REYNA
A V SANT A R OSA
AV UN
IVERS
ITARI
A
AV C
ENTR
AL
AV SA
NTA R
O SA
AV U
N IV E
RSIT
ARI A
A V C
O NDO
R CANQUI,
JOS E G
A BRIE L
AV SAN
TA RO SA
AV C
AV MEN DIOLA, ALF RED O
AV UNGER, GERARDO
AV CA
RABA
YLLO
AV A
AV R
EPU BL
ICA D
EL P
ERU
AV PAR ADO DE BELLIDO,
MARIA
A V CAN
TA C
ALLA
O
AV SAN CARLOS
AV SANG ARARA
AV P
A CA S
MAY O
AV U
N IV E
R SI TA
RIA
AV PRINCIP A L
AV PALMA, RICARDO
A V MA LECON CHILLON
AV PRINCIPAL
AV CE DR OS, LOS
AV MENDIOLA, ALFREDO
AV OLIVOS, LOS
AV PA
NAMERICAN
A NO RTE
AV TO RRES, LAS
AV ANT ISUYO
AV A
AV CENTRAL
AV AL ISOS, LOS
AV U
N IVE
RSI T
A RI A
AV PA LME RAS, L AS
AV SAN ENRIQ UE
AV SANTA RO SA
A V E
AV CUZCO
AV CHOCANO, JO SE SANTO S
AV MENDIOLA, ALFREDO
AV AL ISOS, LOS
AV CANTA
CALLA O
AV JAZM INES, LOS
AV UNIVERSITARIA
AV CH
ACRA C
E RRO
AV A
AV RE
TABL
O , EL
AV OL IVOS, LO S
AV U
NIVE
R SIT
ARI A
AV ROSA DE AMERICA
AV PA
CASMAY
O
AV IN
TEGR
ACIO
N
A V T ORRES,
L AS
AV CANT A C
ALL AO
AV AL ISOS, LOS
AV SANT A AN
A
AV U
NIV E
R SIT A
R IA
AV A
AV CONF RAT ERNIDAD, LA
AV B
AV CENTRAL
AV ALISOS, LOS
AV PACASMAYO
AV CENTRAL
AV PANAMERICANA NORTE
AV CH
ACR A
CERR
O
AV CA
NTA C
ALLA
O
AV UN G ER , G E RA R D O
AV AL ISOS, LOS
AV PA
CASM
A YO
AV TORRES, LAS
AV SA
N FR
ANCI
SCO
AV NARA NJA L, E L
AV AGOS TO , 2 2 D E
A V TUPA C AMARU
AV SA
NTA R
O SA
AV SAN CA RLOS
A V CHI MPU OCLL O, I SAB EL
AV A
AV FAUCETT, ELMER
A V NARA NJA L, E L
AV TR
APICHE CHILLO N
AV RIO M ARAÑON
AV G
AMBE
TTA,
CRN
EL N
E STO
R
AV NARAN JAL
AV RE
TABL
O , EL
AV ALISO S, LO S
AV CEDROS, LOS
AV P
ACAS
MAYOAV
B
AV SANTA RO SA
AV SAUCES, LOS
AV MEN D IO LA , A L FR ED O
AV INDUSTRIAL
A V B ERTE LL O B OLL ATI , A L EJANDRO
AV SAN FEL IPE
AV CANTA CAL LAO
AV VALLEJO, CESAR
AV TU
PAC
AMAR
U
AV P INO S, L OS
AV UN
IVERS
ITARI
A
AV 200 M ILLAS
AV SA U CES, LO S
AV IZAGUIRRE, CARLO S ALBERTO
AV LIMA
AV SA
NTA R
O SA
AV TO RRES, LAS
AV SAUCES, LOS
AV SA
N MAT
EO
AV B
AV DOM INICOS, LO S
AV SEÑOR D E CAUDIVI LLA
AV UNIVERSITARIA
AV 2
AV NARAN JAL, EL
AV M
ENDI
OLA,
AL F
R ED O
AV 20
0 MILL
AS
AV C
AV RO SA RIO, E L
AV B
AV BA V ME ND IO
LA , A LF R ED OAV
PERIM
ETRAL
AV B
AV M
UJI C
A G
ALLO
, MAN
U EL
AV PA
CASMAY
O
AV ROSA DE AME R ICA
AV B
AV ME TROP OL IT A NA
AV MENDIOLA, ALFREDO
A V ANGE LE S, LO S
AV U
N IV E
RSITA
RIA
AV A
AV C
AV CE N TR
AL
A V P
INOS , L
O S
AV B
AV CO
LE CTORA
A V CAN
TA
CALLAO
AV C
AV A
A V U NGE R, GERARDO
AV IZAGUIRRE, CARLO S ALBERTO
AV M EN D IO LA , A LF RE D O
AV SAN FEL IPE
AV VENUS
AV S A NGA RA RA
AV C
AV FAUCETT, ELMER
AV A
A V M AG
NOLIA
S, L A
S
AV CANTA
CALLAO
AV C
ENTE
NARI
O
AV PANAMERICANA NORTE
AV NARA NJA L
AV A
A V T
UPAC
AMAR
U
AV HU
ANDO
Y
AV S
AN J
OSE
AV C
AV CAN TA CALLA O
AV NARANJA L, E L
AV T ANT AMAYO
AV EUCAL IPTOS, LO S
AV TU
PAC
AMAR
U
AV C
ARAB
AYLL
O
AV INDEPENDENC IA
AV A
AV 17
AV IN
TEGR
ACIO
N
A V A
A V D OMIN IC OS, LOS
AV INDOAMERICA
AV CHILLON
AV 2
AV CE
N TRAL
AV PACASMAYO
AV NARAN JA L
AV PINOS, LO S
AV S ANTA ROSA
AV B
A V REV OLUCION
AV PLAT INOS, LO S
AV OLIVOS, LOS
AV TU
PAC
AMAR
U
AV H U AN D OY
AV HU
AYLA
S
A V S
AN TA RO SA
AV C
AV B
A V DOMIN IC OS, LOS
AV UNIV ERS IT ARIA
AV ALI SOS, LOS
AV SANG ARARA
A V ME N DI OL A, A LF RE DO
AV BOLOG NESI , CRNL F RANC ISCO
SA-22
SA-16B
AD-05A
SA-40A
AD-5C
AD-05D
AD-5B
270000
270000
275000
275000
280000
280000
285000
285000
8675
000
8675
000
8680
000
8680
000
8685
000
8685
000·
LEGEND
SEWERAGE SECONDARY NETWORKMaterial
AC (Asbest Cement)CSN (Structural Plain Concrete)FOFO (Cast Iron)PVC (Vinyl Polychloride)
STUDY AREADISTRICT BOUNDARYDRAINAGE AREAROADSGREEN AREABLOCKSRIVERSCOAST
PR OYECTO :
GRAFICO 2.5.9.6: REDES SECUNDARIAS DE ALCANTARILLADOEN AREA DE INFLUENCIA POR TIPO DE MATERIAL
SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMAREPUBLICA DEL PERU
FIGURE 2.5.9-6: SECONDARY SEWERAGE NETWORK IN THEINFLUENCE AREA BY TYPE OF MATERIAL
1:50,000Proyection: UTMDatum: WGS-84
Zone: 18 sur
0 1 20.5km
AC CSN FOFO PVC
AD-A1 18.945 11.370 30.315AD-A2 19.610 4.553 24.163AD-AG1 1.921 2.755 4.676AD-AG2 26.523 3.387 29.910AD-AG3 11.998 0.131 12.129AD-AG4 24.097 2.338 26.435ADC-1 10.078 0.000 10.078ADC-2 13.495 0.019 13.514ADC-3 4.974 4.974ADC-4 6.906 6.906ADC-5 13.657 0.036 13.693ADC-6 11.368 0.008 11.376AD-CH1 24.166 7.855 32.021AD-CH2 12.016 0.558 12.574AD-CH3 21.762 0.123 21.884AD-CH4 0.022 0.022AD-CO1 19.992 0.852 20.844AD-CO2 21.699 5.133 26.833AD-M 1 0.077 11.754 1.490 13.321AD-N1 19.041 5.528 24.569AD-N2 22.503 1.028 23.531AD-PL1 22.179 22.179AD-PL2 20.149 2.436 22.585AD-R1 13.886 0.928 14.814AD-R2 16.435 0.925 17.360AD-T 1 11.078 3.455 14.533AD-T 2 2.330 4.278 6.607AD-T 3 0.035 0.035AD-T 4 12.392 0.147 12.539AD-T 5 10.062 10.062AD-T 6 2.606 2.606T otal 0.077 427.659 0.008 59.345 487.089
LENGT H (Km) OF SECONDARY NET WORKS OF SEWERAGE IN T HE INFLUENCE AREA BY T YPE OF M AT ERIAL
Dr ai nage A r eaT otal (km)
M ater i al
Top Related